You are on page 1of 46

ISSN 0127-8568

SIARAN KHAS
Special Release

SEMENANJUNG MALAYSIA
PENINSULAR MALAYSIA

(UNTUK KERJA-KERJA KEJURUTERAAN AWAM)


(For Civil Engineering Works)

JUN
2011
JUNE

JABATAN PERANGKAAN MALAYSIA


DEPARTMENT OF STATISTICS, MALAYSIA

Tarikh:
Date:

15 Julai 2011
15th July 2011

KANDUNGAN
CONTENTS
Muka Surat
Page

Jadual 1

: Harga unit purata bagi bar keluli & simen

Table 1

: Average unit prices for steel bars & cement

Jadual 2

: Harga unit purata bagi bitumen, minyak bahan api & diesel

Table 2

: Average unit prices for bitumen, fuel oil & diesel

Jadual 3
Table 3

: Harga unit purata bagi :


: Average unit prices for :

-Pasir/Sand
-Batu baur/Aggregates
-Premix
-Fabric Reinforcement
-Guardrail
-Paip air/Water pipe
-Paip pembetungan/Sewerage pipe

Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air & paip pembetungan


Adjustment factor table for water pipe & sewerage pipe

31

39

Nota Teknikal
Technical Notes

JADUAL
TABLE

Jadual 1: Harga unit purata bagi bar keluli dan simen


Table 1: Average unit prices for steel bars and cement

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Tan Metrik


RM Per Metric Ton

(1) Bar Bulat Keluli Lembut BS-4449


Mild Steel Round Bars BS-4449
10mm (3/8")

Kawasan
Region
Tengah
Central

2010 Dis

2240.00

2225.00

2250.00

2011 Jan
Feb

2395.56
2451.39

2281.63
2291.63

2242.86
2600.00

Mac

2503.50

2430.11

2698.29

Apr

2489.00

2437.14

2676.50

Mei

2463.50

2390.50

2676.50

Jun
Jul

2467.50

2429.17

2701.50

Ogo
Sep
Okt
Nov
Dis
12mm (1/2")

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

2240.00
2396.00
2468.06
2486.50
2489.00
2473.00
2467.50

2225.00
2280.84
2341.25
2458.89
2436.19
2404.29
2433.57

2250.00
2242.86
2621.43
2707.29
2685.50
2685.50
2710.50

16mm (5/8")

2010 Dis

2140.00

2125.00

2153.33

2011 Jan
Feb
Mac
Apr

2317.78
2376.11
2417.50
2385.00

2209.17
2209.17
2355.95
2356.67

2170.00
2475.00
2592.50
2592.50

Mei
Jun
Jul

2341.50
2361.00

2315.83
2330.83

2592.50
2617.50

Ogo
Sep
Okt
Nov
Dis

-1 -

Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(1) Bar Bulat Keluli Lembut BS-4449 (Samb.)


Mild Steel Round Bars BS-4449 (Cont'd.)
20mm25mm
(3/4"1")

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton

2010 Dis
2011 Jan

2206.67
2306.74

2191.67
2256.39

2220.00
2150.70

Feb

2364.03

2248.06

2409.03

Mac

2416.46

2362.26

2409.03

Apr
Mei
Jun

2402.04
2396.04
2395.97

2381.94
2339.78
2344.78

2424.31
2436.67
2486.67

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

2206.67
2235.00
2285.00
2341.25
2341.25
2327.50
2322.50

2191.67
2275.83
2275.83
2347.50
2378.33
2340.33
2340.33

2220.00
2141.67
2391.67
2391.67
2408.33
2408.33
2458.33

2010 Dis
2011 Jan
Feb
Mac

2240.00
2395.56
2405.56
2515.00

2233.33
2314.17
2378.75
2509.29

2253.33
2243.75
2631.25
2715.25

Apr
Mei

2489.00
2473.00

2505.54
2505.54

2664.50
2684.50

Jun

2464.50

2503.75

2709.50

Jul
Ogo
Sep
Okt
Nov
Dis
32mm (1 1/4")

(2) Mycon 60
High Tensile Deformed Bars
10mm (3/6")

Jul
Ogo
Sep
Okt
Nov
Dis

-2 -

Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Tan Metrik


RM Per Metric Ton

(2) Mycon 60 (Samb.)


High Tensile Deformed Bars (Cont'd.)
12mm (1/2")

Kawasan
Region
Tengah
Central

2010 Dis

2240.00

2225.00

2253.33

2011 Jan
Feb

2395.56
2405.56

2297.50
2374.59

2231.25
2618.75

Mac

2498.00

2393.21

2711.75

Apr

2489.00

2501.96

2674.00

Mei
Jun

2473.00
2464.50

2484.58
2499.58

2694.00
2719.00

2010 Dis
2011 Jan
Feb

2140.00
2297.80
2300.58

2125.00
2205.83
2269.72

2153.33
2164.58
2446.53

Mac
Apr
Mei

2383.60
2359.50
2338.94

2379.82
2381.79
2330.42

2485.69
2458.92
2523.36

Jun
Jul
Ogo
Sep
Okt
Nov
Dis

2341.81

2357.92

2556.69

2010 Dis
2011 Jan

2140.00
2322.00

2125.00
2208.00

2153.33
2137.50

Feb
Mac
Apr

2322.00
2402.00
2327.00

2258.00
2353.75
2360.00

2387.50
2387.50
2387.50

Mei
Jun
Jul

2327.50
2293.33

2303.25
2330.75

2387.50
2437.50

Jul
Ogo
Sep
Okt
Nov
Dis
16mm25mm
(5/8"1")

