DIVISION 5 - EARTHWORKS
Site Preparation
5/2/1 Public utilities and lines removal L.M 175
5/2/4/1 Removal of street lighting poles, cables and stacking to the designated area as directed by the
engineer Number 0
5/2/4/2 Removal of OH poles, cables and stacking to the designated area as directed by the engineer Number 0
5/2/8 Removal of pavement layers S.M 0
5/2/9 Removal of Fences and gates L.M 0
5/2/10 Cleaning of debris, materials, plants & grass removal. S.M 350,000
5/2/11 Removal of trees Number 1
5/2/12 Carefully remove, protect and relocate existing temporary survey bench mark. Number 0
Fill Works
5/3/1 Common Excavations C.M 325,429
5/3/2 Rock Excavation C.M 17,128
5/4/1 Roadbed preparation S.M 1,681,437
5/4/2/1 Embankment works C.M 1,495,898
5/4/2/2 Embankment works for Soil Replacement in Road foundation C.M 0
5/4/2/3 Sand layer below the Road foundation C.M 0
Sub grade
5/5/2/1 Untreated Sub grade C.M 38,766
5/5/3/1 Lime treated Sub grade C.M 511
5/5/4/1 Surface preparation S.M 1,618
5/5/4/3 Cement treated Sub grade C.M 511
Water Drainage
All work items herein shall include all the works stated (including supply and installation of
materials) in MOMRA's General Specifications
5/7/1 Excavation in all types of soil including disposal
5/7/1/1 Depth to invert not exceeding 1.5m C.M 2,625
5/7/1/2 Depth to invert 1.6-2.5m C.M 46,715
5/7/1/3 Depth to invert 2.6-3.5m C.M 22,053
5/7/1/4 Depth to invert 3.6-4.5m C.M 7,650
5/7/1/5 Depth to invert 4.6-5.5m C.M 4,135
5/7/1/6 Depth to invert 5.6-6.5m C.M 5,120
5/7/1/7 Depth to invert 6.6-7.5m C.M 0
5/7/1/8 Depth to invert 7.6-8.5m C.M 0
5/7/2 Manhole
5/7/2/1 Manhole (Type 1)
5/7/2/1/1 Depth to invert 1.0-2.0m Number 160
5/7/2/1/2 Depth to invert 2.1-3.0m Number 65
5/7/2/1/3 Depth to invert 3.1-4.0m Number 15
5/7/2/1/4 Depth to invert 4.1-5.0m Number 0
5/7/2/1/5 Depth to invert 5.1-6.0m Number 0
5/7/2/2 Manhole (Type 2)
5/7/2/2/1 Depth <= 3000 mm and Pipe Dia. 800 and above
5/7/2/2/1/1 Depth to invert 1.0-2.0m Number 6
5/7/2/2/1/2 Depth to invert 2.1-3.0m Number 45
5/7/2/2/2 Depth > 3000 mm & <= 6000 mm and Pipe Dia. 800 and above
5/7/2/2/2/1 Depth to invert 3.1-4.0m Number 30
1/47
PROJECT: South Dammam Housing Project. (131)
Electomenchanical works including Electrical (substation, earthling, power cables, cable joints,
MCC panel, lighting, power distribution, fire alarm system telephonic, PLC & SCADA system,
5/7/14/3 transformers, silent type stand by generator etc) and Mechanical (pipes, valves, fittings, 3+1
submersible pump with discharge of 530 Liter / Sec @ Head of 25 m each, etc) works complete as
shown on Drwg. IN_SD_851_04_10_001 thru 005 and EL_SD_851_04_10_001 thru 008. Item 0
Division Summary
Page 5/1
Page 5/2
Page 5/3
Page 5/4
Page 5/5
Page 5/6
Page 5/7
Page 5/8
Page 5/9
Page 5/10
Page 5/11
Total of Division 5 Carried to Grand Summary
3/47
PROJECT: South Dammam Housing Project. (131)
4/47
PROJECT: South Dammam Housing Project. (131)
5/47
PROJECT: South Dammam Housing Project. (131)
6/47
PROJECT: South Dammam Housing Project. (131)
7/47
PROJECT: South Dammam Housing Project. (131)
8/47
PROJECT: South Dammam Housing Project. (131)
9/47
PROJECT: South Dammam Housing Project. (131)
Trench excavation to a depth of 1.5m and the width as per specification and drawings. Works shall
include obtaining permissions and providing side safety guards and signs, excavating, shoring,
1.1 dewatering, removing/disposal of excavated material, backfilling and all works needed to complete
works of pipe laying . As indicated in drawings and Ministry of Water and Electricity (MOWE) /
NWC Water network Specifications section 2.03 m3 30,620
1.2 Trench excavation for depth from 1.5 to 2.5m as described in item (1.1) m3 1,345
1.3 Extra over for trench excavation in rock for all depth m³ 0
Granular / crushed aggregate for bedding and surround to pipe Type A. initial backfill including
1.4 supply, and compaction with suitable equipments and all requirements to complete work. As
indicated in drawings and (MOWE / NWC) water network Specifications section 2.04 m3 14,330
1.5 Supply and installation of Concrete encasement m3 0
Total Trench Excavation
2 PIPELINES
Supply and install HDPE pipe, PE100, SDR11, PN 16 bars, and include supply, installation and
protection of pipes, fittings and all accessories, thrust blocks pressure tests, cleaning disinfection,
2.1 surveying and all works needed to complete works as per specifications for the following pipe
diameters. As indicated in drawings and (MOWE) / NWC Water network Specifications section
4.02 and 4.03
2.1.1 160 mm Lm 23,002
Supply and install ductile iron pipes, Class K9, PN-16 and Works shall include supply, installation
and protection of pipes, fittings, accessories and thrust blocks pressure tests, cleaning disinfection,
2.2 surveying and all works needed to complete works as per specifications for the following pipe
diameters. As indicated in drawings and (MOWE) / NWC Water network Specifications section
4.02 and 4.03
2.2.1 800 mm Lm 0
2.2.2 600 mm Lm 0
2.2.3 400 mm Lm 830
2.2.4 300 mm Lm 5,469
Total Pipelines Works
3 NETWORK ACCESSORIES
Valves and Meters
Supply and install gate valves with PN 16 bars and work shall include supply and installation of all
valve accessories, fittings, heavy duty DI frame & cover, surface box, protection tube, stem, marker
3.1 posts, couplings and concrete pad & support according to specifications and drawings for the
following diameters: As indicated in drawings and (MOWE) / NWC Water network Specifications
section 4.04
3.1.1 160 mm Nr. 50
Supply and install butterfly valves with PN 16 bars and work shall include supply and installation of
3.2 all valve accessories, fittings, couplings according to specifications and drawings for the following
diameters: As indicated in drawings and (MOWE) / NWC Water network Specifications section
4.04
3.2.1 300 mm Nr. 2
3.2.2 400 mm Nr. 2
3.2.3 600 mm Nr. 0
3.2.4 800 mm Nr. 0
Supply and install washout valves PN 16 bars and work shall include supply, installation, all parts,
3.3 couplings, fittings, valves accessories and all what is needed according to specifications and
drawings on the water mains with the following diameters. As indicated in drawings and
(MOWE) / NWC Water network Specifications section 4.04
3.3.1 Pipe Size -300 mm - 800 mm Nr. 7
10/47
PROJECT: South Dammam Housing Project. (131)
Supply and install air release valves supplied with isolating valves and PN 16 bars pressure. Works
3.4 shall include supply and installation, all parts, fittings, couplings, valve accessories and all what is
needed according to specifications and drawings on water mains with the following diameters. As
indicated in drawings and (MOWE) / NWC Water network Specifications section 4.04
3.4.1 Pipe Size -300 mm - 800 mm (Air valve size of 60 mm dia) Nr. 6
Supply and install electromagnetic flow meters including fittings and all other items as per drawings
3.5 and Specifications. The item shall also include construction and preparation of the chamber to
allow for installation of RTU to be connected to automatic control center (if used) and all
accessories to finish work as needed for the following meter diameters:
3.5.1 300 mm Nr. 2
3.5.2 400 mm Nr. 2
3.5.3 600 mm Nr. 0
3.5.4 800 mm Nr. 0
Concrete Chambers
Supply and Construct the following reinforced concrete chambers including excavation, backfilling,
reinforced and plain concrete works, waterproofing, heavy duty cover, steel steps, fittings,
3.6 dismantling joints, adapters, puddle flange, pipes needed to connect valves, concrete support,
marker posts and all other requirements needed to finish work as follows. As indicated in drawings
and (MOWE) / NWC Water network Specifications section 4.06
3.6.1 Butterfly Valve Chambers, Type 2, 1500 x 2000 mm, depth to invert 1.5-2.5m Nr. 4
3.6.2 Gate Valve Chambers, 1500 x 1500mm, depth to invert 1.5-2.5m Nr. 50
3.6.3 Washout Valve Chambers, 1500 x 1500 mm, depth to invert 1.5-2.5m Nr. 7
3.6.4
Air Valve Chambers, 1200 x 1500 mm, depth to invert 1.5-2.5m (for 300mm dia and above pipes) Nr 6
3.6.5 Flow Meter Chambers, 1500 x 1500 mm, depth to invert 1.5-2.5m Nr. 4
Fire Hydrant
Supply and install fire hydrant including accessories. Work shall also include gate valve, concrete
chamber, pipe and fittings, connection to water mainline, excavation, backfilling, reinstatement of
3.7 surfaces, reinforced / plain concrete works, insulation, steel bollards, testing and all other items as
required to complete work as per specifications and drawings. As indicated in drawings and
(MOWE) / NWC Water network Specifications section 4.04 Nr. 140
Total Network Accessories
4 HOUSE SERVICE CONNECTION
Supply and construct HDPE house connections including 5m length pipe from main water line,
ferrule cock with spindle, surface box, pipe saddle, pipe & fittings up to plots, water meter, stop
4.1 cock, box connections, excavation, backfilling, bedding, surface reinstatement, removing excavated
material, obtaining permissions, secure the site with safety guards testing, disinfection and all other
items to ensure the work completion. As indicated in drawings and (MOWE) / NWC Water
network Specifications section 4.04. PE100, SDR11, PN16. For 160mm HDPE Pipe Main Line
4.1.1 4nr House connections Nr. 2
4.1.2 3nr House connections Nr. 436
4.1.3 2nr House connections Nr. 265
4.1.4 1nr House connection Nr. 56
For 300mm DI Pipe Main Line
4.1.5 4nr House connections Nr. 1
4.1.6 3nr House connections Nr. 30
4.1.7 2nr House connections Nr. 22
4.1.8 1nr House connections Nr. 10
For 400mm DI Pipe Main Line
4.1.9 4nr House connections Nr. 0
4.1.10 3nr House connections Nr. 0
4.1.11 2nr House connections Nr. 0
4.1.12 1nr House connections Nr. 0
11/47
PROJECT: South Dammam Housing Project. (131)
12/47
