The Assistant Engineer-II from the Rajasthan Rajya Vidhyut Prasaran Nigam Ltd. submitted tower schedules and ground profiles from 220 KV GSS Padampur Gantry to Location No. 75 SB+0 for a 220 KV transmission line to the Executive Engineer-II for recommendation and approval by the Superintending Engineer. The profiles covered 13 locations along the 23.13 KM transmission line and included tower schedules for consideration.
The Assistant Engineer-II from the Rajasthan Rajya Vidhyut Prasaran Nigam Ltd. submitted tower schedules and ground profiles from 220 KV GSS Padampur Gantry to Location No. 75 SB+0 for a 220 KV transmission line to the Executive Engineer-II for recommendation and approval by the Superintending Engineer. The profiles covered 13 locations along the 23.13 KM transmission line and included tower schedules for consideration.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
The Assistant Engineer-II from the Rajasthan Rajya Vidhyut Prasaran Nigam Ltd. submitted tower schedules and ground profiles from 220 KV GSS Padampur Gantry to Location No. 75 SB+0 for a 220 KV transmission line to the Executive Engineer-II for recommendation and approval by the Superintending Engineer. The profiles covered 13 locations along the 23.13 KM transmission line and included tower schedules for consideration.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOCX, PDF, TXT or read online from Scribd
OFFICE OF THE ASSISTANT ENGINEER-II(C&M TCC-IX) RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LTS. SRI GANGANAGAR No./RVPNL/AEN-II/C&M/TCC-IX/SGNR/F. D. Dt.
The Executive Engineer-II(C&M TCC-IX), RVPNL, Suratgarh.
Subject:- Approval of profile & tower schedules in reqpesct of 220 KV S/C Padampur-Udyogvihar Transmission Line from 220 KV GSS Padampur Gantry to Location No. 75 SB+0. As submitted by the firm M/s Moji Construction Company, Jaipur & duly checked by the undersigned kindly find enclosed here with the ground profile of 220 KV S/C Padampur-Udyogvihar Line from 220 KV GSS Padampur Gantry to Location No. 75 SB+0 for your kind recommendation & onward submission to The Superintending Engineer (TCC-IX), RVPNL, Bikaner for conveying the approval at an earliest date :1. Gantry to Location No. 1 DD+0 2. Location No. 1 DD+0 to Location No. 2 DD+0 3. Location No. 2 DD+0 to Location No. 11 DD+0 4. Location No. 11 DD+0 to Location No. 12 SD+0 5. Location No. 12 SD+0 to Location No. 20 SC+0 6. Location No. 20 SC+0 to Location No. 26 SB+0 7. Location No. 26 SB+0 to Location No. 29 SD+0 8. Location No. 29 SD+0 to Location No. 31 SB+0 9. Location No. 31 SB+0 to Location No. 36 SC+0 10. Location No. 36 SC+0 to Location No. 48 SB+0 11. Location No. 48 SB+0 to Location No. 58 SB+0 12. Location No. 58 SB+0 to Location No. 71 SC+0 13. Location No. 71 SC+0 to Location No. 75 SB+0 TOTAL 0.050 KM 0.300 KM 2.860 KM 0.320 KM 2.470 KM 1.880 KM 0.900 KM 0.460 KM 1.530 KM 3.800 KM 3.210 KM 4.030 KM 1.320 KM 23.13 KM
Submitted for further needful action please. Enclose :- Tower schedule four sets with profile.
ASSISTANT ENGINEER-II(C&M TCC-IX) RVPNL, SRI GANGANAGAR
Copy forwarded to M/s Moji Construction Company, Jaipur for information please.
ASSISTANT ENGINEER-II(C&M TCC-IX) RVPNL, SRI GANGANAGAR