You are on page 1of 17

Name of work : Improvements To Road From Naganur To Sangur via Benchihalli, Venkatapur In

Haveri Taluka, Haveri District. Under PMGSY-II

Construction of Bridge Across Nala @ Ch. 0.720 Km

HYDROLOGY

The maximum flood discharge is calculated


based on the catchment area and Ryve's
formula (At cross section - Nala and Road
crossing)
Catchment area from Toposheet = 15.00 Sq Km

Flood discharge from total Catchment Area:


Q1 = C M 2/3
C = Constant
= 8.75
M = Catchment area
= 15.00 Sq. km
Q1 = 8.75 X 15.00 0.67
Q1 = 53.22 Cumecs
Design flood discharge= 53.22 Cumecs

Maximum flood discharge calculation based on cross sectional area at HFL

The probable high flood level mark is RL (HFL) 535.10 m Sill Level 531.60 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Average Wetted
Chainage Nala level HFL RL Depth Length Area
depth perimeter
20.000 538.000
15.000 536.100 535.10 0.000 0.000 0.00 0.00 0.00
10.000 534.000 535.10 1.100 0.550 5.00 2.75 5.42
5.000 534.700 535.10 0.400 0.750 5.00 3.75 5.05
0.000 531.600 535.10 3.500 1.950 5.00 9.75 5.88
5.000 534.500 535.10 0.600 2.050 5.00 10.25 5.78
10.000 534.000 535.10 1.100 0.850 5.00 4.25 5.02
15.000 535.915 535.10 0.000 0.000 0.00 0.00 0.00
20.000 537.900

Total 25.00 30.75 27.16


Wetted perimeter (P) = 27.16 mtr
Area of water way (A) = 30.75 sqmtr
Hydraulic mean depth R = A / P = 1.132
R 2/3 = 1.086
n= 0.030 Pertaining to nala
S = 1 in 400
Velocity (v) = (1/n) (R )(S
2/3 1/2
)= 1.81 m/sec
Q = AxV
= 30.75 X 1.81
= 55.66 Cumecs
The Design discharge in the nala at a RL of 535.100 m, (HFL) 55.66 Cumecs
Hence, HFL adopted is correct.
Linear waterway= 4.8 x Q1/2
Linear waterway= 35.81 M

Calculation of Vent way

Design discharge considered = 55.66 cumecs

Velocity 1.81 m/sec

Area of flow to be provided 55.66 = 30.75 m2


1.81

Providing 6.00 x 4.00 = 24.00 m2

No of Vents required = 30.75 = 1.28 say 2 No's


24.00

Total Ventway provided 2 cell 6 mt x 4 mt

Actual area of flow provided = 2 x 24.00 = 48.00 m2

Actual area of flow provided = 55.66


48.00

= 1.16 < 1.81 m/sec


Scour depth

Linear waterway= w= 4.8 x Q1/2 mtr


w= 35.81 mtr
Nala Width= L= 25.00 mtr
The Scour depth due to water flowing in the nala is calculated as below.

D = 0.473(Q/f)1/3 f= 1.20 alluvial soil


= 1.70 m
Scour depth is taken as 1.5 times the normal scour depth from HFL level
Dmax for U/S = 1.5 x 1.70
= 2.55 mtr

Scour Depth Level = 532.60 mtr

Depth of foundation as per site condition(hard Strata) = 1.50 mtr

Foundation Level as per site = 530.10 mtr

Hence provide foundation at depth( RL) = 530.10 mtr


Name of work : Improvements To Road From Satagihalli To Rattihalli via Shiragambi village In
Hirekerur Taluka, Haveri District. Under PMGSY-II

Construction of Bridge Across Nala @ Ch. 2.740 Km

HYDROLOGY

The maximum flood discharge is calculated


based on the catchment area and Ryve's
formula (At cross section - Nala and Road
crossing)
Catchment area from Toposheet = 7.00 Sq Km

Flood discharge from total Catchment Area:


Q1 = C M 2/3
C = Constant
= 8.75
M = Catchment area
= 7.00 Sq. km
Q1 = 8.75 X 7.00 0.67
Q1 = 32.02 Cumecs
Design flood discharge= 32.02 Cumecs

Maximum flood discharge calculation based on cross sectional area at HFL

The probable high flood level mark is RL (HFL) 560.82 m Sill Level 558.32 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Average Wetted
Chainage Nala level HFL RL Depth Length Area
depth perimeter