32mm (1 1/4")

Ogo
Sep
Okt
Nov
Dis

-3 -

Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(3) Simen
Cement
Portland Biasa
BS 12
Ordinary Portland
BS 12

Kawasan
Region
Tengah
Central

Timur
East

RM Sekarung 50 Kg
RM Per 50 Kg Bag
2010 Dis
2011 Jan

14.40
15.53

14.73
16.03

15.14
15.86

Feb
Mac

15.61
16.16

16.03
16.19

15.86
15.88

Apr
Mei

16.65
16.63

16.60
16.69

16.14
16.18

Jun

16.63

16.74

16.18

Jul
Ogo
Sep
Okt
Nov
Dis

-4 -

Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel
Table 2: Average unit prices for bitumen, fuel oil and diesel
Perkara
Item

Tempoh
Period

Semenanjung Malaysia
Peninsular Malaysia
RM Seliter
RM Per Litre

(1) Minyak Bahan Api


Fuel Oil

Sederhana
Medium

2010 Dis
2011 Jan
Feb
Mac
Apr

1.73
1.84
2.06
2.16
2.25
2.15
2.19

Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

(2) Bitumen Penembusan 80/100


Bitumen 80/100 Penetration

RM Per Tan Metrik


RM Per Metric Ton

2010 Dis
2011 Jan
Feb

1600.00
1600.00
1650.00

Mac
Apr
Mei

1850.00
1826.00
1950.00
1950.00

Jun
Jul
Ogo
Sep
Okt
Nov
Dis

Harga Bitumen Penembusan 80/100 adalah berdasarkan harga purata ex-Port Klang.
The price for Bitumen 80/100 Penetration is based on average ex-Port Klang.

-5-

Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel (samb.)
Table 2: Average unit prices for bitumen, fuel oil and diesel (cont'd.)
Perkara
Item

Tempoh
Period

Semenanjung Malaysia
Peninsular Malaysia

RM Seliter
RM Per Litre

(3) Minyak Gas Automotif


Automotive Gas Oil

Diesel
Diesel

2010 Jan
Feb
Mac
Apr
Mei
Jun
Jul

(115 Julai)
(1631 Julai)

Ogo
Sep
Okt
Nov
Dis (13 Disember)
(431 Disember)

2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
Harga diesel adalah ex-Kuala Lumpur.
The price for diesel is ex-Kuala Lumpur.
* Harga runcit ialah harga selepas ditolak subsidi kerajaan.
Retail price is the price less government subsidy.

-6-

Runcit*
Retail

Sebenar
Actual

1.700
1.700
1.700
1.700
1.700
1.700
1.700
1.750
1.750
1.750
1.750
1.750
1.750
1.800

2.455
2.421
2.496
2.571
2.462
2.430
2.379
2.379
2.387
2.358
2.468
2.558
2.690
2.690

1.800
1.800
1.800
1.800
1.800
1.800

2.749
2.923
3.184
3.309
3.085
3.083

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe

Perkara
Item

Tempoh
Period

Utara
North

Kawasan
Region
Tengah
Central
RM Per Tan Metrik
RM Per Metric Ton

Timur
East

36.80
36.10
36.20
36.20
36.72
36.44
40.08

32.60
32.60
32.60
32.60
32.61
32.66
39.11

20.80
20.80
20.81
20.80
21.21
21.21
20.52

35.40
35.40
35.40
35.40
35.37
35.37
31.33

38.10
38.10
38.10
38.20
38.19
38.19
44.14

29.30
29.30
29.30
29.30
29.25
29.25
29.25

30.00
30.00
30.20
30.20
30.17
30.17
30.00

25.20
25.40
25.50
25.50
25.45
25.50
27.39

24.50
24.90
24.90
24.90
24.88
24.88
30.19

(1) Pasir
Sand
Pasir Sungai
River Sand

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

Pasir Lombong
Mining Sand

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

(2) Batu Baur


Aggregates
Granite
10mm (3/8")
Granite
10mm (3/8")

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.

-7-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(2) Batu Baur (Samb.)


Aggregates (Cont'd.)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton

Granite
20mm (3/4")
Granite
20mm (3/4")

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

28.00
28.00
28.00
28.00
28.03
28.03
31.50

24.40
25.40
25.70
25.70
25.82
25.90
25.52

27.30
27.30
27.30
27.30
27.27
27.27
26.85

Granite
40mm (1 1/2")
Granite
40mm (1 1/2")

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

30.40
30.40
30.40
30.40
30.40
30.40
27.20

25.30
25.30
25.40
25.30
25.14
25.25
25.82

23.80
23.80
23.80
23.80
23.75
23.75
23.75

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

24.30
24.30
24.40
24.40
24.44
24.44
24.00

20.90
21.10
21.10
21.10
21.02
21.03
20.62

16.50
16.00
16.00
16.00
16.20
16.20
20.92

Crushed Aggregate (Crusher Run)


Crushed Aggregate (Crusher Run)
Crusher Run
Crusher Run

-8-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(3) Premix Asphaltic Concrete


