Jadual 1 : Harga unit purata bagi bar keluli dan simen 1


Table 1 : Average unit prices for steel bars and cement

Jadual 2 : Harga unit purata bagi bitumen, minyak bahan api dan diesel 5
Table 2 : Average unit prices for bitumen, fuel oil and diesel

Jadual 3 : Harga unit purata bagi : 7


Table 3 : Average unit prices for :

-Pasir/Sand
-Batu baur/Aggregates
-Premix
-Fabric Reinforcement
-Guardrail
-Paip air/Water pipe
-Paip pembetungan/Sewerage pipe

Lampiran A Jadual faktor pelarasan bagi paip air & paip pembetungan 31
Appendix A Adjustment factor table for water pipe & sewerage pipe

Nota Teknikal 39
Technical Notes

Jadual tarikh pengeluaran Siaran Khas 1 (Untuk Kerja-kerja Kejuruteraan Awam), 40


Semenanjung Malaysia, Januari-Disember 2017
Schedule of release dates for Special Release 1 (For Civil Engineering Works),
Peninsular Malaysia, January-December 2017

i
JADUAL
TABLE
Jadual 1: Harga unit purata bagi bar keluli dan simen
Table 1: Average unit prices for steel bars and cement

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(1) Bar Bulat Keluli Lembut BS-4449 RM Per Tan Metrik
Mild Steel Round Bars BS-4449 RM Per Metric Ton

10mm (3/8") 2016 Dis 2259.38 2242.74 2585.09


2017 Jan 2384.66 2251.24 2660.49
Feb 2464.43 2276.43 2675.59
Mac 2486.80 2291.81 2680.71
Apr 2488.56 2301.99 2684.49
Mei 2508.40 2301.99 2665.56
Jun 2497.21 2290.45 2501.79
Jul 2491.29 2290.45 2496.43
Ogos 2592.47 2314.30 2563.50
Sept 2693.31 2330.64 2663.54
Okt 2700.08 2346.99 2720.92
Nov 2658.33 2405.56 2667.83
Dis

12mm (1/2") 2016 Dis 2274.24 2352.27 2585.09


2017 Jan 2361.39 2347.73 2666.74
Feb 2449.71 2329.80 2681.84
Mac 2483.85 2335.49 2687.85
Apr 2494.83 2356.56 2691.63
Mei 2521.23 2351.94 2672.70
Jun 2511.04 2340.40 2508.93
Jul 2487.45 2333.59 2503.57
Ogos 2612.14 2344.86 2571.83
Sept 2711.30 2366.98 2663.54
Okt 2722.24 2383.33 2720.92
Nov 2685.80 2436.16 2667.83
Dis

16mm (5/8") 2016 Dis 2206.78 2274.33 2475.20


2017 Jan 2314.01 2279.33 2548.25
Feb 2405.83 2298.61 2573.25
Mac 2437.46 2306.62 2590.79
Apr 2429.27 2313.06 2616.54
Mei 2445.68 2313.06 2602.91
Jun 2432.88 2305.14 2459.00
Jul 2432.73 2299.00 2449.63
Ogos 2557.42 2316.50 2493.38
Sept 2664.58 2326.91 2568.44
Okt 2671.56 2328.58 2610.75
Nov 2630.08 2409.22 2565.13
Dis

1
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(1) Bar Bulat Keluli Lembut BS-4449 (samb.) RM Per Tan Metrik
Mild Steel Round Bars BS-4449 (cont'd) RM Per Metric Ton
20mm25mm 2016 Dis 2250.74 2337.09 2613.61
(3/4"1") 2017 Jan 2338.99 2344.09 2629.11
Feb 2397.05 2330.81 2642.28
Mac 2413.00 2331.51 2672.86
Apr 2413.89 2346.07 2706.19
Mei 2411.57 2341.30 2714.53
Jun 2411.57 2324.02 2714.53
Jul 2412.73 2324.02 2714.53
Ogos 2517.54 2355.01 2722.86
Sept 2631.93 2371.05 2768.03
Okt 2642.64 2372.29 2768.03
Nov 2606.69 2420.54 2750.36
Dis

32mm (1 1/4") 2016 Dis 2183.25 2430.86 2466.75


2017 Jan 2231.85 2437.11 2467.25
Feb 2295.95 2437.11 2466.75
Mac 2400.10 2437.74 2553.75
Apr 2463.35 2461.29 2640.75
Mei 2407.88 2456.85 2640.75
Jun 2356.20 2440.74 2640.75
Jul 2439.15 2440.74 2640.75
Ogos 2629.25 2469.63 2640.75
Sept 2828.45 2483.52 2640.75
Okt 2778.28 2485.74 2640.75
Nov 2662.20 2540.74 2640.75
Dis
(2) Mycon 60
High Tensile Deformed Bars
10mm (3/8") 2016 Dis 2225.97 2299.63 2581.31
2017 Jan 2338.19 2310.13 2663.22
Feb 2426.61 2343.01 2678.31
Mac 2459.96 2343.51 2679.82
Apr 2456.83 2380.74 2690.75
Mei 2468.23 2375.28 2671.82
Jun 2458.04 2361.65 2530.57
Jul 2477.12 2361.65 2525.21
Ogos 2587.17 2396.65 2568.93
Sept 2698.98 2414.83 2647.54
Okt 2702.31 2413.24 2717.21
Nov 2644.16 2464.83 2669.39
Dis

2
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)
Table 1: Average unit prices for steel bars and cement (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(2) Mycon 60 (Samb.) RM Per Tan Metrik
High Tensile Deformed Bars (Cont'd) RM Per Metric Ton
12mm (1/2") 2016 Dis 2228.75 2294.59 2581.31
2017 Jan 2340.69 2306.25 2663.22
Feb 2429.11 2342.80 2678.31
Mac 2437.46 2343.36 2686.82
Apr 2452.66 2378.46 2690.61
Mei 2470.73 2373.01 2671.82
Jun 2460.54 2359.37 2530.57
Jul 2477.12 2359.37 2525.21
Ogos 2587.17 2394.37 2568.93
Sept 2688.98 2412.55 2647.54
Okt 2702.31 2410.96 2717.21
Nov 2644.16 2462.55 2669.39
Dis

16mm25mm 2016 Dis 2117.78 2201.44 2567.84


(5/8"1") 2017 Jan 2260.75 2213.19 2605.09
Feb 2336.00 2241.36 2629.04
Mac 2365.58 2244.69 2653.83
Apr 2362.76 2249.18 2660.37
Mei 2365.72 2247.97 2655.07
Jun 2360.72 2235.32 2600.12
Jul 2364.28 2235.32 2597.62
Ogos 2475.75 2271.74 2633.73
Sept 2588.22 2288.49 2705.03
Okt 2598.84 2285.56 2729.09
Nov 2537.26 2338.73 2690.79
Dis