20.000 561.950
15.000 561.150 560.82 0.000 0.000 0.00 0.00 0.00
10.000 560.400 560.82 0.420 0.210 5.00 1.05 5.06
5.000 559.800 560.82 1.020 0.720 5.00 3.60 5.04
0.000 558.320 560.82 2.500 1.760 5.00 8.80 5.21
5.000 560.500 560.82 0.320 1.410 5.00 7.05 5.45
10.000 560.850 560.82 0.000 0.160 0.00 0.00 0.00
15.000 561.150 560.82 0.000 0.000 0.00 0.00 0.00
20.000 561.800

Total 20.00 20.50 20.76


Wetted perimeter (P) = 20.76 mtr
Area of water way (A) = 20.50 sqmtr
Hydraulic mean depth R = A / P = 0.987
R =
2/3
0.992
n= 0.030 Pertaining to nala
S = 1 in 400
Velocity (v) = (1/n) (R 2/3
)(S 1/2
)= 1.65 m/sec
Q = AxV
= 20.50 X 1.65
= 33.83 Cumecs
The Design discharge in the nala at a RL of 560.820 m, (HFL) 33.83 Cumecs
Hence, HFL adopted is correct.
Calculation of Vent way

Design discharge considered = 33.83 cumecs

Velocity 1.65 m/sec

Area of flow to be provided 33.83 = 20.50 m2


1.65

Providing 6.00 x 3.00 = 18.00 m2

No of Vents required = 20.50 = 1.14 say 2 No's


18.00

Total Ventway provided 2 vent 6 mt x 3.00 mt

Actual area of flow provided = 2 x 18.00 = 36.00 m2

Actual area of flow provided = 33.83


36.00

= 0.94 < 1.65 m/sec Hen

Scour depth
Linear waterway= w= 4.8 x Q1/2 mtr
w= 27.92 mtr
Nala Width= L= 20.00 mtr
The Scour depth due to water flowing in the nala is calculated as below.

D = 0.473(Q/f)1/3 f= 1.20 alluvial soil


= 1.44 m
Scour depth is taken as 1.5 times the normal scour depth from HFL level
Dmax for U/S = 1.5 x 1.44
= 2.16 mtr

Scour Depth Level = 558.70 mtr

Depth of foundation as per site condition(hard Strata) = 1.95 mtr

Foundation Level as per site = 556.37 mtr

Hence provide foundation at depth( RL) = 556.37 mtr


Name of work : Improvements To Road From Satagihalli To Rattihalli via Shiragambi village In
Hirekerur Taluka, Haveri District. Under PMGSY-II

Pipe Culvert 4 row 1.00 mt dia @ Ch. 0.106

HYDROLOGY

Discharge by ryve's formula


Q=CM2/3
C= 8.75
Catchment area M in kmSq
M= 30.00 Ha
0.30 Sq. km
Q= 3.92 cumecs
linear waterway= 4.8 x Q1/2
linear waterway= 9.51 M

Calculation of Vent way

Design discharge considered = 3.92 cumecs


Assuming 1.2 m/sec velocity in pipe

Area of flow to be provided 3.92 = 3.27 m2


1.20

Providing 1.00 m dia pipe


Area of 1 pipe = 3.142 x 12 = 0.79 m2
4

No of pipe required = 3.27 = 4.16 say 4 No's


0.79

Hence 1.00 mt dia of 4 No pipe are provided


NAME OF WORK: CONSTRUCTION OF BRIDGE ACROSS NALA AT CH 12.10 KM ON MALANAYAKAN
HALLI TO T-O8 IN RANEBENNUR TALUK , HAVERI DIST.

Construction of Bridge Across Nala @ Ch. 12.10 Km

HYDROLOGY

The maximum flood discharge is calculated


based on the catchment area and Ryve's
formula (At cross section - Nala and Road
crossing)
Catchment area from Toposheet = 22.00 Sq Km

Flood discharge from total Catchment Area:


Q1 = C M 2/3
C = Constant
= 8.75
M = Catchment area
= 22.00 Sq. km
Q1 = 8.75 X 22.00 0.67
Q1 = 68.70 Cumecs
Design flood discharge= 68.70 Cumecs

