Professional Documents
Culture Documents
Jiet Group of Institutions: - Harshit Arora
Jiet Group of Institutions: - Harshit Arora
- HARSHIT ARORA
TOPICS TO BE DISCUSSED
Company overview
Basic configuration
Combined cycle plant
Working & operation of the gas power plant
Activities witnessed
2
COMPANY OVERVIEW
Construction
About 27 kms away form the Surat city in
industrial area termed Hazira ESSAR
Located its two power plants:
4
A View of BHANDER POWER Ltd
5
PLANT’S BASIC CONFIGURATION
6
PHASE-I
Gas turbine-1 (100MW)
7
PHASE-II & III
8
BASIC ELEMENTS OF COMBINED CYCLE
GAS POWER PLANT
Compressor
Combustion chamber
Gas turbine
Steam turbine
Alternator
Cooling system
9
WORKING OF COMBINED CYCLE GAS
POWER PLANT:
10
ACTIVITIES WITNESSED :
1. SWITCHYARD MAINTENANCE
The contacts of the isolator were tightened.
Isolator were cleaned properly.
11
2. BATTERY ROOM PREVENTIVE
MAINTENANCE
The specific gravity of the electrolyte filled in
the battery was checked.
The level of the electrolyte in the battery was
checked.
Checked the voltage (which should be around
2V).
Checked the internal impedance.
12
3. AUXILIARY COOLING WATER PUMP
MAINTENANCE
13
4. BOILER FEED PUMP MOTOR
MAINTENANCE
Tightened the connections of terminal box.