PROJECT: South Dammam Housing Project. (131)
SEWERAGE WORKS
All works should be as per Local Authority requirements and Ministry of Water & Electricity
1 TRENCH EXCAVATION
Trench excavation to a depth of 1.5m and the width as per specification and drawings. Works
include getting required permissions, secure safety guards, signboards, excavating, soil support
1.1 dewatering and removing/disposal of excavated material, backfilling and all requirements needed
to complete works of laying pipes. As indicated in drawings and Ministry of Water and Electricity
(MOWE / NWC) Sewer network Specifications section 2.03 m³ 400
1.1.1 Trench excavation for depth from 1.5 to 2.5m as described in item (1.1) m³ 3,050
1.1.2 Trench excavation for Depth from 2.5 to 4.5m as described in item (1.1) m³ 38,200
1.1.3 Trench excavation for Depth from 4.5m to 6.5 as described in item (1.1) m³ 19,650
1.1.4 Trench excavation for Depth from 6.5m to 8.5 as described in item (1.1) m³ 6,950
1.2 Extra over for trench excavation in rock for all depth m³ 0
Granular bedding and initial backfill including supply, and compaction with suitable equipments
1.3 and all requirements to complete work. As indicated in drawings and (MOWE / NWC) Sewer
network Specifications section 2.04 m3 12,700
1.4 Supply and installation of geotextile fabric for protection, permeable, woven or bonded non-woven,
polypropylene UV resistant and as specified. m2 91,800
Concrete bedding including supply and compaction with suitable equipments and all requirements
1.5 to complete work. As indicated in drawings and (MOWE / NWC) Sewer network Specifications
section 2.04 m3 0
Concrete encasement of 200mm thick on pipes including supply and compaction with suitable
1.6 equipments and all requirements to complete work. As indicated in drawings and (MOWE / NWC)
Sewer network Specifications section 2.04 m3 0
Total Trench Excavation
PIPELINES: Supply and installation of vitrified clay pipes with standard strength including
fittings. Work includes supply, installation and protection for pipes and fittings, thrust blocks,
2 warning tape (if any) leakage tests, operation surveying works and all necessary works as per
specifications for the following pipe diameters. As indicated in drawings and (MOWE /
NWC)Sewer network Specifications section 4.03
2.1 200 mm Lm 24,150
2.2 300 mm Lm 0
2.3 400 mm Lm 1,150
2.4 500 mm Lm 0
2.5 600 mm Lm 0
Supply and installation of GRP pipes with standard strength including fittings. Work includes
supply, installation and protection for pipes and fittings, thrust blocks, warning tape (if any)
leakage tests, operation surveying works and all necessary works as per specifications for the
following pipe diameters. As indicated in drawings and (MOWE / NWC)Sewer network
Specifications section 4.03
2.6 700 mm Lm 0
Total Pipelines Works
3 NETWORK ACCESSORIES:
Manholes
Supply and construct circular manholes of precast / cast in-situ concrete with internal diameter of
1.2m including excavating backfilling, internal and external coating, steps and covers according to
3.1 specifications and drawings and surface reinstatement and all requirements to complete the works
for the following depth categories: As indicated in drawings and (MOWE / NWC) Sewer network
Specifications section 4.06
3.1.1 Depth up to 3m (2.20m to 3.00m) Nr 250
3.1.2 equal to 4m (3.00m to 4.00m)Depth greater than 3m and less than or Nr 130
3.1.3 Depth greater than 4m and less than or equal to 5m (4.00m to 5.00m) Nr 60
3.1.4 Depth greater than 5m and less than or equal to 6m (5.00m to 6.00m) Nr 45
3.1.5 Depth greater than 6m and less than or equal to 7m (6.00m to 7.00m) Nr. 35
13/47
PROJECT: South Dammam Housing Project. (131)
Supply and construct sewer connections to the manholes with a length up to 10m according to
specifications and drawings. Work shall include "Y" connections excavating, backfilling, bedding,
4.1 surfaces reinstatement, removal of excavated material, getting the permissions, secure the site with
safety guards and to supply uPVC pipes, and accessories Class 5 with NP16 bars including all
connection works for the following diameters: As indicated in drawings and (MOWE / NWC)
Sewer network Specifications section 4.04
4.1.1 H.C. 160 mm Nr 310
Supply and construct 160mm dia. sewer connections to the pipelines with diameters up to 500mm
with a length up to 10m according to specifications and drawings. Work shall include "Y" or saddle
4.2 connections, excavating, backfilling, bedding, surfaces reinstatement, removal of excavated
material, getting the permissions, secure the site with safety guards and to supply pipes, including
all connection works for the following sewer main pipelines:
4.2.1 200 mm Nr 560
4.2.2 250 mm Nr 0
4.2.3 300 mm Nr 0
4.2.4 450 mm Nr 0
4.2.5 500 mm Nr 0
Additional house connection uPVC pipelines for inspection chambers and cleanout connections.
4.3 Work includes fittings, excavation, backfilling, bedding, other items needed to finish the work
according to drawings and specifications.
4.3.1 H.C. 160 mm Lm 22,000
Supply and construct cleanouts from uPVC pipes and the item includes all works, material and
4.4 necessary connections needed to finish work according to specifications and drawings for the
following diameters: As indicated in drawings and (MOWE / NWC) Sewer network Specifications
section 4.06
4.4.1 160mm dia uPVC Cleanout Nr 1,450
14/47
PROJECT: South Dammam Housing Project. (131)
Supply and construct inspection chambers on sewer lines and work shall include all excavation
4.5 works, backfilling, concrete, connections and surfaces reinstatement as per specifications and
drawings and all requirements to finish work. As indicated in drawings and (MOWE / NWC)
Sewer network Specifications section 4.06
4.5.1 900 mm dia. Nr 750
Total House Connections
SUMMARY
Total Trench Excavation
Total Pipelines Works
Total Network Accessories
Total House Connections
Total for SEWERAGE WORKS carried to Grand Summary
15/47
PROJECT: South Dammam Housing Project. (131)
ELECTRICAL NETWORKS
All works should be as per Local Authority requirements
1 TRENCH EXCAVATION
All types of excavation to a depth of 1.0m the width as per specification and drawings. Works shall
1.1 include obtaining permissions and providing side safety guards and signs, excavating, shoring,
dewatering, removing/disposal of excavated material, backfilling, and all works needed to complete
works of cable laying for LV Cable. m3 48,800
1.2 Trench excavation for depth from 1.0-1.5m depth as described in item (1.1) for MV cable. m3 91,950
1.3 Supply and installation of Bedding m3 39,000
Total Trench Excavation
2 CABLES
Supply and install medium and low voltage cables in trench including cable splices,
joints/terminations, warning tape, cable tiles, cable accessories, testing and commissioning and
other items as per drawings, specifications and SEC requirements.
Medium Voltage Cables
2.1 8.7 kV/15kV; 1 x 3/C 300mm² CU /XLPE /SWA/PVC Lm 30,400
Low Voltage Cables
2.2 1 x 4C-70mm² AL /XLPE/SWA/PVC Lm 101,000
2.3 1 x 4C-185mm² AL /XLPE/SWA/PVC Lm 3,000
2.4 1 x 4C-300mm² AL /XLPE/SWA/PVC Lm 45,000
Total Cables
3 ELECTRICAL EQUIPMENT
Supply and install electrical equipment including joints/terminations, testing and commissioning
and other items to complete as per drawings, specifications and SEC requirements. Package
Substation
3.1 300 kVA Transformer including LV distribution Panel and RMU (as per 51-SDMS-01 & 31-SDMS-
01)) Nr 1
3.2 500 kVA Transformer including LV distribution Panel and RMU (as per 51-SDMS-01 & 31-SDMS-
01)) Nr 12
3.3 1000 kVA Transformer including LV distribution Panel and RMU (as per 51-SDMS-01 & 31-
SDMS-01)) Nr 84
3.4 1500 kVA Transformer including LV distribution Panel and RMU (as per 51-SDMS-01 & 31-
SDMS-01)) Nr 10
3.5 Distribution Pillar with 5 outgoing (as per 31-SDMS-02) Nr 100
3.6 Distribution Pillar with 4 outgoing (as per 31-SDMS-02) Nr 240
3.7 Distribution Pillar with 3 outgoing (as per 31-SDMS-02) Nr 120
3.8 Distribution Pillar with 2 outgoing (as per 31-SDMS-02) Nr 30
Kilowatt Meter
3.9 KWH meter Nr 1,880
Civil Works
Substation Foundation including earthpit, rod, excavation, backfilling, disposal, concreting works
and other items to complete as per drawings and SEC requirements
3.10 For 300 KVA Substation Nr 1
3.11 For 500 KVA Substation Nr 12
3.12 For 1000 KVA Substation Nr 84
3.13 For 1500 KVA Substation Nr 10
3.14 Distribution Pillar foundation including earthpit, rod, excavation, backfilling, disposal, concreting
works, metalworks and other items to complete as per drawing and SEC requirements Nr 490
Total Electrical Equipment
4 DUCT BANKS
Road crossing ducts including excavation, backfilling, disposal, concrete surround, duct pipes, draw
cord, duct marker and other items as per drawing details, specifications and SEC requirements
16/47
PROJECT: South Dammam Housing Project. (131)
17/47
PROJECT: South Dammam Housing Project. (131)
TELECOMMUNICATIONS NETWORKS
All works should be as per Local Authority requirements
1 TRENCH EXCAVATION
All types of excavation to a depth of 1.5m the width as per specification and drawings. Works shall
1.1 include obtaining permissions and providing side safety guards and signs, excavating, shoring,
dewatering, removing/disposal of excavated material, backfilling, and all works needed to complete
works of duct laying. m3 9,500
1.2 Trench excavation for depth from 1.5-2.0m depth as described in item (1.1) m3 15,600
1.3 Supply and installation of Bedding m3 0
1.4 Supply and installation of Concrete encasement
1.5 50mm m3 0
1.6 110mm m3 225
Total Trench Excavation
2 DUCTS Supply, lay and joint telephone duct in trench including protection, accessories,
warning tape, cleaning, and all works to complete as per drawings and specifications.