32mm (1 1/4") 2016 Dis 2038.42 2195.69 2502.50


2017 Jan 2165.37 2208.81 2502.50
Feb 2234.28 2216.01 2502.50
Mac 2276.80 2216.64 2589.50
Apr 2260.27 2233.08 2676.50
Mei 2240.27 2229.08 2676.50
Jun 2228.67 2214.58 2676.50
Jul 2252.40 2214.58 2676.50
Ogos 2393.50 2240.58 2676.50
Sept 2534.37 2266.06 2676.50
Okt 2503.07 2263.33 2676.50
Nov 2447.53 2319.69 2676.50
Dis

3
Jadual 1: Harga unit purata bagi bar keluli dan simen (samb.)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Simen RM Sekarung 50 Kg
Cement RM Per 50 Kg Bag
Portland Biasa 2016 Dis 18.36 19.06 20.55
BS 12 2017 Jan 18.48 19.06 20.55
Ordinary Portland Feb 18.48 19.30 20.55
BS 12 Mac 18.48 19.30 20.57
Apr 18.42 19.30 20.57
Mei 17.92 19.04 19.86
Jun 17.65 19.04 19.86
Jul 17.28 18.66 19.08
Ogos 17.38 18.49 19.31
Sept 17.87 18.33 19.48
Okt 17.72 18.33 19.05
Nov 17.62 18.18 18.34
Dis

4
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel
Table 2: Average unit prices for bitumen, fuel oil and diesel

Tempoh Semenanjung Malaysia


Item
Period Peninsular Malaysia

(1) Minyak Bahan Api RM Seliter


Fuel Oil RM Per Litre

Sederhana 2016 Dis 2.17


Medium 2017 Jan 2.17
Feb n.a.
Mac n.a.
Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

(2.i) Bitumen Penembusan 80/100 RM Per Tan Metrik


Bitumen 80/100 Penetration RM Per Metric Ton

2016 Dis 1750.00


2017 Jan 1750.00
r
Feb 1720.00
Mac 1720.00
Apr 1530.00r

(2.ii) Bitumen Penembusan 60/70 RM Per Tan Metrik


Bitumen 60/70 Penetration RM Per Metric Ton

Mei 1575.00
Jun 1500.00
Jul 1480.00
Ogos 1480.00
Sept 1550.00
Okt 1560.00
Nov 1640.00
Dis

Bermula Mei 2017, bitumen penembusan 80/100 telah ditukar kepada 60/70. Harga bitumen penembusan 60/70 adalah berdasarkan
harga purata ex-Kuala Lumpur.
Starting May 2017, the bitumen 80/100 penetration has been converted into 60/70.The price for bitumen 60/70 penetration is based on
average ex-Kuala Lumpur.

n.a. = Tidak diperoleh/Not available


r = Kemaskini/Revised

5
Jadual 2: Harga unit purata bagi bitumen, minyak bahan api dan diesel (samb.)
Table 2: Average unit prices for bitumen, fuel oil and diesel (cont'd)

Tempoh Semenanjung Malaysia


Item
Period Peninsular Malaysia

RM Seliter
(3) Minyak Gas Automotif RM Per Litre
Automotive Gas Oil Runcit* Sebenar
Retail Actual

Diesel 2016 Jan 1.600 1.600


Diesel Feb 1.350 1.350
Mac 1.350 1.350
Apr 1.550 1.550
Mei 1.550 1.550
Jun 1.550 1.550
Jul 1.600 1.600
Ogos 1.700 1.700
Sept 1.700 1.700
Okt 1.750 1.750
Nov 1.900 1.900
Dis 1.850 1.850

2017 Jan 2.050 2.050


Feb 2.150 2.150
Mac 2.200 2.200
Apr 2.140 2.140
r r
Mei 2.020 2.020
Jun 1.920 1.920
Jul 1.930 1.930
Ogos 2.010 2.010
Sept 2.090 2.090
Okt 2.130 2.130
Nov 2.210 2.210
Dis

Harga diesel adalah ex-Kuala Lumpur.


The price for diesel is ex-Kuala Lumpur.

n.a. = Tidak diperoleh/Not available

6
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(1) Pasir RM Per Tan Metrik
Sand RM Per Metric Ton

Pasir Sungai 2016 Dis 52.24 48.28 27.26


River Sand 2017 Jan 52.24 48.28 27.26
Feb 52.24 48.28 27.81
Mac 52.24 48.28 27.81
Apr 52.24 47.10 26.30
Mei 49.29 47.10 25.54
Jun 49.29 47.10 25.54
Jul 49.29 47.10 24.78
Ogos 49.29 47.58 24.78
Sept 49.29 48.01 24.78
Okt 49.29 48.01 24.78
Nov 49.29 48.01 24.78
Dis

Pasir Lombong 2016 Dis 33.16 48.79 n.a.


Mining Sand 2017 Jan 33.16 49.11 n.a.
Feb 39.76 50.40 n.a.
Mac 39.76 50.64 n.a.
Apr 38.34 50.64r n.a.
Mei 36.92 50.95 n.a.
Jun 36.92 50.95 n.a.
Jul 36.92 50.95 n.a.
Ogos 36.92 50.84 n.a.
Sept 36.92 51.12 n.a.
Okt 36.92 50.81 n.a.
Nov 36.92 51.12 n.a.
Dis

(2) Batu Baur


Aggregates

Granite 2016 Dis 31.15 31.84 33.38


10mm (3/8") 2017 Jan 31.15 31.84 33.38
Feb 30.29 33.18 34.59
Mac 30.29 33.18 33.32
Apr 30.29 33.18 33.32
Mei 30.29 32.79 33.44
Jun 30.29 32.79 33.44
Jul 30.82 32.87 33.44
Ogos 30.82 32.87 32.38
Sept 30.82 32.97 32.38
Okt 30.82 32.97 32.38
Nov 30.03 32.87 32.38
Dis

Harga bagi pasir, batu baur dan premix adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for sand, aggregates and premix are inclusive of transportation charge for 30km from the outlets.

n.a. = Tidak diperoleh/Not available


7
r = Kemaskini/Revised
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(2) Batu Baur (Samb.) RM Per Tan Metrik
Aggregates (Cont'd) RM Per Metric Ton
Granite 2016 Dis 37.24 33.89 33.42
20mm (3/4") 2017 Jan 37.79 33.89 33.42
Feb 37.79 35.41 33.68
Mac 37.87 35.38 33.68
Apr 37.87 35.64 32.79
Mei 37.72 35.64 32.86
Jun 37.72 35.58 32.91
Jul 37.72 35.79 32.91
Ogos 37.72 35.48 32.30
Sept 37.72 35.66 32.30
Okt 37.72 35.66 32.30
Nov 37.09 35.48 32.30
Dis

