1 Chainage 0+917
2 Description of Catchment 0.08 sq. km.
3 Pipe Diameter Proposed 1 0 M.
1.0 M

Procedure Adopted

1 Discharge Calculation:-
a) Discharge from Dicken's Formula
3/4
Dicken's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.2 of IRC:SP:13-2004 ,C = 14-19 where
C= 14
the annual rain fall is more than 120 cm.)
M= 0.08 sq.km. (The area of catchment in sq.km)
3
Q = 2.11 m /s

b) Discharge from Ryve's Formula


2/3
Ryve's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.3 of IRC:SP:13-2004, C = 10.0
C= 10
for limited areas near the hills)
M= 0.08
0 08 sq.km.
sq km (The area of catchment in sq
sq.km)
km)
3
Q= 1.86 m /s

C) No. of pipe required

3
Max Discharge 2.11 M /sec (Adopt the Max. value of discharge from above two method)

Proposal 1 0 M Dia NP4 Hume Pipe is Prposed to Provide


1.0

Length of Pipe L= 12.5 M

3
Max discharge passing through pipe = 3.2X0.7853= 2.51 M /Sec

D) Hence provide one row of 1000 mm dia pipe is suffucient


Sawytech Engineering Services Project Amarwada - Ramgarh Road
13, Yeswant Colony
Opp. Yeswant Club, Indore, Subject HPC at Km 1+950
E-mail:- sawytech@yahoo.co.in
Ph. No.: - +91-94253-15855 Element Hydraulic Calculations

Client :- E.E. M.P.P.W.D., Chhindwada Contractor M/s Rajaram Construction

Hydraulic Calculation
1 Chainage 1+950
2 Description of Catchment 0.075 sq. km.
3 Pipe Diameter Proposed 1.0 M.

Procedure Adopted

1 Discharge Calculation:-
a) Discharge from Dicken's Formula
3/4
Dicken's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.2 of IRC:SP:13-2004 ,C = 14-19 where
C= 14
the annual rain fall is more than 120 cm.)
M= 0.075 sq.km. (The area of catchment in sq.km)
3
Q = 2.01 m /s

b) Discharge from Ryve's Formula


2/3
Ryve's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.3 of IRC:SP:13-2004, C = 10.0
C= 10
for limited areas near the hills)
M= 0.075 sq.km. (The area of catchment in sq.km)
3
Q= 1.78 m /s

C) No. of pipe required

3
Max Discharge 2.01 M /sec (Adopt the Max. value of discharge from above two method)

Proposal 1.0 M Dia NP4 Hume Pipe is Prposed to Provide

Length of Pipe L= 12.5 M

3
Max discharge passing through pipe = 3.0X0.7853= 2.35 M /Sec

D) Hence provide one row of 1000 mm dia pipe is suffucient


Sawytech Engineering Services Project Amarwada - Ramgarh Road
13, Yeswant Colony
Opp. Yeswant Club, Indore, Subject HPC at Km 2+2550
E-mail:- sawytech@yahoo.co.in
Ph. No.: - +91-94253-15855 Element Hydraulic Calculations

Client :- E.E. M.P.P.W.D., Chhindwada Contractor M/s Rajaram Construction

Hydraulic Calculation
1 Chainage 2+2250
2 Description of Catchment 0.085 sq. km.
3 Pipe Diameter Proposed 1.0 M.

Procedure Adopted

1 Discharge Calculation:-
a) Discharge from Dicken's Formula
3/4
Dicken's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.2 of IRC:SP:13-2004 ,C = 14-19
C= 14
where the annual rain fall is more than 120 cm.)
M= 0.085 sq.km. (The area of catchment in sq.km)
3
Q = 2.20 m /s

b) Discharge from Ryve's Formula


Ryve's Discharge 'Q' = CM2/3
Where,
3
Q = the peak run-off in m /s
(Clause 4.3 of IRC:SP:13-2004, C = 10.0
C= 10
for limited areas near the hills)
M= 0.085 sq.km. (The area of catchment in sq.km)
3
Q= 1.93 m /s

C) No. of pipe required

Max Discharge 2.20 M3/sec (Adopt the Max. value of discharge from above two method)

Proposal 1.0 M Dia NP4 Hume Pipe is Prposed to Provide

Length of Pipe L= 12.5 M

3
Max discharge passing through pipe = 3.3X0.7853= 2.60 M /Sec

D) Hence provide one row of 1000 mm dia pipe is suffucient


Sawytech Engineering Services Project Amarwada - Ramgarh Road
13, Yeswant Colony
Opp. Yeswant Club, Indore, Subject HPC at Km 4+150
E-mail:- sawytech@yahoo.co.in
Ph. No.: - +91-94253-15855 Element Hydraulic Calculations

Client :- E.E. M.P.P.W.D., Chhindwada Contractor M/s Rajaram Construction

Hydraulic Calculation
1 Chainage 4+150
2 Description of Catchment 0.087 sq. km.
3 Pipe Diameter Proposed 1.0 M.

Procedure Adopted

1 Discharge Calculation:-
a) Discharge from Dicken's Formula
3/4
Dicken's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.2 of IRC:SP:13-2004 ,C = 14-19 where
C= 14
the annual rain fall is more than 120 cm.)
M= 0.087 sq.km. (The area of catchment in sq.km)
3
Q = 2.24 m /s

b) Discharge from Ryve's Formula


2/3
Ryve's Discharge 'Q' = CM
Where,
3
Q = the peak run-off in m /s
(Clause 4.3 of IRC:SP:13-2004, C = 10.0
C= 10
for limited areas near the hills)
M= 0.087 sq.km. (The area of catchment in sq.km)
3
Q= 1.96 m /s

C) No. of pipe required

3
Max Discharge 2.24 M /sec (Adopt the Max. value of discharge from above two method)

Proposal 1.0 M Dia NP4 Hume Pipe is Prposed to Provide

Length of Pipe L= 12.5 M

3
Max discharge passing through pipe = 3.5X0.7853= 2.74 M /Sec

D) Hence provide one row of 1000 mm dia pipe is suffucient