2.1 4 x PEC 110mm Duct with 5 Sub-Ducts Lm 16,000
2.2 50mm HDPE Drop Duct Lm 55,000
Total Ducts
3 MANHOLES / HANDHOLES
Reinforced Concrete Manholes/Handholes including earthworks, backfilling, disposal, concreting
works, concrete protection, waterstop, manhole cover and frames, ladders and all other items to
complete as per drawing details and specifications.
3.1 Manhole, Type A Nr 87
3.2 Manhole, Type B Nr 0
3.3 Handhole Nr 36
Total Manholes / Handholes
SUMMARY
1 Total Trench Excavation
2 Total Ducts
3 Total Manholes / Handholes
Total for TELECOMMUNICATIONS NETWORKS Carried to Grand Summary
18/47
PROJECT: South Dammam Housing Project. (131)
IRRIGATION NETWORKS
All works should be as per Local Authority requirements
1 TRENCH EXCAVATION
All types of excavation to a depth of 1.5m the width as per specification and drawings. Works shall
1.1 include obtaining permissions and providing side safety guards and signs, excavating, shoring,
dewatering, removing of excavated material, backfilling, and all works needed to complete works of
pipe laying. m3 24,033
1.2 Trench excavation for depth from 1.5-2.0m depth as described in item (1.1) m3 8,011
1.3 Supply and installation of Bedding m3 1,755
1.4 Supply and installation of Concrete encasement m3 135
Total Trench Excavation
PIPELINES Supply, lay and joint HDPE pipes and fittings including protection, accessories,
2 pressure test, warning tape, cleaning, testing and commissioning and all works to complete as
per drawings and specifications. PE100, SDR11, PN 16
2.1 HDPE Pipes
2.1.1 DN 110 HDPE pipe Lm 25,212
2.1.2 DN 160 HDPE pipe Lm 1,165
2.1.3 (1) DN 200 HDPE pipe Lm 1,660
2.1.3 (2) DN 250 HDPE pipe Lm 0
2.1.4 DN 355 HDPE pipe Lm 0
Total Pipelines
3 VALVES AND CHAMBERS
3.1 Supply and install DI Gate Valves including spindles and other accessories to complete as per
drawings and specifications. Including gate valve for washout, riser & POC.
3.1.1 DN 100 Nr 525
3.1.2 DN 150 Nr 3
3.1.3 DN 200 Nr 0
3.1.4 DN 250 Nr 0
3.1.5 DN 300 Nr 0
3.2 Supply and install Air Valve including isolation valve and other accessories to complete as per
drawings and specifications
3.2.1 DN 40 Nr 6
Reinforced concrete chambers including earthworks, backfilling, disposal, concreting works,
3.4 concrete protection, waterstop, steel steps, manhole cover and frames, surface box, valve support,
pipe pieces, fittings, adaptors, joints, adaptors from HDPE to DI material and all other items to
complete the connection of valves as per drawing details and specifications.
3.4.1 Gate Valve Chambers, Type I, 1500 x 1500 mm, depth to invert 1.5-2.0m (for 200mm dia gate
valve and below) Nr 15
3.4.2 Gate Valve Chambers, Type II, 1500 x 1800 mm, depth to invert 1.5-2.0m (for 200mm dia gate
valve and below) Nr 7
3.4.3 Washout Valve Chambers, 1500 x 1500 mm, depth to invert not exceeding 1.5m Nr 5
3.4.4 Washout Valve Chambers, 1500 x 1500 mm, depth to invert 1.5-2.0m Nr 2
3.4.5 Air Valve Chambers, 1200 x 1500 mm, depth to invert 1.5-2.0m Nr 6
Surface box cover, for buried gate valves, including concrete base, heavy duty ductile iron frame
3.5 and cover, protection tube, concrete valve support and all other items as per detail drawings. For
gate valve of irrigation riser and POC. Nr 499
Total Valves and Chambers
4 IRRIGATION RISERS & POC
Supply, lay and joint Irrigation Riser and POC from the main line including required length of pipe
as shown, fittings and thrust block, adaptor from HDPE to PVC material and all other items to
complete as per drawings and specifications (Gate valve & surface box measured separately)
4.1 Irrigation Riser, 110mm dia. Nr 446
4.2 POC, 110mm dia. uPVC Nr 47
19/47
PROJECT: South Dammam Housing Project. (131)
20/47
PROJECT: South Dammam Housing Project. (131)
LANDSCAPING
2 DIVISION 2: LANDSCAPING
SEC 1 SOFTSCAPE & TREE PLANTING
Supply and plant following type of plants and grass complete including all associated works,
necessary nursing, transportation, temporary storage, guy wires, stakes, wind screen, excavation,
spoils disposal, bed preparation, sweetsoil backfilling, watering including temporary water supply,
fertilization, sand control measures, establishment period, replacement/ maintenance of plant, etc.,
and as indicated on drawings & specification 02200 & 02950. For each site, the Contractor shall
provide a minimum of 10%, and a maximum of 35% of any one Tree Type Species. Contractor shall
provide a uniform Tree Type Species, for each Tree Type, along each section of Road. Section
breaks shall be permitted at intersection of Primary Roads only, with written approval of Site
Landscape Architect. For each site, the Contractor shall provide a minimum of 10%, and a
maximum of 35% of any one Shrubs and Groundcover Type Species.
2.1 Palm Trees Type 1: 2m clear trunk palm trees as per softscape/ planting schedule, drawings &
specifications. nr 0
2.2 Palm Trees Type 2: 2m clear trunk palm trees as per softscape/ planting schedule, drawings &
specifications. nr 0
2.3 Shade Trees Type 1: 50mm caliper large shade trees as per softscape/ planting schedule, drawings &
specifications. nr 6,321
Total Carried to Section 1 Summary DIVISION 2: LANDSCAPING
Supply and plant following type of plants and grass complete including all associated works,
necessary nursing, transportation, temporary storage, guy wires, stakes, wind screen, excavation,
spoils disposal, bed preparation, sweetsoil backfilling, watering including temporary water supply,
fertilization, sand control measures, establishment period, replacement/ maintenance of plant, etc.,
and as indicated on drawings & specification 02200 & 02950.
2.4 Shade Trees Type 2: 50mm caliper shade trees as per softscape/ planting schedule, drawings &
specifications. nr 2,219
2.5 Shade Trees Type 3: 50mm caliper shade trees as per softscape/ planting schedule, drawings &
specifications. nr 0
2.6 Ornamental Small Trees Type 1: 35mm caliper ornamental trees as per softscape/ planting schedule,
drawings & specifications. nr 0
2.7 Ornamental Small Trees Type 2: 35mm caliper ornamental trees as per softscape/ planting schedule,
drawings & specifications. nr 0
2.8 Conical Trees Type 1: 50mm caliper conical trees as per softscape/ planting schedule, drawings &
specifications. nr 0
2.9 Conical Trees Type 2: 50mm caliper conical trees as per softscape/ planting schedule, drawings &
specifications. nr 0
Supply and plant following type of plants and grass complete including all associated works,
necessary nursing, transportation, temporary storage, guy wires, stakes, wind screen, excavation,
spoils disposal, bed preparation, sweetsoil backfilling, watering including temporary water supply,
fertilization, sand control measures, establishment period, replacement/ maintenance of plant, etc.,
and as indicated on drawings & specification 02200 & 02950.
2.10 Shrubs Type 1&2: Shrubs as per softscape/ planting schedule, drawings & specifications. m2 0
2.11 Shrubs Type 3: Shrubs as per softscape/ planting schedule, drawings & specifications. m2 0
2.12 Succulents Type 1: Succulents as per softscape/ planting schedule, drawings & specifications. m2 0
2.13
Groundcover Type 2: Groundcover as per softscape/ planting schedule, drawings & specifications. m2 0
2.14
Groundcover Type 3: Groundcover as per softscape/ planting schedule, drawings & specifications. m2 0
2.15 Grasses Type 2: Grasses as per softscape/ planting schedule, drawings & specifications. m2 0
2.16 Grasses Type 4: Grasses as per softscape/ planting schedule, drawings & specifications. m2 0
Tree Pit Drainage/Soak-away
Provide minimum 150 mm diameter mechanically augered/ drilled drainge pit, minimum 1 meter
2.17 deep and backfill with 50mm gravel to achieve positive drainage of tree pits in accordance with
specifications and to satisfaction of landscape engineer. nr 8,540
21/47
PROJECT: South Dammam Housing Project. (131)
2.20 Supply and fix tegula kerb K3 (100 x 125 x 200mm) around grass, sand and planting edging in
courtyard complete including in-situ reinforced concrete haunch containment, A252 mesh, 50mm
blinding, subgrade preparation, etc., as indicated on hardscape schedule, drawings and specification. m 0
Kerb edging; straight or curved complete including, formwork, earthworks, excavation, minor fill to
achieve finished levels, backfilling, disposal of surplus excavated material to spoil heaps on
designated areas, sand control measures, etc., in accordance with hard scape schedule drawings and
specification 02971.
