You are on page 1of 1

CGW-P Installation and Operation Manual

Appendix A: Package
Contents
A.
When opening the package of your new CGW-P, the following equipment items must be
included:

Item Quantity
19” 3U rack 1
CPU card 1
PRI card 1
Cellular card 1 (or more)
Standard antennas (omni) 2 (or more)
RJ-45 cable (1 meter) 2
Power supply cable 1
Cabinet installation screws set 2
Installation CD 1
Modem (optional) 1

This list refers to the minimum necessary equipment.

These contents could vary depending on your specific order.

If the package is damaged or items are missing, contact your distributor.

You might also like