SIARAN KHAS
Special Release
SEMENANJUNG MALAYSIA
PENINSULAR MALAYSIA
JUN
2011
JUNE
Tarikh:
Date:
15 Julai 2011
15th July 2011
KANDUNGAN
CONTENTS
Muka Surat
Page
Jadual 1
Table 1
Jadual 2
: Harga unit purata bagi bitumen, minyak bahan api & diesel
Table 2
Jadual 3
Table 3
-Pasir/Sand
-Batu baur/Aggregates
-Premix
-Fabric Reinforcement
-Guardrail
-Paip air/Water pipe
-Paip pembetungan/Sewerage pipe
Lampiran A
Appendix A
31
39
Nota Teknikal
Technical Notes
JADUAL
TABLE
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
Kawasan
Region
Tengah
Central
2010 Dis
2240.00
2225.00
2250.00
2011 Jan
Feb
2395.56
2451.39
2281.63
2291.63
2242.86
2600.00
Mac
2503.50
2430.11
2698.29
Apr
2489.00
2437.14
2676.50
Mei
2463.50
2390.50
2676.50
Jun
Jul
2467.50
2429.17
2701.50
Ogo
Sep
Okt
Nov
Dis
12mm (1/2")
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
2240.00
2396.00
2468.06
2486.50
2489.00
2473.00
2467.50
2225.00
2280.84
2341.25
2458.89
2436.19
2404.29
2433.57
2250.00
2242.86
2621.43
2707.29
2685.50
2685.50
2710.50
16mm (5/8")
2010 Dis
2140.00
2125.00
2153.33
2011 Jan
Feb
Mac
Apr
2317.78
2376.11
2417.50
2385.00
2209.17
2209.17
2355.95
2356.67
2170.00
2475.00
2592.50
2592.50
Mei
Jun
Jul
2341.50
2361.00
2315.83
2330.83
2592.50
2617.50
Ogo
Sep
Okt
Nov
Dis
-1 -
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
Timur
East
2010 Dis
2011 Jan
2206.67
2306.74
2191.67
2256.39
2220.00
2150.70
Feb
2364.03
2248.06
2409.03
Mac
2416.46
2362.26
2409.03
Apr
Mei
Jun
2402.04
2396.04
2395.97
2381.94
2339.78
2344.78
2424.31
2436.67
2486.67
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
2206.67
2235.00
2285.00
2341.25
2341.25
2327.50
2322.50
2191.67
2275.83
2275.83
2347.50
2378.33
2340.33
2340.33
2220.00
2141.67
2391.67
2391.67
2408.33
2408.33
2458.33
2010 Dis
2011 Jan
Feb
Mac
2240.00
2395.56
2405.56
2515.00
2233.33
2314.17
2378.75
2509.29
2253.33
2243.75
2631.25
2715.25
Apr
Mei
2489.00
2473.00
2505.54
2505.54
2664.50
2684.50
Jun
2464.50
2503.75
2709.50
Jul
Ogo
Sep
Okt
Nov
Dis
32mm (1 1/4")
(2) Mycon 60
High Tensile Deformed Bars
10mm (3/6")
Jul
Ogo
Sep
Okt
Nov
Dis
-2 -
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
Kawasan
Region
Tengah
Central
2010 Dis
2240.00
2225.00
2253.33
2011 Jan
Feb
2395.56
2405.56
2297.50
2374.59
2231.25
2618.75
Mac
2498.00
2393.21
2711.75
Apr
2489.00
2501.96
2674.00
Mei
Jun
2473.00
2464.50
2484.58
2499.58
2694.00
2719.00
2010 Dis
2011 Jan
Feb
2140.00
2297.80
2300.58
2125.00
2205.83
2269.72
2153.33
2164.58
2446.53
Mac
Apr
Mei
2383.60
2359.50
2338.94
2379.82
2381.79
2330.42
2485.69
2458.92
2523.36
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
2341.81
2357.92
2556.69
2010 Dis
2011 Jan
2140.00
2322.00
2125.00
2208.00
2153.33
2137.50
Feb
Mac
Apr
2322.00
2402.00
2327.00
2258.00