2.20.1 Supply and fix hydraulic pressed precast concrete upstand kerb K4 (150 x 305mm) along the
driveways accessing stilt parking complete including in-situ concrete haunch containment, blinding,
subgrade preparation, etc., as indicated on hardscape schedule, drawings and specification. m 0
2.20.2 Supply and fix hydraulic pressed precast concrete upstand kerb K5 (150 x 305mm) connecting kerb
K4 and flash to the streetscape paving complete including in-situ concrete haunch containment,
blinding, subgrade preparation, etc., as indicated on hardscape schedule, drawings and specification. m 0
Light duty pavement
Unit Pavers; straight or curved complete including, formwork, earthworks, excavation, minor fill to
achieve finished levels, backfilling, disposal of surplus excavated material to spoil heaps on
designated areas, sand control measures, etc., in accordance with hard scape schedule drawings and
specification 02971.
60mm thick pre-cast concrete unit pavers (P1/P2) complete including 50mm compacted sand
2.21 leveling bed, 150mm compacted aggregate subbase, subgrade preparation, etc., as indicated on
hardscape schedule, drawings and specification 02971. (On side walk & side walk interface) m2 235,860
60mm thick pre-cast concrete unit pavers (P1/P2) complete including 30mm mortar bed, in-situ
2.22 reinforced concrete haunch/footing (400 x 100mm) with A252 mesh, 50mm blinding, subgrade
preparation, etc., as indicated on hardscape schedule, drawings and specification 02971. (On edge
and bonding conditions) m2 24,471
80mm thick pre-cast concrete unit pavers (P3) complete including 50mm compacted sand leveling
2.23 bed, 150mm compacted aggregate subbase, subgrade preparation, etc., as indicated on hardscape
schedule, drawings and specification 02971. (On driveway) m2 32,117
60mm thick pre-cast concrete truncated dome' pavers (P4) for pedestrian handicap ramps complete
2.24 including compacted sand leveling bed, compacted aggregate subbase, subgrade preparation, etc., as
indicated on hardscape schedule, drawings and specification 02971. m2 871
100mm thick native/local tan colored, fractured limestone (P5) complete including 50mm mortar
2.25 bed, 100mm blinding, 100mm compacted aggregate subbase, subgrade preparation, etc., as
indicated on hardscape schedule, drawings and specification 02971. m2 0
60mm Thick Pre-cast concrete unit pavers (P1/P2/P6/P7A/P7B/P8A/P8B/P9) SIKKA'S complete
2.26 including 50mm compacted sand leveling bed , 150mm compacted aggregate subbase, subgrade
preparation, etc., as indicated on hardscape schedule, drawings and specification 02971 m2 2,409
22/47
PROJECT: South Dammam Housing Project. (131)
Contractor to ensure courtyard furnishings (pergolas, benches, seat cubes, screen walls,
playgrounds, etc.) shall be of the same type for each individual courtyard. Overall the contractor
shall provide a minimum of 25% and a maximum of 50% of any one furniture type. Contractor to
ensure streetscape furnishings (trash receptacles, benches, seat cubes, bollards, screen walls etc.)
shall be of the same type along each section of Road. Section breaks shall be permitted at
intersection of Primary Roads only, with written approval of Site Landscape Architect. Overall the
contractor shall provide a minimum of 25% and a maximum of 50% of any one furniture type.
Provide custom pre-cast concrete bench (F1) complete including all associated works, integral
2.39 color, sandblast finish, SS fixing pins, etc., as indicated on hardscape schedule, drawings and
specifications. nr 0
Provide custom pre-cast concrete seat cube (F2) complete including all associated works, integral
2.40 color, sandblast finish, direct burial, etc., as indicated on hardscape schedule, drawings and
specifications. nr 0
2.41 Provide custom pre-cast concrete litter bins (F3) complete including all associated works, integral
color, sandblast finish, etc., as indicated on hardscape schedule, drawings and specifications. nr 0
23/47
PROJECT: South Dammam Housing Project. (131)
2.42 Provide custom pre-cast concrete bollards (F4) complete including all associated works, integral
color, sandblast finish, etc., as indicated on hardscape schedule, drawings and specifications. nr 968
Provide solid cast aluminum bicycle rack (F5) complete including all associated works, in-situ
2.43 concrete foundation/footing, fixing hardware, standard color/finish, per manufacturers instructions,
etc., as indicated on hardscape schedule, drawings and specifications. nr 0
Provide stainless steel marine grade lift out and lockable bollards (F6) complete including all
2.44 associated works, brushed satin finish, etc., as indicated on hardscape schedule, drawings and
specifications. (On courtyards CD roads) nr 0
Provide stainless steel landscape lighting (L1) 35 watt metal halide for entry feature wall
2.45 illumination, complete including all associated works, as indicated on hardscape schedule, drawings
and specifications. nr 0
Provide stainless steel landscape lighting (L2) 100 watt metal halide for palm tree uplights,
2.46 complete including all associated works, as indicated on hardscape schedule, drawings and
specifications. nr 0
2.47 Provide stainless steel landscape lighting (L3) 3 x 1 watt LED pergola downlighters, complete
including all associated works, as indicated on hardscape schedule, drawings and specifications. nr 0
Provide stainless steel landscape lighting (L4) 3-4m pole top light with 150 watt metal halide,
2.48 complete including all associated works, as indicated on hardscape schedule, drawings and
specifications. nr 0
Provide tensile fabric shade structure (S1) complete including all associated works, tension
2.49 hardware, cables, bolts and all mounting/fixing hardware , etc., as indicated on hardscape schedule,
drawings and specifications. m2 0
Provide play sail shade structure (S2) for play areas in courtyard, complete including all associated
2.50 works, roof, columns, beams, fixing hardware, concrete foundation, tiles (if any), etc., as indicated
on hardscape schedule, drawings and specifications. nr 0
Provide large sail shade structure (S3) for seating areas in courtyard complete including all
2.51 associated works, roof, columns, beams, fixing hardware, concrete foundation, tiles (if any), etc., as
indicated on hardscape schedule, drawings and specifications. nr 0
Provide pergola shade structure (S4) with peaked fabric roof for courtyard complete including all
2.52 associated works, roof, columns, beams, fixing hardware, concrete foundation, tiles (if any), etc., as
indicated on hardscape schedule, drawings and specifications. nr 0
Provide pergola shade structure (S5) with flat fabric roof for courtyard complete including all
2.53 associated works, roof, columns, beams, fixing hardware, concrete foundation, tiles (if any), etc., as
indicated on hardscape schedule, drawings and specifications. nr 0
Provide pergola shade structure (S6) with wooden slatted roof for courtyard complete including all
2.54 associated works, roof, columns, beams, fixing hardware, concrete foundation, tiles (if any), etc., as
indicated on hardscape schedule, drawings and specifications. nr 0
Supply and installation of galvanized steel post and base street wayfinding signage with powder
coated finish per manufacturers standard RAL color chart. Signs are direct burial in concrete
2.55 foundation sized per fabricators/suppliers installation specifications. Sign box panel to be built-up
aluminum, traffic grade, reflective cut-out vinyl film graphics. All inclusive of flanges, locking
mechanishm, hardware to be galvanized and vandalproof. Signage to have minimum 5 year
warranty. nr 198
Supply and installation of courtyard pocket playground, complete if any including foundations,
triangle transfer platform, transfer system with barrier, ridge climber, toad stool climber, clover leaf
2.56 climber, schooner climber, bubble climber, single gizmo panel, click wheel assembly, bongos,
rumble and roll, free standing x-pod step, entry way, flower talk tube, shingle roof, sail roof,
stepping stones, storefront panel, F5 spiral slide w/ enclosure, fixing hardware, play sand, concrete
edger etc., as indicated in the drawings and specification. nr 0
SEC 3 IRRIGATION NETWORK
Pipe Work - Pipes
Supply, lay and joint uPVC pipe PN-16 in trenches complete including fittings, supports,
excavation, backfill with selected excavated material, disposal of surplus excavated material to spoil
heaps on designated areas, clean dune sand/granular material for bed and surround to pipes,
concrete surround and ducts to pipe, marking tape, testing, etc., in accordance with specification
and drawings.
2.57 For 32 mm dia uPVC pipe PN-16 m 61,600
2.58 For 40 mm dia uPVC pipe PN-16 m 0
2.59 For 50 mm dia uPVC pipe PN-16 m 8,140
2.60 For 63 mm dia uPVC pipe PN-16 m 594
24/47
PROJECT: South Dammam Housing Project. (131)
Supply and install pressure compensating bubbler for palms including stake clamps - 227 LPH
and all accessories necessary to complete the works in accordance with specification and drawings.
2.73 Pressure compensating Bubbler 227L/H nr 0
Supply and install metal pedestal field decoder controller including all associated works to
complete in accordance with specification and drawings. Power supply shall be from nearest feeder
pillar.
2.74 Field Decoder controller on site nr 3
Supply and install single station decoder for valve connection to controller including waterproof
connectors and all other accessories necessary to complete the works in accordance with
specification and drawings.
2.75 Decoder Single station nr 259
Supply and install Irrigation cable two way wire including connection, pull boxes, surge protection
each 200 m, fittings, 5/8" grounding and all other associated works to complete in accordance with
specification and drawings.
2.76 Irrigation cable two way path gauge 12 m 0
2.77 Irrigation cable two way path gauge 14 m 26,840
2.78 Pull Box nr 880
Supply, lay and joint uPVC Conduit pipe PN-10 in trenches including fittings, excavation, backfill
with selected excavated material, disposal of surplus excavated material to spoil heaps on
designated areas and all other associated works to complete in accordance with specification and
drawings.