Granite 2016 Dis 30.21 31.33 29.68


40mm (1 1/2") 2017 Jan 30.21 31.33 29.68
Feb 30.21 33.02 30.32
Mac 30.21 33.02 30.32
Apr 30.21 32.02 30.32
Mei 30.21 32.02 30.32
Jun 30.21 32.02 30.44
Jul 30.21 32.02 30.44
Ogos 30.21 32.02 29.80
Sept 30.21 33.23 29.80
Okt 30.21 33.23 29.80
Nov 30.21 33.23 29.80
Dis

Crushed Aggregate (Crusher Run)


Crushed Aggregate (Crusher Run)

Crusher Run 2016 Dis 20.69 24.86 21.47


2017 Jan 20.69 24.86 21.60
Feb 20.38 25.77 22.61
Mac 20.38 26.67 22.61
Apr 20.22 26.73 21.66
Mei 20.22 26.73 20.71
Jun 20.22 26.59 20.71
Jul 20.29 27.11 20.71
Ogos 20.29 27.11 20.71
Sept 20.29 27.24 20.71
Okt 19.55 26.97 20.71
Nov 19.55 26.97 20.71
Dis

8
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Asphaltic Concrete RM Per Tan Metrik
Premix Asphaltic Concrete RM Per Metric Ton

AC 10 (Wearing Course) 2016 Dis 163.63 193.76 201.40


2017 Jan 163.63 193.76 201.40
Feb 159.47 184.42 201.40
Mac 159.47 189.93 201.40
Apr 159.47 175.07 201.40
Mei 159.47 175.07 201.40
Jun 159.47 181.25 201.40
Jul 167.21 187.93 201.40
Ogos 167.21 186.43 201.40
Sept 167.21 188.43 201.40
Okt 167.21 188.43 201.40
Nov 167.21 188.43 201.40
Dis

AC 14 (Wearing Course) 2016 Dis 159.41 188.78 171.68


2017 Jan 159.41 188.78 171.68
Feb 161.55 175.67 178.78
Mac 161.55 175.67 184.43
Apr 161.55 177.45 181.43
Mei 161.55 189.23 179.84
Jun 161.55 186.56 179.84
Jul 165.42 186.92 179.84
Ogos 165.42 185.47 179.84
Sept 165.42 187.28 181.16
Okt 160.73 187.28 182.22
Nov 156.05 187.28 182.22
Dis

AC 28 (Binder Course) 2016 Dis 162.65 189.78 168.32


2017 Jan 162.65 189.78 168.32
Feb 161.05 173.99 171.99
Mac 161.05 175.67 173.57
Apr 161.05 182.58 175.94
Mei 161.05 189.48 176.72
Jun 161.05 188.08 176.72
Jul 164.23 188.08 176.72
Ogos 164.23 185.98 176.72
Sept 164.23 187.98 178.05
Okt 159.55 188.28 179.11
Nov 154.86 188.28 179.11
Dis

9
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Asphaltic Concrete (samb.) RM Per Tan Metrik
Premix Asphaltic Concrete (cont'd) RM Per Metric Ton

ACW 20 (Wearing Course) 2016 Dis 161.68 189.04 169.60


2017 Jan 161.68 189.04 169.60
Feb 164.45 179.37 173.58
Mac 164.45 173.99 175.90
Apr 162.79 179.32 179.38
Mei 162.79 184.65 179.67
Jun 162.79 184.15 179.67
Jul 166.65 186.95 179.67
Ogos 166.65 189.25 179.67
Sept 166.65 191.25 182.32
Okt 161.97 191.25 184.44
Nov 157.29 191.25 184.44
Dis

10
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam RM Per Tan Metrik
Premix Bituminous Macadam RM Per Metric Ton
BMR40 (Bound Roadbase) 2016 Dis 172.78 183.87 139.92
2017 Jan 172.78 183.87 139.92
Feb 172.78 178.63 n.a.
Mac 172.78 178.63 n.a.
Apr 172.78 178.63 n.a.
Mei 172.78 178.63 n.a.
Jun 172.78 177.13 n.a.
Jul 172.78 177.13 n.a.
Ogos 172.78 176.51 n.a.
Sept 172.78 176.51 n.a.
Okt 163.24 176.51 n.a.
Nov 153.70 176.51 n.a.
Dis

BMR28 (Bound Roadbase) 2016 Dis 172.78 183.74 153.00


2017 Jan 172.78 183.74 n.a.
Feb 172.78 179.10 n.a.
Mac 172.78 179.10 n.a.
Apr 172.78 179.10 n.a.
Mei 172.78 179.10 n.a.
Jun 172.78 173.89 n.a.
Jul 172.78 173.89 n.a.
Ogos 172.78 171.67 n.a.
Sept 172.78 171.67 n.a.
Okt 163.24 172.23 n.a.
Nov 153.70 172.23 n.a.
Dis

BML10 (Levelling Course) 2016 Dis 174.90 192.06 130.38


2017 Jan 174.90 192.06 130.38
Feb 174.90 187.80 138.33
Mac 174.90 187.80 147.61
Apr 174.90 187.80 156.88
Mei 174.90 187.80 150.52
Jun 174.90 187.58 150.52
Jul 174.90 187.58 150.52
Ogos 174.90 187.03 150.52
Sept 174.90 189.25 155.82
Okt 164.30 189.25 160.06
Nov 153.70 189.25 160.06
Dis
n.a. = Tidak diperoleh/Not available

11
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam (samb.) RM Per Tan Metrik
Premix Bituminous Macadam (cont'd) RM Per Metric Ton

BMB28 (Binder Course) 2016 Dis 172.78 192.32 124.02


2017 Jan 172.78 192.32 124.02
Feb 172.78 192.32 131.97
Mac 172.78 192.32 136.61
Apr 172.78 192.32 143.57
Mei 172.78 192.32 144.16
Jun 172.78 186.71 144.16
Jul 172.78 186.71 144.16
Ogos 172.78 186.08 144.16
Sept 172.78 188.58 149.46
Okt 162.18 187.33 153.70
Nov 151.58 187.33 153.70
Dis

BMB20 (Binder Course) 2016 Dis 172.78 185.42 175.61


2017 Jan 172.78 185.42 175.61
Feb 172.78 185.00 180.91
Mac 172.78 185.00 184.44
Apr 172.78 185.00 184.44
Mei 172.78 185.00 182.32
Jun 172.78 184.66 182.32
Jul 172.78 188.05 182.32
Ogos 172.78 190.88 182.32
Sept 172.78 193.11 184.09
Okt 163.24 193.11 185.50
Nov 153.70 193.11 185.50
Dis