2353.75
2360.00
2387.50
2387.50
2387.50
Mei
Jun
Jul
2327.50
2293.33
2303.25
2330.75
2387.50
2437.50
Jul
Ogo
Sep
Okt
Nov
Dis
16mm25mm
(5/8"1")
32mm (1 1/4")
Ogo
Sep
Okt
Nov
Dis
-3 -
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
(3) Simen
Cement
Portland Biasa
BS 12
Ordinary Portland
BS 12
Kawasan
Region
Tengah
Central
Timur
East
RM Sekarung 50 Kg
RM Per 50 Kg Bag
2010 Dis
2011 Jan
14.40
15.53
14.73
16.03
15.14
15.86
Feb
Mac
15.61
16.16
16.03
16.19
15.86
15.88
Apr
Mei
16.65
16.63
16.60
16.69
16.14
16.18
Jun
16.63
16.74
16.18
Jul
Ogo
Sep
Okt
Nov
Dis
-4 -
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel
Table 2: Average unit prices for bitumen, fuel oil and diesel
Perkara
Item
Tempoh
Period
Semenanjung Malaysia
Peninsular Malaysia
RM Seliter
RM Per Litre
Sederhana
Medium
2010 Dis
2011 Jan
Feb
Mac
Apr
1.73
1.84
2.06
2.16
2.25
2.15
2.19
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
2010 Dis
2011 Jan
Feb
1600.00
1600.00
1650.00
Mac
Apr
Mei
1850.00
1826.00
1950.00
1950.00
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
Harga Bitumen Penembusan 80/100 adalah berdasarkan harga purata ex-Port Klang.
The price for Bitumen 80/100 Penetration is based on average ex-Port Klang.
-5-
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel (samb.)
Table 2: Average unit prices for bitumen, fuel oil and diesel (cont'd.)
Perkara
Item
Tempoh
Period
Semenanjung Malaysia
Peninsular Malaysia
RM Seliter
RM Per Litre
Diesel
Diesel
2010 Jan
Feb
Mac
Apr
Mei
Jun
Jul
(115 Julai)
(1631 Julai)
Ogo
Sep
Okt
Nov
Dis (13 Disember)
(431 Disember)
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
Harga diesel adalah ex-Kuala Lumpur.
The price for diesel is ex-Kuala Lumpur.
* Harga runcit ialah harga selepas ditolak subsidi kerajaan.
Retail price is the price less government subsidy.
-6-
Runcit*
Retail
Sebenar
Actual
1.700
1.700
1.700
1.700
1.700
1.700
1.700
1.750
1.750
1.750
1.750
1.750
1.750
1.800
2.455
2.421
2.496
2.571
2.462
2.430
2.379
2.379
2.387
2.358
2.468
2.558
2.690
2.690
1.800
1.800
1.800
1.800
1.800
1.800
2.749
2.923
3.184
3.309
3.085
3.083
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
RM Per Tan Metrik
RM Per Metric Ton
Timur
East
36.80
36.10
36.20
36.20
36.72
36.44
40.08
32.60
32.60
32.60
32.60
32.61
32.66
39.11
20.80
20.80
20.81
20.80
21.21
21.21
20.52
35.40
35.40
35.40
35.40
35.37
35.37
31.33
38.10
38.10
38.10
38.20
38.19
38.19
44.14
29.30
29.30
29.30
29.30
29.25
29.25
29.25
30.00
30.00
30.20
30.20
30.17
30.17
30.00
25.20
25.40
25.50
25.50
25.45
25.50
27.39
24.50
24.90
24.90
24.90
24.88
24.88
30.19
(1) Pasir
Sand
Pasir Sungai
River Sand
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
Pasir Lombong
Mining Sand
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.
