You are on page 1of 10

DAVIS FAMILY 1-42 PRE RECORDED IMFORMATION

# 1: #2 D.P.
D.P. HWDP 1200 PSI @ 40 SPM 2050 PSI @ TODAY

TVD

18,450

MD

18,450 0

FOOTAGE

SLOW PUMP PRESSURES:CHOKE L/FRICTION PRESS.


60 SPM NO. 1 1200 PSI @ 40 SPM 2050 PSI @ 60 SPM 95%

0 LAST BIT
TRUE PUMP OUT PUT NO. 2

MD-TVD =
ORIG. M/WT

PUMPS

95% EFFICIENCY .0690 191.3 0.0 0.00 1.71 3.53

DRILL STRING CAP.


5 SIZE SIZE SIZE 19.5 WEIGHT WEIGHT WEIGHT .0178 .0000 .0000 .0087 .0087 BPF .X BPF X BPF X BPFX BPF.X 0 10,748 LENGTH LENGTH LENGTH LENGTH LENGTH

.0690
= = = = =

DP--BBLS.
DP--BBLS. HWDP-BBLS

D'STG-I.D. 3.34

D.C. D.C

9
8.00

SIZE SIZE

192
150

WEIGHT I.D.

196
406

D.C.--BBLS. DC--BBLS.

0 2.5 STROKES,SURF. TO BIT

194.8

TOTAL BBLS. BBL/FT. BBL/FT. BBL/FT. BBL/FT. BBL/FT BBL/FT. BBL/FT X X X

<:> 0

.0690 TPO.= .= .=

2,824 STROKES TO BIT


ANNUL.-I.D.

ANNULAR CAP.
VOL.BETWEEN13.375&5" 7 5/8 CAS & DP 4" DP VOL BETWEENN OH & 5" DP

.1495 .1215 .0000 .0000 .0000 .0836 .0670

3,473 FT/CSG 7,275 FT/CSG 0 0 0 406

519.21 BBLS.
883.84 BBLS.

VOL. BETWEEN VOL.BETWEEN


VOL. BETWEEN 8"

DC & OH

X X X

FT./N/A .= .= FT/N/A/OH .= FT./HWDP/OH .= FT./OH/D.C. . = =

0.00 BBLS.
0.00 0.00 BBLS. 33.94 13.13 BBLS. =

VOL. BETWEEN OH &9" 4 DC 3/4" D.C.

X LENGTH OF LINER-------------1416.2

196 FT./OH/DC

0 T/BBLS. <:> .0690 TPO 20,524 18.3 BBLS.

CASING INFORMATION
CSG. 7.63 SIZE/IN. 39 WT.# FT. Q125 GRADE

M/D 16,985 0

16,164 .@ M/TVD SH. TEST

MEASURE INF.

SIDPP

PSI

SICP

PSI

PIT GAIN

FIND KILL WT. MUD:


0 SIDPP(PSI) <:> 0.052 <:> 18,450 (TVD)

.+

13.5 (ORIG. WT.MUD PPG.) = 13.5 PPG.KILL .MUD

INITAL CIRC. PRESSURE (ICP)


0 SIDPP (PSI) + 2050 SLOW P/PRES. = 2050 PSI

INITIAL CIRC. PRESSURE (ICP)

FINAL CIRC. PRESSURE (FCP)


P-#2
2050 SLOW PUMP PRESS.

13.5

KILL WT. MUD

<:>

13.5 ORIG. WT. MUD =


2050 FCP

MAXIMUM CSG. PRESSURE (MCP)


