Hydrology Report
June- 2021
Table of Content
S.No. Item Description
1.0 Summary Sheet
2.0 Introduction
3.0 Codes & References
4.0 Design Approach
5.0 Hydrological Calculation
6.0 HFL Calculation
7.0 Afflux Calculation
8.0 Scour Calculation
9.0 Catchment area marking
1. Summary Sheet
Summary of Hydrological studies of Bridge
Dicken's Slope
method Synthetic Unit Hydrograph method (cumec) Area
(cumec) method
Catch- Average Design
Rational's by
Chaina ment annual Discharge
Sl. No. 100 year Discharge observed Remarks
ge (km) Area rainfall Length of Level at Equivale Discharge adopted
(sq.km) (mm) Dicken Bed Level return period (cumec) HFL/ (cumec)
Dicken Q Longest u/s of nt river by SUH
co- at Bridge rainfall for 24 water
(cumec) Stream, L Stream slope (m/ method Q
efficient (m) hr (CWC sub mark
(km) (m) Km) (cumec)
zone 1e) (cumec)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Factored
Discharge
1 22.345 2509.00 600.00 11.00 3899.58 130.00 513.00 219.000 0.728 240.00 2388.00 947.17 829.85 1244.77 adopted as
design
discharge
Notes: 1) Minimum proposed soffit level (m) in any case not be less than that of existing bridge.
2) In the event that bedrock is encountered above the calculated scour level, bridge pier(s) / abutments should be anchored to the bedrock.
2.0 Introduction
The Hydrological and hydraulic calculations has been carried out for proposed Major
bridge at ch. 22.345 Km to justify the waterway required for the stream crossing
the alignment.
1 0 0 219
2 10000 12500 221
3 10000 25000 222
4 10000 37500 224
5 10000 50000 225
6 10000 62500 226
7 10000 75000 228
8 10000 87500 243
9 10000 100000 277
10 10000 112500 352
11 10000 125000 485
12 10000 130000 513
Water Shed Area in Sq Km(A) 2509
Watershed Length in Km (L) 130
Point Rainfall Value (100 years) in mm 240.000
CWC Flood Estimation Report Subzone = 1e
IRC: SP-84: 2014- Manual of specifications and standards for four laning of highways through public private partnership.
IRC-78:2014- Standard specifications and code of practice for road bridges Section - VII
CWC- Flood Estimation report for Upper Indo Ganga Plains subzone 1(e)
Catchment area and main stream length has been marked on the toposheet as attached.
Discharge has been calculated using (i) Empirical method, (ii) Rational Method (iii) Slope area method
(iv) Synthetic unit hydrograph method. As per CWC guideline, for catchment area >25 sq.km,
the discharge obtained from SUH method shall be adopted.
The hydrological and hydraulic calculations has been done for 100 years return period.
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m)
216
215
River Bed Level(m)
214
213
212
211
210
209
0 50 100 150 200 250
Chainage(m)
Lowest
S.No. Distance (m)
elevation (m)
1 0 210.279
2 35.479 210.567
3 65.735 210.506
4 90.44 210.234
5 113.043 210.091
6 136.821 209.652
7 150.608 209.983
8 175.22 209.943
211
210.5
210
209.5
209
0 20 40 60 80 100 120 140 160 180 200
Equivalent Stream Slope method is used for calculation the slope of the stream
River Name : West or Black Bein Nalla
Length of River : 130.00 km
Reduced Height
Segment
Sl Distance Segment above Li * (Di +
Reduced Level Length Di + Di-1
No. from Pt. of Length datum, Di-1)
Li
study Di
m m m km m m km.m
1 0 219 0 0.00 0.00 0.00 0.00
2 12500 221 12500 12.50 2.00 2.00 25.00
3 25000 222 12500 12.50 3.00 5.00 62.50
4 37500 224 12500 12.50 5.00 8.00 100.00
5 50000 225 12500 12.50 6.00 11.00 137.50
6 62500 226 12500 12.50 7.00 13.00 162.50
7 75000 228 12500 12.50 9.00 16.00 200.00
8 87500 243 12500 12.50 24.00 33.00 412.50
9 100000 277 12500 12.50 58.00 82.00 1025.00
10 112500 352 12500 12.50 133.00 191.00 2387.50
11 125000 485 12500 12.50 266.00 399.00 4987.50
12 130000 513 5000 5.00 294.00 560.00 2800.00
Total 130.00 12300.00
2
Equivalent River Slope = Σ Li * (Di + Di-1) / L
= ( 12300 / 130^2) = 0.728 m / Km
B. Calculations for 1 Hr. Synthetic Unit Hydrograph
1 Catchment Area, A = 2509.00 Sq.Km.
CWC Subzone = 1e
Length of Main stream, L = 130.00 Km.
Equivalent Stream Slope S = 0.728 m / Km
L/S = 178.618
L / (sqrt(S)) = 152.382
Therefore, following relationships have been used for estimating 2-hr unit hydrograph parameter of the said catchment.