-7-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
Timur
East
Granite
20mm (3/4")
Granite
20mm (3/4")
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
28.00
28.00
28.00
28.00
28.03
28.03
31.50
24.40
25.40
25.70
25.70
25.82
25.90
25.52
27.30
27.30
27.30
27.30
27.27
27.27
26.85
Granite
40mm (1 1/2")
Granite
40mm (1 1/2")
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
30.40
30.40
30.40
30.40
30.40
30.40
27.20
25.30
25.30
25.40
25.30
25.14
25.25
25.82
23.80
23.80
23.80
23.80
23.75
23.75
23.75
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
24.30
24.30
24.40
24.40
24.44
24.44
24.00
20.90
21.10
21.10
21.10
21.02
21.03
20.62
16.50
16.00
16.00
16.00
16.20
16.20
20.92
-8-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
Timur
East
155.80
154.80
154.80
154.80
154.80
155.80
156.50
158.10
160.20
161.80
164.00
163.14
169.61
160.03
175.00
177.50
180.00
180.00
180.00
192.00
202.00
Okt
Nov
Dis
AC 14 (Wearing Course)
2010 Dis
153.80
157.30
166.90
2011 Jan
153.00
159.30
165.80
Feb
152.20
162.10
167.10
Mac
152.20
162.40
167.10
Apr
152.17
161.92
167.00
Mei
153.83
169.59
175.88
Jun
153.83
165.51
180.88
2010 Dis
151.70
156.90
164.70
2011 Jan
Feb
Mac
Apr
150.80
149.70
149.70
149.67
156.50
159.90
160.40
161.21
163.10
164.30
164.30
162.58
Mei
151.33
161.93
169.83
Jun
152.00
159.37
174.83
Jul
Ogo
Sep
Okt
Nov
Dis
AC 28 (Binder Course)
Jul
Ogo
Sep
Okt
Nov
Dis
-9-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
Timur
East
155.20
156.70
2011 Jan
154.20
157.80
165.30
Feb
153.20
158.90
166.60
Mac
153.20
159.50
166.60
Apr
153.20
160.23
166.58
Mei
155.20
165.46
173.08
Jun
154.33
161.00
188.10
Jul
Ogo
Sep
Okt
Nov
Dis
-10-
164.70
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
Kawasan
Region
Tengah
Central
2010 Dis
2011 Jan
151.00
148.50
144.70
146.20
144.00
144.00
Feb
Mac
148.50
148.50
146.20
146.40
144.00
144.00
Apr
148.50
146.43
144.00
Mei
Jun
Jul
Ogo
Sep
151.00
151.00
150.43
154.00
144.00
144.00
152.50
150.00
150.00
150.00
150.00
152.50
152.50
150.60
152.10
152.10
152.30
152.34
156.34
152.20
153.00
153.00
153.00
153.00
153.00
153.00
153.00
2010 Dis
2011 Jan
Feb
154.50
152.00
152.00
163.70
165.70
165.70
158.00
163.00
163.00
Mac
Apr
Mei
Jun
152.00
152.00
154.50
154.50
166.00
166.00
171.33
162.25
163.00
155.00
172.00
172.00
Okt
Nov
Dis
BMR28 (Bound Roadbase)
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
Jul
Ogo
Sep
Okt
Nov
Dis
-11-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
Kawasan
Region
Tengah
Central
2010 Dis
150.30
158.70
147.50
2011 Jan
Feb
148.70
146.30
160.70
160.70
150.00
150.00
Mac
146.30
161.00
150.00
Apr
Mei
146.33
149.67
161.00
166.33
147.50
154.00
Jun
