You are on page 1of 1

KETERANGAN

5/7 atap genteng 8/12

8/12

+ 10.39

2x 5/10

DAK BETON

RAILING BALKON

+ 7.34 + 7.34 + 6.24 + 7.34

+ 4.96 + 4.14 + 3.74 + 3.74 + 3.74 ROOM 3 + 4.14

+ 1.14 + 0.54 0.00 120 A B

ROOM 1 + 0.54 0.00 400 B' 100 100 C D 361,5 D'

POTONGAN.A-A
SCALE 1 : 100

01
IMAGINE

TAMPAKDEPAN
SCALE 1 : 100

01
IMAGINE

8/12 atap genteng

8/12

+ 10.39
NO. DATE

SUBJECT

+ 7.34 + 7.34 + 6.24


Proyek

+ 7.34

+ 7.34

+ 7.34

+ 4.14 + 3.74

KM / WC + 4.09

ROOM 3 + 4.14

ROOM 4 + 4.14

ROOM 5 + 4.14

KANTOR (TEGAL)
+ 3.74
Pemilik Proyek

+ 3.74

+ 3.74

+ 0.54 0.00 0.00 160 1 2 475

ROOM 1 + 0.54

ROOM 2 + 0.54

515 2' 3

515 3' 4

Arsitek Perencana

Ivan Hanley S.T.


Asisten Arsitek

Perencana Sipil

POTONGAN.B-B
SCALE 1 : 100

Digambar
Imgn / 18 July 2011

01
IMAGINE

Diperiksa

Disetujui

DRAWING NO

CODE

JOB NO

ARS - 002
JUDUL GAMBAR TANGGAL HALAMAN

- TAMPAK & POTONGAN

17 JULI 2011

02 00

ALL DESIGN ARE THE PROPERTY OF THE ARCHITECT AND CANNOT BE USED WITHOUT THEIR WRITEN PERMISION ALL DIMENSION MUST BE CHEKED AND VERIFIED ON SITE BEFORE COMMENCEMENT OF WORK. THE DESIGNER MUST BE INFORMED OF ANY DISCREPANCY AT SITE IMMEDIATELY

You might also like