18.3 SH. TEST - O/M/WT. 13.5 .=

4.80

0.052

16,985

TVD/SH.=

4239 PSI-MAX.PRESS.

4239

PRESSURE DECLINE SCHEDULE


1 STROKES 2823.9
DPP ICP 2050 2050 10 0 10 282 2050 2

4
1130 2050

5
1412 2050

6
1694 2050

7
1977 2050

8
2259 2050

565 847 2050 2050 0

2541
2050

10 2824 2050

TO FILL ABOVE DECI[LINE SCHEDULE: 1. PUT STROKES TO BIT IN "STROKES" BOX. FIND CHANGE PER BOX WITH STROKES <:> 10. ADD THAT AMOUNT TO EACH BOX 2.PUT ICP & FCP IN MARKED BOXES. FIND CHANGE PER BOX WITH (ICP-FCP)<:> 10. SUBTRACT THAT FROM ICP. WAIT & WT. KILL PROCEDURE: 1. BUILD MUD WT. TO KWM.2. CIRCULATE KWM AROUND WELL FOLLOWING KILL SHEET. 3 CHECK FOR REMAINING PRESSURE OR FLOW

ANNULAR VOL. IMFORMATION


CSG. CSG. CSG. CSG. HOLE SIZE 7.63 0 0 6 1/2 I.D 6.625 0 0 10 LENGTH 16,985 0 0 1,465

VOL.
724.473 0.00 0.00 142.37 866.844 TOTAL VOL. OF HOLE

SACKS OF WT. NEEDED TO BUILD KILL MUD WT. 35 .10 .= 25


KILL WT

0.0
KILL WT

.-

0
P/M/WT

14.7

<>

25

.=

0
SK/BLL

1600 SYS/VOL

.=

0
TOTAL SKS

FAMILY 1-42
18,450

13.5 . D'STG-I.D.

STROKES,SURF. TO BIT
STROKES TO BIT
ANNUL.-I.D.

6.625 6.5 0 0 0 6.5


BIT-SURF

PPG EMW

PPG.KILL .MUD

INITIAL CIRC. PRESSURE (ICP)

PSI-MAX.PRESS.

MCP

STROKES

FCP

LONSDALE 1-6 PRE RECORDED IMFORMATION


# 1: #2 D.P.
D.P. HWDP 1550 PSI @ 30 SPM 2000 PSI @ TODAY

TVD

3,530

MD

3,530 0

FOOTAGE

SLOW PUMP PRESSURES:CHOKE L/FRICTION PRESS.


40 SPM NO. 1 1600 PSI @ 30 SPM 2070 PSI @ 40 SPM 95%

0 LAST BIT
TRUE PUMP OUT PUT NO. 2

MD-TVD =
ORIG. M/WT

PUMPS

95% EFFICIENCY .0910 27.8 0.0 0.00 0.00 5.84

DRILL STRING CAP.


4 SIZE SIZE SIZE SIZE 4.75 O.D. 14 WEIGHT WEIGHT WEIGHT .0108 .0000 .0000 .0000 .0061 BPF .X BPF X BPF X BPFX BPF.X 0 2,568 LENGTH LENGTH LENGTH LENGTH LENGTH

.0910
= = = = =

DP--BBLS.
DP--BBLS. HWDP-BBLS

D'STG-I.D. 3.34

D.C. D.C

0
2.5

WEIGHT I.D.

0
962

D.C.--BBLS. DC--BBLS.

0 2.5 STROKES,SURF. TO BIT

33.7

TOTAL BBLS. BBL/FT. BBL/FT. BBL/FT. BBL/FT. BBL/FT BBL/FT. BBL/FT X X X

<:> 0

.0910 TPO.= .= .=

370 STROKES TO BIT


ANNUL.-I.D.

ANNULAR CAP.
VOL.BETWEEN 7 5/8 CAS & 4" DP VOL.BETWEEN OH & 4" D.P.

.0271 .0255 .0000 .0000 .0000 .0000 .0191

15,450 FT/CSG -12,882 FT/CSG 0 0 0 0

418.77 BBLS.
-328.62 BBLS.

VOL. BETWEEN VOL.BETWEEN VOL. BETWEEN HWDP& OH..


VOL. BETWEEN

X X X

FT./N/A .= .= FT/N/A/OH .= FT./HWDP/OH .= FT./OH/D.C. . = =

0.00 BBLS.
0.00 0.00 BBLS. 0.00 18.41 BBLS. =

VOL. BETWEEN OH & 4 3/4" D.C.