Premix Asphaltic Concrete
AC 10 (Wearing Course)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep

155.80
154.80
154.80
154.80
154.80
155.80
156.50

158.10
160.20
161.80
164.00
163.14
169.61
160.03

175.00
177.50
180.00
180.00
180.00
192.00
202.00

Okt
Nov
Dis
AC 14 (Wearing Course)

2010 Dis

153.80

157.30

166.90

2011 Jan

153.00

159.30

165.80

Feb

152.20

162.10

167.10

Mac

152.20

162.40

167.10

Apr

152.17

161.92

167.00

Mei

153.83

169.59

175.88

Jun

153.83

165.51

180.88

2010 Dis

151.70

156.90

164.70

2011 Jan
Feb
Mac
Apr

150.80
149.70
149.70
149.67

156.50
159.90
160.40
161.21

163.10
164.30
164.30
162.58

Mei

151.33

161.93

169.83

Jun

152.00

159.37

174.83

Jul
Ogo
Sep
Okt
Nov
Dis
AC 28 (Binder Course)

Jul
Ogo
Sep
Okt
Nov
Dis

-9-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(3) Premix Asphaltic Concrete (Samb.)


Premix Asphaltic Concrete (Cont'd.)
ACW 20 (Wearing Course)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton
2010 Dis

155.20

156.70

2011 Jan

154.20

157.80

165.30

Feb

153.20

158.90

166.60

Mac

153.20

159.50

166.60

Apr

153.20

160.23

166.58

Mei

155.20

165.46

173.08

Jun

154.33

161.00

188.10

Jul
Ogo
Sep
Okt
Nov
Dis

-10-

164.70

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Tan Metrik


RM Per Metric Ton

(3) Premix Bituminous Macadam


Premix Bituminous Macadam
BMR40 (Bound Roadbase)

Kawasan
Region
Tengah
Central

2010 Dis
2011 Jan

151.00
148.50

144.70
146.20

144.00
144.00

Feb
Mac

148.50
148.50

146.20
146.40

144.00
144.00

Apr

148.50

146.43

144.00

Mei
Jun
Jul
Ogo
Sep

151.00
151.00

150.43
154.00

144.00
144.00

152.50
150.00
150.00
150.00
150.00
152.50
152.50

150.60
152.10
152.10
152.30
152.34
156.34
152.20

153.00
153.00
153.00
153.00
153.00
153.00
153.00

2010 Dis
2011 Jan
Feb

154.50
152.00
152.00

163.70
165.70
165.70

158.00
163.00
163.00

Mac
Apr
Mei
Jun

152.00
152.00
154.50
154.50

166.00
166.00
171.33
162.25

163.00
155.00
172.00
172.00

Okt
Nov
Dis
BMR28 (Bound Roadbase)

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

BML10 (Levelling Course)

Jul
Ogo
Sep
Okt
Nov
Dis

-11-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Tan Metrik


RM Per Metric Ton

(3) Premix Bituminous Macadam (Samb.)


Premix Bituminous Macadam (Cont'd.)
BMB28 (Binder Course)

Kawasan
Region
Tengah
Central

2010 Dis

150.30

158.70

147.50

2011 Jan
Feb

148.70
146.30

160.70
160.70

150.00
150.00

Mac

146.30

161.00

150.00

Apr
Mei

146.33
149.67

161.00
166.33

147.50
154.00

Jun
Jul
Ogo
Sep

150.00

150.29

168.00

152.00
150.30
150.30
150.30
150.33
152.00
152.00

154.20
155.20
155.20
155.40
155.37
158.04
145.20

167.50
170.00
170.00
170.00
167.50
179.00
182.67

2010 Dis
2011 Jan
Feb
Mac
Apr

154.70
154.70
153.00
153.00
153.00

153.70
154.50
154.50
154.70
155.38

168.50
171.00
171.00
171.00
167.50

Mei
Jun

154.67
154.67

159.81
154.88

180.00
183.33

Okt
Nov
Dis
BMB20 (Binder Course)

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

BMW14 (Wearing Course)

Jul
Ogo
Sep
Okt
Nov
Dis

-12-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(3) Premix Bituminous Macadam (Samb.)


Premix Bituminous Macadam (Cont'd.)
BMW20 (Wearing Course)

Kawasan
Region
Tengah
Central

Timur
East

RM Per Tan Metrik


RM Per Metric Ton
2010 Dis
2011 Jan
Feb

154.50
152.00
152.00

149.20
150.20
150.20

160.70
162.30
162.30

Mac

152.00

150.40

162.30

Apr
Mei

152.00
154.50

151.21
156.38

160.00
168.33

Jun

154.50

152.11

175.00

Jul
Ogo
Sep
Okt
Nov
Dis

-13-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement


Fabric Reinforcement
A4, MS145

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg
2010 Dis
2011 Jan
Feb

3.02
2.56
2.56

3.08
2.97
2.97

3.30
3.16
3.22

Mac

2.79

2.97

3.22

Apr
Mei
Jun

2.68
2.60
2.60

2.97
3.04
3.04

3.22
3.37
3.37

3.00
2.56
2.56
2.79
2.68
2.60
2.60

3.05
2.94
2.94
2.94
2.94
3.01
3.01

3.27
3.13
3.20
3.20
3.19
3.34
3.34

2010 Dis
2011 Jan
Feb

2.69
2.30
2.30

2.74
2.44
2.44

2.94
2.81
2.87

Mac
Apr
Mei

2.50
2.40
2.33

2.44
2.44
2.48

2.87
2.86
3.00

Jun

2.33

2.52

3.00

Jul
Ogo
Sep
Okt
Nov
Dis
A5, MS145

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

A6, MS145

Jul
Ogo
Sep
Okt
Nov
Dis

-14-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (Samb.)


