You are on page 1of 8

FIELD CALCULATIONS

Made By Dmitry Lokhov (10-03-01 "ASTRA")

Material requirements to increase mud weight


INPUT DATA Weight Up Calculations (Volume increase tolerated) m3 bbl g/cm3 lb/gal Vi - Starting volume of mud 19.40 122.02 S.G. of the weight material 4.00 33.38 Wf - Desired mud weight 1.86 15.52 Wi - Starting mud weight 1.26 10.52 Package size of weighting , kg material., kg Weight Up Calculations (Final volume specified) S.G. of the weight material 4.20 35.05 Wf - Desired mud weight 1.55 12.94 Wi - Starting mud weight 1.05 8.76 Vd - Desired final volume 35.00 220.14 Package size of weighting , kg material., kg OUTPUT DATA WEIGHT OF MATERIAL TO VOLUME INCREASE ADD sacks kg lb liters m3 bbl

24.0

21759 47969.44

5440

5.44

34.22

907

Weight Up Calculations (Final volume specified) WEIGHT OF MATERIAL TO STARTING VOLUME OF MUD ADD sacks kg lb liters m3 bbl

1000

23.3

23325 51422.82 29446

29.45

185.21

Material requirements to decrease mud weight


Decrease mud weight (Volume increase tolerated) m3 bbl g/cm3 lb/gal Vi - Starting volume of mud 200 1257.96 Wf - Desired mud weight 1.6 13.35 Wi - Starting mud weight 1.61 13.44 pdf - S.G. of dilution fluid 1.55 12.94 Decrease mud weight (Final volume specified) Vd - Desired final volume 160 1006.37 Wf - Desired mud weight 1.32 11.02 Wi - Starting mud weight 1.35 11.27 pdf - S.G. of dilution fluid 1.06 8.85 VOLUME OF DILUTION FLUID REQUIRED liters m3 bbl

39939.09

39.94

251.21

Enter Input Values To White Color Cells Only

Decrease mud weight (Final volume specified) VOLUME OF DILUTION STARTING VOLUME OF MUD FLUID REQUIRED liters m3 bbl liters m3 bbl

16551.62

16.55

104.11 143448 143.45 902.26

Dilution Programm
Total Circulating Time Volume of dilution fluid required Pit Geometry Height, cm Volume/ 1cm, m3 m3 180 9.00 bbl 56.61 Level Drop, cm Time/ 1m3 transf Time/ 1cm drop

55.5

20.0

minutes

3.2

minutes

260.0

0.1623

FIELD CALCULATIONS
Made By Dmitry Lokhov (10-03-01 "ASTRA")

Calculating hole volume


INPUT DATA Hole Diameter mm inches 220.6 8.692 Section Length m feet 280 918.64 mm 168 Pipe OD inches 6.619 mm 10.6 ID inches 0.418 OUTPUT DATA Hole Volume (w/o drillstring) Annular Volume (Capacity) m3 bbl m3/m bbl/ft m3 m3/m bbl bbl/ft 10.7183 67.42 0.0383 0.0734 4.5020 0.0161 28.32 0.0308

DP or DC capacity and displacement m3/m bbl/ft m3/m bbl/ft 0.0001 0.0002 0.0221 0.0424

0.088 Liters/m

22.108 Liters/m

Calculating pump output


DUPLEX mm inches 0.000 0.000 0.000 Enter values in mm TRIPLEX mm inches 191 305 95 7.506 12.017

DUPLEX OP
liters/ 1stroke strokes on 1m3

TRIPLEX OP
liters/ 1stroke strokes on 1m3

Rod OD Liner ID Stroke Length Efficiency, %

0.0000
bbl/ 1 stroke

#DIV/0!
strokes on 1 bbl

24.8468
bbl/ 1 stroke

40
strokes on 1 bbl

0.0000

#DIV/0!

0.1563

Pit Volumes
PIT DATA Tank Height m3 / 1cm Desired Volume L from the top Current Volume 260 0.1623 30.00 28.00 20.00 cm m3 cm m3 Total Volume Current Volume Cm from top for desired volume Cm from the top for current volume

42.20

37.65

75.2

136.8