2.79 For 32mm dia uPVC pipe PN-10 m 26,840
25/47
PROJECT: South Dammam Housing Project. (131)
DIVISION 5 - EARTHWORKS
Site Preparation
5/2/1 Public utilities and lines removal L.M 175
5/2/4/1 Removal of street lighting poles, cables and stacking to the designated area as directed by the
engineer Number 0
5/2/4/2 Removal of OH poles, cables and stacking to the designated area as directed by the engineer Number 0
5/2/8 Removal of pavement layers S.M 0
5/2/9 Removal of Fences and gates L.M 0
5/2/10 Cleaning of debris, materials, plants & grass removal. S.M 350,000
5/2/11 Removal of trees Number 1
5/2/12 Carefully remove, protect and relocate existing temporary survey bench mark. Number 0
To Collection
DIVISION 5 - EARTHWORKS (Cont'd….)
Fill Works
5/3/1 Common Excavations C.M 325,429
5/3/2 Rock Excavation C.M 17,128
Fill Works
5/4/1 Roadbed preparation S.M 1,681,437
5/4/2/1 Embankment works C.M 1,495,898
5/4/2/2 Embankment works for Soil Replacement in Road foundation C.M 0
5/4/2/3 Sand layer below the Road foundation C.M 0
Sub grade
5/5/2/1 Untreated Sub grade C.M 38,766
5/5/3/1 Lime treated Sub grade C.M 511
To Collection
DIVISION 5 - EARTHWORKS (Cont'd….)
Sub grade (Cont'd….)
5/5/4/1 Surface preparation S.M 1,618
5/5/4/3 Cement treated Sub grade C.M 511
To Collection
DIVISION 5 - EARTHWORKS (Cont'd….)
Water Drainage
All work items herein shall include all the works stated (including supply and installation of
materials) in MOMRA's General Specifications
5/7/1 Excavation in all types of soil including disposal
5/7/1/1 Depth to invert not exceeding 1.5m C.M 2,625
5/7/1/2 Depth to invert 1.6-2.5m C.M 46,715
5/7/1/3 Depth to invert 2.6-3.5m C.M 22,053
5/7/1/4 Depth to invert 3.6-4.5m C.M 7,650
5/7/1/5 Depth to invert 4.6-5.5m C.M 4,135
5/7/1/6 Depth to invert 5.6-6.5m C.M 5,120
5/7/1/7 Depth to invert 6.6-7.5m C.M 0
5/7/1/8 Depth to invert 7.6-8.5m C.M 0
To Collection
DIVISION 5 - EARTHWORKS (Cont'd….)
Water Drainage (Cont'd….)
5/7/2 Manhole
5/7/2/1 Manhole (Type 1)
26/47
PROJECT: South Dammam Housing Project. (131)
All civil works for the supply and installation of drainage pumping station of 530 Liter / Sec
5/7/14/2 Capacity including necessary earthworks, concrete works, covers and frames, ladders, accessories,
etc complete as shown on Drwg. ME_SD_851_04_10_001 thru 003 Item 0
Electomenchanical works including Electrical (substation, earthling, power cables, cable joints,
MCC panel, lighting, power distribution, fire alarm system telephonic, PLC & SCADA system,
5/7/14/3 transformers, silent type stand by generator etc) and Mechanical (pipes, valves, fittings, 3+1
submersible pump with discharge of 530 Liter / Sec @ Head of 25 m each, etc) works complete as
shown on Drwg. IN_SD_851_04_10_001 thru 005 and EL_SD_851_04_10_001 thru 008. Item 0
DIVISION 5 - EARTHWORKS (Cont'd….)
Division Summary
Page 5/1
Page 5/2
Page 5/3
Page 5/4
Page 5/5
Page 5/6
28/47
PROJECT: South Dammam Housing Project. (131)
29/47
PROJECT: South Dammam Housing Project. (131)
30/47
PROJECT: South Dammam Housing Project. (131)
31/47
PROJECT: South Dammam Housing Project. (131)
32/47
PROJECT: South Dammam Housing Project. (131)
Trench excavation to a depth of 1.5m and the width as per specification and drawings. Works shall
include obtaining permissions and providing side safety guards and signs, excavating, shoring,
1.1 dewatering, removing/disposal of excavated material, backfilling and all works needed to complete
works of pipe laying . As indicated in drawings and Ministry of Water and Electricity (MOWE) /
NWC Water network Specifications section 2.03 m3 30,620
1.2 Trench excavation for depth from 1.5 to 2.5m as described in item (1.1) m3 1,345
1.3 Extra over for trench excavation in rock for all depth m³ 0
Granular / crushed aggregate for bedding and surround to pipe Type A. initial backfill including
1.4 supply, and compaction with suitable equipments and all requirements to complete work. As
indicated in drawings and (MOWE / NWC) water network Specifications section 2.04 m3 14,330
1.5 Supply and installation of Concrete encasement m3 0
Total Trench Excavation
2 PIPELINES
Supply and install HDPE pipe, PE100, SDR11, PN 16 bars, and include supply, installation and
protection of pipes, fittings and all accessories, thrust blocks pressure tests, cleaning disinfection,
2.1 surveying and all works needed to complete works as per specifications for the following pipe
diameters. As indicated in drawings and (MOWE) / NWC Water network Specifications section
4.02 and 4.03
2.1.1 160 mm Lm 23,002
Supply and install ductile iron pipes, Class K9, PN-16 and Works shall include supply, installation
and protection of pipes, fittings, accessories and thrust blocks pressure tests, cleaning disinfection,
2.2 surveying and all works needed to complete works as per specifications for the following pipe
diameters. As indicated in drawings and (MOWE) / NWC Water network Specifications section
4.02 and 4.03
2.2.1 800 mm Lm 0
2.2.2 600 mm Lm 0
2.2.3 400 mm Lm 830
2.2.4 300 mm Lm 5,469
Total Pipelines Works
3 NETWORK ACCESSORIES
Valves and Meters
Supply and install gate valves with PN 16 bars and work shall include supply and installation of all
valve accessories, fittings, heavy duty DI frame & cover, surface box, protection tube, stem, marker
3.1 posts, couplings and concrete pad & support according to specifications and drawings for the
following diameters: As indicated in drawings and (MOWE) / NWC Water network Specifications
section 4.04
3.1.1 160 mm Nr. 50
Supply and install butterfly valves with PN 16 bars and work shall include supply and installation of
3.2 all valve accessories, fittings, couplings according to specifications and drawings for the following
diameters: As indicated in drawings and (MOWE) / NWC Water network Specifications section
4.04
3.2.1 300 mm Nr. 2
3.2.2 400 mm Nr. 2
3.2.3 600 mm Nr. 0
3.2.4 800 mm Nr. 0
Supply and install washout valves PN 16 bars and work shall include supply, installation, all parts,
3.3 couplings, fittings, valves accessories and all what is needed according to specifications and
drawings on the water mains with the following diameters. As indicated in drawings and
(MOWE) / NWC Water network Specifications section 4.04
3.3.1 Pipe Size -300 mm - 800 mm Nr. 7
NETWORK ACCESSORIES (Cont'd…)
33/47
PROJECT: South Dammam Housing Project. (131)
Supply and install air release valves supplied with isolating valves and PN 16 bars pressure. Works
3.4 shall include supply and installation, all parts, fittings, couplings, valve accessories and all what is
needed according to specifications and drawings on water mains with the following diameters. As
indicated in drawings and (MOWE) / NWC Water network Specifications section 4.04
3.4.1 Pipe Size -300 mm - 800 mm (Air valve size of 60 mm dia) Nr. 6
Supply and install electromagnetic flow meters including fittings and all other items as per drawings
3.5 and Specifications. The item shall also include construction and preparation of the chamber to
allow for installation of RTU to be connected to automatic control center (if used) and all
accessories to finish work as needed for the following meter diameters:
3.5.1 300 mm Nr. 2
3.5.2 400 mm Nr. 2
3.5.3 600 mm Nr. 0
3.5.4 800 mm Nr. 0
Concrete Chambers
Supply and Construct the following reinforced concrete chambers including excavation, backfilling,
reinforced and plain concrete works, waterproofing, heavy duty cover, steel steps, fittings,
3.6 dismantling joints, adapters, puddle flange, pipes needed to connect valves, concrete support,
marker posts and all other requirements needed to finish work as follows. As indicated in drawings
and (MOWE) / NWC Water network Specifications section 4.06
3.6.1 Butterfly Valve Chambers, Type 2, 1500 x 2000 mm, depth to invert 1.5-2.5m Nr. 4
NETWORK ACCESSORIES (Cont'd…)
Concrete Chambers (Cont'd…)
3.6.2 Gate Valve Chambers, 1500 x 1500mm, depth to invert 1.5-2.5m Nr. 50
3.6.3 Washout Valve Chambers, 1500 x 1500 mm, depth to invert 1.5-2.5m Nr. 7
3.6.4 Air Valve Chambers, 1200 x 1500 mm, depth to invert 1.5-2.5m (for 300mm dia and above pipes) Nr 6
3.6.5 Flow Meter Chambers, 1500 x 1500 mm, depth to invert 1.5-2.5m Nr. 4
Fire Hydrant
Supply and install fire hydrant including accessories. Work shall also include gate valve, concrete
chamber, pipe and fittings, connection to water mainline, excavation, backfilling, reinstatement of
3.7 surfaces, reinforced / plain concrete works, insulation, steel bollards, testing and all other items as
required to complete work as per specifications and drawings. As indicated in drawings and
(MOWE) / NWC Water network Specifications section 4.04 Nr. 140
Total Network Accessories
4 HOUSE SERVICE CONNECTION
Supply and construct HDPE house connections including 5m length pipe from main water line,
ferrule cock with spindle, surface box, pipe saddle, pipe & fittings up to plots, water meter, stop
4.1 cock, box connections, excavation, backfilling, bedding, surface reinstatement, removing excavated
material, obtaining permissions, secure the site with safety guards testing, disinfection and all other
items to ensure the work completion. As indicated in drawings and (MOWE) / NWC Water
network Specifications section 4.04. PE100, SDR11, PN16. For 160mm HDPE Pipe Main Line
4.1.1 4nr House connections Nr. 2
4.1.2 3nr House connections Nr. 436
4.1.3 2nr House connections Nr. 265
4.1.4 1nr House connection Nr. 56
For 300mm DI Pipe Main Line
4.1.5 4nr House connections Nr. 1
4.1.6 3nr House connections Nr. 30
4.1.7 2nr House connections Nr. 22
4.1.8 1nr House connections Nr. 10
For 400mm DI Pipe Main Line
4.1.9 4nr House connections Nr. 0
4.1.10 3nr House connections Nr. 0
4.1.11 2nr House connections Nr. 0
34/47
PROJECT: South Dammam Housing Project. (131)
Trench excavation to a depth of 1.5m and the width as per specification and drawings. Works
include getting required permissions, secure safety guards, signboards, excavating, soil support
1.1 dewatering and removing/disposal of excavated material, backfilling and all requirements needed
to complete works of laying pipes. As indicated in drawings and Ministry of Water and Electricity
(MOWE / NWC) Sewer network Specifications section 2.03 m³ 400
1.1.1 Trench excavation for depth from 1.5 to 2.5m as described in item (1.1) m³ 3,050
1.1.2 Trench excavation for Depth from 2.5 to 4.5m as described in item (1.1) m³ 38,200
1.1.3 Trench excavation for Depth from 4.5m to 6.5 as described in item (1.1) m³ 19,650
1.1.4 Trench excavation for Depth from 6.5m to 8.5 as described in item (1.1) m³ 6,950
1.2 Extra over for trench excavation in rock for all depth m³ 0
Granular bedding and initial backfill including supply, and compaction with suitable equipments
1.3 and all requirements to complete work. As indicated in drawings and (MOWE / NWC) Sewer
network Specifications section 2.04 m3 12,700
TRENCH EXCAVATION (Cont'd…)
1.4 Supply and installation of geotextile fabric for protection, permeable, woven or bonded non-woven,
polypropylene UV resistant and as specified. m2 91,800
Concrete bedding including supply and compaction with suitable equipments and all requirements
1.5 to complete work. As indicated in drawings and (MOWE / NWC) Sewer network Specifications
section 2.04 m3 0
Concrete encasement of 200mm thick on pipes including supply and compaction with suitable
1.6 equipments and all requirements to complete work. As indicated in drawings and (MOWE / NWC)
Sewer network Specifications section 2.04 m3 0
Total Trench Excavation
PIPELINES: Supply and installation of vitrified clay pipes with standard strength including fittings.
