59+360
HYDRAULIC CALCULATION
HFL = 326.355 M
Comp I
DIFF OF
CHAINAGE RL HT AVG HT DISTANCE AREA PERIMETER
SU. GL
59349 326.355 0.000
59351 326.166 0.189 0.095 2.00 0.189 0.189 2.009
TOTAL= 0.189 2.009
n = 0.04
R = 0.094
S = 0.0053 1: 190
V = 1 / n * S ^ 0.5 * R ^ 2/3
= 0.376 M/sec
Discharge Q = A * V
= 0.071 Cumecs
DIFF OF
CHAINAGE RL HT AVG HT DISTANCE AREA PERIMETER
SU. GL
59351 326.166 0.189
59352 326.090 0.265 0.227 1.00 0.227 0.076 1.003
59355 325.655 0.700 0.483 3.00 1.448 0.435 3.031
59360 324.520 1.835 1.268 5.00 6.338 1.135 5.127
59365 324.486 1.869 1.852 5.00 9.260 0.034 5.000
59368 324.470 1.885 1.877 3.00 5.631 0.016 3.000
59369 324.467 1.888 1.887 1.00 1.887 0.003 1.000
TOTAL= 24.790 18.162
n = 0.035
R = 1.365
S = 0.0053
V = 1 / n * S ^ 0.5 * R ^ 2/3
= 2.560 M/sec
Discharge Q = A * V
= 63.5 Cumecs
Comp III
DIFF OF
CHAINAGE RL HT AVG HT DISTANCE AREA PERIMETER
SU. GL
59369 324.467 1.888
59370 324.462 1.893 1.891 1.00 1.891 0.005 1.000
59375 326.150 0.205 1.049 5.00 5.245 1.688 5.277
59376 326.355 0.000 0.103 1.00 0.103 0.205 1.021
TOTAL= 7.238 7.298
n = 0.04
R = 0.992
S = 0.0053
V = 1 / n * S ^ 0.5 * R ^ 2/3
= 1.810 M/sec
Discharge Q = A * V
= 13.101 Cumecs
Total Discharge (Manning's)= 0.071 + 63.5 + 13.10
= 76.63 Cumecs
Obstruction calculations :
Water way = 2 Span of 8.525 C/C
2 2
H= V + 0.0150 Q -1
17.86 q
2
6.55 + 0.0150 76.72 -1
17.86 57.99
= 0.290 m
A.H.F.L. = 326.355 + 0.2900
= 326.645 m
Obstructed velocity
= v x Q/q
= 3.39 m/sec.
Road level with vertical clearance for high level bridge
H.F.L. = = 326.355
Afflux = = 0.2900
Vertical clerance = = 2.1660
Top Slab Thickness = = 0.7000
Wearing Coat = = 0.0750
= 329.586 m
Road level proposed on deck = 329.586 m