BMW14 (Wearing Course) 2016 Dis 174.90 183.96 179.49


2017 Jan 174.90 185.96 179.49
Feb 174.90 189.63 184.79
Mac 174.90 193.29 186.56
Apr 172.78 188.46 188.33
Mei 174.90 188.46 186.21
Jun 174.90 183.14 186.21
Jul 174.90 183.14 186.21
Ogos 174.90 182.64 186.21
Sept 174.90 183.14 187.97
Okt 164.30 182.34 189.39
Nov 153.70 182.34 189.39
Dis

12
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(3) Premix Bituminous Macadam (samb.) RM Per Tan Metrik
Premix Bituminous Macadam (cont'd) RM Per Metric Ton

BMW20 (Wearing Course) 2016 Dis 174.90 183.65 201.40


2017 Jan 174.90 185.65 201.40
Feb 174.90 192.95 201.40
Mac 174.90 192.95 201.40
Apr 174.90 188.15 201.40
Mei 174.90 188.15 201.40
Jun 174.90 186.84 201.40
Jul 174.90 186.84 201.40
Ogos 174.90 186.34 201.40
Sept 174.90 186.84 201.40
Okt 164.30 185.04 201.40
Nov 153.70 185.04 201.40
Dis

n.a. = Tidak diperoleh/Not available

13
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement RM Per Kg
Fabric Reinforcement RM Per Kg

A4, MS145 2016 Dis 2.45 2.84 3.47


2017 Jan 2.45 2.84 3.47
Feb 2.45 2.84 3.47
Mac 2.45 2.84 3.62
Apr 2.45 2.84 3.62
Mei 2.45 2.84 3.62
Jun 2.45 2.84 3.62
Jul 2.45 2.84 3.62
Ogos 2.53 2.84 3.74
Sept 2.64 2.84 3.74
Okt 2.72 2.84 3.78
Nov 2.72 2.84 3.78
Dis

A5, MS145 2016 Dis 2.44 2.81 3.44


2017 Jan 2.44 2.81 3.44
Feb 2.44 2.81 3.44
Mac 2.44 2.81 3.59
Apr 2.44 2.81 3.59
Mei 2.44 2.81 3.59
Jun 2.44 2.81 3.59
Jul 2.44 2.81 3.59
Ogos 2.51 2.81 3.70
Sept 2.75 2.81 3.70
Okt 2.70 2.81 3.74
Nov 2.70 2.81 3.74
Dis

A6, MS145 2016 Dis 2.27 2.52 3.09


2017 Jan 2.27 2.52 3.09
Feb 2.27 2.52 3.09
Mac 2.27 2.52 3.22
Apr 2.27 2.52 3.22
Mei 2.27 2.52 3.22
Jun 2.27 2.52 3.22
Jul 2.27 2.52 3.22
Ogos 2.34 2.52 3.32
Sept 2.56 2.52 3.32
Okt 2.51 2.52 3.36
Nov 2.51 2.52 3.36
Dis

14
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

A7, MS145 2016 Dis 2.18 2.52 3.09


2017 Jan 2.18 2.52 3.09
Feb 2.18 2.52 3.09
Mac 2.18 2.52 3.22
Apr 2.18 2.52 3.22
Mei 2.18 2.52 3.22
Jun 2.18 2.52 3.22
Jul 2.18 2.52 3.22
Ogos 2.25 2.52 3.32
Sept 2.49 2.52 3.32
Okt 2.42 2.52 3.36
Nov 2.42 2.52 3.36
Dis

A8, MS145 2016 Dis 2.19 2.53 3.09


2017 Jan 2.19 2.53 3.09
Feb 2.19 2.53 3.09
Mac 2.19 2.53 3.22
Apr 2.19 2.53 3.22
Mei 2.19 2.53 3.22
Jun 2.19 2.53 3.22
Jul 2.19 2.53 3.22
Ogos 2.25 2.53 3.32
Sept 2.49 2.53 3.32
Okt 2.42 2.53 3.36
Nov 2.42 2.53 3.36
Dis

A9, MS145 2016 Dis 2.18 2.52 3.09


2017 Jan 2.18 2.52 3.09
Feb 2.18 2.52 3.09
Mac 2.18 2.52 3.21
Apr 2.18 2.52 3.21
Mei 2.18 2.52 3.21
Jun 2.18 2.52 3.21
Jul 2.18 2.52 3.21
Ogos 2.25 2.52 3.32
Sept 2.49 2.52 3.32
Okt 2.42 2.52 3.36
Nov 2.42 2.52 3.36
Dis

15
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

A10, MS145 2016 Dis 2.36 2.44 3.09


2017 Jan 2.36 2.44 3.09
Feb 2.36 2.44 3.09
Mac 2.36 2.44 3.21
Apr 2.36 2.44 3.21
Mei 2.36 2.44 3.21
Jun 2.36 2.44 3.21
Jul 2.36 2.44 3.21
Ogos 2.50 2.44 3.32
Sept 2.97 2.44 3.32
Okt 2.84 2.44 3.36
Nov 2.84 2.44 3.36
Dis

B5, MS145 2016 Dis 2.63 2.82 3.43


2017 Jan 2.63 2.82 3.43
Feb 2.63 2.82 3.43
Mac 2.63 2.82 3.57
Apr 2.63 2.82 3.57
Mei 2.63 2.82 3.57
Jun 2.63 2.82 3.57
Jul 2.63 2.82 3.57
Ogos 2.78 2.82 3.69
Sept 3.30 2.82 3.69
Okt 3.15 2.82 3.73
Nov 3.15 2.82 3.73
Dis

B6, MS145 2016 Dis 2.36 2.51 3.09


2017 Jan 2.36 2.51 3.09
Feb 2.36 2.51 3.09
Mac 2.36 2.51 3.22
Apr 2.36 2.51 3.22
Mei 2.36 2.51 3.22
Jun 2.36 2.51 3.22
Jul 2.36 2.51 3.22
Ogos 2.50 2.51 3.32
Sept 2.97 2.51 3.32
Okt 2.84 2.51 3.36
Nov 2.84 2.51 3.36
Dis

16
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

B7, MS145 2016 Dis 2.36 2.54 3.09


2017 Jan 2.36 2.54 3.09
Feb 2.36 2.54 3.09
Mac 2.36 2.54 3.22
Apr 2.36 2.54 3.22
Mei 2.36 2.54 3.22
Jun 2.36 2.54 3.22
Jul 2.36 2.54 3.22
Ogos 2.50 2.54 3.32
Sept 2.97 2.54 3.32
Okt 2.84 2.54 3.36
Nov 2.84 2.54 3.36
Dis