Maximum flood discharge calculation based on cross sectional area at HFL

The probable high flood level mark is RL (HFL) 535.10 m Sill Level 531.60 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Average Wetted
Chainage Nala level HFL RL Depth Length Area
depth perimeter
20.000 538.000
15.000 536.100 535.10 0.000 0.000 0.00 0.00 0.00
10.000 534.000 535.10 1.100 0.550 5.00 2.75 5.42
5.000 534.700 535.10 0.400 0.750 5.00 3.75 5.05
0.000 531.600 535.10 3.500 1.950 5.00 9.75 5.88
5.000 534.500 535.10 0.600 2.050 5.00 10.25 5.78
10.000 534.000 535.10 1.100 0.850 5.00 4.25 5.02
15.000 535.915 535.10 0.000 0.000 0.00 0.00 0.00
20.000 537.900

Total 25.00 30.75 27.16


Wetted perimeter (P) = 27.16 mtr
Area of water way (A) = 30.75 sqmtr
Hydraulic mean depth R = A / P = 1.132
R 2/3 = 1.086
n= 0.030 Pertaining to nala
S = 1 in 400
Velocity (v) = (1/n) (R )(S
2/3 1/2
)= 1.81 m/sec
Q = AxV
= 30.75 X 1.81
= 55.66 Cumecs
The Design discharge in the nala at a RL of 535.100 m, (HFL) 68.70 Cumecs
Hence, HFL adopted is correct.
Linear waterway= 4.8 x Q1/2
Linear waterway= 35.81 M

Calculation of Vent way

Design discharge considered = 68.70 cumecs

Velocity 1.81 m/sec

Area of flow to be provided 68.70 = 37.96 m2


1.81

Providing 6.00 x 4.00 = 24.00 m2

No of Vents required = 37.96 = 1.58 say 2 No's


24.00

Total Ventway provided 2 cell 6 mt x 4 mt

Actual area of flow provided = 2 x 24.00 = 48.00 m2

Actual area of flow provided = 68.70


48.00

= 1.43 < 1.81 m/sec


Scour depth

Linear waterway= w= 4.8 x Q1/2 mtr


w= 35.81 mtr
Nala Width= L= 25.00 mtr
The Scour depth due to water flowing in the nala is calculated as below.

D = 0.473(Q/f)1/3 f= 1.20 alluvial soil


= 1.82 m
Scour depth is taken as 1.5 times the normal scour depth from HFL level
Dmax for U/S = 1.5 x 1.82
= 2.73 mtr

Scour Depth Level = 532.40 mtr

Depth of foundation as per site condition(hard Strata) = 1.50 mtr

Foundation Level as per site = 530.10 mtr

Hence provide foundation at depth( RL) = 530.10 mtr


Name of work : Improvements To Road From Ingalagondi To Rattihalli via Satagihalli,
Shiragambi village In Hirekerur Taluka, Haveri District. Under PMGSY-II

Pipe Culvert 4 row 1.20 mt dia @ Ch. 1.047

HYDROLOGY

Discharge by ryve's formula


Q=CM2/3
C= 8.75
Catchment area M in kmSq
M= 50.00 Ha
0.50 Sq. km
Q= 5.51 cumecs
linear waterway= 4.8 x Q1/2
linear waterway= 11.27 M

Calculation of Vent way

Design discharge considered = 5.51 cumecs


Assuming 1.2 m/sec velocity in pipe

Area of flow to be provided 5.51 = 4.59 m2


1.20

Providing 1.20 m dia pipe


Area of 1 pipe = 3.142 x 1.22 = 1.13 m2
4

No of pipe required = 4.59 = 4.06 say 4 No's


1.13

Hence 1.20 mt dia of 4 No pipe are provided


Name of work : Improvements To Road From Kudapali To Join T T Road via Hiremadapur,
Sannagubbi In Hirekerur Taluka, Haveri District. Under PMGSY-II

Construction of Slab Culvert Across Nala @ Ch. 1+986 Km

HYDROLOGY

The maximum flood discharge is calculated


based on the catchment area and Ryve's
formula (At cross section - Nala and Road
crossing)
The total catchment area at the site = 1.00 Sq Km

Flood discharge from total Catchment Area:


Q1 = C M 2/3
C = Constant
= 8.75
M = Catchment area
= 1.00 Sq. km
Q1 = 8.75 X 1.00 0.67
Q1 = 8.75 Cumecs
Design flood discharge= 8.75 Cumecs