Work includes supply, installation and protection for pipes and fittings, thrust blocks, warning tape
2 (if any) leakage tests, operation surveying works and all necessary works as per specifications for
the following pipe diameters. As indicated in drawings and (MOWE / NWC)Sewer network
Specifications section 4.03
2.1 200 mm Lm 24,150
2.2 300 mm Lm 0
2.3 400 mm Lm 1,150
2.4 500 mm Lm 0
35/47
PROJECT: South Dammam Housing Project. (131)
Supply and installation of GRP pipes with standard strength including fittings. Work includes
supply, installation and protection for pipes and fittings, thrust blocks, warning tape (if any)
leakage tests, operation surveying works and all necessary works as per specifications for the
following pipe diameters. As indicated in drawings and (MOWE / NWC)Sewer network
Specifications section 4.03
2.6 700 mm Lm 0
Total Pipelines Works
3 NETWORK ACCESSORIES:
Manholes
Supply and construct circular manholes of precast / cast in-situ concrete with internal diameter of
1.2m including excavating backfilling, internal and external coating, steps and covers according to
3.1 specifications and drawings and surface reinstatement and all requirements to complete the works
for the following depth categories: As indicated in drawings and (MOWE / NWC) Sewer network
Specifications section 4.06
3.1.1 Depth up to 3m (2.20m to 3.00m) Nr 250
3.1.2 equal to 4m (3.00m to 4.00m)Depth greater than 3m and less than or Nr 130
3.1.3 Depth greater than 4m and less than or equal to 5m (4.00m to 5.00m) Nr 60
3.1.4 Depth greater than 5m and less than or equal to 6m (5.00m to 6.00m) Nr 45
3.1.5 Depth greater than 6m and less than or equal to 7m (6.00m to 7.00m) Nr. 35
3.1.6 Depth greater than 7m and less than or equal to 8m (7.00m to 8.00m) Nr. 5
3.1.7 Depth greater than 8m and less than or equal to 9m (8.00m to 9.00m) Nr. 0
Manholes (Cont'd..)
Supply and construct drop manholes with depth up to 5.0m and the item shall include all works and
3.2 necessary material needed to accomplish works according to specifications and drawings for the
following depth categories:
3.2.1 Drop Manhole with 200mm dia. Backdrop pipe with less than 1.5m depth
3.2.1.1 Depth greater than 3m and less than or equal to 4m Nr 2
3.2.1.2 Depth greater than 4m and less than or equal to 5m Nr 0
3.2.2 Drop Manhole with 200mm dia. Backdrop pipe with more than 1.5m depth
3.2.2.1 Depth greater than 4m and less than or equal to 5m Nr 0
Supply and construct drop manholes with depth greater than 5.0m and the item includes all works
3.3 and needed material to finish work according to specifications and drawings for the following
depths:
3.3.1 Drop Manhole with 200mm dia. Backdrop pipe with less than 1.5m depth
3.3.1.1 Depth greater than 5m and less than or equal to 6m Nr 0
3.3.1.2 Depth greater than 6m and less than or equal to 7m Nr. 2
NETWORK ACCESSORIES: (Cont'd..)
Manholes (Cont'd..)
3.3.2 Drop Manhole with 200mm dia. Backdrop pipe with more than 1.5m depth
3.3.2.1 Depth greater than 5m and less than or equal to 6m Nr 2
3.3.2.2 Depth greater than 6m and less than or equal to 7m Nr. 1
3.3.2.3 Depth greater than 7m and less than or equal to 8m Nr. 1
3.3.3 Drop Manhole with 250mm dia. Backdrop pipe with less than 1.5m depth
3.3.3.1 Depth greater than 6m and less than or equal to 7m Nr. 1
3.3.4 Drop Manhole with 450mm dia. Backdrop pipe with less than 1.5m depth
3.3.4.1 Depth greater than 7m and less than or equal to 8m Nr. 1
Total Network Accessories
4 HOUSE CONNECTIONS :
36/47
PROJECT: South Dammam Housing Project. (131)
Supply and construct sewer connections to the manholes with a length up to 10m according to
specifications and drawings. Work shall include "Y" connections excavating, backfilling, bedding,
4.1 surfaces reinstatement, removal of excavated material, getting the permissions, secure the site with
safety guards and to supply uPVC pipes, and accessories Class 5 with NP16 bars including all
connection works for the following diameters: As indicated in drawings and (MOWE / NWC)
Sewer network Specifications section 4.04
4.1.1 H.C. 160 mm Nr 310
Supply and construct 160mm dia. sewer connections to the pipelines with diameters up to 500mm
with a length up to 10m according to specifications and drawings. Work shall include "Y" or saddle
4.2 connections, excavating, backfilling, bedding, surfaces reinstatement, removal of excavated
material, getting the permissions, secure the site with safety guards and to supply pipes, including
all connection works for the following sewer main pipelines:
4.2.1 200 mm Nr 560
4.2.2 250 mm Nr 0
4.2.3 300 mm Nr 0
4.2.4 450 mm Nr 0
4.2.5 500 mm Nr 0
HOUSE CONNECTIONS : (Cont'd..)
Additional house connection uPVC pipelines for inspection chambers and cleanout connections.
4.3 Work includes fittings, excavation, backfilling, bedding, other items needed to finish the work
according to drawings and specifications.
4.3.1 H.C. 160 mm Lm 22,000
Supply and construct cleanouts from uPVC pipes and the item includes all works, material and
4.4 necessary connections needed to finish work according to specifications and drawings for the
following diameters: As indicated in drawings and (MOWE / NWC) Sewer network Specifications
section 4.06
4.4.1 160mm dia uPVC Cleanout Nr 1,450
Supply and construct inspection chambers on sewer lines and work shall include all excavation
4.5 works, backfilling, concrete, connections and surfaces reinstatement as per specifications and
drawings and all requirements to finish work. As indicated in drawings and (MOWE / NWC)
Sewer network Specifications section 4.06
4.5.1 900 mm dia. Nr 750
Total House Connections
SUMMARY
Total Trench Excavation
Total Pipelines Works
Total Network Accessories
Total House Connections
Total for SEWERAGE WORKS carried to Grand Summary
ELECTRICAL NETWORKS
All works should be as per Local Authority requirements
1 TRENCH EXCAVATION
All types of excavation to a depth of 1.0m the width as per specification and drawings. Works shall
1.1 include obtaining permissions and providing side safety guards and signs, excavating, shoring,
dewatering, removing/disposal of excavated material, backfilling, and all works needed to complete
works of cable laying for LV Cable. m3 48,800
1.2 Trench excavation for depth from 1.0-1.5m depth as described in item (1.1) for MV cable. m3 91,950
1.3 Supply and installation of Bedding m3 39,000
Total Trench Excavation
2 CABLES
Supply and install medium and low voltage cables in trench including cable splices,
joints/terminations, warning tape, cable tiles, cable accessories, testing and commissioning and
other items as per drawings, specifications and SEC requirements.