B8, MS145 2016 Dis 2.37 2.54 3.09


2017 Jan 2.37 2.54 3.09
Feb 2.37 2.54 3.09
Mac 2.37 2.54 3.22
Apr 2.37 2.54 3.22
Mei 2.37 2.54 3.22
Jun 2.37 2.54 3.22
Jul 2.37 2.54 3.22
Ogos 2.50 2.54 3.33
Sept 2.97 2.54 3.33
Okt 2.84 2.54 3.36
Nov 2.84 2.54 3.36
Dis

B9, MS145 2016 Dis 2.37 2.45 3.09


2017 Jan 2.37 2.45 3.09
Feb 2.37 2.45 3.09
Mac 2.37 2.45 3.22
Apr 2.37 2.45 3.22
Mei 2.37 2.45 3.22
Jun 2.37 2.45 3.22
Jul 2.37 2.45 3.22
Ogos 2.50 2.45 3.32
Sept 2.97 2.45 3.32
Okt 2.84 2.45 3.36
Nov 2.84 2.45 3.36
Dis

17
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

B10, MS145 2016 Dis 2.36 2.54 3.08


2017 Jan 2.36 2.54 3.08
Feb 2.36 2.54 3.08
Mac 2.36 2.54 3.21
Apr 2.36 2.54 3.21
Mei 2.36 2.54 3.21
Jun 2.36 2.54 3.21
Jul 2.36 2.54 3.21
Ogos 2.50 2.54 3.32
Sept 2.97 2.54 3.32
Okt 2.83 2.54 3.35
Nov 2.83 2.54 3.35
Dis

B12, MS145 2016 Dis 2.61 2.78 3.41


2017 Jan 2.61 2.78 3.41
Feb 2.61 2.78 3.41
Mac 2.61 2.78 3.55
Apr 2.61 2.78 3.55
Mei 2.61 2.78 3.55
Jun 2.61 2.78 3.55
Jul 2.61 2.78 3.55
Ogos 2.76 2.78 3.67
Sept 3.29 2.78 3.67
Okt 3.14 2.78 3.71
Nov 3.14 2.78 3.71
Dis

C5, MS145 2016 Dis 2.63 2.88 3.44


2017 Jan 2.63 2.88 3.44
Feb 2.63 2.88 3.44
Mac 2.63 2.88 3.58
Apr 2.63 2.88 3.58
Mei 2.63 2.88 3.58
Jun 2.63 2.88 3.58
Jul 2.63 2.88 3.58
Ogos 2.78 2.88 3.70
Sept 3.31 2.88 3.70
Okt 3.16 2.88 3.73
Nov 3.16 2.88 3.73
Dis

18
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

C6, MS145 2016 Dis 2.63 2.86 3.43


2017 Jan 2.63 2.86 3.43
Feb 2.63 2.86 3.43
Mac 2.63 2.86 3.57
Apr 2.63 2.86 3.57
Mei 2.63 2.86 3.57
Jun 2.63 2.86 3.57
Jul 2.63 2.86 3.57
Ogos 2.78 2.86 3.69
Sept 3.30 2.86 3.69
Okt 3.15 2.86 3.73
Nov 3.15 2.86 3.73
Dis

C7, MS145 2016 Dis 2.63 2.98 3.43


2017 Jan 2.63 2.98 3.43
Feb 2.63 2.98 3.43
Mac 2.63 2.98 3.57
Apr 2.63 2.98 3.57
Mei 2.63 2.98 3.57
Jun 2.63 2.98 3.57
Jul 2.63 2.98 3.57
Ogos 2.78 2.98 2.69
Sept 3.30 2.98 2.69
Okt 3.15 2.98 3.73
Nov 3.15 2.98 3.73
Dis

C8, MS145 2016 Dis 2.62 3.05 3.42


2017 Jan 2.62 3.05 3.42
Feb 2.62 3.05 3.42
Mac 2.62 3.05 3.56
Apr 2.62 3.05 3.56
Mei 2.62 3.05 3.56
Jun 2.62 3.05 3.56
Jul 2.62 3.05 3.56
Ogos 2.77 3.05 3.68
Sept 3.29 3.05 3.68
Okt 3.15 3.05 3.72
Nov 3.15 3.05 3.72
Dis

19
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

C9, MS145 2016 Dis 2.62 2.98 3.43


2017 Jan 2.62 2.98 3.43
Feb 2.62 2.98 3.43
Mac 2.62 2.98 3.57
Apr 2.62 2.98 3.57
Mei 2.62 2.98 3.57
Jun 2.62 2.98 3.57
Jul 2.62 2.98 3.57
Ogos 2.77 2.98 3.69
Sept 3.30 2.98 3.69
Okt 3.15 2.98 3.72
Nov 3.15 2.98 3.72
Dis

C10, MS145 2016 Dis 2.63 2.98 3.43


2017 Jan 2.63 2.98 3.43
Feb 2.63 2.98 3.43
Mac 2.63 2.98 3.57
Apr 2.63 2.98 3.57
Mei 2.63 2.98 3.57
Jun 2.63 2.98 3.57
Jul 2.63 2.98 3.57
Ogos 2.78 2.98 3.69
Sept 3.39 2.98 3.69
Okt 3.15 2.98 3.73
Nov 3.15 2.98 3.73
Dis

DA4, MS145 2016 Dis 2.65 3.01 3.46


2017 Jan 2.65 3.01 3.46
Feb 2.65 3.01 3.46
Mac 2.65 3.01 3.61
Apr 2.65 3.01 3.61
Mei 2.65 3.01 3.61
Jun 2.65 3.01 3.61
Jul 2.65 3.01 3.61
Ogos 2.80 3.01 3.72
Sept 3.33 3.01 3.72
Okt 3.18 3.01 3.76
Nov 3.18 3.01 3.76
Dis

20
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

DA5, MS145 2016 Dis 2.64 2.99 3.44


2017 Jan 2.64 2.99 3.44
Feb 2.64 2.99 3.44
Mac 2.64 2.99 3.59
Apr 2.64 2.99 3.59
Mei 2.64 2.99 3.59
Jun 2.64 2.99 3.59
Jul 2.64 2.99 3.59
Ogos 2.79 2.99 3.70
Sept 3.31 2.99 3.70
Okt 3.16 2.99 3.74
Nov 3.16 2.99 3.74
Dis

DA6, MS145 2016 Dis 2.36 2.67 3.09


2017 Jan 2.36 2.67 3.09
Feb 2.36 2.67 3.09
Mac 2.36 2.67 3.22
Apr 2.36 2.67 3.22
Mei 2.36 2.67 3.22
Jun 2.36 2.67 3.22
Jul 2.36 2.67 3.22
Ogos 2.50 2.67 3.32
Sept 2.97 2.67 3.32
Okt 2.84 2.67 3.36
Nov 2.84 2.67 3.36
Dis