200
Discharge (cumecs)
150
100
50
0
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100
Time (hr)
Calculation of 100-year
( From % Rainfall vs % Time Graph)
Effective Rainfall
Rainfall Hourly
Cumulative R.F. Loss Rate
hr % hr % Rainfall increment Effective
increment (cm) (cm/hr)
(cm) Rainfall (cm)
1 2 3 4 5 6 7
2 8.3% 42.0% 7.76 7.76 0.60 7.16
4 16.7% 50.0% 9.24 1.48 0.60 0.88
6 25.0% 64.0% 11.83 2.59 0.60 1.99
8 33.3% 73.0% 13.49 1.66 0.60 1.06
10 41.7% 80.0% 14.78 1.29 0.60 0.69
12 50.0% 84.0% 15.52 0.74 0.60 0.14
14 58.3% 88.0% 16.26 0.74 0.60 0.14
16 66.7% 90.0% 16.63 0.37 0.60 0.00
18 75.0% 92.0% 17.00 0.37 0.60 0.00
20 83.3% 95.0% 17.56 0.55 0.60 0.00
22 91.7% 98.0% 18.11 0.55 0.60 0.00
24 100.0% 100.0% 18.48 0.37 0.60 0.00
Total 18.480
Direct
UG Ordinates Effective Rainfall
Time(Hr) Runoff
(cumecs) (cm)
(cumec)
24 195.11 7.16 1397.28
26 189 0.88 166.02
22 180 1.99 357.70
28 175 1.06 186.06
30 164 0.69 113.75
20 150 0.14 20.88
32 150 0.14 20.88
34 140 0.00 0.00
36 128 0.00 0.00
38 118 0.00 0.00
18 113 0.00 0.00
40 108 0.00 0.00
Total Runoff (cumec) = 2262.56
Base Flow (cumec) = 125.45
Peak Flow = Total Runoff + Base Flow (cumec) 2388.00
Hence, 100 year flood peak = 2388.00 Cumecs
Note: Dicken's and Rational are suitable for small catchment area, Hence ignored. Comparision
between Slope area and SUH has been made. Also, the area within the catchment area has well
defined irrigation and drainage basin plans, Hence, Flood water shall not directly reaches to bridge
location and having much more time to peak.
3
HFL _100 216.031 Q100= 1244.77 m /s
Min.
Natural
Offset Bed Level Channel Distance h Avg h Diff in h Area Perimeter
HFL
B.L.
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m)
CS Data
217
216
215
River Bed Level(m)
214
213
212
211
210
209
0 50 100 150 200 250
Chainage(m)
8 Scour Calculation
The mean depth of scour dsm shall be calculated below HFL as per the provision of
Clause 703.2 of IRC :78 -2000
where,
dsm = Mean scour depth below HFL
Db = (Q/L) ,
Q= Discharge adopted for scour depth calculations
(after increasing the design discharge as per clause 703.1.1 of IRC 78: 2000)
L= Clear waterway after making deductions for obstruction upto HFL
Db = The design discharge for foundation per metre with effective linear waterway
Ksf = Silt factor for a representative sample of bed material obtained upto the level
of anticipated deepest scour
HFL = Highest flood level
3
Design Discharge Q = 1244.77 m /s
HFL Calculated = 216.324 m
Lowest bed level at existing bridge = 210.091 m
Ksf = 1.00
Fine Sand Strata
Effective waterway L = 101.6 m
3
Increase in design discharge by 30% (Q) = 1618.2 m /s
Db = Q/L = 15.927 Cumec/m
Mean Scour Depth dsm = 8.483 m
Maximum scour depth at abutment
= 1.27 x dsm = 10.773 m
Maximum scour depth at Piers
= 2 x dsm = - m
Table of Content
S.No. Item Description
1.0 Summary Sheet
2.0 Introduction
3.0 Codes & References
4.0 Design Approach
5.0 Hydrological Calculation
6.0 Hydraulic Calculation
7.0 Scour Calculation
Amritsar Connectivity Road Hydrological and Hydraulic Analysis
Discharge
from
Rational
1 25.935 1.435 600.00 11.00 14.42 1.04 217.00 215.315 1.69 240.00 16.35 216.00 1.773 16.35 adopted as
design
discharge
Proposed 1 x
1 25.935 1 0 10.00 10.000 - 215.315 13.57 1.210 216.580 0.200 216.780 0.600 217.380 2.065 - 1.94 3.87 2.90 10m Box
type
Notes: 1) Minimum proposed soffit level (m) in any case not be less than that of existing bridge.
2) In the event that bedrock is encountered above the calculated scour level, bridge pier(s) / abutments should be anchored to the bedrock.
Amritsar Connectivity Road Hydrological and Hydraulic Analysis
2.0 Introduction
The Hydrological and hydraulic calculations has been carried out for proposed minor
bridge at ch. 29.935 Km to justify the waterway required for the stream crossing
the alignment.
IRC:89:1997- Guidelines for design and construction of River Training and control works for road bridges
IRC: SP-84: 2014- Manual of specifications and standards for four laning of highways through public private
partnership.
IRC-78:2014- Standard specifications and code of practice for road bridges Section - VII
CWC- Flood Estimation report for Upper Indo - Ganga Plains suzone 1( e)
Catchment area and main stream length has been marked on the settelite imaginaries as attached.
Discharge has been calculated using (i) Empirical method, (ii) Rational Method (iii) Slope area
method. The highest value of these three values is adopted as design discharge, provided it does not
exceed next highest discharge by more than 50 percent. If it does, restrict it to the limit.
The hydrological and hydraulic calculations has been done for 100 years return period.