Maximum flood discharge calculation based on cross sectional area at HFL

The probable high flood level mark is RL (HFL) 552.82 m Sill Level 551.32 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Nala Average Wetted
Chainage HFL RL Depth Length Area
level depth perimeter
20.000 553.100
15.000 552.970 552.82 0.000 0.000 0.00 0.00 0.00
10.000 552.950 552.82 0.000 0.000 0.00 0.00 0.00
5.000 552.820 552.82 0.000 0.000 0.00 0.00 0.00
0.000 551.320 552.82 1.500 0.750 5.00 3.75 5.22
5.000 552.820 552.82 0.000 0.750 0.00 0.00 0.00
10.000 552.950 552.82 0.000 0.000 0.00 0.00 0.00
15.000 552.970 552.82 0.000 0.000 0.00 0.00 0.00
20.000 553.120
Total 5.00 3.75 5.22
Wetted perimeter (P) = 5.22 mtr
Area of water way (A) = 3.75 sqmtr
Hydraulic mean depth R = A / P = 0.718
R =
2/3
0.802
n= 0.02 Pertaining to nala
S = 1 in 400
Velocity (v) = (1/n) (R 2/3
)(S 1/2
)= 2.01 m / sec
Q = AxV
= 3.75 X 2.01
= 7.52 Cumecs
The Design discharge in the nala at a RL of 552.820 m, (HFL) 8.75
Hence, HFL adopted is correct.

Scour depth
Regime Width
Regime Width= w= 4.8(Q) ^ 0.5 mtr
w= 13.16 mtr
Nala Width= L= 5.00 mtr
The Scour depth due to water flowing in the nala is calculated as below.
D = 0.473(Q/f)1/3 f= 1.20 alluvial soil
= 0.92 m
Scour depth is taken as 1.5 times the normal scour depth from HFL level
Dmax for U/S = 1.5 x 0.92
= 1.38 mtr
Scour Depth Level = 551.50 mtr
Depth of foundation as per site condition(hard Strata) = 1.70 mtr
Foundation Level as per site = 549.62 mtr
Hence provide foundation at depth( RL) = 549.62 mtr
ROAD DETAILS
Road Width = 7.50 m
Road level = 553.240 m
Nala bed level = 551.320 m
Foundation Level = 549.62
Slab Thickness = 0.345 m
Free Board = 0.30 m
Depth of Foundation = 1.70 m
Bottom of Slab = 552.820 m
Thickness of Wearing Coat = 0.075 m
Depth fo Water = 1.50 m
HFL at site = 552.82 m
Afflux at Site = 0.00 m
Height=H= = 3.5 m
Span of vent way adopted = 4.00 m
Area of each Vent = 4.00 x 1.50
No of vents Provided = 1 Nos.
Total Ventway provided = 4.00 x 1.50 X 1

Maximum flood discharge in the Bridge Vents :

The probable high flood level mark is RL+Afflux 552.82 m Sill Level 551.32 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Nala Bridge Bed Average Wetted
Chainage HFL RL Depth Length Area
level Level depth perimeter
15.00 552.970 0.00 0.00 0.000
10.000 552.950 551.32 552.82 1.500
5.000 552.820 551.32 552.82 1.500
1.500 4.00 6.00 7.00
0.000 551.320 551.32 552.82 1.500
5.000 552.820 551.32 552.82 1.500
10.000 552.950 551.32 552.82 1.500
15.000 552.970 551.32 552.82 1.500
Total 4.00 6.00 7.00
Wetted perimeter (P) = 7.000 mtr
Area of water way (A) = 6.00 sqmtr
Hydraulic mean depth R = A / P = 0.857
R 2/3 = 0.902 Pertaining to revised nala
n = 0.025
S = 1 in 400
Velocity (v) = (1/n) (R 2/3)(S 1/2) = 1.80 m / sec
= AxV
= 6.00 X 1.80
= 10.83 Cumecs
The discharge in the nala at a RL of 552.820 m,=(HFL) 10.83 Cumecs.
which is nearly equal to flood discharge by Ryve's formula. Hence, HFL adopted is correct.
Name of work : Improvements To Road From Naganur To Sangur via Benchihalli, Venkatapur In
Haveri Taluka, Haveri District. Under PMGSY-II

Construction of Box Culvert Across Nala @ Ch. 0.720 Km

HYDROLOGY

The maximum flood discharge is calculated


based on the catchment area and Ryve's
formula (At cross section - Nala and Road
crossing)
Catchment area from Toposheet = 19.00 Sq Km

Flood discharge from total Catchment Area:


Q1 = C M 2/3
C = Constant
= 8.75
M = Catchment area
= 19.00 Sq. km
Q1 = 8.75 X 19.00 0.67
Q1 = 62.30 Cumecs
Design flood discharge= 62.30 Cumecs