Medium Voltage Cables
2.1 8.7 kV/15kV; 1 x 3/C 300mm² CU /XLPE /SWA/PVC Lm 30,400
37/47
PROJECT: South Dammam Housing Project. (131)
Road crossing ducts including excavation, backfilling, disposal, concrete surround, duct pipes, draw
cord, duct marker and other items as per drawing details, specifications and SEC requirements
4.1 4 Way LV Duct 150mm PVC Lm 16,000
4.2 6 Way LV Duct 150mm PVC Lm 3,000
Total Duct Banks
SUMMARY
Total Trench Excavation
Total Cables
Total Electrical Equipment
Total Duct Banks
Total for ELECTRICAL WORKS Carried to Grand Summary
TELECOMMUNICATIONS NETWORKS
All works should be as per Local Authority requirements
1 TRENCH EXCAVATION
38/47
PROJECT: South Dammam Housing Project. (131)
All types of excavation to a depth of 1.5m the width as per specification and drawings. Works shall
1.1 include obtaining permissions and providing side safety guards and signs, excavating, shoring,
dewatering, removing/disposal of excavated material, backfilling, and all works needed to complete
works of duct laying. m3 9,500
1.2 Trench excavation for depth from 1.5-2.0m depth as described in item (1.1) m3 15,600
1.3 Supply and installation of Bedding m3 0
1.4 Supply and installation of Concrete encasement
1.5 50mm m3 0
1.6 110mm m3 225
Total Trench Excavation
2 DUCTS Supply, lay and joint telephone duct in trench including protection, accessories, warning
tape, cleaning, and all works to complete as per drawings and specifications.
2.1 4 x PEC 110mm Duct with 5 Sub-Ducts Lm 16,000
2.2 50mm HDPE Drop Duct Lm 55,000
Total Ducts
3 MANHOLES / HANDHOLES
Reinforced Concrete Manholes/Handholes including earthworks, backfilling, disposal, concreting
works, concrete protection, waterstop, manhole cover and frames, ladders and all other items to
complete as per drawing details and specifications.
3.1 Manhole, Type A Nr 87
3.2 Manhole, Type B Nr 0
3.3 Handhole Nr 36
Total Manholes / Handholes
SUMMARY
1 Total Trench Excavation
2 Total Ducts
3 Total Manholes / Handholes
Total for TELECOMMUNICATIONS NETWORKS Carried to Grand Summary
IRRIGATION NETWORKS
All works should be as per Local Authority requirements
1 TRENCH EXCAVATION
All types of excavation to a depth of 1.5m the width as per specification and drawings. Works shall
1.1 include obtaining permissions and providing side safety guards and signs, excavating, shoring,
dewatering, removing of excavated material, backfilling, and all works needed to complete works of
pipe laying. m3 24,033
1.2 Trench excavation for depth from 1.5-2.0m depth as described in item (1.1) m3 8,011
1.3 Supply and installation of Bedding m3 1,755
1.4 Supply and installation of Concrete encasement m3 135
Total Trench Excavation
PIPELINES Supply, lay and joint HDPE pipes and fittings including protection, accessories,
2 pressure test, warning tape, cleaning, testing and commissioning and all works to complete as per
drawings and specifications. PE100, SDR11, PN 16
2.1 HDPE Pipes
2.1.1 DN 110 HDPE pipe Lm 25,212
2.1.2 DN 160 HDPE pipe Lm 1,165
2.1.3 (1) DN 200 HDPE pipe Lm 1,660
2.1.3 (2) DN 250 HDPE pipe Lm 0
2.1.4 DN 355 HDPE pipe Lm 0
Total Pipelines
3 VALVES AND CHAMBERS
3.1 Supply and install DI Gate Valves including spindles and other accessories to complete as per
drawings and specifications. Including gate valve for washout, riser & POC.
39/47
PROJECT: South Dammam Housing Project. (131)
40/47
PROJECT: South Dammam Housing Project. (131)
Supply and plant following type of plants and grass complete including all associated works,
necessary nursing, transportation, temporary storage, guy wires, stakes, wind screen, excavation,
spoils disposal, bed preparation, sweetsoil backfilling, watering including temporary water supply,
fertilization, sand control measures, establishment period, replacement/ maintenance of plant, etc.,
and as indicated on drawings & specification 02200 & 02950. For each site, the Contractor shall
provide a minimum of 10%, and a maximum of 35% of any one Tree Type Species. Contractor shall
provide a uniform Tree Type Species, for each Tree Type, along each section of Road. Section
breaks shall be permitted at intersection of Primary Roads only, with written approval of Site
Landscape Architect. For each site, the Contractor shall provide a minimum of 10%, and a
maximum of 35% of any one Shrubs and Groundcover Type Species.
2.1 Palm Trees Type 1: 2m clear trunk palm trees as per softscape/ planting schedule, drawings &
specifications. nr 0
2.2 Palm Trees Type 2: 2m clear trunk palm trees as per softscape/ planting schedule, drawings &
specifications. nr 0
2.3 Shade Trees Type 1: 50mm caliper large shade trees as per softscape/ planting schedule, drawings &
specifications. nr 6,321
Total Carried to Section 1 Summary DIVISION 2: LANDSCAPING
SEC 1 SOFTSCAPE & TREE PLANTING (Cont.)
Supply and plant following type of plants and grass complete including all associated works,
necessary nursing, transportation, temporary storage, guy wires, stakes, wind screen, excavation,
spoils disposal, bed preparation, sweetsoil backfilling, watering including temporary water supply,
fertilization, sand control measures, establishment period, replacement/ maintenance of plant, etc.,
and as indicated on drawings & specification 02200 & 02950.
2.4 Shade Trees Type 2: 50mm caliper shade trees as per softscape/ planting schedule, drawings &
specifications. nr 2,219
2.5 Shade Trees Type 3: 50mm caliper shade trees as per softscape/ planting schedule, drawings &
specifications. nr 0
2.6 Ornamental Small Trees Type 1: 35mm caliper ornamental trees as per softscape/ planting schedule,
drawings & specifications. nr 0
2.7 Ornamental Small Trees Type 2: 35mm caliper ornamental trees as per softscape/ planting schedule,
drawings & specifications. nr 0
2.8 Conical Trees Type 1: 50mm caliper conical trees as per softscape/ planting schedule, drawings &
specifications. nr 0
2.9 Conical Trees Type 2: 50mm caliper conical trees as per softscape/ planting schedule, drawings &
specifications. nr 0
Total Carried to Section 1 Summary
DIVISION 2: LANDSCAPING
SEC 1 SOFTSCAPE & TREE PLANTING (Cont.)
Supply and plant following type of plants and grass complete including all associated works,
necessary nursing, transportation, temporary storage, guy wires, stakes, wind screen, excavation,
spoils disposal, bed preparation, sweetsoil backfilling, watering including temporary water supply,
fertilization, sand control measures, establishment period, replacement/ maintenance of plant, etc.,
and as indicated on drawings & specification 02200 & 02950.
2.10 Shrubs Type 1&2: Shrubs as per softscape/ planting schedule, drawings & specifications. m2 0
2.11 Shrubs Type 3: Shrubs as per softscape/ planting schedule, drawings & specifications. m2 0
2.12 Succulents Type 1: Succulents as per softscape/ planting schedule, drawings & specifications. m2 0
2.13 Groundcover Type 2: Groundcover as per softscape/ planting schedule, drawings & specifications. m2 0
2.14 Groundcover Type 3: Groundcover as per softscape/ planting schedule, drawings & specifications. m2 0
2.15 Grasses Type 2: Grasses as per softscape/ planting schedule, drawings & specifications. m2 0
2.16 Grasses Type 4: Grasses as per softscape/ planting schedule, drawings & specifications. m2 0
Total Carried to Section 1 Summary
DIVISION 2: LANDSCAPING
SEC 1 SOFTSCAPE & TREE PLANTING (Cont.)
Tree Pit Drainage/Soak-away
Provide minimum 150 mm diameter mechanically augered/ drilled drainge pit, minimum 1 meter
2.17 deep and backfill with 50mm gravel to achieve positive drainage of tree pits in accordance with
specifications and to satisfaction of landscape engineer. nr 8,540
41/47
PROJECT: South Dammam Housing Project. (131)
2.20 Supply and fix tegula kerb K3 (100 x 125 x 200mm) around grass, sand and planting edging in
courtyard complete including in-situ reinforced concrete haunch containment, A252 mesh, 50mm
blinding, subgrade preparation, etc., as indicated on hardscape schedule, drawings and specification. m 0
Total Carried to Section 2 Summary
2 DIVISION 2: LANDSCAPING
SEC 2 HARDSCAPE WORKS
Kerbs and edgings (Cont.)
Kerb edging; straight or curved complete including, formwork, earthworks, excavation, minor fill to
achieve finished levels, backfilling, disposal of surplus excavated material to spoil heaps on
designated areas, sand control measures, etc., in accordance with hard scape schedule drawings and
specification 02971.
Supply and fix hydraulic pressed precast concrete upstand kerb K4 (150 x 305mm) along the
2.20.1 driveways accessing stilt parking complete including in-situ concrete haunch containment, blinding,
subgrade preparation, etc., as indicated on hardscape schedule, drawings and specification. m 0
2.20.2 Supply and fix hydraulic pressed precast concrete upstand kerb K5 (150 x 305mm) connecting kerb
K4 and flash to the streetscape paving complete including in-situ concrete haunch containment,
blinding, subgrade preparation, etc., as indicated on hardscape schedule, drawings and specification. m 0
Total Carried to Section 2 Summary
2 DIVISION 2: LANDSCAPING
SEC 2 HARDSCAPE WORKS
Light duty pavement
Unit Pavers; straight or curved complete including, formwork, earthworks, excavation, minor fill to
achieve finished levels, backfilling, disposal of surplus excavated material to spoil heaps on
designated areas, sand control measures, etc., in accordance with hard scape schedule drawings and
specification 02971.
