Professional Documents
Culture Documents
Field Calculations: Material Requirements To Increase Mud Weight
Field Calculations: Material Requirements To Increase Mud Weight
24.0
21759 47969.44
5440
5.44
34.22
907
Weight Up Calculations (Final volume specified) WEIGHT OF MATERIAL TO STARTING VOLUME OF MUD ADD sacks kg lb liters m3 bbl
1000
23.3
29.45
185.21
39939.09
39.94
251.21
Decrease mud weight (Final volume specified) VOLUME OF DILUTION STARTING VOLUME OF MUD FLUID REQUIRED liters m3 bbl liters m3 bbl
16551.62
16.55
Dilution Programm
Total Circulating Time Volume of dilution fluid required Pit Geometry Height, cm Volume/ 1cm, m3 m3 180 9.00 bbl 56.61 Level Drop, cm Time/ 1m3 transf Time/ 1cm drop
55.5
20.0
minutes
3.2
minutes
260.0
0.1623
FIELD CALCULATIONS
Made By Dmitry Lokhov (10-03-01 "ASTRA")
DP or DC capacity and displacement m3/m bbl/ft m3/m bbl/ft 0.0001 0.0002 0.0221 0.0424
0.088 Liters/m
22.108 Liters/m
DUPLEX OP
liters/ 1stroke strokes on 1m3
TRIPLEX OP
liters/ 1stroke strokes on 1m3
0.0000
bbl/ 1 stroke
#DIV/0!
strokes on 1 bbl
24.8468
bbl/ 1 stroke
40
strokes on 1 bbl
0.0000
#DIV/0!
0.1563
Pit Volumes
PIT DATA Tank Height m3 / 1cm Desired Volume L from the top Current Volume 260 0.1623 30.00 28.00 20.00 cm m3 cm m3 Total Volume Current Volume Cm from top for desired volume Cm from the top for current volume
42.20
37.65
75.2
136.8