Professional Documents
Culture Documents
DESIGN CONSULTANT :
CODE REV.
DOC. No. O 1 0 0 0 - C - R P - M N - H C - 0 0 0 4
IRC 0
PROPSED BRIDGE :-
1) Location @ : 95+811 Km
2) (a)-Span Details : x m
(b)- Width of the pier : m (top)
m (bottom)
Skew : 0
8) Soffit Level :
`
9) Bed Level :
Simplified Approach :
Slope, S = 55.71 m / Km
= 0.1609 hr.
Say 0.20 hr.
Since there are many wells and ponds in the catchment area eating
up the discharge,so we are taking 50% of Q50 as the effective
discharge calculated by UH method.
Slope, S = 56 m / Km
0.34 x 1.00
Hence, S Qiti = = 0.944
0.36 x 1.00
1 Q = CM^0.75
C= 14 - 19 Where annual rainfall is more than 120cm
11 - 14 Where annual rainfall is 60 - 120cm
22.000 in western ghats
Value of C adopted in the present case 11.000
Catchment area (M) (Sq Km) = 0.340
Q (Cum/s) = 4.898
Q = CM^(2/3)
C= 10.000
Catchment area (M) (Sq Km) = 0.340
Q (Cum/s) = 4.871
Clear Height is fixed based on the Highest flood level plus the free board from IRC 5