216.2
216.0
River Bed Level(m)
215.8
215.6
215.4
215.2
215.0
0 5 10 15 20 25
Chainage(m)
Lowest
Distance
S.No. elevation
(m)
(m)
1 0 215.672
2 9.217 215.578
3 26.441 215.483
4 44.202 215.423
5 65.955 215.266
6 93.155 215.400
7 104.882 215.315
8 133.071 215.214
9 159.23 214.914
10 175.769 214.796
11 194.376 214.664
215.8
215.6
215.4
y = -0.0045x + 215.66
215.2 R² = 0.9041
215
214.8
214.6
0 50 100 150 200 250
216.6
216.4
River Bed Level(m)
216.2
216.0
215.8
215.6
215.4
215.2
0 5 10 15 20 25
Chainage(m)
Amritsar Connectivity Road Hydrological and Hydraulic Analysis
Unobstructed width W = 19 m
L/W = 0.526
C0 = 0.893 (Ref: IRC:SP-13-2004, Fig.15.4)
e = 1.05 (Ref: IRC:SP-13-2004, Fig.15.3)
h = 0.2 m
Dd (avg) = 0.714 m
Velocity in section u = 1.21 m/sec
Q achieved = 16.79 Cumec
h/ (under Br) = 0.28 m
v (under Br) = 2.64 m/sec
=
Adopt afflux = 0.200 m
HFL without Afflux = 216.580 m
HFL with Afflux = 216.780 m
where,
dsm = Mean scour depth below HFL
Db = (Q/L) ,
Q= Discharge adopted for scour depth calculations
(after increasing the design discharge as per clause 703.2.2 of IRC 78: 2014)
L= Clear waterway after making deductions for obstruction upto HFL
Db = The design discharge for foundation per metre with effective linear waterway
Ksf = Silt factor for a representative sample of bed material obtained upto the level
of anticipated deepest scour
HFL = Highest flood level
3
Design Discharge Q = 16.35 m /s
HFL Calculated = 216.78 m
Lowest bed level at existing bridge = 215.315 m
Ksf = 1.50
( Sandy Strata)
Effective waterway L = 10.00 m
3
Increase in design discharge by 30% (Q) = 21.260 m /s
Db = Q/L = 2.126 Cumec/m
Mean Scour Depth dsm = 1.935 m
Major Bridge at Design Ch. 26.612 Km (Landa Nallah) on Amritsar Greenfield Road
Table of Content
S.No. Item Description
1.0 Summary Sheet
2.0 Introduction
3.0 Codes & References
4.0 Design Approach
5.0 Hydrological Calculation
6.0 HFL Calculation
7.0 Afflux Calculation
8.0 Scour Calculation
9.0 Catchment area marking
1. Summary Sheet
Summary of Hydrological studies of Bridge
Dicken's Slope
method Synthetic Unit Hydrograph method (cumec) Area
(cumec) method
Catch- Average Design
Rational's by
Chaina ment annual Discharge
Sl. No. 100 year Discharge observed Remarks
ge (km) Area rainfall Length of Level at Equivale Discharge adopted
(sq.km) (mm) Dicken Bed Level return period (cumec) HFL/ (cumec)
Dicken Q Longest u/s of nt river by SUH
co- at Bridge rainfall for 24 water
(cumec) Stream, L Stream slope (m/ method Q
efficient (m) hr (CWC sub mark
(km) (m) Km) (cumec)
zone 1e) (cumec)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Factored
Discharge
1 26.612 80.00 600.00 11.00 294.25 20.50 218.00 212.560 0.277 240.00 207.00 70.94 95.34 143.01 adopted as
design
discharge
Proposed 1
span of 30
1 26.612 1 29 30.00 26.24 - 212.560 57.22 2.500 216.713 0.059 216.772 0.900 217.672 5.11 4.62 - 210.90 m with
Abutment
Notes: 1) Minimum proposed soffit level (m) in any case not be less than that of existing bridge.
2) In the event that bedrock is encountered above the calculated scour level, bridge pier(s) / abutments should be anchored to the bedrock.
2.0 Introduction
The Hydrological and hydraulic calculations has been carried out for proposed Major
bridge at ch. 26.612 Km to justify the waterway required for the stream crossing
the alignment.
1 0 0 212.56
2 2500 2500 214
3 2500 5000 213
4 2500 7500 214
5 2500 10000 217
6 2500 12500 217
7 2500 15000 216
8 2500 17500 217
9 2500 20000 217
10 500 20500 218
Water Shed Area in Sq Km(A) 80
Watershed Length in Km (L) 20.5
Point Rainfall Value (100 years) in mm 240.000
CWC Flood Estimation Report Subzone = 1e
IRC: SP-84: 2014- Manual of specifications and standards for four laning of highways through public private partnership.
IRC-78:2014- Standard specifications and code of practice for road bridges Section - VII
CWC- Flood Estimation report for Upper Indo Ganga Plains subzone 1(e)
Catchment area and main stream length has been marked on the toposheet as attached.
Discharge has been calculated using (i) Empirical method, (ii) Rational Method (iii) Slope area method
(iv) Synthetic unit hydrograph method. As per CWC guideline, for catchment area >25 sq.km,
the discharge obtained from SUH method shall be adopted.
The hydrological and hydraulic calculations has been done for 100 years return period.
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m)
217
217
216
River Bed Level(m)
216
215
215
214
214
213
213
212
0 5 10 15 20 25 30 35 40 45
Chainage(m)
Lowest
S.No. Distance (m)
elevation (m)
1 0 213.57
2 8.446 213.83
3 24.836 214.871
4 41.9895 214.921
5 65.6579 213.579
6 80.3702 214.093
7 96.2481 212.56
8 107.4153 212.965
9 127.8999 213.094
10 133.9499 213.316
11 154.9829 213.115
12 166.2629 213.74
y = -0.0066x + 214.19
Stream Slope R² = 0.271
216
Series1 Linear (Series1)
215.5
215
214.5
214
213.5
213
212.5
212
211.5
211
0 20 40 60 80 100 120 140 160 180
Equivalent Stream Slope method is used for calculation the slope of the stream
River Name : Landa Nallah
Length of River : 20.50 km
Reduced Height
Segment
Distance Segment above Li * (Di +
Sl No. Reduced Level Length Di + Di-1
from Pt. of Length datum, Di-1)
Li
study Di
m m m km m m km.m
1 0 212.56 0 0.00 0.00 0.00 0.00
2 2500 214 2500 2.50 1.44 1.44 3.60
3 5000 213 2500 2.50 0.44 1.88 4.70
4 7500 214 2500 2.50 1.44 1.88 4.70
5 10000 217 2500 2.50 4.44 5.88 14.70
6 12500 217 2500 2.50 4.44 8.88 22.20
7 15000 216 2500 2.50 3.44 7.88 19.70
8 17500 217 2500 2.50 4.44 7.88 19.70
9 20000 217 2500 2.50 4.44 8.88 22.20
10 20500 218 500 0.50 5.44 9.88 4.94
Therefore, following relationships have been used for estimating 2-hr unit hydrograph parameter of the said catchment.