DA7, MS145 2016 Dis 2.36 2.68 3.09


2017 Jan 2.36 2.68 3.09
Feb 2.36 2.68 3.09
Mac 2.36 2.68 3.22
Apr 2.36 2.68 3.22
Mei 2.36 2.68 3.22
Jun 2.36 2.68 3.22
Jul 2.36 2.68 3.22
Ogos 2.50 2.68 3.32
Sept 2.97 2.68 3.32
Okt 2.84 2.68 3.36
Nov 2.84 2.68 3.36
Dis

21
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(4) Fabric Reinforcement (samb.) RM Per Kg
Fabric Reinforcement (cont'd) RM Per Kg

DA8, MS145 2016 Dis 2.37 2.68 3.09


2017 Jan 2.37 2.68 3.09
Feb 2.37 2.68 3.09
Mac 2.37 2.68 3.22
Apr 2.37 2.68 3.22
Mei 2.37 2.68 3.22
Jun 2.37 2.68 3.22
Jul 2.37 2.68 3.22
Ogos 2.50 2.68 3.32
Sept 2.97 2.68 3.32
Okt 2.84 2.68 3.36
Nov 2.84 2.68 3.36
Dis

DA9, MS145 2016 Dis 2.36 2.68 3.09


2017 Jan 2.36 2.68 3.09
Feb 2.36 2.68 3.09
Mac 2.36 2.68 3.21
Apr 2.36 2.68 3.21
Mei 2.36 2.68 3.21
Jun 2.36 2.68 3.21
Jul 2.36 2.68 3.21
Ogos 2.50 2.68 3.32
Sept 2.98 2.68 3.32
Okt 2.84 2.68 3.36
Nov 2.84 2.68 3.36
Dis

DA10, MS145 2016 Dis 2.36 2.68 3.07


2017 Jan 2.36 2.68 3.07
Feb 2.36 2.68 3.07
Mac 2.36 2.68 3.20
Apr 2.36 2.68 3.20
Mei 2.36 2.68 3.20
Jun 2.36 2.68 3.20
Jul 2.36 2.68 3.20
Ogos 2.50 2.68 3.31
Sept 2.97 2.68 3.31
Okt 2.84 2.68 3.34
Nov 2.84 2.68 3.34
Dis

22
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(5) Guardrail RM Per Meter
Guardrail RM Per Metre

Single Mounted 2016 Dis 135.00 136.75 140.50


i) 1.95m Post Spacing 2017 Jan 154.25 156.00 159.75
Feb 173.50 175.25 179.00
Mac 181.35 183.15 186.90
Apr 181.35 183.15 186.90
Mei 181.35 183.15 186.90
Jun 181.35 183.15 186.90
Jul 181.35 183.15 186.90
Ogos 181.35 183.15 186.90
Sept 181.35 183.15 186.90
Okt 181.35 183.15 186.90
Nov 181.35 183.15 186.90
Dis

ii) 3.80m Post Spacing 2016 Dis 95.85 97.05 99.70


2017 Jan 108.95 110.18 112.80
Feb 122.05 123.30 125.90
Mac 127.55 128.85 131.50
Apr 127.55 128.85 131.50
Mei 127.55 128.85 131.50
Jun 127.55 128.85 131.50
Jul 127.55 128.85 131.50
Ogos 127.55 128.85 131.50
Sept 127.55 128.85 131.50
Okt 127.55 128.85 131.50
Nov 127.55 128.85 131.50
Dis

Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.

23
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Utara Tengah Timur
North Central East
(5) Guardrail (samb.) RM Per Meter
Guardrail (cont'd) RM Per Metre

Double Mounted 2016 Dis 207.35 210.00 215.70


i) 1.95m Post Spacing 2017 Jan 236.18 239.58 244.25
Feb 265.00 269.15 272.80
Mac 276.15 278.80 284.50
Apr 276.15 278.80 284.50
Mei 276.15 278.80 284.50
Jun 276.15 278.80 284.50
Jul 276.15 278.80 284.50
Ogos 276.15 278.80 284.50
Sept 276.15 278.80 284.50
Okt 276.15 278.80 284.50
Nov 276.15 278.80 284.50
Dis

ii) 3.80m Post Spacing 2016 Dis 160.35 162.35 166.70


2017 Jan 181.63 183.65 188.00
Feb 202.90 204.95 209.30
Mac 211.90 213.95 218.30
Apr 211.90 213.95 218.30
Mei 211.90 213.95 218.30
Jun 211.90 213.95 218.30
Jul 211.90 213.95 218.30
Ogos 211.90 213.95 218.30
Sept 211.90 213.95 218.30
Okt 211.90 213.95 218.30
Nov 211.90 213.95 218.30
Dis

Harga guardrail adalah termasuk kos pengangkutan bagi jarak 30km dari outlet.
The prices for guardrail are inclusive of transportation charges for 30km from the outlets.

24
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6a) Paip Air RM Per Meter
Water Pipe RM Per Metre

Mild Steel Pipe 2016 Dis 201.00


300mm 2017 Jan 201.00
Feb 233.00
Mac 233.00
Apr 237.00
Mei 230.00
Jun 230.00
Jul 222.00
Ogos 222.00
Sept 236.00
Okt 236.00
Nov 236.00
Dis

Stainless Steel Pipe 2016 Dis 27.00


25mm 2017 Jan 27.00
Feb n.a.
Mac n.a.
Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

Ductile Iron Pipe 2016 Dis 283.30


300mm 2017 Jan 283.30
Feb n.a.
Mac n.a.
Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

Harga bagi paip air dan paip pembetungan adalah harga di kilang.
The prices for water pipe and sewerage pipe are ex-factory prices.

n.a. = Tidak diperoleh/Not available

25
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6a) Paip Air (samb.) RM Per Meter
Water Pipe (cont'd) RM Per Metre

High Density Polyethylene 2016 Dis 1.50


(HDPE) Pipe 2017 Jan 1.50
i. Compression Fitting Using Feb n.a.
For Jointing Mac n.a.
25mm Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

ii. Electrofusion Jointing 2016 Dis 72.30


160mm 2017 Jan 72.30
Feb n.a.
Mac n.a.
Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

iii. Butt Fussion 2016 Dis 57.63


160mm 2017 Jan 57.63
Feb n.a.
Mac n.a.
Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

26
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

Mild Steel Pipe 2016 Dis 217.08


300mm 2017 Jan 217.08
Feb 249.48
Mac 249.48
Apr 255.96
Mei 248.40
Jun 248.40
Jul 239.76
Ogos 239.76
Sept 254.88
Okt 254.88
Nov 254.88
Dis

Ductile Iron Pipe 2016 Dis 185.00


250mm 2017 Jan 185.00
Feb n.a.
Mac n.a.
Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

High Density Polyethylene 2016 Dis 30.25


(HDPE) Pipe 2017 Jan 30.25
i. Profile Pipe Feb 30.25
150mm Mac 30.25
Apr 30.25
Mei 30.25
Jun 30.25
Jul 30.25
Ogos 30.25
Sept 30.25
Okt 30.25
Nov 30.25
Dis