Fabric Reinforcement (Cont'd.)
A7, MS145

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg
2010 Dis
2011 Jan

2.69
2.29

2.74
2.44

2.94
2.81

Feb
Mac

2.29
2.50

2.44
2.44

2.87
2.87

Apr

2.39

2.44

2.86

Mei
Jun

2.33
2.33

2.44
2.48

3.00
3.00

2.69
2.30
2.30
2.50
2.40
2.34
2.34

2.74
2.45
2.45
2.45
2.45
2.44
2.48

2.94
2.81
2.87
2.87
2.86
3.00
3.00

2010 Dis
2011 Jan

2.69
2.29

2.74
2.44

2.94
2.81

Feb
Mac
Apr

2.29
2.49
2.39

2.44
2.44
2.44

2.87
2.87
2.86

Mei
Jun

2.33
2.33

2.48
2.52

3.00
3.00

Jul
Ogo
Sep
Okt
Nov
Dis
A8, MS145

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

A9, MS145

Jul
Ogo
Sep
Okt
Nov
Dis

-15-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Kg
RM Per Kg

(4) Fabric Reinforcement (Samb.)


Fabric Reinforcement (Cont'd.)
A10, MS145

Kawasan
Region
Tengah
Central

2010 Dis
2011 Jan
Feb

2.69
2.30
2.30

2.74
2.44
2.44

2.93
2.81
2.87

Mac
Apr

2.50
2.40

2.44
2.44

2.87
2.86

Mei

2.33

2.46

3.00

Jun
Jul
Ogo
Sep
Okt

2.33

2.50

3.00

Nov
Dis
B5, MS145

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

2.99
2.67
2.67
3.10
3.00
2.74
2.74

3.04
2.93
2.93
2.93
2.93
3.04
3.04

3.26
3.12
3.19
3.19
3.18
3.33
3.33

B6, MS145

2010 Dis
2011 Jan
Feb

2.69
2.50
2.50

2.74
2.61
2.61

2.94
2.81
2.87

Mac
Apr
Mei
Jun

2.91
2.70
2.57
2.57

2.61
2.61
2.71
2.71

2.87
2.86
3.00
3.00

Jul
Ogo
Sep
Okt
Nov
Dis

-16-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Kg
RM Per Kg

(4) Fabric Reinforcement (Samb.)


Fabric Reinforcement (Cont'd.)
B7, MS145

Kawasan
Region
Tengah
Central

2010 Dis
2011 Jan

2.69
2.50

2.74
2.63

2.94
2.81

Feb
Mac

2.50
2.90

2.63
2.63

2.87
2.87

Apr

2.70

2.63

2.86

Mei
Jun

2.57
2.57

2.74
2.74

3.00
3.00

2.69
2.50
2.50
2.91
2.72
2.57
2.57

2.74
2.64
2.64
2.64
2.64
2.74
2.74

2.94
2.81
2.87
2.87
2.86
3.00
3.00

2010 Dis
2011 Jan
Feb

2.69
2.50
2.50

2.74
2.64
2.64

2.94
2.81
2.87

Mac
Apr
Mei
Jun

2.91
2.70
2.57
2.57

2.64
2.64
2.74
2.74

2.87
2.86
3.00
3.00

Jul
Ogo
Sep
Okt
Nov
Dis
B8, MS145

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

B9, MS145

Jul
Ogo
Sep
Okt
Nov
Dis

-17-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Kg
RM Per Kg

(4) Fabric Reinforcement (Samb.)


Fabric Reinforcement (Cont'd.)
B10, MS145

Kawasan
Region
Tengah
Central

2010 Dis

2.68

2.73

2.93

2011 Jan

2.50

2.63

2.80

Feb
Mac

2.50
2.90

2.63
2.63

2.86
2.86

Apr

2.70

2.63

2.85

Mei

2.56

2.73

2.99

Jun
Jul
Ogo
Sep

2.56

2.73

2.99

2.97
2.76
2.76
3.21
2.99
2.84
2.84

3.02
2.88
2.88
2.88
2.88
3.00
3.00

3.25
3.10
3.17
3.17
3.16
3.31
3.31

2010 Dis
2011 Jan
Feb

2.99
2.78
2.78

3.04
2.82
2.82

3.27
3.12
3.19

Mac
Apr
Mei

3.23
3.01
2.85

2.82
2.82
2.93

3.19
3.18
3.33

Jun

2.85

2.93

3.33

Okt
Nov
Dis
B12, MS145

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

C5, MS145

Jul
Ogo
Sep
Okt
Nov
Dis

-18-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Kg
RM Per Kg

(4) Fabric Reinforcement (Samb.)


