Professional Documents
Culture Documents
Background
According to a complaint from Shadharan Bima Tower, Representative (3S Network (BD) Ltd.) of RNO visited office on 11st October 2011 & 7th December 2011 and network scenario, findings and recommendation are accumulated in this report.
Findings (Post)
1. Poor Indoor RxLev, RxQual and SQI. 2. Sector mismatch observed in the site D48N39. 3. Adjacent BCCH between D48123C (68) and D48N39C (67). . 1. 2. 3. 4.
Recommendation (Pre)
Match the sectors of the site D48N39. Change the BCCH of D48123C (68) or D48N39C (67). Decrease the tilt of D48007B by 2 deg (from 6 to 4). Reorient cell D48123A by 10 deg (anticlockwise).
MapInfo view
Lat:23.755028N33N Long:90.37020833E
May 5, 2012
Indoor Plane
Level 1
N
May 5, 2012
Pre RxLev
Post RxLev
-65 to -10
-75 to -65
-85 to -75
-93 to -85
-110 to -93
Outdoor Rxlevel
May 5, 2012
Outdoor RxQual
0 to 4
4 to 6
6 to 8
Outdoor SQI
Pre SQI
20 to 30
10 to 20
-20 to 10
BCCh ARFCN
5/5/2012
10
Pre Investigation
May 5, 2012
11
Pre Investigation
May 5, 2012
12
Pre Investigation
May 5, 2012
13
Outdoor RxLev
Pre RxLev
Post RxLev
Pre D.T.
Post D.T.
May 5, 2012
15
Outdoor RxQual
Pre RxQual
Post RxQual
May 5, 2012
16
Outdoor SQI
Pre SQI
Post SQI
May 5, 2012 17
Pre Investigation
Post Investigation
May 5, 2012
18
Pre Investigation
Post Investigation
May 5, 2012
19
Pre Investigation
Post Investigation
May 5, 2012
20
Thank You