Jul
Ogo
Sep
150.00
150.29
168.00
152.00
150.30
150.30
150.30
150.33
152.00
152.00
154.20
155.20
155.20
155.40
155.37
158.04
145.20
167.50
170.00
170.00
170.00
167.50
179.00
182.67
2010 Dis
2011 Jan
Feb
Mac
Apr
154.70
154.70
153.00
153.00
153.00
153.70
154.50
154.50
154.70
155.38
168.50
171.00
171.00
171.00
167.50
Mei
Jun
154.67
154.67
159.81
154.88
180.00
183.33
Okt
Nov
Dis
BMB20 (Binder Course)
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
Jul
Ogo
Sep
Okt
Nov
Dis
-12-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
Timur
East
154.50
152.00
152.00
149.20
150.20
150.20
160.70
162.30
162.30
Mac
152.00
150.40
162.30
Apr
Mei
152.00
154.50
151.21
156.38
160.00
168.33
Jun
154.50
152.11
175.00
Jul
Ogo
Sep
Okt
Nov
Dis
-13-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
Timur
East
RM Per Kg
RM Per Kg
2010 Dis
2011 Jan
Feb
3.02
2.56
2.56
3.08
2.97
2.97
3.30
3.16
3.22
Mac
2.79
2.97
3.22
Apr
Mei
Jun
2.68
2.60
2.60
2.97
3.04
3.04
3.22
3.37
3.37
3.00
2.56
2.56
2.79
2.68
2.60
2.60
3.05
2.94
2.94
2.94
2.94
3.01
3.01
3.27
3.13
3.20
3.20
3.19
3.34
3.34
2010 Dis
2011 Jan
Feb
2.69
2.30
2.30
2.74
2.44
2.44
2.94
2.81
2.87
Mac
Apr
Mei
2.50
2.40
2.33
2.44
2.44
2.48
2.87
2.86
3.00
Jun
2.33
2.52
3.00
Jul
Ogo
Sep
Okt
Nov
Dis
A5, MS145
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
A6, MS145
Jul
Ogo
Sep
Okt
Nov
Dis
-14-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
Timur
East
RM Per Kg
RM Per Kg
2010 Dis
2011 Jan
2.69
2.29
2.74
2.44
2.94
2.81
Feb
Mac
2.29
2.50
2.44
2.44
2.87
2.87
Apr
2.39
2.44
2.86
Mei
Jun
2.33
2.33
2.44
2.48
3.00
3.00
2.69
2.30
2.30
2.50
2.40
2.34
2.34
2.74
2.45
2.45
2.45
2.45
2.44
2.48
2.94
2.81
2.87
2.87
2.86
3.00
3.00
2010 Dis
2011 Jan
2.69
2.29
2.74
2.44
2.94
2.81
Feb
Mac
Apr
2.29
2.49
2.39
2.44
2.44
2.44
2.87
2.87
2.86
Mei
Jun
2.33
2.33
2.48
2.52
3.00
3.00
Jul
Ogo
Sep
Okt
Nov
Dis
A8, MS145
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
A9, MS145
Jul
Ogo
Sep
Okt
Nov
Dis
-15-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
RM Per Kg
RM Per Kg
Kawasan
Region
Tengah
Central
2010 Dis
2011 Jan
Feb
2.69
2.30
2.30
2.74
2.44
2.44
2.93
2.81
2.87
Mac
Apr
2.50
2.40
2.44
2.44
2.87
2.86
Mei
2.33
2.46
3.00
Jun
Jul
Ogo
Sep
Okt
2.33
2.50
3.00
Nov
Dis
B5, MS145
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
2.99
2.67
2.67
3.10
3.00
2.74
2.74
3.04
2.93
2.93
2.93
2.93
3.04
3.04
3.26
3.12
3.19
3.19
3.18
3.33
3.33
B6, MS145
2010 Dis
2011 Jan
Feb
2.69
2.50
2.50
2.74
2.61
2.61
2.94
2.81
2.87
Mac
Apr
Mei
Jun
2.91
2.70
2.57
2.57
2.61
2.61
2.71
2.71
2.87
2.86
3.00
3.00
Jul
Ogo
Sep
Okt
Nov
Dis
-16-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
RM Per Kg
RM Per Kg