Fabric Reinforcement (Cont'd.)
C6, MS145

Kawasan
Region
Tengah
Central

2010 Dis
2011 Jan

2.99
2.78

3.04
2.81

3.26
3.12

Feb
Mac

2.78
3.23

2.81
2.81

3.19
3.19

Apr

3.00

2.81

3.18

Mei
Jun

2.85
2.85

2.93
2.93

3.33
3.33

Jul
Ogo
Sep
Okt
Nov
Dis
C7, MS145

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

2.99
2.78
2.78
3.23
3.00
2.85
2.85

3.04
2.93
2.93
2.93
2.93
3.04
3.04

3.26
3.12
3.19
3.19
3.18
3.33
3.33

C8, MS145

2010 Dis
2011 Jan

2.98
2.77

3.03
3.00

3.25
3.11

Feb
Mac
Apr

2.77
3.22
3.00

3.00
3.00
3.00

3.18
3.18
3.17

Mei
Jun
Jul

2.85
2.85

3.11
3.11

3.32
3.32

Ogo
Sep
Okt
Nov
Dis

-19-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(4) Fabric Reinforcement (Samb.)


Fabric Reinforcement (Cont'd.)
C9, MS145

Kawasan
Region
Tengah
Central

Timur
East

RM Per Kg
RM Per Kg
2010 Dis

2.98

3.04

3.26

2011 Jan
Feb
Mac

2.77
2.77
3.22

2.92
2.92
2.92

3.12
3.18
3.18

Apr

3.00

2.92

3.17

Mei
Jun

2.85
2.85

3.04
3.04

3.33
3.33

Jul
Ogo
Sep
Okt
Nov
Dis
C10, MS145

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

2.98
2.78
2.78
3.23
3.00
2.85
2.85

3.04
2.93
2.93
2.93
2.93
3.04
3.04

3.26
3.12
3.18
3.18
3.17
3.33
3.33

DA4, MS145

2010 Dis

3.01

3.07

3.29

2011 Jan
Feb
Mac

2.80
2.80
3.26

2.95
2.95
2.95

3.15
3.21
3.21

Apr
Mei
Jun
Jul

3.03
2.88
2.88

2.95
3.07
3.07

3.20
3.36
3.36

Ogo
Sep
Okt
Nov
Dis

-20-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Kg
RM Per Kg

(4) Fabric Reinforcement (Samb.)


Fabric Reinforcement (Cont'd.)
DA5, MS145

Kawasan
Region
Tengah
Central

2010 Dis
2011 Jan
Feb

3.00
2.79
2.79

3.05
2.94
2.94

3.27
3.13
3.20

Mac

3.24

2.94

3.20

Apr
Mei
Jun

3.01
2.86
2.86

2.94
3.05
3.05

3.19
3.34
3.34

Jul
Ogo
Sep
Okt
Nov
Dis
DA6, MS145

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

2.69
2.50
2.50
2.91
2.70
2.57
2.57

2.74
2.62
2.62
2.62
2.62
2.72
2.72

2.94
2.81
2.87
2.87
2.86
3.00
3.00

DA7, MS145

2010 Dis
2011 Jan
Feb

2.69
2.50
2.50

2.74
2.57
2.57

2.94
2.81
2.87

Mac
Apr
Mei
Jun

2.90
2.70
2.57
2.57

2.57
2.57
2.74
2.74

2.87
2.86
3.00
3.00

Jul
Ogo
Sep
Okt
Nov
Dis

-21-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Timur
East

RM Per Kg
RM Per Kg

(4) Fabric Reinforcement (Samb.)


Fabric Reinforcement (Cont'd.)
DA8, MS145

Kawasan
Region
Tengah
Central

2010 Dis
2011 Jan

2.69
2.97

2.74
2.64

2.94
2.81

Feb
Mac

2.97
2.91

2.64
2.64

2.87
2.87

Apr

2.70

2.64

2.86

Mei
Jun

3.05
3.05

2.59
2.59

3.00
3.00

2.69
2.50
2.50
2.90
2.70
2.57
2.57

2.74
2.63
2.63
2.63
2.63
2.54
2.54

2.93
2.81
2.87
2.87
2.86
3.00
3.00

2010 Dis
2011 Jan

2.68
2.50

2.72
2.63

2.92
2.80

Feb
Mac
Apr

2.50
2.90
2.70

2.63
2.63
2.63

2.85
2.85
2.84

Mei
Jun

2.57
2.57

2.73
2.73

2.98
2.98

Jul
Ogo
Sep
Okt
Nov
Dis
DA9, MS145

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

DA10, MS145

Jul
Ogo
Sep
Okt
Nov
Dis

-22-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

(5) Guardrail
Guardrail
Single Mounted
i) 1.95m Post Spacing

Kawasan
Region
Tengah
Central

Timur
East

RM Per Meter
RM Per Metre
2010 Dis
2011 Jan
Feb

166.84
156.82
156.82

168.48
158.37
158.37

171.26
160.98
160.98

Mac

156.82

158.37

160.98

Apr

156.82

158.37

160.98

Mei
Jun

156.82
156.82

158.37
158.37

160.98
160.98

116.14
109.17
109.17
109.17
109.17
109.17
109.17

117.38
110.34
110.34
110.34
110.34
110.34
110.34

119.31
112.15
112.15
112.15
112.15
112.15
112.15

Jul
Ogo
Sep
Okt
Nov
Dis
ii) 3.80m Post Spacing

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.

