Construction of Minor Bridge at CH.

59+360
HYDRAULIC CALCULATION

Discharge Calculation by Manning's

HFL = 326.355 M

Comp I

DIFF OF
CHAINAGE RL HT AVG HT DISTANCE AREA PERIMETER
SU. GL
59349 326.355 0.000
59351 326.166 0.189 0.095 2.00 0.189 0.189 2.009
TOTAL= 0.189 2.009
n = 0.04
R = 0.094
S = 0.0053 1: 190
V = 1 / n * S ^ 0.5 * R ^ 2/3
= 0.376 M/sec
Discharge Q = A * V
= 0.071 Cumecs

Comp II Bridge Portion

DIFF OF
CHAINAGE RL HT AVG HT DISTANCE AREA PERIMETER
SU. GL
59351 326.166 0.189
59352 326.090 0.265 0.227 1.00 0.227 0.076 1.003
59355 325.655 0.700 0.483 3.00 1.448 0.435 3.031
59360 324.520 1.835 1.268 5.00 6.338 1.135 5.127
59365 324.486 1.869 1.852 5.00 9.260 0.034 5.000
59368 324.470 1.885 1.877 3.00 5.631 0.016 3.000
59369 324.467 1.888 1.887 1.00 1.887 0.003 1.000
TOTAL= 24.790 18.162
n = 0.035
R = 1.365
S = 0.0053
V = 1 / n * S ^ 0.5 * R ^ 2/3
= 2.560 M/sec
Discharge Q = A * V
= 63.5 Cumecs

Comp III

DIFF OF
CHAINAGE RL HT AVG HT DISTANCE AREA PERIMETER
SU. GL
59369 324.467 1.888
59370 324.462 1.893 1.891 1.00 1.891 0.005 1.000
59375 326.150 0.205 1.049 5.00 5.245 1.688 5.277
59376 326.355 0.000 0.103 1.00 0.103 0.205 1.021
TOTAL= 7.238 7.298
n = 0.04
R = 0.992
S = 0.0053
V = 1 / n * S ^ 0.5 * R ^ 2/3
= 1.810 M/sec
Discharge Q = A * V
= 13.101 Cumecs
Total Discharge (Manning's)= 0.071 + 63.5 + 13.10
= 76.63 Cumecs

1 Hydralic Calculations MNB.xls


( b ) DISCHARGE FROM INGLIS FORMULA
Catchment Area M = 3.42 Sq.km.
Discharge Q = 125*M / M+10
Q = 116.70 Cumecs

Design discharge = 116.70 Cumecs


( C ) DISCHARGE CALCULATION FROM RATIONAL FORMULA
Design discharge = 51.14 Cumecs (Calculation of the same is attached
in Separate Sheet)
( D ) DISCHARGE CALCULATION FROM DICKEN'S FORMULA
Design discharge = 35.21 Cumecs (Calculation of the same is attached
in Separate Sheet)
( D ) DISCHARGE CALCULATION FROM RYVE'S FORMULA
Design discharge = 19.30 Cumecs (Calculation of the same is attached
in Separate Sheet)
as per CL 6.2.1 of IRC SP-13:2004
Design Discharge = 76.72 Cumecs

After increasing 30% discharge as per IRC 78:2014 pg NO. 9


Design discharge Considered = 99.73 Cumecs

Scour depth calculations :


For design discharge = 99.73 cumecs
Normal scour depth
2 1/3
Dsm = 1.34 (Db / Ksf)
Ksf =
2.85
Q
Where Db =
We
Q =Total design discharge = 99.73 Cumecs
We = effective waterway =
= 17.65 -(2x0.60+1x0.45)
= 16 m
99.73
Db =
16.00
Db = 6.23 cumecs / m
Dsm = 3.2 m below H.F.L.
Normal scour level = H.F.L. - dsm
= 326.36 - 3.2
= 323.155 m

Therefore Maxm Scour level consider in design = 323.155 m

Obstruction calculations :
Water way = 2 Span of 8.525 C/C

DISCHARGE = 99.731 CUMECS


HFL RL = 326.355 m
VELOCITY OF FLOW = 2.560 m/sec
1.1 LOCATION OF BRIDGE
Total no of span= 2.000 Nos
Span length(c/c)= 8.525 Mts

2 Hydralic Calculations MNB.xls


POSITION CHAINAGE G.L
m m
Left wall 59351.48 326.130
Mid Wall 59360.00 324.520
Right wall 59368.53 324.468

Av. GL for Box = 325.039 m


1.2 OBSTRUCTION CALCULATION:
Assumed afflux= 0.290 Mts
Th. of bearing+pedestal= 0.000 Mts
NOW
Provided verti. clearance= 2.166 Mts
Intermediate wall width at av. GL= 0.450 Mts
Outer wall width at av. GL= 0.600 Mts
Outer wall Width at HFL= 0.600 Mts
Intermediate wall Width at HFL= 0.450 Mts
1.3 OBSTRUCTION DUE TO Walls:
Nos of Intermediate wall = 1.000
Obstruction due to one Intermediate wall= 0.59 Sq. Mts.
Hence obstr. due to Intermediate walls= 0.59 Sq. Mts.
OBSTRUCTION DUE TO OUTER VERTICAL WALLS:
Obstruction due to one Vertical wall= 0.79 Sq. Mts.
Hence obstruction due to Vertical walls= 1.58 Sq. Mts.
1.4 TOTAL OBSTRUCTION:
Obstruction Due To Approach = 7.427 Sq mt
Total Obstruction = 9.598 Sq mt
Obstruction Discharge = 5.557 Cumecs 13.172
Clear Discharge = 57.99
Total discharge = 76.716 Cumecs
% Obstruction= 24.41 %
1.5 Afflux calculation :

2 2
H= V + 0.0150 Q -1
17.86 q
2
6.55 + 0.0150 76.72 -1
17.86 57.99
= 0.290 m
A.H.F.L. = 326.355 + 0.2900
= 326.645 m
Obstructed velocity
= v x Q/q
= 3.39 m/sec.
Road level with vertical clearance for high level bridge
H.F.L. = = 326.355
Afflux = = 0.2900
Vertical clerance = = 2.1660
Top Slab Thickness = = 0.7000
Wearing Coat = = 0.0750
= 329.586 m
Road level proposed on deck = 329.586 m

3 Hydralic Calculations MNB.xls


1.6 SUMMARY OF HYDRAULIC FEATURES:
SR NO HYDRAULICS FEATURES DETAILS
1 DESIGN DISCHARGE (CUMECS) 99.73
2 DESIGN H.F.L. (MTS) 326.355
3 AFFLUX 0.290
4 OBSTRUCTED VELOCITY 3.39
7 F.R.L OF WALLS 322.788

8 PERCENTAGE OBSTRUCTION 24.41


9 AFFLUX HFL 326.65
10 ROAD LEVEL 329.586

4 Hydralic Calculations MNB.xls