Kawasan
Region
Tengah
Central
2010 Dis
2011 Jan
2.69
2.50
2.74
2.63
2.94
2.81
Feb
Mac
2.50
2.90
2.63
2.63
2.87
2.87
Apr
2.70
2.63
2.86
Mei
Jun
2.57
2.57
2.74
2.74
3.00
3.00
2.69
2.50
2.50
2.91
2.72
2.57
2.57
2.74
2.64
2.64
2.64
2.64
2.74
2.74
2.94
2.81
2.87
2.87
2.86
3.00
3.00
2010 Dis
2011 Jan
Feb
2.69
2.50
2.50
2.74
2.64
2.64
2.94
2.81
2.87
Mac
Apr
Mei
Jun
2.91
2.70
2.57
2.57
2.64
2.64
2.74
2.74
2.87
2.86
3.00
3.00
Jul
Ogo
Sep
Okt
Nov
Dis
B8, MS145
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
B9, MS145
Jul
Ogo
Sep
Okt
Nov
Dis
-17-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
RM Per Kg
RM Per Kg
Kawasan
Region
Tengah
Central
2010 Dis
2.68
2.73
2.93
2011 Jan
2.50
2.63
2.80
Feb
Mac
2.50
2.90
2.63
2.63
2.86
2.86
Apr
2.70
2.63
2.85
Mei
2.56
2.73
2.99
Jun
Jul
Ogo
Sep
2.56
2.73
2.99
2.97
2.76
2.76
3.21
2.99
2.84
2.84
3.02
2.88
2.88
2.88
2.88
3.00
3.00
3.25
3.10
3.17
3.17
3.16
3.31
3.31
2010 Dis
2011 Jan
Feb
2.99
2.78
2.78
3.04
2.82
2.82
3.27
3.12
3.19
Mac
Apr
Mei
3.23
3.01
2.85
2.82
2.82
2.93
3.19
3.18
3.33
Jun
2.85
2.93
3.33
Okt
Nov
Dis
B12, MS145
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
C5, MS145
Jul
Ogo
Sep
Okt
Nov
Dis
-18-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
RM Per Kg
RM Per Kg
Kawasan
Region
Tengah
Central
2010 Dis
2011 Jan
2.99
2.78
3.04
2.81
3.26
3.12
Feb
Mac
2.78
3.23
2.81
2.81
3.19
3.19
Apr
3.00
2.81
3.18
Mei
Jun
2.85
2.85
2.93
2.93
3.33
3.33
Jul
Ogo
Sep
Okt
Nov
Dis
C7, MS145
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
2.99
2.78
2.78
3.23
3.00
2.85
2.85
3.04
2.93
2.93
2.93
2.93
3.04
3.04
3.26
3.12
3.19
3.19
3.18
3.33
3.33
C8, MS145
2010 Dis
2011 Jan
2.98
2.77
3.03
3.00
3.25
3.11
Feb
Mac
Apr
2.77
3.22
3.00
3.00
3.00
3.00
3.18
3.18
3.17
Mei
Jun
Jul
2.85
2.85
3.11
3.11
3.32
3.32
Ogo
Sep
Okt
Nov
Dis
-19-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
Timur
East
RM Per Kg
RM Per Kg
2010 Dis
2.98
3.04
3.26
2011 Jan
Feb
Mac
2.77
2.77
3.22
2.92
2.92
2.92
3.12
3.18
3.18
Apr
3.00
2.92
3.17
Mei
Jun
2.85
2.85
3.04
3.04
3.33
3.33
Jul
Ogo
Sep
Okt
Nov
Dis
C10, MS145
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
2.98
2.78
2.78
3.23
3.00
2.85
2.85
3.04
2.93
2.93
2.93
2.93
3.04
3.04
3.26
3.12
3.18
3.18
3.17
3.33
3.33
DA4, MS145
2010 Dis
3.01
3.07
3.29
2011 Jan
Feb
Mac
2.80
2.80
3.26
2.95
2.95
2.95
3.15
3.21
3.21
Apr
Mei
Jun
Jul
3.03
2.88
2.88
2.95
3.07
3.07
3.20
3.36
3.36
Ogo
Sep
Okt
Nov
Dis
-20-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
RM Per Kg
RM Per Kg
Kawasan
Region
Tengah
Central
2010 Dis
2011 Jan
Feb
3.00
2.79
2.79
3.05
2.94
2.94
3.27
3.13
3.20
Mac
3.24
2.94
3.20
Apr
Mei
Jun
3.01
2.86
2.86
2.94
3.05
3.05
3.19
