Joint Measurement of Hard Rock in Pour 2 Raft area of Metro Station in between Columns 10A and 10B , Grid

d Q and Grid P beyond.

10000

2000

A= 10X2.5X2.5 B=4.5X2X1.5

=62.5Cum =13.5Cum

Total(Between 10A & 10B, Grid P&Q) =76.00 Cum

Contractor Representative

Client Representative

4500

2500

QS Representative