X LENGTH OF LINER-------------108.5

962 FT./OH/DC

0 T/BBLS. <:> .0910 TPO 1,193 18 BBLS.

CASING INFORMATION
CSG. 7.63 SIZE/IN. 39 WT.# FT. P110 GRADE

M/D 15,450 0

15,450 .@ M/TVD SH. TEST

MEASURE INF.

SIDPP

PSI

SICP

PSI

PIT GAIN

FIND KILL WT. MUD:


0 SIDPP(PSI) <:> 0.052 <:> 3,530 (TVD)

.+

15.8 (ORIG. WT.MUD PPG.) = 15.8 PPG.KILL .MUD

INITAL CIRC. PRESSURE (ICP)


0 SIDPP (PSI) + 1600 SLOW P/PRES. = 1600 PSI

INITIAL CIRC. PRESSURE (ICP)

FINAL CIRC. PRESSURE (FCP)


P-#2
1600 SLOW PUMP PRESS.

15.8

KILL WT. MUD

<:>

15.8 ORIG. WT. MUD =


1600 FCP

MAXIMUM CSG. PRESSURE (MCP)


18.0 SH. TEST - O/M/WT. 09.5 .=

8.50

0.052

15,450

TVD/SH.=

6829 PSI-MAX.PRESS.

6829

PRESSURE DECLINE SCHEDULE


1 STROKES 370.15
DPP ICP 1600 1600 10 0 10 37 1600 2

4
148 1600

5
185 1600

6
222 1600

7
259 1600

8
296 1600

74 111 1600 1600 0

333
1600

10 370 1600

TO FILL ABOVE DECI[LINE SCHEDULE: 1. PUT STROKES TO BIT IN "STROKES" BOX. FIND CHANGE PER BOX WITH STROKES <:> 10. ADD THAT AMOUNT TO EACH BOX 2.PUT ICP & FCP IN MARKED BOXES. FIND CHANGE PER BOX WITH (ICP-FCP)<:> 10. SUBTRACT THAT FROM ICP. WAIT & WT. KILL PROCEDURE: 1. BUILD MUD WT. TO KWM.2. CIRCULATE KWM AROUND WELL FOLLOWING KILL SHEET. 3 CHECK FOR REMAINING PRESSURE OR FLOW

ANNULAR VOL. IMFORMATION


CSG. CSG. CSG. CSG. HOLE SIZE 7.63 0 0 6 1/2 I.D 6.625 0 0 10 LENGTH 15,450 0 0 -11,920

VOL.
658.999 0.00 0.00 -1158.41 -499.41 TOTAL VOL. OF HOLE

SACKS OF WT. NEEDED TO BUILD KILL MUD WT. 35 .10 .= 25


KILL WT

10.0
KILL WT

.-

9.7
P/M/WT

14.7

<>

25

.=

0.1764
SK/BLL

2223 SYS/VOL

.=

392
TOTAL SKS

SDALE 1-6
3,530

9.5 . D'STG-I.D.

STROKES,SURF. TO BIT
STROKES TO BIT
ANNUL.-I.D.

6.625 6.5 0 0 0 6.5


BIT-SURF

PPG EMW

PPG.KILL .MUD

INITIAL CIRC. PRESSURE (ICP)

PSI-MAX.PRESS.

MCP

STROKES

FCP

LOUELLA 2 - 33
PRE RECORDED IMFORMATION
# 1: #2 D.P.
D.P. HWDP PSI @ SPM 50 TODAY

TVD

10,400

MD

10,400 0

FOOTAGE

SLOW PUMP PRESSURES:CHOKE L/FRICTION PRESS.


SPM NO. 1 PSI @ SPM PSI @ SPM 95%

0 LAST BIT
TRUE PUMP OUT PUT NO. 2

MD-TVD =
ORIG. M/WT

PUMPS

95% EFFICIENCY

DRILL STRING CAP.