3.34
3.34
Jul
Ogo
Sep
Okt
Nov
Dis
DA6, MS145
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
2.69
2.50
2.50
2.91
2.70
2.57
2.57
2.74
2.62
2.62
2.62
2.62
2.72
2.72
2.94
2.81
2.87
2.87
2.86
3.00
3.00
DA7, MS145
2010 Dis
2011 Jan
Feb
2.69
2.50
2.50
2.74
2.57
2.57
2.94
2.81
2.87
Mac
Apr
Mei
Jun
2.90
2.70
2.57
2.57
2.57
2.57
2.74
2.74
2.87
2.86
3.00
3.00
Jul
Ogo
Sep
Okt
Nov
Dis
-21-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Timur
East
RM Per Kg
RM Per Kg
Kawasan
Region
Tengah
Central
2010 Dis
2011 Jan
2.69
2.97
2.74
2.64
2.94
2.81
Feb
Mac
2.97
2.91
2.64
2.64
2.87
2.87
Apr
2.70
2.64
2.86
Mei
Jun
3.05
3.05
2.59
2.59
3.00
3.00
2.69
2.50
2.50
2.90
2.70
2.57
2.57
2.74
2.63
2.63
2.63
2.63
2.54
2.54
2.93
2.81
2.87
2.87
2.86
3.00
3.00
2010 Dis
2011 Jan
2.68
2.50
2.72
2.63
2.92
2.80
Feb
Mac
Apr
2.50
2.90
2.70
2.63
2.63
2.63
2.85
2.85
2.84
Mei
Jun
2.57
2.57
2.73
2.73
2.98
2.98
Jul
Ogo
Sep
Okt
Nov
Dis
DA9, MS145
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
DA10, MS145
Jul
Ogo
Sep
Okt
Nov
Dis
-22-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
(5) Guardrail
Guardrail
Single Mounted
i) 1.95m Post Spacing
Kawasan
Region
Tengah
Central
Timur
East
RM Per Meter
RM Per Metre
2010 Dis
2011 Jan
Feb
166.84
156.82
156.82
168.48
158.37
158.37
171.26
160.98
160.98
Mac
156.82
158.37
160.98
Apr
156.82
158.37
160.98
Mei
Jun
156.82
156.82
158.37
158.37
160.98
160.98
116.14
109.17
109.17
109.17
109.17
109.17
109.17
117.38
110.34
110.34
110.34
110.34
110.34
110.34
119.31
112.15
112.15
112.15
112.15
112.15
112.15
Jul
Ogo
Sep
Okt
Nov
Dis
ii) 3.80m Post Spacing
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.
-23-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Utara
North
Kawasan
Region
Tengah
Central
Timur
East
RM Per Meter
RM Per Metre
2010 Dis
250.99
253.37
257.56
2011 Jan
235.93
238.16
242.11
Feb
Mac
235.93
235.93
238.16
238.16
242.11
242.11
Apr
Mei
Jun
235.93
235.93
235.93
238.16
238.16
238.16
242.11
242.11
242.11
190.99
182.03
182.03
182.03
182.03
182.03
182.03
193.09
181.50
181.50
181.50
181.50
181.50
181.50
195.98
184.22
184.22
184.22
184.22
184.22
184.22
Jul
Ogo
Sep
Okt
Nov
Dis
ii) 3.80m Post Spacing
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
-24-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
203.00
206.00
208.00
216.00
216.00
216.00
216.00
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
30.00
32.00
34.00
34.00
34.00
33.00
33.00
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
216.00
216.00
280.00
230.00
232.00
232.00
Harga bagi paip air dan paip pembetungan adalah harga di kilang.
The prices for water pipe and sewerage pipe are ex-factory prices.
