1.2. Hungarian method


A cost matrix
c11 c21 : cn1 c12 c22 : cn2 c13 c1n c23 c2n : : cn3 cnn =C

For example: cij = is the wage paid to the ith worker for the jth task. We want to hire n workers to complete n tasks with minimun costs, i.e., we have to pick exactly one element from each row and from each column of the cost matrix C in such a way that the sum of these elements is as small as possible. Hungarian method: the algorithm 1. Subtract the entries of each row by the row minimum. => Each row has at least one zero => All entries are positive or zero. 2. Subtract the entries of each column by the column minimum. => Each row and each column has at least one zero. 3. Select rows and columns across which you draw lines, in such a way that all the zeros are covered and that no more lines have been drawn than necessary. 4. A test for optimality. (i) If the number of the lines is n, choose a combination from the modified cost matrix in such a way that the sum is zero. (ii) If the number of the lines is < n, go to 5. 5. Find the smallest element which is not covered by any of the lines. Then subtract it from each entry which is not covered by the lines and add it to each entry which is covered by a vertical and a horizontal line. Go back to 3. If we have, instead of a minimization problem, a maximization problem, multiply the matrix C by -1 and proceed as above. If C is not a square

matrix (there are more tasks than workers or conversely), we have to augmentC into a square matrix by adding zero rows or columns.

You might also like