-23-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

Utara
North

Kawasan
Region
Tengah
Central

Timur
East

RM Per Meter
RM Per Metre

(5) Guardrail (Samb.)


Guardrail (Cont'd.)
Double Mounted

2010 Dis

250.99

253.37

257.56

i) 1.95m Post Spacing

2011 Jan

235.93

238.16

242.11

Feb
Mac

235.93
235.93

238.16
238.16

242.11
242.11

Apr
Mei
Jun

235.93
235.93
235.93

238.16
238.16
238.16

242.11
242.11
242.11

190.99
182.03
182.03
182.03
182.03
182.03
182.03

193.09
181.50
181.50
181.50
181.50
181.50
181.50

195.98
184.22
184.22
184.22
184.22
184.22
184.22

Jul
Ogo
Sep
Okt
Nov
Dis
ii) 3.80m Post Spacing

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

-24-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

(6a) Paip Air


Water Pipe

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

Mild Steel Pipe


300mm

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

203.00
206.00
208.00
216.00
216.00
216.00
216.00

Stainless Steel Pipe


25mm

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

30.00
32.00
34.00
34.00
34.00
33.00
33.00

Ductile Iron Pipe


300mm

2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

216.00
216.00
280.00
230.00
232.00
232.00

Harga bagi paip air dan paip pembetungan adalah harga di kilang.
The prices for water pipe and sewerage pipe are ex-factory prices.

-25-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

(6a) Paip Air (Samb.)


Water Pipe (Cont'd.)

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

High Density Polyethylene


(HDPE) Pipe
i. Compression Fitting Using
For Jointing
25mm

2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

1.41
1.43
1.46
1.47
1.47
1.33

ii. Electrofusion Jointing


160mm

2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

68.86
69.55
70.86
71.20
71.20
65.62

iii. Butt Fussion


160mm

2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

54.19
54.88
56.18
56.53
56.53
50.95

-26-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

(6b) Paip Pembetungan (Samb.)


Sewerage Pipe (Cont'd.)

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

Mild Steel Pipe


300mm

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

265.65
277.00
277.00
277.00
233.30
233.30
233.30

Ductile Iron Pipe


250mm

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

305.00
305.00
305.00
221.00
183.30
185.00
185.00

2010 Dis
2011 Jan

17.90
17.90

High Density Polyethylene


(HDPE) Pipe
i. Profile Pipe
150mm

Feb

17.90

Mac
Apr

16.50
16.50

Mei
Jun

16.50
16.50

Jul
Ogo
Sep
Okt
Nov
Dis
R = Kemaskini/Revised

-27-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

(6b) Paip Pembetungan (Samb.)


Sewerage Pipe (Cont'd.)

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

High Density Polyethylene


(HDPE) Pipe
ii. Solid Pipe
250mm

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

60.17
60.17
60.17
60.35
61.70
61.70
61.70

Vitrified Clay Pipe


i. Standard Pipe
225mm

2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun

118.00
89.00
89.00
89.00
50.15
50.15
57.80

Jul
Ogo
Sep
Okt
Nov
Dis
ii. Jacking Pipe
225mm

2010 Dis

330.00

2011 Jan
Feb
Mac

248.00
248.00
248.00

Apr
Mei
Jun
Jul
Ogo

238.00
238.00
302.00

Sep
Okt
Nov
Dis

-28-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

RM Per Meter
RM Per Metre

(6b) Paip Pembetungan (Samb.)


Sewerage Pipe (Cont'd.)
Reinforced Concrete Pipe
i. Without Lining
900mm

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia

2010 Dis
2011 Jan

108.00
108.00

Feb
Mac

108.00
108.00

Apr

174.75

Mei
Jun

174.75
176.50

Jul
Ogo
Sep
Okt
Nov
Dis
ii. With Lining (High Alumina)
900mm

iii. With Lining (Sacrificial Lining)


900mm

2010 Dis
2011 Jan

108.00
108.00

Feb

108.00

Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis

108.00
227.90
227.90
230.20

2010 Dis
2011 Jan
Feb

108.00
108.00
108.00

Mac
Apr
Mei

108.00
201.35
201.35

Jun
Jul
Ogo
Sep

203.40

Okt
Nov
Dis

-29-

Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)

Perkara
Item

Tempoh
Period

(6b) Paip Pembetungan (Samb.)


Sewerage Pipe (Cont'd.)

Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre

ABS Pipe

2010 Dis

29.31

i. Gravity
110mm

2011 Jan
Feb

29.31
29.31

Mac
Apr
Mei

29.31
28.92
28.92

Jun

28.92

Jul
Ogo
Sep
Okt
Nov
Dis
ii. Force Main
225mm

2010 Dis
2011 Jan
Feb

82.76
82.76
82.76

Mac
Apr
Mei
Jun

82.76
81.65
81.65
81.65

Jul
Ogo
Sep
Okt
Nov
Dis

-30-

LAMPIRAN
APPENDIX

Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe

Faktor pelarasan
Adjustment factor

Paip air
Water pipe
1. Mild Steel Pipe
100 mm
150 "
200 "
250 "
300 "
350 "
400 "
450 "
500 "
600 "
700 "
750 "
800 "
900 "
1000 "
1100 "
1150 "
1200 "
1300 "
1400 "
1500 "
1600 "
1700 "
1800 "
1900 "
2000 "
2100 "
2200 "