-25-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
1.41
1.43
1.46
1.47
1.47
1.33
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
68.86
69.55
70.86
71.20
71.20
65.62
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
54.19
54.88
56.18
56.53
56.53
50.95
-26-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
265.65
277.00
277.00
277.00
233.30
233.30
233.30
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
305.00
305.00
305.00
221.00
183.30
185.00
185.00
2010 Dis
2011 Jan
17.90
17.90
Feb
17.90
Mac
Apr
16.50
16.50
Mei
Jun
16.50
16.50
Jul
Ogo
Sep
Okt
Nov
Dis
R = Kemaskini/Revised
-27-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
60.17
60.17
60.17
60.35
61.70
61.70
61.70
2010 Dis
2011 Jan
Feb
Mac
Apr
Mei
Jun
118.00
89.00
89.00
89.00
50.15
50.15
57.80
Jul
Ogo
Sep
Okt
Nov
Dis
ii. Jacking Pipe
225mm
2010 Dis
330.00
2011 Jan
Feb
Mac
248.00
248.00
248.00
Apr
Mei
Jun
Jul
Ogo
238.00
238.00
302.00
Sep
Okt
Nov
Dis
-28-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
RM Per Meter
RM Per Metre
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
2010 Dis
2011 Jan
108.00
108.00
Feb
Mac
108.00
108.00
Apr
174.75
Mei
Jun
174.75
176.50
Jul
Ogo
Sep
Okt
Nov
Dis
ii. With Lining (High Alumina)
900mm
2010 Dis
2011 Jan
108.00
108.00
Feb
108.00
Mac
Apr
Mei
Jun
Jul
Ogo
Sep
Okt
Nov
Dis
108.00
227.90
227.90
230.20
2010 Dis
2011 Jan
Feb
108.00
108.00
108.00
Mac
Apr
Mei
108.00
201.35
201.35
Jun
Jul
Ogo
Sep
203.40
Okt
Nov
Dis
-29-
Jadual 3: Harga unit purata bagi pasir, batu baur, premix, fabric reinforcement, guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd.)
Perkara
Item
Tempoh
Period
Kawasan
Region
Semenanjung Malaysia
Peninsular Malaysia
RM Per Meter
RM Per Metre
ABS Pipe
2010 Dis
29.31
i. Gravity
110mm
2011 Jan
Feb
29.31
29.31
Mac
Apr
Mei
29.31
28.92
28.92
Jun
28.92
Jul
Ogo
Sep
Okt
Nov
Dis
ii. Force Main
225mm
2010 Dis
2011 Jan
Feb
82.76
82.76
82.76
Mac
Apr
Mei
Jun
82.76
81.65
81.65
81.65
Jul
Ogo
Sep
Okt
Nov
Dis
-30-
LAMPIRAN
APPENDIX
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
Paip air
Water pipe
1. Mild Steel Pipe
100 mm
150 "
200 "
250 "
300 "
350 "
400 "
450 "
500 "
600 "
700 "
750 "
800 "
900 "
1000 "
1100 "
1150 "
1200 "
1300 "
1400 "
1500 "
1600 "
1700 "
1800 "
1900 "
2000 "
2100 "
2200 "
0.25
0.36
0.47
0.59
1.00
1.16
1.32
1.48
1.63
2.18
2.80
2.99
3.18
3.56
4.25
5.53
5.83
6.40
7.60
8.16
10.32
10.98
11.64
12.30
12.96
14.74
16.01
17.33
0.53
0.69
1.00
1.34
1.59
2.14
3.42
4.66
6.72
-31 -
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
Paip air
Water pipe
3. Ductile Iron Pipe
100 mm
150 "
200 "
250 "
300 "
350 "
400 "
450 "
500 "
600 "
700 "
0.35
0.45
0.60
0.79
1.00
1.25
1.50
1.78
2.05
2.70
3.50
ii.
mm
"
"
"
"
"
"
"
0.69
1.00
1.63
2.59
3.93
6.18
8.83
12.68
Electrofusion Jointing
110
125
140
160
180
200
225
250
280
315
355
400
450
500
560
mm
"
"
"
"
"
"
"
"
"
"
"
"
"
"
0.48
0.63
0.80
1.00
1.30
1.54
1.96
2.46
3.27
3.97
6.29
7.80
12.98
17.76
21.02
-32 -
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
Paip air
Water pipe
iii.
