The probable high flood level mark is RL (HFL) 535.10 m Sill Level 531.60 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Average Wetted
Chainage Nala level HFL RL Depth Length Area
depth perimeter
20.000 538.000
15.000 536.100 535.10 0.000 0.000 0.00 0.00 0.00
10.000 534.000 535.10 1.100 0.550 5.00 2.75 5.42
5.000 534.700 535.10 0.400 0.750 5.00 3.75 5.05
0.000 531.600 535.10 3.500 1.950 5.00 9.75 5.88
5.000 534.500 535.10 0.600 2.050 5.00 10.25 5.78
10.000 534.000 535.10 1.100 0.850 5.00 4.25 5.02
15.000 535.915 535.10 0.000 0.000 0.00 0.00 0.00
20.000 537.900
HYDROLOGY
The probable high flood level mark is RL (HFL) 560.82 m Sill Level 558.32 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Average Wetted
Chainage Nala level HFL RL Depth Length Area
depth perimeter
20.000 561.950
15.000 561.150 560.82 0.000 0.000 0.00 0.00 0.00
10.000 560.400 560.82 0.420 0.210 5.00 1.05 5.06
5.000 559.800 560.82 1.020 0.720 5.00 3.60 5.04
0.000 558.320 560.82 2.500 1.760 5.00 8.80 5.21
5.000 560.500 560.82 0.320 1.410 5.00 7.05 5.45
10.000 560.850 560.82 0.000 0.160 0.00 0.00 0.00
15.000 561.150 560.82 0.000 0.000 0.00 0.00 0.00
20.000 561.800
Scour depth
Linear waterway= w= 4.8 x Q1/2 mtr
w= 27.92 mtr
Nala Width= L= 20.00 mtr
The Scour depth due to water flowing in the nala is calculated as below.
HYDROLOGY
HYDROLOGY
The probable high flood level mark is RL (HFL) 535.10 m Sill Level 531.60 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Average Wetted
Chainage Nala level HFL RL Depth Length Area
depth perimeter
20.000 538.000
15.000 536.100 535.10 0.000 0.000 0.00 0.00 0.00
10.000 534.000 535.10 1.100 0.550 5.00 2.75 5.42
5.000 534.700 535.10 0.400 0.750 5.00 3.75 5.05
0.000 531.600 535.10 3.500 1.950 5.00 9.75 5.88
5.000 534.500 535.10 0.600 2.050 5.00 10.25 5.78
10.000 534.000 535.10 1.100 0.850 5.00 4.25 5.02
15.000 535.915 535.10 0.000 0.000 0.00 0.00 0.00
20.000 537.900
HYDROLOGY
HYDROLOGY
The probable high flood level mark is RL (HFL) 552.82 m Sill Level 551.32 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Nala Average Wetted
Chainage HFL RL Depth Length Area
level depth perimeter
20.000 553.100
15.000 552.970 552.82 0.000 0.000 0.00 0.00 0.00
10.000 552.950 552.82 0.000 0.000 0.00 0.00 0.00
5.000 552.820 552.82 0.000 0.000 0.00 0.00 0.00
0.000 551.320 552.82 1.500 0.750 5.00 3.75 5.22
5.000 552.820 552.82 0.000 0.750 0.00 0.00 0.00
10.000 552.950 552.82 0.000 0.000 0.00 0.00 0.00
15.000 552.970 552.82 0.000 0.000 0.00 0.00 0.00
20.000 553.120
Total 5.00 3.75 5.22
Wetted perimeter (P) = 5.22 mtr
Area of water way (A) = 3.75 sqmtr
Hydraulic mean depth R = A / P = 0.718
R =
2/3
0.802
n= 0.02 Pertaining to nala
S = 1 in 400
Velocity (v) = (1/n) (R 2/3
)(S 1/2
)= 2.01 m / sec
Q = AxV
= 3.75 X 2.01
= 7.52 Cumecs
The Design discharge in the nala at a RL of 552.820 m, (HFL) 8.75
Hence, HFL adopted is correct.
Scour depth
Regime Width
Regime Width= w= 4.8(Q) ^ 0.5 mtr
w= 13.16 mtr
Nala Width= L= 5.00 mtr
The Scour depth due to water flowing in the nala is calculated as below.