0.25
0.36
0.47
0.59
1.00
1.16
1.32
1.48
1.63
2.18
2.80
2.99
3.18
3.56
4.25
5.53
5.83
6.40
7.60
8.16
10.32
10.98
11.64
12.30
12.96
14.74
16.01
17.33

2. Stainless Steel Pipe


13 mm (1/2")
20 " (3/4")
25 " (1")
32 " (1 1 4 ")
38 " (1 1 2 ")
50 " (2")
63 " (2 1 2 ")
75 " (3")
100 " (4")

0.53
0.69
1.00
1.34
1.59
2.14
3.42
4.66
6.72

-31 -

Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe

Faktor pelarasan
Adjustment factor

Paip air
Water pipe
3. Ductile Iron Pipe
100 mm
150 "
200 "
250 "
300 "
350 "
400 "
450 "
500 "
600 "
700 "

0.35
0.45
0.60
0.79
1.00
1.25
1.50
1.78
2.05
2.70
3.50

4. High Density Polyethylene (HDPE) Pipe


i.

Compression Fitting Using For


Jointing
20
25
32
40
50
63
75
90

ii.

mm
"
"
"
"
"
"
"

0.69
1.00
1.63
2.59
3.93
6.18
8.83
12.68

Electrofusion Jointing
110
125
140
160
180
200
225
250
280
315
355
400
450
500
560

mm
"
"
"
"
"
"
"
"
"
"
"
"
"
"

0.48
0.63
0.80
1.00
1.30
1.54
1.96
2.46
3.27
3.97
6.29
7.80
12.98
17.76
21.02

-32 -

Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe

Faktor pelarasan
Adjustment factor

Paip air
Water pipe
iii.

Butt Fussion
110
125
140
160
180
200
225
250
280
315
355
400
450
500
560

mm
"
"
"
"
"
"
"
"
"
"
"
"
"
"

0.48
0.62
0.76
1.00
1.25
1.56
1.94
2.38
2.97
3.76
4.79
6.06
7.90
7.90
12.61

-33 -

Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe

Faktor pelarasan
Adjustment factor

Paip pembetungan
Sewerage pipe
1. Mild Steel Pipe
100 mm
125 "
150 "
200 "
250 "
300 "
350 "
400 "
450 "
500 "
550 "
600 "
650 "
700 "
750 "
800 "
850 "
900 "
950 "
1000 "
1200 "
1400 "
1600 "
1800 "
2000 "
2100 "
2200 "

0.40
0.50
0.59
0.79
0.99
1.00
1.38
1.58
1.78
1.98
2.20
2.37
2.50
2.77
2.96
3.16
3.40
3.56
3.80
3.95
4.74
5.53
6.32
7.11
7.91
8.30
8.70

2. Ductile Iron Pipe


80 mm
100 "
150 "
200 "
250 "
300 "
350 "
400 "
450 "
500 "
600 "
700 "
800 "
1000 "
1200 "

0.35
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.40
2.80
3.20
3.40
3.60

-34 -

Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe

Faktor pelarasan
Adjustment factor

Paip pembetungan
Sewerage pipe
i.

HDPE (Profile) Pipe


100 mm
125 "
150 "
200 "
250 "
300 "
350 "
400 "
450 "
500 "
550 "
600 "
650 "
700 "
750 "
800 "
850 "
900 "
950 "
1000 "
1200 "
1400 "
1600 "
1800 "
2000 "
2100 "
2200 "

ii.

0.64
0.80
1.00
1.73
1.28
4.10
7.50
10.55
12.00
17.00
19.31
19.32
19.50
20.25
21.27
25.60
31.07
35.00
38.19
54.82
74.00
94.00
123.23
165.00
207.35
300.00
400.00

HDPE (Solid) Pipe


100 mm
125 "
150 "
200 "
250 "
300 "
350 "
400 "
450 "
500 "
550 "
600 "
650 "
700 "
750 mm

0.20
0.25
0.50
0.65
1.00
1.50
2.00
2.69
3.51
4.48
5.50
6.00
7.50
8.50
10.00

-35 -

Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe

Faktor pelarasan
Adjustment factor

Paip pembetungan
Sewerage pipe
800
850
900
950
1000
1200
1400
1600
1800
2000
2100
2200

"
"
"
"
"
"
"
"
"
"
"
"

11.75
15.00
16.50
18.00
20.40
24.00
26.00
32.00
36.00
38.00
42.00
45.00

4. Vitrified Clay Pipe


i.

Vitrified Clay (Standard) Pipe


100 mm
150 "
200 "
225 "
300 "
375 "
400 "
450 "
500 "
600 "
700 "
800 "

ii.

0.40
0.52
0.84
1.00
2.37
4.24
4.95
5.63
7.96
11.78
14.33
14.50

Vitrified Clay (Jacking) Pipe


100 mm
150 "
200 "
225 "
300 "
375 "
400 "
450 "
500 "
600 "
700 "
800 "

0.80
0.85
0.90
1.00
1.60
1.87
2.17
2.60
3.22
3.75
4.15
4.65

-36 -

Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe

Faktor pelarasan
Adjustment factor

Paip pembetungan
Sewerage pipe
5. Reinforced Concrete Pipe (RCP)
i.