27
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

High Density Polyethylene 2016 Dis 108.02


(HDPE) Pipe 2017 Jan 108.02
ii. Solid Pipe Feb 108.02
250mm Mac 108.02
Apr 108.02
Mei 108.02
Jun 108.02
Jul 108.02
Ogos 108.02
Sept 108.02
Okt 108.02
Nov 108.02
Dis

Vitrified Clay Pipe 2016 Dis 64.55


i. Standard Pipe 2017 Jan 100.14
225mm Feb 100.14
Mac 127.98
Apr 142.97
Mei 142.97
Jun 142.97
Jul 142.97
Ogos 142.97
Sept 142.97
Okt 142.97
Nov 137.96
Dis

ii. Jacking Pipe 2016 Dis 302.00


225mm 2017 Jan 371.00
Feb 371.00
Mac 371.00
Apr 371.00
Mei 371.00
Jun 371.00
Jul 371.00
Ogos 371.00
Sept 371.00
Okt 371.00
Nov 371.00
Dis

28
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

Reinforced Concrete Pipe 2016 Dis 296.80


i. Without Lining 2017 Jan 296.80
900mm Feb 296.80
Mac 296.80
Apr 296.80
Mei 276.85
Jun 256.90
Jul 256.90
Ogos 256.90
Sept 296.80
Okt 296.80
Nov 256.90
Dis

ii. With Lining (High Alumina) 2016 Dis 241.70


900mm 2017 Jan 241.70
Feb n.a.
Mac n.a.
Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

iii. With Lining (Sacrificial Lining) 2016 Dis 213.60


900mm 2017 Jan 213.60
Feb n.a.
Mac n.a.
Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

29
Jadual 3: Harga unit purata bagi pasir, batu baur, premix , fabric reinforcement , guardrail dan
paip air & paip pembetungan (samb.)
Table 3: Average unit prices for sand, aggregates, premix, fabric reinforcement, guardrail and
water pipe & sewerage pipe (cont'd)

Kawasan
Tempoh Region
Item
Period Semenanjung Malaysia
Peninsular Malaysia
(6b) Paip Pembetungan (samb.) RM Per Meter
Sewerage Pipe (cont'd) RM Per Metre

ABS Pipe 2016 Dis 28.92


i. Gravity 2017 Jan 28.92
110mm Feb 38.84
Mac 48.75
Apr 48.75
Mei 48.75
Jun 48.75
Jul 48.75
Ogos 48.75
Sept 48.75
Okt 48.75
Nov 48.75
Dis

ii. Force Main 2016 Dis 81.65


225mm 2017 Jan 81.65
Feb 81.65
Mac n.a.
Apr n.a.
Mei n.a.
Jun n.a.
Jul n.a.
Ogos n.a.
Sept n.a.
Okt n.a.
Nov n.a.
Dis

30
LAMPIRAN
APPENDIX
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip air
Water pipe

1. Mild Steel Pipe

100 mm 0.25
150 " 0.36
200 " 0.47
250 " 0.59
300 " 1.00
350 " 1.16
400 " 1.32
450 " 1.48
500 " 1.63
600 " 2.18
700 " 2.80
750 " 2.99
800 " 3.18
900 " 3.56
1000 " 4.25
1100 " 5.53
1150 " 5.83
1200 " 6.40
1300 " 7.60
1400 " 8.16
1500 " 10.32
1600 " 10.98
1700 " 11.64
1800 " 12.30
1900 " 12.96
2000 " 14.74
2100 " 16.01
2200 " 17.33

2. Stainless Steel Pipe

13 mm (1/2") 0.53
20 " (3/4") 0.69
25 " (1") 1.00
32 " (1 1 4 ") 1.34
38 " (1 1 2 ") 1.59
50 " (2") 2.14
63 " (2 1 2 ") 3.42
75 " (3") 4.66
100 " (4") 6.72

31
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip air
Water pipe

3. Ductile Iron Pipe

100 mm 0.35
150 " 0.45
200 " 0.60
250 " 0.79
300 " 1.00
350 " 1.25
400 " 1.50
450 " 1.78
500 " 2.05
600 " 2.70
700 " 3.50

4. High Density Polyethylene (HDPE) Pipe

i. Compression Fitting Using For


Jointing

20 mm 0.69
25 " 1.00
32 " 1.63
40 " 2.59
50 " 3.93
63 " 6.18
75 " 8.83
90 " 12.68

ii. Electrofusion Jointing

110 mm 0.48
125 " 0.63
140 " 0.80
160 " 1.00
180 " 1.30
200 " 1.54
225 " 1.96
250 " 2.46
280 " 3.27
315 " 3.97
355 " 6.29
400 " 7.80
450 " 12.98
500 " 17.76
560 " 21.02

32
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip air
Water pipe

iii. Butt Fussion

110 mm 0.48
125 " 0.62
140 " 0.76
160 " 1.00
180 " 1.25
200 " 1.56
225 " 1.94
250 " 2.38
280 " 2.97
315 " 3.76
355 " 4.79
400 " 6.06
450 " 7.90
500 " 7.90
560 " 12.61

33
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

1. Mild Steel Pipe

100 mm 0.40
125 " 0.50
150 " 0.59
200 " 0.79
250 " 0.99
300 " 1.00
350 " 1.38
400 " 1.58
450 " 1.78
500 " 1.98
550 " 2.20
600 " 2.37
650 " 2.50
700 " 2.77
750 " 2.96
800 " 3.16
850 " 3.40
900 " 3.56
950 " 3.80
1000 " 3.95
1200 " 4.74
1400 " 5.53
1600 " 6.32
1800 " 7.11
2000 " 7.91
2100 " 8.30
2200 " 8.70

2. Ductile Iron Pipe

80 mm 0.35
100 " 0.40
150 " 0.60
200 " 0.80
250 " 1.00
300 " 1.20
350 " 1.40
400 " 1.60
450 " 1.80
500 " 2.00
600 " 2.40
700 " 2.80
800 " 3.20
1000 " 3.40
1200 " 3.60

34
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

i. HDPE (Profile) Pipe

100 mm 0.64
125 " 0.80
150 " 1.00
200 " 1.73
250 " 1.28
300 " 4.10
350 " 7.50
400 " 10.55
450 " 12.00
500 " 17.00
550 " 19.31
600 " 19.32
650 " 19.50
700 " 20.25
750 " 21.27
800 " 25.60
850 " 31.07
900 " 35.00
950 " 38.19
1000 " 54.82
1200 " 74.00
1400 " 94.00
1600 " 123.23
1800 " 165.00
2000 " 207.35
2100 " 300.00
2200 " 400.00

ii. HDPE (Solid) Pipe

100 mm 0.20
125 " 0.25
150 " 0.50
200 " 0.65
250 " 1.00
300 " 1.50
350 " 2.00
400 " 2.69
450 " 3.51
500 " 4.48
550 " 5.50
600 " 6.00
650 " 7.50
700 " 8.50
750 mm 10.00