5 SIZE SIZE SIZE SIZE 6.50 O.D. 19.5 WEIGHT WEIGHT WEIGHT .0178 .0000 .0000 .0000 .0073 BPF .X BPF X BPF X BPFX BPF.X 0 9,603 LENGTH LENGTH LENGTH LENGTH LENGTH

.0914
= = = = =

.0914
170.6 0.0 0.00 0.00 5.82

D'STG-I.D. DP--BBLS.
DP--BBLS. HWDP-BBLS

4.276

D.C. D.C

0
2.0125

WEIGHT I.D.

0
797

D.C.--BBLS. DC--BBLS.

0 2.8125 STROKES,SURF. TO BIT

176.5

TOTAL BBLS. BBL/FT. BBL/FT. BBL/FT. BBL/FT. BBL/FT BBL/FT. X X X

<:> 0

.0997 TPO.= .= .=

1,770 STROKES TO BIT


ANNUL.-I.D.

ANNULAR CAP.
VOL.BETWEEN 9-5/8 CAS&5" DP VOL.BETWEEN OH & 5" D.P.

.0530 .0501 .0000 .0000 .0000 .0000

3,558 FT/CSG 6,842 FT/CSG 0 0 0 0

188.74 BBLS.
342.85 BBLS.

VOL. BETWEEN VOL.BETWEEN VOL. BETWEEN HWDP& OH..


VOL. BETWEEN

X X X

FT./N/A .= .= FT/N/A/OH .= FT./HWDP/OH .= FT./OH/D.C. . = =

0.00 BBLS.
0.00 0.00 BBLS. 0.00 26.94 BBLS. =

VOL. BETWEEN OH && 7" 6.5" D.C. DC

.0338 BBL/FT X LENGTH OF LINER-------------558.5

797 FT./OH/DC

0 T/BBLS. <:>
3,558

.0997 TPO

5,602 10.5 BBLS.

CASING INFORMATION
CSG. 9.63 SIZE/IN. 36 WT.# FT. K-55 GRADE

M/D 3,558 0

.@ M/TVD SH. TEST

MEASURE INF.

SIDPP

PSI

SICP

PSI

PIT GAIN

FIND KILL WT. MUD:


0 SIDPP(PSI) <:> 0.052 <:> 10,400 (TVD)

.+

9.2 (ORIG. WT.MUD PPG.) = 9.2 PPG.KILL .MUD

INITAL CIRC. PRESSURE (ICP)


0 SIDPP (PSI) + 0 SLOW P/PRES. = 0 PSI

INITIAL CIRC. PRESSURE (ICP)

FINAL CIRC. PRESSURE (FCP)


P-#2
0 SLOW PUMP PRESS.

9.2

KILL WT. MUD

<:>

9.2 ORIG. WT. MUD =


0 FCP

MAXIMUM CSG. PRESSURE (MCP)


09.3 SH. TEST - O/M/WT. 09.2 .=

0.10

0.052

3,515

TVD/SH.=

18 PSI-MAX.PRESS.

18

PRESSURE DECLINE SCHEDULE


1 STROKES 1769.8
DPP ICP 0 0 10 0 10 177 0 2

2
354 0 0

3
531 0

4
708 0

5
885 0

6
1062 0

7
1239 0

8
1416 0

1593
0

10 1770 0

TO FILL ABOVE DECI[LINE SCHEDULE: 1. PUT STROKES TO BIT IN "STROKES" BOX. FIND CHANGE PER BOX WITH STROKES <:> 10. ADD THAT AMOUNT TO EACH BOX 2.PUT ICP & FCP IN MARKED BOXES. FIND CHANGE PER BOX WITH (ICP-FCP)<:> 10. SUBTRACT THAT FROM ICP. WAIT & WT. KILL PROCEDURE: 1. BUILD MUD WT. TO KWM.2. CIRCULATE KWM AROUND WELL FOLLOWING KILL SHEET. 3 CHECK FOR REMAINING PRESSURE OR FLOW

ANNULAR VOL. IMFORMATION


CSG. CSG. CSG. CSG. HOLE SIZE 9.63 0 0 8 3/4 I.D 8.921 0 0 8.75 LENGTH 3,558 0 0 6,842

VOL.
275.18 0.00 0.00 509.08 784.258 TOTAL VOL. OF HOLE

SACKS OF WT. NEEDED TO BUILD KILL MUD WT. 35 .10 .= 25


KILL WT

10.0
KILL WT

.-

9.4
P/M/WT

14.7

<>

25

.=

0.3528
SK/BLL

700 SYS/VOL

.=

247
TOTAL SKS

LOUELLA 2 - 33
10,400
10400

9.2 .