D = 0.473(Q/f)1/3 f= 1.20 alluvial soil
= 0.92 m
Scour depth is taken as 1.5 times the normal scour depth from HFL level
Dmax for U/S = 1.5 x 0.92
= 1.38 mtr
Scour Depth Level = 551.50 mtr
Depth of foundation as per site condition(hard Strata) = 1.70 mtr
Foundation Level as per site = 549.62 mtr
Hence provide foundation at depth( RL) = 549.62 mtr
ROAD DETAILS
Road Width = 7.50 m
Road level = 553.240 m
Nala bed level = 551.320 m
Foundation Level = 549.62
Slab Thickness = 0.345 m
Free Board = 0.30 m
Depth of Foundation = 1.70 m
Bottom of Slab = 552.820 m
Thickness of Wearing Coat = 0.075 m
Depth fo Water = 1.50 m
HFL at site = 552.82 m
Afflux at Site = 0.00 m
Height=H= = 3.5 m
Span of vent way adopted = 4.00 m
Area of each Vent = 4.00 x 1.50
No of vents Provided = 1 Nos.
Total Ventway provided = 4.00 x 1.50 X 1
The probable high flood level mark is RL+Afflux 552.82 m Sill Level 551.32 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Nala Bridge Bed Average Wetted
Chainage HFL RL Depth Length Area
level Level depth perimeter
15.00 552.970 0.00 0.00 0.000
10.000 552.950 551.32 552.82 1.500
5.000 552.820 551.32 552.82 1.500
1.500 4.00 6.00 7.00
0.000 551.320 551.32 552.82 1.500
5.000 552.820 551.32 552.82 1.500
10.000 552.950 551.32 552.82 1.500
15.000 552.970 551.32 552.82 1.500
Total 4.00 6.00 7.00
Wetted perimeter (P) = 7.000 mtr
Area of water way (A) = 6.00 sqmtr
Hydraulic mean depth R = A / P = 0.857
R 2/3 = 0.902 Pertaining to revised nala
n = 0.025
S = 1 in 400
Velocity (v) = (1/n) (R 2/3)(S 1/2) = 1.80 m / sec
= AxV
= 6.00 X 1.80
= 10.83 Cumecs
The discharge in the nala at a RL of 552.820 m,=(HFL) 10.83 Cumecs.
which is nearly equal to flood discharge by Ryve's formula. Hence, HFL adopted is correct.
Name of work : Improvements To Road From Naganur To Sangur via Benchihalli, Venkatapur In
Haveri Taluka, Haveri District. Under PMGSY-II
HYDROLOGY
The probable high flood level mark is RL (HFL) 536.10 m Sill Level 531.60 m
Details of Nala .(Cross Section at U/S side of Bridge Location)
Average Wetted
Chainage Nala level HFL RL Depth Length Area
depth perimeter
20.000 538.000
15.000 536.100 536.10 0.000 0.000 0.00 0.00 0.00
10.000 535.800 536.10 0.300 0.150 5.00 0.75 5.01
5.000 534.950 536.10 1.150 0.725 5.00 3.63 5.07
0.000 531.950 536.10 4.150 2.650 5.00 13.25 5.83
5.000 535.300 536.10 0.800 2.475 5.00 12.38 6.02
10.000 535.500 536.10 0.600 0.700 5.00 3.50 5.00
15.000 535.915 536.10 0.185 0.000 5.00 0.00 0.00
20.000 537.900
Scour depth
Phase - I
Start
Topo Survey Bhargav & Naveen Rec. Survey Bhargav & Naveen
Soil Sample Collection at every 500 mts or
change in strata
GPS Marking Bhargav & Naveen Condition Survey Of Road and Structures Bhargav & Naveen Bhargav, Naveen
Bhargav & Naveen Photo at every 100 meter Bhargav & Naveen
TBM on permanent
Structure
Preparation of Drawings Surveyor Road and Structure Inventory Bhargav & Naveen
Start of Phase - II
Survey Drawings
Rec. Details
Inputs from Phase I
Soil Samples
Generation of Cross
Structures list finalaization Discussion With
Preparation of Strip Plans Section and Longitudinal
CD's, balancing CD's and Rate Analysis Department. regarding
and Photo documentation Section & Quantity
bridges if any Provision
(Preliminary) @ OGL
Ramesh Sir & Basavaraj Sir Ramesh Sir & Basavaraj Sir
Ramesh Sir & Basavaraj Sir Ramesh Sir & Basavaraj Sir Ramesh Sir & Basavaraj Sir
Akhila, Naveen & Bhargav Akhila, Naveen & Bhargav