35
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

800 " 11.75


850 " 15.00
900 " 16.50
950 " 18.00
1000 " 20.40
1200 " 24.00
1400 " 26.00
1600 " 32.00
1800 " 36.00
2000 " 38.00
2100 " 42.00
2200 " 45.00

4. Vitrified Clay Pipe

i. Vitrified Clay (Standard) Pipe

100 mm 0.40
150 " 0.52
200 " 0.84
225 " 1.00
300 " 2.37
375 " 4.24
400 " 4.95
450 " 5.63
500 " 7.96
600 " 11.78
700 " 14.33
800 " 14.50

ii. Vitrified Clay (Jacking) Pipe

100 mm 0.80
150 " 0.85
200 " 0.90
225 " 1.00
300 " 1.60
375 " 1.87
400 " 2.17
450 " 2.60
500 " 3.22
600 " 3.75
700 " 4.15
800 " 4.65

36
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

5. Reinforced Concrete Pipe (RCP)

i. Without Lining

375 mm 0.26
450 " 0.31
600 " 0.47
750 " 0.69
900 " 1.00
1050 " 1.33
1200 " 1.56
1350 " 1.97
1500 " 2.44
1650 " 2.80
1800 " 3.59

ii. With Lining (High Alumina)

375 mm 0.26
450 " 0.31
600 " 0.47
750 " 0.69
900 " 1.00
1050 " 1.33
1200 " 1.56
1350 " 1.97
1500 " 2.44
1650 " 2.80
1800 " 3.59

iii. With Lining (Sacrificial Lining)

375 mm 0.26
450 " 0.31
600 " 0.47
750 " 0.69
900 " 1.00
1050 " 1.33
1200 " 1.56
1350 " 1.97
1500 " 2.44
1650 " 2.80
1800 " 3.59

37
Lampiran A
Appendix A

Jadual faktor pelarasan bagi paip air dan paip pembetungan


Adjustment factor table for water pipe and sewerage pipe

Kategori dan saiz paip Faktor pelarasan


Category and size of pipe Adjustment factor

Paip pembetungan
Sewerage pipe

6. ABS Pipe

i. Gravity

90 mm 0.67
110 " 1.00
150 " 2.07
225 " 3.64
315 " 7.10

ii. Force Main

15 mm 0.01
20 " 0.02
25 " 0.03
32 " 0.04
40 " 0.05
50 " 0.08
65 " 0.15
80 " 0.18
100 " 0.30
150 " 0.61
200 " 1.13
225 " 1.00
250 " 3.73
280 " 1.48
315 " 1.87
355 " 2.37
400 " 3.01
450 " 3.81
500 " 4.71
630 " 7.47

38
NOTA TEKNIKAL
TECHNICAL NOTES
NOTA TEKNIKAL TECHNICAL NOTES

Harga bar keluli, simen dan fabric reinforcement The prices for steel bars, cement and fabric
yang diterbitkan dalam Siaran Khas 1 ini reinforcement published in this Special Release 1
diperoleh dari pungutan harga yang dibuat oleh are obtained from the price collection conducted
Jabatan Perangkaan Malaysia. by Department of Statistics, Malaysia.

Harga yang dilaporkan adalah mengikut 3 Prices are reported according to 3 regions in
kawasan di Semenanjung Malaysia seperti Peninsular Malaysia as follows:
berikut:

Utara = Perlis, Kedah, Pulau Pinang North = Perlis, Kedah, Pulau


dan Perak Pinang and Perak

Tengah = Wilayah Persekutuan Kuala Central = Wilayah Persekutuan Kuala


Lumpur, Melaka, Negeri Lumpur, Melaka, Negeri
Sembilan, Selangor dan Sembilan, Selangor and
Johor Johor

Timur = Pahang, Terengganu dan East = Pahang, Terengganu and


Kelantan Kelantan

Harga bitumen penembusan 80/100 adalah The Bitumen 80/100 Penetration is based on the
berdasarkan harga purata ex-Kuala Lumpur. average ex-Kuala Lumpur.

Harga diesel diperoleh daripada Kementerian The price for diesel is obtained from the Ministry
Perdagangan Dalam Negeri, Koperasi dan of Domestic Trade, Co-operatives and
Kepenggunaan. Consumerism.

Harga paip air dan paip pembetungan diperoleh The prices for water pipe and sewerage pipe are
daripada persatuan pembekal. Faktor pelarasan obtained from the supplier associations. The
bagi kategori dan saiz paip yang tidak diterbitkan adjustment factors for the other categories and
dalam Siaran Khas 1 ini adalah seperti di sizes not published in this Special Release 1 are
Lampiran A. shown in Appendix A.

Harga bagi bahan-bahan binaan lain (yang tidak The prices for other building materials (not stated
dinyatakan di atas) adalah diperoleh dari above) are obtained from the price collection
pungutan harga yang dibuat oleh Jabatan conducted by Department of Statistics, Malaysia.
Perangkaan Malaysia.

Semua harga yang tersebut di atas adalah bagi All prices mentioned above are relevant for
tujuan pengiraan kadar perubahan harga sahaja escalation purposes only and should not be used
dan tidak boleh digunakan untuk mewakili to represent actual price levels.
kedudukan harga yang sebenar.

39
Jadual Tarikh Pengeluaran Siaran Khas 1
(Untuk Kerja-Kerja Kejuruteraan Awam), Semenanjung Malaysia
Januari - Disember 2017
Schedule Of Release Dates For Special Release 1
(For Civil Engineering Works), Peninsular Malaysia
January - December 2017

Bulan Rujukan Tarikh


Reference Month Date

Januari 2017 10 Februari 2017


January 2017 10 February 2017

Februari 2017 10 Mac 2017


February 2017 10 March 2017

Mac 2017 10 April 2017


March 2017 10 April 2017

April 2017 09 Mei 2017


April 2017 09 May 2017

Mei 2017 09 Jun 2017


May 2017 09 June 2017

Jun 2017 10 Julai 2017


June 2017 10 July 2017

Julai 2017 10 Ogos 2017


July 2017 10 August 2017

Ogos 2017 11 September 2017


August 2017 11 September 2017

September 2017 10 Oktober 2017


September 2017 10 October 2017

Oktober 2017 10 November 2017


October 2017 10 November 2017

November 2017 11 Disember 2017


November 2017 11 December 2017

Disember 2017 10 Januari 2018


December 2017 10 January 2018

40

You might also like