60mm thick pre-cast concrete unit pavers (P1/P2) complete including 50mm compacted sand
2.21 leveling bed, 150mm compacted aggregate subbase, subgrade preparation, etc., as indicated on
hardscape schedule, drawings and specification 02971. (On side walk & side walk interface) m2 235,860
42/47
PROJECT: South Dammam Housing Project. (131)
60mm thick pre-cast concrete unit pavers (P1/P2) complete including 30mm mortar bed, in-situ
2.22 reinforced concrete haunch/footing (400 x 100mm) with A252 mesh, 50mm blinding, subgrade
preparation, etc., as indicated on hardscape schedule, drawings and specification 02971. (On edge
and bonding conditions) m2 24,471
80mm thick pre-cast concrete unit pavers (P3) complete including 50mm compacted sand leveling
2.23 bed, 150mm compacted aggregate subbase, subgrade preparation, etc., as indicated on hardscape
schedule, drawings and specification 02971. (On driveway) m2 32,117
Total Carried to Section 2 Summary
2 DIVISION 2: LANDSCAPING
SEC 2 HARDSCAPE WORKS
Light duty pavement (Cont.)
60mm thick pre-cast concrete truncated dome' pavers (P4) for pedestrian handicap ramps complete
2.24 including compacted sand leveling bed, compacted aggregate subbase, subgrade preparation, etc., as
indicated on hardscape schedule, drawings and specification 02971. m2 871
100mm thick native/local tan colored, fractured limestone (P5) complete including 50mm mortar
2.25 bed, 100mm blinding, 100mm compacted aggregate subbase, subgrade preparation, etc., as
indicated on hardscape schedule, drawings and specification 02971. m2 0
60mm Thick Pre-cast concrete unit pavers (P1/P2/P6/P7A/P7B/P8A/P8B/P9) SIKKA'S complete
2.26 including 50mm compacted sand leveling bed , 150mm compacted aggregate subbase, subgrade
preparation, etc., as indicated on hardscape schedule, drawings and specification 02971 m2 2,409
60mm Thick Pre-cast concrete tiles (P10) SIKKA'S complete including 50mm compacted sand
2.27 leveling bed , 150mm compacted aggregate subbase , subgrade preparation, etc., as indicated on
hardscape schedule, drawings and specification 02971 m2 116
Total Carried to Section 2 Summary
2 DIVISION 2: LANDSCAPING
SEC 2 HARDSCAPE WORKS
Light duty pavement (Cont.)
60mm Thick Pre-cast concrete unit pavers (P11) on reinforce concrete slab complete including
2.28 A252 mesh, mortar bed, compacted aggregate subbase, subgrade preparation, etc., as indicated on
hardscape schedule, drawings and specification 02971. (On courtyard seating corner/ plazas) m2 0
60mm Thick Pre-cast concrete interlocking paving blocks (P12) complete including compacted
2.29 sand leveling bed , compacted aggregate subbase , subgrade preparation, etc., as indicated on
hardscape schedule, drawings and specification 02971. (On courtyard pedestrian footpath) m2 0
80mm Thick Pre-cast concrete interlocking paving blocks (P13) complete including compacted
2.30 sand leveling bed , compacted aggregate subbase , subgrade preparation, etc., as indicated on
hardscape schedule, drawings and specification 02971. (On courtyard firepaths & parking
shoulders) m2 0
Synthetic Artificial Turf (PX1) complete including hydro compacted sand bed, compacted
2.31 aggregate subbase, reinforced in-situ concrete foundation, A252 mesh, blinding, subgrade
preparation, etc., as indicated on hardscape schedule, drawings and specification 02971. (On
Courtyards) m2 0
Total Carried to Section 2 Summary
2 DIVISION 2: LANDSCAPING
SEC 2 HARDSCAPE WORKS
Light duty pavement (Cont.)
Repair and fix Damaged Pavers and Kerbs caused by additional utility interfacing or damaged
caused by others (beyond the control of the contractor) including but not limited to re-use, supply
2.32 and installation of additional precast concrete/ stone paving tiles and kerbs of any sizes, bedding,
filling, compaction and disposal of surplus materials to authorized tipping area or as directed by
Engineer. m2 14,600
Gravel Finishes
Supply and placed decorative gravel including all other associated works, sand control measures,
etc., to complete.
Decorative gravel aggregates (G1) 150x250mm local natural limestone rubble/ boulders placed in
2.33 blinding and joints backfill with 150mm sand/cement as indicated on hardscape schedule, drawings
and specifications 02200. m² 0
2.34 Decorative gravel aggregates (G2) 15-50mm local natural limestone crushed aggregate mulch
minimum 100mm depth as indicated on hardscape schedule, drawings and specifications 02200. m² 8,540
43/47
PROJECT: South Dammam Housing Project. (131)
2.35 Decorative gravel aggregates (G3) 500-750mm diameter local natural limestone feature boulders as
indicated on hardscape schedule, drawings and specifications 02200. m² 0
Total Carried to Section 2 Summary
2 DIVISION 2: LANDSCAPING
SEC 2 HARDSCAPE WORKS
2.36 Large feature boulders (G5) 1000-2000mm diameter local natural limestone as indicated on
hardscape schedule, drawings and specifications 02200. m² 0
Feature Entrance Wall
Provide integral colored cast-in-place feature wall 4000 PSI with reinforcement per fabrication
2.37 engineer calculation, complete including all associated works with special finish and materials as
indicated on drawings and architectural specifications . m 0
Courtyard Screen Wall
Provide screen wall Type 1, 2 and 3 for the courtyard complete including all associated works, pre-
2.38 cast screen panel, precast concrete coping, concrete blocks, beams, footings, etc., as indicated on
drawings and specifications . m 0
Street Furnitures
Supply and fix street furnitures including all associated works necessary to complete in accordance
with the hardscape schedule, drawings and specification 02977.
Contractor to ensure courtyard furnishings (pergolas, benches, seat cubes, screen walls,
playgrounds, etc.) shall be of the same type for each individual courtyard. Overall the contractor
shall provide a minimum of 25% and a maximum of 50% of any one furniture type. Contractor to
ensure streetscape furnishings (trash receptacles, benches, seat cubes, bollards, screen walls etc.)
shall be of the same type along each section of Road. Section breaks shall be permitted at
intersection of Primary Roads only, with written approval of Site Landscape Architect. Overall the
contractor shall provide a minimum of 25% and a maximum of 50% of any one furniture type.
Total Carried to Section 2 Summary
2 DIVISION 2: LANDSCAPING
SEC 2 HARDSCAPE WORKS
Street Furnitures (Cont.)
Provide custom pre-cast concrete bench (F1) complete including all associated works, integral
2.39 color, sandblast finish, SS fixing pins, etc., as indicated on hardscape schedule, drawings and
specifications. nr 0
Provide custom pre-cast concrete seat cube (F2) complete including all associated works, integral
2.40 color, sandblast finish, direct burial, etc., as indicated on hardscape schedule, drawings and
specifications. nr 0
2.41 Provide custom pre-cast concrete litter bins (F3) complete including all associated works, integral
color, sandblast finish, etc., as indicated on hardscape schedule, drawings and specifications. nr 0
2.42 Provide custom pre-cast concrete bollards (F4) complete including all associated works, integral
color, sandblast finish, etc., as indicated on hardscape schedule, drawings and specifications. nr 968
Provide solid cast aluminum bicycle rack (F5) complete including all associated works, in-situ
2.43 concrete foundation/footing, fixing hardware, standard color/finish, per manufacturers instructions,
etc., as indicated on hardscape schedule, drawings and specifications. nr 0
Provide stainless steel marine grade lift out and lockable bollards (F6) complete including all
2.44 associated works, brushed satin finish, etc., as indicated on hardscape schedule, drawings and
specifications. (On courtyards CD roads) nr 0
Provide stainless steel landscape lighting (L1) 35 watt metal halide for entry feature wall
2.45 illumination, complete including all associated works, as indicated on hardscape schedule, drawings
and specifications. nr 0
Total Carried to Section 2 Summary
2 DIVISION 2: LANDSCAPING
SEC 2 HARDSCAPE WORKS
Street Furnitures (Cont.)
Provide stainless steel landscape lighting (L2) 100 watt metal halide for palm tree uplights,
2.46 complete including all associated works, as indicated on hardscape schedule, drawings and
specifications. nr 0
2.47 Provide stainless steel landscape lighting (L3) 3 x 1 watt LED pergola downlighters, complete
including all associated works, as indicated on hardscape schedule, drawings and specifications. nr 0
44/47
PROJECT: South Dammam Housing Project. (131)
Supply and installation of galvanized steel post and base street wayfinding signage with powder
coated finish per manufacturers standard RAL color chart. Signs are direct burial in concrete
2.55 foundation sized per fabricators/suppliers installation specifications. Sign box panel to be built-up
aluminum, traffic grade, reflective cut-out vinyl film graphics. All inclusive of flanges, locking
mechanishm, hardware to be galvanized and vandalproof. Signage to have minimum 5 year
warranty. nr 198
Supply and installation of courtyard pocket playground, complete if any including foundations,
triangle transfer platform, transfer system with barrier, ridge climber, toad stool climber, clover leaf
2.56 climber, schooner climber, bubble climber, single gizmo panel, click wheel assembly, bongos,
rumble and roll, free standing x-pod step, entry way, flower talk tube, shingle roof, sail roof,
stepping stones, storefront panel, F5 spiral slide w/ enclosure, fixing hardware, play sand, concrete
edger etc., as indicated in the drawings and specification. nr 0
Total Carried to Section 2 Summary
DIVISION 2: LANDSCAPING
SECTION 2 SUMMARY
HARDSCAPE WORKS
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
45/47
PROJECT: South Dammam Housing Project. (131)
Supply and install pressure compensating bubbler for palms including stake clamps - 227 LPH
and all accessories necessary to complete the works in accordance with specification and drawings.
2.73 Pressure compensating Bubbler 227L/H nr 0
Supply and install metal pedestal field decoder controller including all associated works to
complete in accordance with specification and drawings. Power supply shall be from nearest feeder
pillar.
2.74 Field Decoder controller on site nr 3
Total Carried to Section 3 Summary
46/47