12
10
8
6
4
2
0
0 5 10 15 20 25 30 35 40 45 50 55 60
Time (hr)
Calculation of 100-year
( From % Rainfall vs % Time Graph)
Effective Rainfall
Rainfall Hourly
Cumulative R.F. Loss Rate
hr % hr % Rainfall increment Effective
increment (cm) (cm/hr)
(cm) Rainfall (cm)
1 2 3 4 5 6 7
2 16.7% 54.0% 10.32 10.32 0.60 9.72
4 33.3% 73.0% 13.95 3.63 0.60 3.03
6 50.0% 82.0% 15.67 1.72 0.60 1.12
8 66.7% 90.0% 17.20 1.53 0.60 0.93
9 75.0% 95.0% 18.15 0.96 0.60 0.36
10 83.3% 97.0% 18.54 0.38 0.60 0.00
11 91.7% 99.0% 18.92 0.38 0.60 0.00
12 100.0% 100.0% 19.11 0.19 0.60 0.00
Total 19.110
Direct
UG Ordinates Effective Rainfall
Time(Hr) Runoff
(cumecs) (cm)
(cumec)
12 14.540 9.72 141.32
14 12.500 3.03 37.89
16 10.500 1.12 11.76
10 10.000 0.93 9.29
18 8 0.36 2.84
20 6.5 0.00 0.00
Note: Dicken's and Rational are suitable for small catchment area, Hence ignored. Comparision
between Slope area and SUH has been made. Also, the area within the catchment area has well
defined irrigation and drainage basin plans, Hence, Flood water shall not directly reaches to bridge
location and having much more time to peak.
3
HFL _100 216.713 Q100= 143.01 m /s
Min.
Natural
Offset Bed Level Channel Distance h Avg h Diff in h Area Perimeter
HFL
B.L.
(m) (m) (m) (m) (m) (m) (m) (m) (m2) (m)
0.00 215.60 216.713 212.560 0.000 0.000 0.000 0.000 0.000 0.000
10.00 215.78 216.713 212.560 10.000 0.936 0.468 0.936 4.678 10.044
15.00 215.87 216.713 212.560 5.000 0.845 0.890 0.091 4.452 5.001
19.39 215.95 216.713 212.560 4.390 0.766 0.805 0.079 3.536 4.391
20.00 215.57 216.713 212.560 0.610 1.140 0.953 0.374 0.581 0.715
21.33 214.76 216.713 212.560 1.325 1.952 1.546 0.812 2.049 1.554
22.14 212.83 216.713 212.560 0.810 3.888 2.920 1.936 2.365 2.099
23.68 212.56 216.713 212.560 1.548 4.153 4.021 0.265 6.224 1.571
25.04 212.96 216.713 212.560 1.356 3.756 3.955 0.397 5.362 1.413
26.66 213.95 216.713 212.560 1.616 2.763 3.260 0.993 5.267 1.897
35.00 215.28 216.713 212.560 8.345 1.436 2.099 1.327 17.519 8.450
38.75 215.873 216.713 212.560 3.745 0.840 1.138 0.596 4.262 3.792
40.00 216.0726 216.713 212.560 1.255 0.640 0.740 0.200 0.929 1.270
CS Data
217
217
216
216
River Bed Level(m)
215
215
214
214
213
213
212
0 5 10 15 20 25 30 35 40 45
Chainage(m)
8 Scour Calculation
The mean depth of scour dsm shall be calculated below HFL as per the provision of
Clause 703.2 of IRC :78 -2000
where,
dsm = Mean scour depth below HFL
Db = (Q/L) ,
Q= Discharge adopted for scour depth calculations
(after increasing the design discharge as per clause 703.1.1 of IRC 78: 2000)
L= Clear waterway after making deductions for obstruction upto HFL
Db = The design discharge for foundation per metre with effective linear waterway
Ksf = Silt factor for a representative sample of bed material obtained upto the level
of anticipated deepest scour
HFL = Highest flood level
3
Design Discharge Q = 143.01 m /s
HFL Calculated = 216.772 m
Lowest bed level at existing bridge = 212.56 m
Ksf = 1.00
Fine Sand Strata
Effective waterway L = 29 m
3
Increase in design discharge by 30% (Q) = 185.9 m /s
Db = Q/L = 6.411 Cumec/m
Mean Scour Depth dsm = 4.624 m
Maximum scour depth at abutment
= 1.27 x dsm = 5.873 m
Maximum scour depth at Piers
= 2 x dsm = - m
Table of Content
S.No. Item Description
1.0 Summary Sheet
2.0 Introduction
3.0 Codes & References
4.0 Design Approach
5.0 Hydrological Calculation
6.0 HFL Calculation
7.0 Afflux Calculation
8.0 Scour Calculation
9.0 Catchment area marking
Delhi - Katra Project Hydrological and Hydraulic Analysis
1. Summary Sheet
Summary of Hydrological studies of Bridge
Sl. No. Chaina Catch- Average Outflow Flood Discharge of Shah Design Discharge By Catchment Observed discharge Design Remarks
ge (km) ment annual Discharge from Nahar Barrage (cumec) Area Basis (cumec) Q by water marks on Discharge
Area rainfall adopted
Pong Dam nearest bridge
(sq.km) (mm) (cumec)
(Cumec) (cumec)
Observed Observed
HFL by discharge Q
water mark by Area-
on nearest velocity
bridge method
1 2 3 4 5 6 7 8 9 10 11
Varies
Maximum
from 600 discharge
to from Slope
1 38.205 - 3000mm 12375.00 11043.00 13447.585 220.000 15969.05 15969.05 area method
plain to is considered
as design
hilly
discharge
region
Proposed
Cable
arrangement
with other
1 38.205 20 0 ###### 2140.0 - 206.941 6447.67 2.147 220.025 0.002 220.027 4.000 224.027 17.09 For Details refer scour Calculation sheet
spans of 1 x
300 + 1 x 700 +
1 x 300 + 9 x 50
+6 x 60 m
Delhi - Katra Project Hydrological and Hydraulic Analysis
2.0 Introduction
The Hydrological and hydraulic calculations has been carried out for proposed major
bridge at ch.38.205 Km to justify the waterway required for the stream crossing
the alignment.
Normal Annual Rainfall in mm : Varies from 600 to 3000mm plain to hilly region
IRC: SP-84: 2014- Manual of specifications and standards for four laning of highways through public private partnership.
