ABB Power Systems: Substations References
ABB Power Systems: Substations References
Substations References
Substations
ABBs response
One of the worlds largest outdoor 500kV GIS substations with 90 breakers and around 860 m of 3-phase bus bar and duct length 10 teams working in parallel 18. Jan 2003 Start installation works 16. July 2003 Start commissioning 04. Nov 2003 Connection to grid
Customers benefits
Project completed on time in spite of very tight schedule and unpredictably adverse conditions (SARS, weather)
Substations
ABBs response
ABB offered two 138/13,8 kV turnkey GIS Substations, with 12 HV GIS Bays and 88 MV GIS bays ABB optimized the space requirements for the S/S, enabling the saved area to be sold
ABB Power Technologies BA PTPS - 3 -
PICTURE
Additional free area
Customers benefits
Rio Light received two new S/S and the costs were covered by the sales revenues of the additional area
Substations
ABBs response
110 kV Switchgear, 5 bays 33 kV GIS, type ZX2, indoor 11 kV AIS, type ZS1, indoor 2 x 35 MVA Transformers, 110/33/11 kV Control & Protection equipment Auxiliary equipment
Customers benefits
ABB Power Technologies BA PTPS - 4 -
Due to the use of a high-rise application, NEC received a space saving Double Bus Bar application
Substations
ABBs response
115 kV GIS ELK-04 including: 3 incoming, 5 outgoing, 3 transformer, 1 sectionalizer, 1 metering bay Cable connection 115kV from GIS to transformer Control & Protection
Customers benefits
ABB Power Technologies BA PTPS - 5 -
Substations
ABBs response
8 bays 132 kV SF6 GIS ELK-04 51 panels 11 kV ZV2 (SF6) 4 transformers 40 MVA 132/11 kV Auxiliary equipment Substation Automation
ABB Power Technologies BA PTPS - 6 -
Customers benefits
Optimized arrangement in a small building in the center of the city Environmentally friendly, low noise Aesthetic view
Substations
ABBs response
7 bays 66 kV SF6 GIS ELK-04 17 panels 11 kV switchgear 2 transformers 25 MVA 66/11 kV Auxiliary equipment, control & protection Civil works
ABB Power Technologies BA PTPS - 7 -
Customers benefits
Full turnkey installation MV, LV, control & protection panels assembled in a local ABB factory
Substations
ABBs response
Managing the short delivery time utilizing the programmed outages of the existing installation Turn-key delivery, 2 bays 440 kV and 6 bays 230kV including a 750MVA autotransformer
Customers benefits
ABB Power Technologies BA PTPS - 8 -
CTEEP managed to enter into a partnership with the industrial customer - a Brazilian Aluminium Company securing future revenues based on fast track delivery of reliable ABB systems and products
Substations
ABBs response
Turnkey delivery of a 400 kV AIS S/S
12 bays 400 kV Switchgear with 3 busbars R&C and communications Civil works, erection and commissioning
Customers benefits
ABB Power Technologies BA PTPS - 9 -
A new substation with the latest primary & secondary equipment technology that secures safe power transmission
Substations
ABBs response
A turnkey substation 400 kV in three phases Close co-operation with EDELCA with many engineering reviews that resulted in a faster engineering approval
Customers benefits
ABB Power Technologies BA PTPS - 10 -
ABBs flexibility made it possible to divide the 1st phase & deliver the first bay in record time, enabling EDELCAs first generator to enter commercial use before scheduled
Substations
ABBs response
Turnkey delivery of 400kV AIS S/S
Reactors, 2x75 MVAr 400 kV Switchgear R&C and communication systems Civil works, erection and commissioning
ABB Power Technologies BA PTPS - 11 -
Customers benefits
ABB provided a high quality substation that met a crucial power demand with increased security
Substations
ABBs response
Turnkey delivery of 400/220 kV AIS S/S Innovative AIS using Combined and Compact Switchgear Modules.
Customers benefits
ABB Power Technologies BA PTPS - 12 -
Small footprint made it possible to have both 400 kV and 220 kV new switchgear on the old 220 kV site Higher availability than solution with conventional Circuit Breakers and Disconnectors
Substations
ABBs response
Turnkey 220kV GIS and 110kV PASS substation expandable to 400kV State of the Art equipment fulfilling all specified requirements and beyond!
ABB Power Technologies BA PTPS - 13 -
Customers benefits
One competent partner until completion Rehabilitation without interruption of power!
Substations
ABBs response
Turnkey 220/33kV GIS substations State of the Art equipment fulfilling all specified requirements and beyond!
Customers benefits
One competent partner until completion
ABB Power Technologies BA PTPS - 14 -
Substations
ABBs response
400 kV double breaker substation using Disconnecting Circuit-Breaker (Combined) Computerized Relay and Control
Customers benefits
ABB Power Technologies BA PTPS - 15 -
S/S with all primary contacts enclosed in SF6 Retrofit with S/S in service, 2*36 h outage only Higher availability, lower maintenance cost and minimum Life Cycle Cost
Substations
ABBs response
500 kV(15 CBs), 230 kV(16 CBs) 1 - breaker and 115 kV(7 CBs) main and transfer scheme Digital relay and control equipment
Customers benefits
ABB Power Technologies BA PTPS - 16 -
Turnkey supply of switchgear and relay and control equipment including civil works EGAT first decentralized digital control system