Professional Documents
Culture Documents
Strip Footing Design
Strip Footing Design
Load2
Load3
=
=
=
2200 Span
2600 Span
2200 Span
Total
7000
Sbc
Ubc
=
=
100
300
Width
1.8
Depth
of Excavation
2.4 m
Foot - ht Ht of beam -
0.7 m
0.9
Load per m -
479.4521
Wtof found -
60.75
Wt of soil -
68.04
Resultant load
Say
1.8975
5.5
1.8
5.5
5.5
1.8975
5.5
1.8
14.6
Approx width
350.6621
350
5.5 m
2200
b
0.047
a
0.0625
a
Moments
5.25
2600
d
0.047
0.094
661.7188 Knm
b
Moments
c
497.6125
Moments
d
995.225
Moments
453.4031
Moments
1.598174
m
2200
e
0.0625
602.9297