IRC-78:2014- Standard specifications and code of practice for road bridges Section - VII
CWC- Flood Estimation report for Upper Indo Ganga Plains subzone 1 ( e) & Western Himalaya Sub zone 7
5000 sq km synthetic unit hydrograph method is not applicable. Therefore, design discharge has been
calculated using existing dam data & barrage data located in U/S. There are two irrigation/power house schemes
in U/S. Pong Dam is 155 Km U/S,Shah Nehar Barrage is just D/S of Pong Dam from proposed bridge location.
Design Spill Discharge of Pong Dam is 12375 cumec, Design Flood Discharge of Shah Nehar Barrage is 11043
cumec.Salient Features of these schemes is annexed in the report.The Pong Dam discharge data is interpolated
based on the catchment and worked out the anticipated discharge at proposed bridge location.For the slope
area method,cross section based on the observed HFL at Local enquiry taken on guide bund road crossing at
ch. 36.540 which was touched in 1988 flood ( HFL level- 220.00m). Flood discharge estimated using these
Where,
QDS = Design Flood at Proposed Bridge Location
QGD = Design Flood at Pong Dam = 11043 cumec
Catchment area upto Proposed Bridge =
CADS =
Location 16333 Sq. Km.
CAGD = Catchment area upto Pong Dam = 12560 Sq. Km.
QDS = 11043 X (16333/12560)^0.75
= 13447.59 cumecs
(Km) (m) (m) (m) (m) (m) (m) (m) (m) (m2) (m)
37.300 0.000 217.101 220 206.941 0.000 0.000 0.000 0.000 0.000 0.000
37.320 20.000 217.172 220 206.941 20.000 2.828 1.414 2.828 28.280 20.199
37.340 40.000 216.996 220 206.941 20.000 3.004 2.916 0.176 58.320 20.001
37.360 60.000 216.894 220 206.941 20.000 3.106 3.055 0.102 61.100 20.000
37.380 80.000 216.856 220 206.941 20.000 3.144 3.125 0.038 62.500 20.000
37.400 100.000 216.754 220 206.941 20.000 3.246 3.195 0.102 63.900 20.000
37.420 120.000 216.804 220 206.941 20.000 3.196 3.221 0.050 64.420 20.000
37.440 140.000 216.75 220 206.941 20.000 3.250 3.223 0.054 64.460 20.000
37.460 160.000 216.601 220 206.941 20.000 3.399 3.325 0.149 66.490 20.001
37.480 180.000 216.552 220 206.941 20.000 3.448 3.424 0.049 68.470 20.000
37.500 200.000 217.658 220 206.941 20.000 2.342 2.895 1.106 57.900 20.031
37.520 220.000 217.74 220 206.941 20.000 2.260 2.301 0.082 46.020 20.000
37.540 240.000 217.738 220 206.941 20.000 2.262 2.261 0.002 45.220 20.000
37.560 260.000 217.69 220 206.941 20.000 2.310 2.286 0.048 45.720 20.000
37.580 280.000 218.347 220 206.941 20.000 1.653 1.982 0.657 39.630 20.011
37.600 300.000 217.907 220 206.941 20.000 2.093 1.873 0.440 37.460 20.005
37.620 320.000 217.622 220 206.941 20.000 2.378 2.235 0.285 44.710 20.002
37.640 340.000 217.909 220 206.941 20.000 2.091 2.235 0.287 44.690 20.002
37.660 360.000 218.44 220 206.941 20.000 1.560 1.826 0.531 36.510 20.007
37.680 380.000 217.403 220 206.941 20.000 2.597 2.079 1.037 41.570 20.027
37.700 400.000 216.549 220 206.941 20.000 3.451 3.024 0.854 60.480 20.018
37.720 420.000 216.524 220 206.941 20.000 3.476 3.464 0.025 69.270 20.000
37.740 440.000 216.582 220 206.941 20.000 3.418 3.447 0.058 68.940 20.000
37.760 460.000 218.961 220 206.941 20.000 1.039 2.229 2.379 44.570 20.141
37.780 480.000 220.572 220 206.941 20.000 0.000 0.519 1.039 10.390 20.027
Delhi - Katra Project Hydrological and Hydraulic Analysis
37.800 500.000 216.496 220 206.941 20.000 3.504 1.752 3.504 35.040 20.305
37.820 520.000 216.578 220 206.941 20.000 3.422 3.463 0.082 69.260 20.000
37.840 540.000 216.624 220 206.941 20.000 3.376 3.399 0.046 67.980 20.000
37.860 560.000 216.631 220 206.941 20.000 3.369 3.373 0.007 67.450 20.000
37.880 580.000 216.648 220 206.941 20.000 3.352 3.361 0.017 67.210 20.000
37.900 600.000 216.757 220 206.941 20.000 3.243 3.298 0.109 65.950 20.000
37.920 620.000 216.89 220 206.941 20.000 3.110 3.177 0.133 63.530 20.000
37.940 640.000 216.999 220 206.941 20.000 3.001 3.056 0.109 61.110 20.000
37.960 660.000 218.325 220 206.941 20.000 1.675 2.338 1.326 46.760 20.044
37.980 680.000 217.346 220 206.941 20.000 2.654 2.165 0.979 43.290 20.024
38.000 700.000 217.403 220 206.941 20.000 2.597 2.626 0.057 52.510 20.000
38.020 720.000 217.414 220 206.941 20.000 2.586 2.592 0.011 51.830 20.000
38.040 740.000 217.243 220 206.941 20.000 2.757 2.672 0.171 53.430 20.001
38.060 760.000 217.398 220 206.941 20.000 2.602 2.680 0.155 53.590 20.001
38.080 780.000 217.298 220 206.941 20.000 2.702 2.652 0.100 53.040 20.000
38.100 800.000 218.028 220 206.941 20.000 1.972 2.337 0.730 46.740 20.013
38.120 820.000 217.892 220 206.941 20.000 2.108 2.040 0.136 40.800 20.000
38.140 840.000 216.797 220 206.941 20.000 3.203 2.656 1.095 53.110 20.030
38.160 860.000 217.155 220 206.941 20.000 2.845 3.024 0.358 60.480 20.003