STROKES,SURF. TO BIT
STROKES TO BIT
ANNUL.-I.D.

8.921 8.75 0 0 0 8.75


BIT-SURF

PPG EMW

PPG.KILL .MUD

INITIAL CIRC. PRESSURE (ICP)

PSI-MAX.PRESS.

MCP

STROKES

FCP

REED 1-20 PRE RECORDED IMFORMATION


# 1: #2 D.P.
D.P. HWDP 1850 PSI @ 40 SPM 1400 PSI @ TODAY

TVD

20,270

MD

20,270 0

FOOTAGE

SLOW PUMP PRESSURES:CHOKE L/FRICTION PRESS.


30 SPM NO. 1 1850 PSI @ 40 SPM 1400 PSI @ 30 SPM 95%

0 LAST BIT
TRUE PUMP OUT PUT NO. 2

MD-TVD =
ORIG. M/WT

PUMPS

95% EFFICIENCY

DRILL STRING CAP.


4 2 7/8 SIZE SIZE SIZE SIZE 3.50 O.D. 14 10.4 WEIGHT WEIGHT WEIGHT WEIGHT I.D. .0108 .0045 .0000 .0000 .0022 BPF .X BPF X BPF X BPFX BPF.X 15,717 3532 0 LENGTH LENGTH LENGTH LENGTH LENGTH

.0510
= = = = =

.0510
170.4 15.9 0.00 0.00 2.23

DP--BBLS.
DP--BBLS. HWDP-BBLS

D'STG-I.D. 3.34 2.151 0 1.5 STROKES,SURF. TO BIT

D.C. D.C

0
1.975

0
1021

D.C.--BBLS. DC--BBLS.

188.5

TOTAL BBLS. BBL/FT. BBL/FT. BBL/FT. BBL/FT. BBL/FT BBL/FT. BBL/FT X X X

<:> 0

.0510 TPO.= .= .=

3,696 STROKES TO BIT


ANNUL.-I.D.

ANNULAR CAP.
VOL.BETWEEN 7 5/8 CAS & 4" DP VOL.BETWEEN OH & 2 7/8" D.P.

.0271 .0087 -.0080 -.0080 .0000 .0000 .0124

19,175 FT/CSG 74 FT/CSG 0 0 0 0

519.73 BBLS.
0.65 BBLS.

VOL. BETWEEN VOL.BETWEEN VOL. BETWEEN HWDP& OH..


VOL. BETWEEN

X X X

FT./N/A .= .= FT/N/A/OH .= FT./HWDP/OH .= FT./OH/D.C. . = =

0.00 BBLS.
0.00 0.00 BBLS. 0.00 12.65 BBLS. =

VOL. BETWEEN OH & 3.5" D.C.

X LENGTH OF LINER-------------533.0

1021 FT./OH/DC

0 T/BBLS. <:> .0510 TPO 10,452 16.5 BBLS.

CASING INFORMATION
CSG. 5.50 SIZE/IN. 17 WT.# FT. P110 GRADE

M/D 19,175 0

19,175 .@ M/TVD SH. TEST

MEASURE INF.

SIDPP

PSI

SICP

PSI

PIT GAIN

FIND KILL WT. MUD:


0 SIDPP(PSI) <:> 0.052 <:> 20,270 (TVD)

.+

16.0 (ORIG. WT.MUD PPG.) = 16.0 PPG.KILL .MUD

INITAL CIRC. PRESSURE (ICP)


0 SIDPP (PSI) + 1850 SLOW P/PRES. = 1850 PSI

INITIAL CIRC. PRESSURE (ICP)

FINAL CIRC. PRESSURE (FCP)


P-#2
1850 SLOW PUMP PRESS.

