percussion + rotation
percussion
rotation
Drill Tube
Large outer diameter of section means rigid drill string Smooth drill string facilitates stable hole walls and reduces risk of jamming Balanced clearance between drill tube and hole wall provides effective hole cleaning Limited flushing air requirement Less installed power needed (compared with DTH)
Impact Rods
Impact power
No threaded joints Effective transmission of the impact power Virtually no energy loss in joints (compared with
Tophammer)
Down-The-Hole Drilling
1910s First patent claimed in Russia
Hydraulic TH
19 51 mm
Hydraulic TH
60 70 mm
COPROD
DTH Hammers
Rotary Drilling
445
25 50 75 100 125 150 175 200 225 250
mm
ROC D3 51 - 89 12 x 81) 15
ROC D7 LM 64 - 115 20 x 1 + 14 x 1 18
ROC F9 LM 89 - 127 20 x 6 25
ROC L7 89 - 127 14 x 7 30
ROC L7 LM 89 - 127 20 x 6 30
Smart Rigs
Automatic feed alignment
Automatic rod adding/drilling process Measuring while drilling
GPS Antenna Radio modem antenna
GPS Antenna
Sensors
Smart Rigs
GPS navigation menu
Bearing
Geographic north
Smart Rigs
GPS navigation menu
Coverage area Hole bottom Calculated hole start Drill bit
Integrated
Laser Auto Auto
instrument
plane
Improved
Diagnostic
Crawler drill
ROC F7CR
ROC F9CR
ROC L7CR
Hole range
CR 76, CR 89 CR 89/CR 102 CR 89/CR 102/CR 127
mm
ft x qty ft x qty ft x qty
90 - 127
12 x 9 ---------
90 - 127
12 x 9 ---------
105 - 165
----12 x 9/12 x 8 20 x 6/20 x 5/20 x 4
Drill output
kW
21
25
30/38
Crawler drill Hole range Drill tube Max pressure mm m x qty bar
Crawler drill Hole range Drill rod Hyd rock drill mm ft x qty
CM 470 LC 64 - 89 10 x 6 YH 70
ECM 470 64 - 89 12 x 6 YH 70
Drill output
kW
15
15
18
18
Crawler drill Hole range Drill rod Rock drill mm ft x qty type x Kw
Air pressure
1)
bar
-----
24
24
-----
Safety
Efficiency Property site
Limestone quarrying
ROC L6 with COP 34 at Bopfingen Bortolazzi Quarry
Hole diameter
Hole length Net pen rate Hourly capacity Fuel cons.
95 mm
17 m 1,3 m/min 60 m 0,6-0,8 l/dm
Blasting pattern, 1,5 x 2,5 m - Tight pattern for least possible vibration into bed rock - Controlled hole bottom and hole inclination Electric detonators Cartridge explosives
Drill string Hole diameter Hole depth Hole pattern Work schedule
Heavily quartsited (SiO2) rock Climatic conditions - winter low - 35oC - summer high + 35o Why COPROD? Large top-hammer drilling faster and less expensive than DTH
Limestone quarrying
Taiwan Cement Ho Ping Quarry Contract Drilling - Taiwan
Limestone - very fractured Annual prod. Nbr of drills Drill string Hole dia Hole inclination Gross/hour Pattern Bench height Work schedule: - shift/day - days/week
Performance 2003 approx: - availability 95%, serviced by customer - 37 000 m/year at 1,25 x 8h shifts/day at 220 days/year - 1 770 engine hours - 140 hours tramming approx. 5 km at a time Fully detailed report for all 2003 will follow within a fortnight
Geology: - siderite (main) - iron ore content 38% - other mixed species of rock - usually rather fractured rock
Coal mining
Anglo American Coal AMCO - Nevaal Coal overburden drilling Coal seam drilling
ROC L8 replacing Drillteck DK 35
Hole dia 165 mm Bench heigh ~ 8 16 m Shift capacity 500 m + Drillteck DK35 Higer net pen. rate Bigger compressor Higher pressure But Slow set up and Tramming Why ROC L8? Reduced cycle time by 10% and less cost
Pre-split drilling
Sisheen iron ore mine South Africa
Pre-split drilling
Imagine the potential saving for your operation if you would Double Bench your pre-splits instead
ROC L8
Savings: Detonators!
Charging crew!
Hole collaring and set-up!
Mine production
Typical ROC L8 applications
Contour holes - 95-165 mm Buffer holes - 110-165 mm
Slope Stabilization
Installing MAI self drilling anchors
Principle
Nut Anchor plate Anchor coupling Anchor bolt R25/R38/R51 16m Sacrificed drill bit 41-115 mm
Junction Bromely, Kent, UK Applications: Slope stabilization Micro injection pile Temporary support anchor Soil nailing
Slope stabilization
ROC D5 drilling SDA in Switzerland Highway embankment Equipped for drilling with SDA
Anchor rod Bit diameter Hole length Angle fr horizontal Installed anchors/day
R38 51 mm 10 20 m 15 29o 20 - 30
Semi jack up platform GPS nav. system for exact anchoring Platform mounted drill w/o track frames Rail system to fit X & Y coordinates Feed with wave change compensator Accepts waves up to 1, 5 m
Drill rod diameter Speedrod Depth below water surface - planning for
RC - Reverse Circulation
Working principle
Application Flexibility!
Currently the ROC L8 is the only rig on the market that covers all drilling requirements in the open-pits
Production Drilling 95 mm 171 mm