38.180 880.000 217.19 220 206.941 20.000 2.810 2.828 0.035 56.550 20.000
38.200 900.000 217.151 220 206.941 20.000 2.849 2.830 0.039 56.590 20.000
38.220 920.000 217.098 220 206.941 20.000 2.902 2.875 0.053 57.510 20.000
38.240 940.000 217.018 220 206.941 20.000 2.982 2.942 0.080 58.840 20.000
38.260 960.000 217.003 220 206.941 20.000 2.997 2.990 0.015 59.790 20.000
38.280 980.000 216.966 220 206.941 20.000 3.034 3.016 0.037 60.310 20.000
38.300 1000.000 216.968 220 206.941 20.000 3.032 3.033 0.002 60.660 20.000
38.320 1020.000 216.969 220 206.941 20.000 3.031 3.032 0.001 60.630 20.000
38.340 1040.000 216.939 220 206.941 20.000 3.061 3.046 0.030 60.920 20.000
38.360 1060.000 216.931 220 206.941 20.000 3.069 3.065 0.008 61.300 20.000
38.380 1080.000 216.809 220 206.941 20.000 3.191 3.130 0.122 62.600 20.000
38.400 1100.000 217.374 220 206.941 20.000 2.626 2.909 0.565 58.170 20.008
38.420 1120.000 217.463 220 206.941 20.000 2.537 2.582 0.089 51.630 20.000
38.440 1140.000 217.357 220 206.941 20.000 2.643 2.590 0.106 51.800 20.000
38.460 1160.000 217.662 220 206.941 20.000 2.338 2.491 0.305 49.810 20.002
38.480 1180.000 217.764 220 206.941 20.000 2.236 2.287 0.102 45.740 20.000
38.500 1200.000 217.987 220 206.941 20.000 2.013 2.125 0.223 42.490 20.001
38.520 1220.000 217.834 220 206.941 20.000 2.166 2.090 0.153 41.790 20.001
38.540 1240.000 218.027 220 206.941 20.000 1.973 2.070 0.193 41.390 20.001
38.560 1260.000 218.332 220 206.941 20.000 1.668 1.821 0.305 36.410 20.002
38.563 1263.044 218.661 220 206.941 3.044 1.339 1.504 0.329 4.577 3.062
38.566 1265.528 217.341 220 206.941 2.484 2.659 1.999 1.320 4.966 2.813
38.575 1275.100 217.204 220 206.941 9.572 2.796 2.727 0.137 26.108 9.573
38.593 1293.038 217.487 220 206.941 17.938 2.513 2.655 0.283 47.616 17.940
38.595 1294.978 217.85 220 206.941 1.940 2.150 2.332 0.363 4.523 1.974
38.615 1315.269 218.546 220 206.941 20.291 1.454 1.802 0.696 36.564 20.303
Delhi - Katra Project Hydrological and Hydraulic Analysis
38.635 1335.000 218.931 220 206.941 19.731 1.069 1.262 0.385 24.891 19.735
38.655 1355.000 218.066 220 206.941 20.000 1.934 1.501 0.865 30.030 20.019
38.675 1375.000 219.387 220 206.941 20.000 0.613 1.274 1.321 25.470 20.044
38.681 1381.112 217.985 220 206.941 6.112 2.015 1.314 1.402 8.031 6.271
38.700 1400.000 210.5 220 206.941 18.888 9.500 5.757 7.485 108.748 20.317
38.750 1450.000 208.5 220 206.941 50.000 11.500 10.500 2.000 525.000 50.040
38.800 1500.000 206.941 220 206.941 50.000 13.059 12.280 1.559 613.975 50.024
38.850 1550.000 208 220 206.941 50.000 12.000 12.530 1.059 626.475 50.011
38.900 1600.000 210 220 206.941 50.000 10.000 11.000 2.000 550.000 50.040
38.918 1618.250 217.976 220 206.941 18.250 2.024 6.012 7.976 109.719 19.917
38.934 1633.683 217.798 220 206.941 15.433 2.202 2.113 0.178 32.610 15.434
38.960 1660.000 217.939 220 206.941 26.317 2.061 2.132 0.141 56.095 26.317
38.980 1680.000 218.279 220 206.941 20.000 1.721 1.891 0.340 37.820 20.003
39.000 1700.000 218.122 220 206.941 20.000 1.878 1.799 0.157 35.990 20.001
39.020 1720.000 218.236 220 206.941 20.000 1.764 1.821 0.114 36.420 20.000
39.040 1740.000 218.399 220 206.941 20.000 1.601 1.683 0.163 33.650 20.001
39.060 1760.000 218.506 220 206.941 20.000 1.494 1.548 0.107 30.950 20.000
39.080 1780.000 220.87 220 206.941 20.000 0.000 0.747 1.494 14.940 20.056
39.100 1800.000 219.028 220 206.941 20.000 0.972 0.486 0.972 9.720 20.024
39.120 1820.000 220.577 220 206.941 20.000 0.000 0.486 0.972 9.720 20.024
39.140 1840.000 220.572 220 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.160 1860.000 220.701 220 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.180 1880.000 220.412 220 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.200 1900.000 220.453 220 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.220 1920.000 221.244 220 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.240 1940.000 220.395 220 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.260 1960.000 220.115 220 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.280 1980.000 220.192 220 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.300 2000.000 220.081 220 206.941 20.000 0.000 0.000 0.000 0.000 0.000
Sum = 6403.667 1824.852
Wetted perimeter R = A/P R 3.509
Manning's Value n 0.035
Channel slope = 1 in 700 S 0.00143
Velocity in channel (m/s) V 2.49
K = (1/n) x A x R^(2/3) Keq 422501
Calculated discharge (cumec) Q 15969.05
Max. depth below HFL (m) Dd (max) 13.059
Delhi - Katra Project Hydrological and Hydraulic Analysis
observed HFL
Cross Section at C/L of bridge location Series1
222
220
218
River Bed Level(m)
216
214
212
210
208
206
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Chainage(m)
Distance Lowest
S.No.