16.0

KILL WT. MUD

<:>

16.0 ORIG. WT. MUD =


1850 FCP

MAXIMUM CSG. PRESSURE (MCP)


16.5 SH. TEST - O/M/WT. 16.0 .=

0.50

0.052

19,175

TVD/SH.=

499 PSI-MAX.PRESS.

499

PRESSURE DECLINE SCHEDULE


1 STROKES 3696.2
DPP ICP 1850 1850 10 0 10 370 1850 2

4
1478 1850

5
1848 1850

6
2218 1850

7
2587 1850

8
2957 1850

739 1109 1850 1850 0

3327
1850

10 3696 1850

TO FILL ABOVE DECI[LINE SCHEDULE: 1. PUT STROKES TO BIT IN "STROKES" BOX. FIND CHANGE PER BOX WITH STROKES <:> 10. ADD THAT AMOUNT TO EACH BOX 2.PUT ICP & FCP IN MARKED BOXES. FIND CHANGE PER BOX WITH (ICP-FCP)<:> 10. SUBTRACT THAT FROM ICP. WAIT & WT. KILL PROCEDURE: 1. BUILD MUD WT. TO KWM.2. CIRCULATE KWM AROUND WELL FOLLOWING KILL SHEET. 3 CHECK FOR REMAINING PRESSURE OR FLOW

ANNULAR VOL. IMFORMATION


CSG. CSG. CSG. CSG. HOLE 5 SIZE 5.50 0 0 I.D 6.625 0 0 10 LENGTH 19,175 0 0 1,095

VOL.
817.884 0.00 0.00 106.41 924.298 TOTAL VOL. OF HOLE

SACKS OF WT. NEEDED TO BUILD KILL MUD WT. 35 .10 .= 25


KILL WT

10.0
KILL WT

.-

9.7
P/M/WT

14.7

<>

25

.=

0.1764
SK/BLL

2223 SYS/VOL

.=

392
TOTAL SKS

EED 1-20
20,270

16.0 . D'STG-I.D.

STROKES,SURF. TO BIT
STROKES TO BIT
ANNUL.-I.D.

6.625 5 0 0 0 5
BIT-SURF

PPG EMW

PPG.KILL .MUD

INITIAL CIRC. PRESSURE (ICP)

PSI-MAX.PRESS.

MCP

STROKES

FCP

SALLY 1-18

SALLY 1-18
TODAY

PRE RECORDED IMFORMATION


# 1: #2 D.P.
D.P. HWDP 1800 PSI @ 25 SPM 2800 PSI @

TVD

17,984

MD

17,984 0

FOOTAGE

SLOW PUMP PRESSURES:CHOKE L/FRICTION PRESS.


35 SPM NO. 1 1000 PSI @ 25 SPM 1650 PSI @ 35 SPM 95%

0 LAST BIT
TRUE PUMP OUT PUT NO. 2

MD-TVD =
ORIG. M/WT

PUMPS

95% EFFICIENCY

DRILL STRING CAP.


3.5 SIZE SIZE SIZE SIZE 4.75 O.D. 4 WEIGHT WEIGHT WEIGHT .0063 .0000 .0000 .0000 .0049 BPF .X BPF X BPF X BPFX BPF.X 0 17,044 LENGTH LENGTH LENGTH LENGTH LENGTH

.0690
= = = = =

.0997
107.4 0.0 0.00 0.00 4.61

DP--BBLS.
DP--BBLS. HWDP-BBLS

D'STG-I.D. 2.76

D.C. D.C

0
2.5

WEIGHT I.D.

0
940

D.C.--BBLS. DC--BBLS.

0 2.5 STROKES,SURF. TO BIT

112.0

TOTAL BBLS. BBL/FT. BBL/FT. BBL/FT. BBL/FT. BBL/FT BBL/FT. BBL/FT X X X

<:> 0

.0997 TPO.= .= .=

1,123 STROKES TO BIT


ANNUL.-I.D.

ANNULAR CAP.
VOL.BETWEEN7" 7"& CAS 3.5 & 3.5" DP VOL.BETWEENOH OH&3.5 & 3.5" D.P.