Maximum flood discharge calculation based on cross sectional area at HFL

The probable high flood level mark is RL (HFL) 536.10 m Sill Level 531.60 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Average Wetted
Chainage Nala level HFL RL Depth Length Area
depth perimeter
20.000 538.000
15.000 536.100 536.10 0.000 0.000 0.00 0.00 0.00
10.000 535.800 536.10 0.300 0.150 5.00 0.75 5.01
5.000 534.950 536.10 1.150 0.725 5.00 3.63 5.07
0.000 531.950 536.10 4.150 2.650 5.00 13.25 5.83
5.000 535.300 536.10 0.800 2.475 5.00 12.38 6.02
10.000 535.500 536.10 0.600 0.700 5.00 3.50 5.00
15.000 535.915 536.10 0.185 0.000 5.00 0.00 0.00
20.000 537.900

Total 30.00 33.50 26.93


Wetted perimeter (P) = 26.93 mtr
Area of water way (A) = 33.50 sqmtr
Hydraulic mean depth R = A / P = 1.244
R 2/3 = 1.157
n= 0.030 Pertaining to nala
S = 1 in 400
Velocity (v) = (1/n) (R )(S
2/3 1/2
)= 1.93 m/sec
Q = AxV
= 33.50 X 1.93
= 64.66 Cumecs
The Design discharge in the nala at a RL of 536.100 m, (HFL) 64.66 Cumecs
Hence, HFL adopted is correct.
Linear waterway= 4.8 x Q1/2
Linear waterway= 38.60 M

Calculation of Vent way

Design discharge considered = 64.66 cumecs

Velocity 1.93 m/sec

Area of flow to be provided 64.66 = 33.50 m2


1.93

Providing 5.00 x 4.50 = 22.50 m2

No of Vents required = 33.50 = 1.49 say 3 No's


22.50

Actual area of flow provided = 3 x 22.50 = 67.50 m2

Total Ventway provided 3 cell 5 mt x 5 mt

Scour depth

Linear waterway= w= 4.8 x Q1/2 mtr


w= 38.60 mtr
Nala Width= L= 30.00 mtr
The Scour depth due to water flowing in the nala is calculated as below.

D = 0.473(Q/f)1/3 f= 1.20 alluvial soil


= 1.79 m
Scour depth is taken as 1.5 times the normal scour depth from HFL level
Dmax for U/S = 1.5 x 1.79
= 2.68 mtr

Scour Depth Level = 533.50 mtr

Depth of foundation as per site condition(hard Strata) = 0.70 mtr

Foundation Level as per site = 530.90 mtr

Hence provide foundation at depth( RL) = 530.90 mtr


Preparation Of DPR For NGNRY Project

Phase - I
Start

Topo Survey Bhargav & Naveen Rec. Survey Bhargav & Naveen
Soil Sample Collection at every 500 mts or
change in strata

GPS Marking Bhargav & Naveen Condition Survey Of Road and Structures Bhargav & Naveen Bhargav, Naveen

Bhargav & Naveen Photo at every 100 meter Bhargav & Naveen
TBM on permanent
Structure

Preparation of Drawings Surveyor Road and Structure Inventory Bhargav & Naveen
Start of Phase - II
Survey Drawings

Rec. Details
Inputs from Phase I
Soil Samples

Generation of Cross
Structures list finalaization Discussion With
Preparation of Strip Plans Section and Longitudinal
CD's, balancing CD's and Rate Analysis Department. regarding
and Photo documentation Section & Quantity
bridges if any Provision
(Preliminary) @ OGL

Keerti, Akhila & Naveen,


Akhila, Naveen & Bhargav Ramesh Sir & Basavaraj Sir Ramesh Sir & Basavaraj Sir Ramesh Sir & Basavaraj Sir
Bhargav
Start of Phase - III Draft DPR

Crust Design (C/S , L/S , Quantity


Input to Data Sheet Estimate Preliminary reports
Qty.) Sheet/Measurement Sheet

Ramesh Sir & Basavaraj Sir Ramesh Sir & Basavaraj Sir
Ramesh Sir & Basavaraj Sir Ramesh Sir & Basavaraj Sir Ramesh Sir & Basavaraj Sir
Akhila, Naveen & Bhargav Akhila, Naveen & Bhargav

Draft DPR Printouts

Keerti, Akhila, Naveen &


Bhargav
Start of Phase - IV

Ramesh Sir & Basavaraj Sir


Scrutiny at office, with AE,AEE,EE Naveen & Bhargav

Final Draft DPR Ramesh Sir & Basavaraj Sir


Naveen & Bhargav

You might also like