(m) elevation (m)
1 0 206.941
2 92.46 206.841
3 167.814 206.748
4 308.634 206.784
5 372.114 206.139
6 517.246 206.079
7 555.608 205.665
8 977.122 205.258
9
206
205.5
205
0 200 400 600 800 1000 1200
3
Hence, Peak Design Discharge = 15969.05 m /s
3
HFL _100 220.025 Q100= 15969.05 m /s
Min.
Offset as Natural
Offset Bed Level Channel Distance h Avg h Diff in h Area Perimeter
C/L HFL
B.L.
(Km) (m) (m) (m) (m) (m) (m) (m) (m) (m2) (m)
37.300 0.000 217.101 220.025 206.941 0.000 0.000 0.000 0.000 0.000 0.000
37.320 20.000 217.172 220.025 206.941 20.000 2.853 1.427 2.853 28.530 20.202
37.340 40.000 216.996 220.025 206.941 20.000 3.029 2.941 0.176 58.820 20.001
37.360 60.000 216.894 220.025 206.941 20.000 3.131 3.080 0.102 61.600 20.000
37.380 80.000 216.856 220.025 206.941 20.000 3.169 3.150 0.038 63.000 20.000
37.400 100.000 216.754 220.025 206.941 20.000 3.271 3.220 0.102 64.400 20.000
37.420 120.000 216.804 220.025 206.941 20.000 3.221 3.246 0.050 64.920 20.000
37.440 140.000 216.750 220.025 206.941 20.000 3.275 3.248 0.054 64.960 20.000
37.460 160.000 216.601 220.025 206.941 20.000 3.424 3.350 0.149 66.990 20.001
37.480 180.000 216.552 220.025 206.941 20.000 3.473 3.449 0.049 68.970 20.000
37.500 200.000 217.658 220.025 206.941 20.000 2.367 2.920 1.106 58.400 20.031
37.520 220.000 217.74 220.025 206.941 20.000 2.285 2.326 0.082 46.520 20.000
37.540 240.000 217.738 220.025 206.941 20.000 2.287 2.286 0.002 45.720 20.000
37.560 260.000 217.69 220.025 206.941 20.000 2.335 2.311 0.048 46.220 20.000
37.580 280.000 218.347 220.025 206.941 20.000 1.678 2.007 0.657 40.130 20.011
37.600 300.000 217.907 220.025 206.941 20.000 2.118 1.898 0.440 37.960 20.005
37.620 320.000 217.622 220.025 206.941 20.000 2.403 2.260 0.285 45.210 20.002
37.640 340.000 217.909 220.025 206.941 20.000 2.116 2.260 0.287 45.190 20.002
37.660 360.000 218.44 220.025 206.941 20.000 1.585 1.851 0.531 37.010 20.007
37.680 380.000 217.403 220.025 206.941 20.000 2.622 2.104 1.037 42.070 20.027
37.700 400.000 216.549 220.025 206.941 20.000 3.476 3.049 0.854 60.980 20.018
37.720 420.000 216.524 220.025 206.941 20.000 3.501 3.489 0.025 69.770 20.000
37.740 440.000 216.582 220.025 206.941 20.000 3.443 3.472 0.058 69.440 20.000
37.760 460.000 218.961 220.025 206.941 20.000 1.064 2.254 2.379 45.070 20.141
37.780 480.000 220.572 220.025 206.941 20.000 0.000 0.532 1.064 10.640 20.028
37.800 500.000 216.496 220.025 206.941 20.000 3.529 1.765 3.529 35.290 20.309
37.820 520.000 216.578 220.025 206.941 20.000 3.447 3.488 0.082 69.760 20.000
37.840 540.000 216.624 220.025 206.941 20.000 3.401 3.424 0.046 68.480 20.000
37.860 560.000 216.631 220.025 206.941 20.000 3.394 3.398 0.007 67.950 20.000
37.880 580.000 216.648 220.025 206.941 20.000 3.377 3.386 0.017 67.710 20.000
37.900 600.000 216.757 220.025 206.941 20.000 3.268 3.323 0.109 66.450 20.000
37.920 620.000 216.89 220.025 206.941 20.000 3.135 3.202 0.133 64.030 20.000
37.940 640.000 216.999 220.025 206.941 20.000 3.026 3.081 0.109 61.610 20.000
37.960 660.000 218.325 220.025 206.941 20.000 1.700 2.363 1.326 47.260 20.044
37.980 680.000 217.346 220.025 206.941 20.000 2.679 2.190 0.979 43.790 20.024
38.000 700.000 217.403 220.025 206.941 20.000 2.622 2.651 0.057 53.010 20.000
38.020 720.000 217.414 220.025 206.941 20.000 2.611 2.617 0.011 52.330 20.000
38.040 740.000 217.243 220.025 206.941 20.000 2.782 2.697 0.171 53.930 20.001
38.060 760.000 217.398 220.025 206.941 20.000 2.627 2.705 0.155 54.090 20.001
38.080 780.000 217.298 220.025 206.941 20.000 2.727 2.677 0.100 53.540 20.000
38.100 800.000 218.028 220.025 206.941 20.000 1.997 2.362 0.730 47.240 20.013
38.120 820.000 217.892 220.025 206.941 20.000 2.133 2.065 0.136 41.300 20.000
38.140 840.000 216.797 220.025 206.941 20.000 3.228 2.681 1.095 53.610 20.030
38.160 860.000 217.155 220.025 206.941 20.000 2.870 3.049 0.358 60.980 20.003
38.180 880.000 217.19 220.025 206.941 20.000 2.835 2.853 0.035 57.050 20.000
38.200 900.000 217.151 220.025 206.941 20.000 2.874 2.855 0.039 57.090 20.000
38.220 920.000 217.098 220.025 206.941 20.000 2.927 2.900 0.053 58.010 20.000
38.240 940.000 217.018 220.025 206.941 20.000 3.007 2.967 0.080 59.340 20.000
38.260 960.000 217.003 220.025 206.941 20.000 3.022 3.015 0.015 60.290 20.000
38.280 980.000 216.966 220.025 206.941 20.000 3.059 3.041 0.037 60.810 20.000
38.300 1000.000 216.968 220.025 206.941 20.000 3.057 3.058 0.002 61.160 20.000
38.320 1020.000 216.969 220.025 206.941 20.000 3.056 3.057 0.001 61.130 20.000
38.340 1040.000 216.939 220.025 206.941 20.000 3.086 3.071 0.030 61.420 20.000