.0242 .0241 .0000 .0000 .0000 .0241 .0142

16,900 FT/CSG 144 FT/CSG 0 0 0 0

408.98 BBLS.
3.47 BBLS.

VOL. BETWEEN VOL.BETWEEN VOL. BETWEEN HWDP& OH..


VOL. BETWEEN7"

& 4 3/4" DC

X X X

FT./N/A .= .= FT/N/A/OH .= FT./HWDP/OH .= FT./OH/D.C. . = =

0.00 BBLS.
0.00 0.00 BBLS. 0.00 13.35 BBLS. =

VOL. BETWEEN OH & 4-3/4" D.C.

X LENGTH OF LINER-------------425.8

940 FT./OH/DC

0 T/BBLS. <:> .0997 TPO 4,271 14.6 BBLS.

CASING INFORMATION
CSG. 7.00 SIZE/IN. 32 WT.# FT. Q-125 GRADE

M/D 16,900 0

16,900 .@ M/TVD SH. TEST

MEASURE INF.

SIDPP

PSI

SICP

PSI

PIT GAIN

FIND KILL WT. MUD:


0 SIDPP(PSI) <:> 0.052 <:> (TVD)

.+

(ORIG. WT.MUD PPG.) = #DIV/0!

PPG.KILL .MUD

INITAL CIRC. PRESSURE (ICP)


0 SIDPP (PSI) + 1000 SLOW P/PRES. = 1000 PSI

INITIAL CIRC. PRESSURE (ICP)

FINAL CIRC. PRESSURE (FCP)


P-#2
1000 SLOW PUMP PRESS.

#DIV/0! KILL WT. MUD

<:>

0.0 ORIG. WT. MUD =


#DIV/0!

FCP

MAXIMUM CSG. PRESSURE (MCP)


14.6 SH. TEST - O/M/WT. 14.7 .=

-0.10

0.052

16,900

TVD/SH.=

-88 PSI-MAX.PRESS.

-88

PRESSURE DECLINE SCHEDULE


1 STROKES 1123.2
DPP ICP 1000 #DIV/0!

7
786 #DIV/0!

8
899 #DIV/0!

10 112 225 337 449 562 674 ###### ##### #DIV/0! #### #DIV/0! ##### #DIV/0! 10 2 #DIV/0!

1011
#DIV/0!

10 1123 #DIV/0!

TO FILL ABOVE DECI[LINE SCHEDULE: 1. PUT STROKES TO BIT IN "STROKES" BOX. FIND CHANGE PER BOX WITH STROKES <:> 10. ADD THAT AMOUNT TO EACH BOX 2.PUT ICP & FCP IN MARKED BOXES. FIND CHANGE PER BOX WITH (ICP-FCP)<:> 10. SUBTRACT THAT FROM ICP. WAIT & WT. KILL PROCEDURE: 1. BUILD MUD WT. TO KWM.2. CIRCULATE KWM AROUND WELL FOLLOWING KILL SHEET. 3 CHECK FOR REMAINING PRESSURE OR FLOW

ANNULAR VOL. IMFORMATION


CSG. CSG. CSG. CSG. HOLE 6 SIZE 7.00 0 0 I.D 6.1 0 0 6 LENGTH 16,900 0 0 1,084

VOL.
611.126 0.00 0.00 37.92 649.051 TOTAL VOL. OF HOLE

SACKS OF WT. NEEDED TO BUILD KILL MUD WT. 35 .10 .= 25


KILL WT

14.2
KILL WT

.-

13.5
P/M/WT

14.7

<>

25

.=

0.4116
SK/BLL

1599 SYS/VOL

.=

658
TOTAL SKS

SALLY 1-18 17,984


17984

14.7 . D'STG-I.D.

STROKES,SURF. TO BIT
STROKES TO BIT
ANNUL.-I.D.

6.1 6 0 0 0 6
BIT-SURF

PPG EMW

PPG.KILL .MUD

INITIAL CIRC. PRESSURE (ICP)

PSI-MAX.PRESS.

MCP

STROKES

FCP

You might also like