Without Lining
375 mm
450 "
600 "
750 "
900 "
1050 "
1200 "
1350 "
1500 "
1650 "
1800 "

ii.

0.26
0.31
0.47
0.69
1.00
1.33
1.56
1.97
2.44
2.80
3.59

With Lining (High Alumina)


375 mm
450 "
600 "
750 "
900 "
1050 "
1200 "
1350 "
1500 "
1650 "
1800 "

iii.

0.26
0.31
0.47
0.69
1.00
1.33
1.56
1.97
2.44
2.80
3.59

With Lining (Sacrificial Lining)


375 mm
450 "
600 "
750 "
900 "
1050 "
1200 "
1350 "
1500 "
1650 "
1800 "

0.26
0.31
0.47
0.69
1.00
1.33
1.56
1.97
2.44
2.80
3.59

-37 -

Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe
Kategori dan saiz paip
Category and size of pipe

Faktor pelarasan
Adjustment factor

Paip pembetungan
Sewerage pipe
6. ABS Pipe
i.

Gravity
90 mm
110 "
150 "
225 "
315 "

ii.

0.67
1.00
2.07
3.64
7.10

Force Main
15 mm
20 "
25 "
32 "
40 "
50 "
65 "
80 "
100 "
150 "
200 "
225 "
250 "
280 "
315 "
355 "
400 "
450 "
500 "
630 "

0.01
0.02
0.03
0.04
0.05
0.08
0.15
0.18
0.30
0.61
1.13
1.00
3.73
1.48
1.87
2.37
3.01
3.81
4.71
7.47

-38 -

NOTA TEKNIKAL
TECHNICAL NOTES

TECHNICAL NOTES

NOTA TEKNIKAL

Starting from January 2011, the prices for


steel bars, cement and fabric reinforcement
published in this Special Release 1 are
obtained from the price collection conducted
by Department of Statistics, Malaysia.

Mulai Januari 2011, harga bar keluli, simen


dan fabric reinforcement yang diterbitkan
dalam Siaran Khas 1 ini diperoleh dari
pungutan harga yang dibuat oleh Jabatan
Perangkaan Malaysia.

Prices are reported according to 3 regions in


Peninsular Malaysia as follows:

Harga yang dilaporkan adalah mengikut 3


kawasan di Semenanjung Malaysia seperti
berikut:
Utara

Perlis, Kedah, Pulau


Pinang dan Perak

North

Perlis, Kedah, Pulau


Pinang and Perak

Tengah

Wilayah Persekutuan
Kuala Lumpur, Melaka,
Negeri Sembilan,
Selangor dan Johor

Central

Wilayah Persekutuan
Kuala Lumpur, Melaka,
Negeri Sembilan,
Selangor and Johor

Timur

Pahang, Terengganu dan


Kelantan

East

Pahang, Terengganu
and Kelantan

Harga diesel adalah harga kawalan kerajaan


yang
diperoleh
dari
Kementerian
Perdagangan Dalam Negeri, Koperasi dan
Kepenggunaan.

The price for diesel is government controlled


price which obtained from the Ministry of
Domestic
Trade,
Co-operatives
and
Consumerism.

Harga Bitumen Penembusan 80/100 dan


minyak bahan api diperoleh dari Shell
Malaysia.

The prices for Bitumen 80/100 Penetration


and fuel oil are obtained from Shell Malaysia.

Harga paip air diperoleh dari persatuan


pembekal.
Harga paip pembetungan
diperoleh dari Jabatan
Perkhidmatan
Pembetungan (JPP). Faktor pelarasan bagi
kategori dan saiz paip yang tidak diterbitkan
dalam Siaran Khas 1 ini adalah seperti di
Lampiran A.

The price for water pipe is obtained from the


supplier associations.
The price for
sewerage pipe is obtained from Jabatan
Perkhidmatan Pembetungan (JPP). The
adjustment factors for the other categories
and sizes not published in this Special
Release 1 are shown in Appendix A.

Harga bagi bahan-bahan binaan lain (yang

The prices for other building materials (not

tidak dinyatakan di atas) adalah diperoleh


dari pungutan harga yang dibuat oleh
Jabatan Perangkaan Malaysia.

stated above) are obtained from the price


collection conducted by Department of
Statistics, Malaysia.
- 39 -

All prices mentioned above are relevant for


escalation purposes only and should not be
used to represent actual price levels.

Semua harga yang tersebut di atas adalah


bagi tujuan pengiraan kadar perubahan
harga sahaja dan tidak boleh digunakan
untuk mewakili kedudukan harga yang
sebenar.

- 40 -

HARGA :
PRICE

RM 2.00

BOLEH DIPEROLEH DARI:


OBTAINABLE FROM:
JABATAN PERANGKAAN MALAYSIA,
(DEPARTMENT OF STATISTICS, MALAYSIA)
PARCEL C, BLOK C6,
PUSAT PENTADBIRAN KERAJAAN PERSEKUTUAN,
62514 PUTRAJAYA,
MALAYSIA
Tel

: 03 - 8885 7000

Faks/Fax

: 03 - 8888 9248

E-mel/E-mail

: jpbkkp@stats.gov.my

Laman web/Homepage

: http://www.statistics.gov.my

Diterbitkan dan dicetak oleh Jabatan Perangkaan Malaysia