Butt Fussion
110
125
140
160
180
200
225
250
280
315
355
400
450
500
560
mm
"
"
"
"
"
"
"
"
"
"
"
"
"
"
0.48
0.62
0.76
1.00
1.25
1.56
1.94
2.38
2.97
3.76
4.79
6.06
7.90
7.90
12.61
-33 -
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
Paip pembetungan
Sewerage pipe
1. Mild Steel Pipe
100 mm
125 "
150 "
200 "
250 "
300 "
350 "
400 "
450 "
500 "
550 "
600 "
650 "
700 "
750 "
800 "
850 "
900 "
950 "
1000 "
1200 "
1400 "
1600 "
1800 "
2000 "
2100 "
2200 "
0.40
0.50
0.59
0.79
0.99
1.00
1.38
1.58
1.78
1.98
2.20
2.37
2.50
2.77
2.96
3.16
3.40
3.56
3.80
3.95
4.74
5.53
6.32
7.11
7.91
8.30
8.70
0.35
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00
2.40
2.80
3.20
3.40
3.60
-34 -
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
Paip pembetungan
Sewerage pipe
i.
ii.
0.64
0.80
1.00
1.73
1.28
4.10
7.50
10.55
12.00
17.00
19.31
19.32
19.50
20.25
21.27
25.60
31.07
35.00
38.19
54.82
74.00
94.00
123.23
165.00
207.35
300.00
400.00
0.20
0.25
0.50
0.65
1.00
1.50
2.00
2.69
3.51
4.48
5.50
6.00
7.50
8.50
10.00
-35 -
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
Paip pembetungan
Sewerage pipe
800
850
900
950
1000
1200
1400
1600
1800
2000
2100
2200
"
"
"
"
"
"
"
"
"
"
"
"
11.75
15.00
16.50
18.00
20.40
24.00
26.00
32.00
36.00
38.00
42.00
45.00
ii.
0.40
0.52
0.84
1.00
2.37
4.24
4.95
5.63
7.96
11.78
14.33
14.50
0.80
0.85
0.90
1.00
1.60
1.87
2.17
2.60
3.22
3.75
4.15
4.65
-36 -
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
Paip pembetungan
Sewerage pipe
5. Reinforced Concrete Pipe (RCP)
i.
Without Lining
375 mm
450 "
600 "
750 "
900 "
1050 "
1200 "
1350 "
1500 "
1650 "
1800 "
ii.
0.26
0.31
0.47
0.69
1.00
1.33
1.56
1.97
2.44
2.80
3.59
iii.
0.26
0.31
0.47
0.69
1.00
1.33
1.56
1.97
2.44
2.80
3.59
0.26
0.31
0.47
0.69
1.00
1.33
1.56
1.97
2.44
2.80
3.59
-37 -
Lampiran A
Appendix A
Faktor pelarasan
Adjustment factor
Paip pembetungan
Sewerage pipe
6. ABS Pipe
i.
Gravity
90 mm
110 "
150 "
225 "
315 "
ii.
0.67
1.00
2.07
3.64
7.10
Force Main
15 mm
20 "
25 "
32 "
40 "
50 "
65 "
80 "
100 "
150 "
200 "
225 "
250 "
280 "
315 "
355 "
400 "
450 "
500 "
630 "
0.01
0.02
0.03
0.04
0.05
0.08
0.15
0.18
0.30
0.61
1.13
1.00
3.73
1.48
1.87
2.37
3.01
3.81
4.71
7.47
-38 -
NOTA TEKNIKAL
TECHNICAL NOTES
TECHNICAL NOTES
NOTA TEKNIKAL
North
Tengah
Wilayah Persekutuan
Kuala Lumpur, Melaka,
Negeri Sembilan,
Selangor dan Johor
Central
Wilayah Persekutuan
Kuala Lumpur, Melaka,
Negeri Sembilan,
Selangor and Johor
Timur
East
Pahang, Terengganu
and Kelantan
- 40 -
HARGA :
PRICE
RM 2.00
: 03 - 8885 7000
Faks/Fax
: 03 - 8888 9248
E-mel/E-mail
: jpbkkp@stats.gov.my
Laman web/Homepage
: http://www.statistics.gov.my