SECTION 1
Preparation and checks to be carried out by Officer in Charge of cold work to be performed.
Yes
1 The equipment/pipeline has been prepared as follows :
Vented to atmosphere :
Drained :
Washed :
Purged :
2 The equipment/pipeline has been isolated as follows :
Lines Blanked :
Lines Disconnected :
Valves Closed :
Other : _______________________________________
3 Is equipment free from :
Oil :
Gas :
H2S :
Steam :
Pressure :
No
N/A
SECTION 2
Information and instructions to person carrying out cold work :
1 The following personal protection must be worn __________________________________________________
2 Equipment/pipeline contained following material in service _________________________________________
3 Equipment expected to contain the following hazardous material when opened _________________________
4 Special conditions / precautions ______________________________________________________________
In the circumstances noted it is considered safe to proceed with this cold work.
Signed : Master _______________________
SECTION 3
Cold work has been completed & all persons under my supervision, materials and equipment have been withdrawn.
Date ___________
THIS PERMIT IS RENDERED INVALID SHOULD ANY OF THE CONDITIONS NOTED IN THE CHECKLIST CHANGE
Note : This permit should be used for but not be limited to the following cold work:
A.OPENING UP FUEL OIL / DIESEL OIL / LUB OIL PIPELINES, VALVES AND FLANGES IN THE ENGINE ROOM
B.OPENING UP OF ANY PIPELINES, VALVES, FLANGES OR PUMPS IN HAZARDOUS AND DANGEROUS AREAS
SUCH AS PUMPROOMS, CARGO TANKS AND VOID SPACES
REV 2
Original : Master Pink Copy: Fleet Management Limited Yellow Copy: For display at Work area
Dec-05
DE-23C