38.360 1060.000 216.931 220.025 206.941 20.000 3.094 3.090 0.008 61.800 20.000
38.380 1080.000 216.809 220.025 206.941 20.000 3.216 3.155 0.122 63.100 20.000
38.400 1100.000 217.374 220.025 206.941 20.000 2.651 2.934 0.565 58.670 20.008
38.420 1120.000 217.463 220.025 206.941 20.000 2.562 2.607 0.089 52.130 20.000
38.440 1140.000 217.357 220.025 206.941 20.000 2.668 2.615 0.106 52.300 20.000
38.460 1160.000 217.662 220.025 206.941 20.000 2.363 2.516 0.305 50.310 20.002
38.480 1180.000 217.764 220.025 206.941 20.000 2.261 2.312 0.102 46.240 20.000
38.500 1200.000 217.987 220.025 206.941 20.000 2.038 2.150 0.223 42.990 20.001
38.520 1220.000 217.834 220.025 206.941 20.000 2.191 2.115 0.153 42.290 20.001
38.540 1240.000 218.027 220.025 206.941 20.000 1.998 2.095 0.193 41.890 20.001
38.560 1260.000 218.332 220.025 206.941 20.000 1.693 1.846 0.305 36.910 20.002
38.563 1263.044 218.661 220.025 206.941 3.044 1.364 1.529 0.329 4.653 3.062
38.566 1265.528 217.341 220.025 206.941 2.484 2.684 2.024 1.320 5.028 2.813
38.575 1275.100 217.204 220.025 206.941 9.572 2.821 2.753 0.137 26.347 9.573
38.593 1293.038 217.487 220.025 206.941 17.938 2.538 2.680 0.283 48.065 17.940
38.595 1294.978 217.85 220.025 206.941 1.940 2.175 2.357 0.363 4.572 1.974
38.615 1315.269 218.546 220.025 206.941 20.291 1.479 1.827 0.696 37.072 20.303
38.635 1335.000 218.931 220.025 206.941 19.731 1.094 1.287 0.385 25.384 19.735
38.655 1355.000 218.066 220.025 206.941 20.000 1.959 1.527 0.865 30.530 20.019
38.675 1375.000 219.387 220.025 206.941 20.000 0.638 1.299 1.321 25.970 20.044
38.681 1381.112 217.985 220.025 206.941 6.112 2.040 1.339 1.402 8.184 6.271
38.700 1400.000 210.5 220.025 206.941 18.888 9.525 5.783 7.485 109.220 20.317
38.750 1450.000 208.5 220.025 206.941 50.000 11.525 10.525 2.000 526.250 50.040
38.800 1500.000 206.941 220.025 206.941 50.000 13.084 12.305 1.559 615.225 50.024
38.850 1550.000 208 220.025 206.941 50.000 12.025 12.555 1.059 627.725 50.011
38.900 1600.000 210 220.025 206.941 50.000 10.025 11.025 2.000 551.250 50.040
38.918 1618.250 217.976 220.025 206.941 18.250 2.049 6.037 7.976 110.175 19.917
38.934 1633.683 217.798 220.025 206.941 15.433 2.227 2.138 0.178 32.996 15.434
38.960 1660.000 217.939 220.025 206.941 26.317 2.086 2.157 0.141 56.753 26.317
38.980 1680.000 218.279 220.025 206.941 20.000 1.746 1.916 0.340 38.320 20.003
39.000 1700.000 218.122 220.025 206.941 20.000 1.903 1.825 0.157 36.490 20.001
39.020 1720.000 218.236 220.025 206.941 20.000 1.789 1.846 0.114 36.920 20.000
39.040 1740.000 218.399 220.025 206.941 20.000 1.626 1.708 0.163 34.150 20.001
39.060 1760.000 218.506 220.025 206.941 20.000 1.519 1.573 0.107 31.450 20.000
39.080 1780.000 220.87 220.025 206.941 20.000 0.000 0.760 1.519 15.190 20.058
39.100 1800.000 219.028 220.025 206.941 20.000 0.997 0.499 0.997 9.970 20.025
39.120 1820.000 220.577 220.025 206.941 20.000 0.000 0.499 0.997 9.970 20.025
39.140 1840.000 220.572 220.025 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.160 1860.000 220.701 220.025 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.180 1880.000 220.412 220.025 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.200 1900.000 220.453 220.025 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.220 1920.000 221.244 220.025 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.240 1940.000 220.395 220.025 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.260 1960.000 220.115 220.025 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.280 1980.000 220.192 220.025 206.941 20.000 0.000 0.000 0.000 0.000 0.000
39.300 2000.000 220.081 220.025 206.941 20.000 0.000 0.000 0.000 0.000 0.000
HFL
Cross Section at bridge location
CS Data
222.00
220.00
218.00
River Bed Level(m)
216.00
214.00
212.00
210.00
208.00
206.00
0 200 400 600 800 1000 1200 1400 1600 1800 2000
Chainage(m)
8 Scour Calculation
The mean depth of scour dsm shall be calculated below HFL as per the provision of
Clause 703.2 of IRC :78 -2000
where,
dsm = Mean scour depth below HFL
Db = (Q/L) ,
Q= Discharge adopted for scour depth calculations
(after increasing the design discharge as per clause 703.1.1 of IRC 78: 2000)
L= Clear waterway after making deductions for obstruction upto HFL
Db = The design discharge for foundation per metre with effective linear waterway
Ksf = Silt factor for a representative sample of bed material obtained upto the level
of anticipated deepest scour
HFL = Highest flood level
= 12560 sqkm
Consultancy services for preparation Delhi - Katra Project Hydrological and Hydraulic Analysis
= 3772.559 sqkm
=12560 + 3773
= 16333 sqkm