A1 A2

6400
75 THK R.C.C
WEARING COAT

(EXP. GAP)
FRL - 155.495

HFL - 154.070

NOTES :-
A1
1. TYPE OF BRIDGE - HIGH LEVEL
6400 2. SPAN ARRANGEMENT - 1 X 6.0 M (TOTAL LENGTH OF BRIDGE 6.4 M)
3. OVERALL WIDTH - 12.0 M
4. CARRIAGEWAY WIDTH - 10.9 M
5. FORMATION LEVEL - 155.495 M
500

500
6. SOFFIT LEVEL - 154.820 M
7. H.F.L. - 154.070 M

TO RAMGARH
8. L.W.L. -
9. FOUNDATION LEVEL - VARIABLE
10. TYPE OF FOUNDATION - OPEN FOUNDATION
11. TYPE OF SUBSTRUCTURE
P.C.C A) ABUTMENT - P.C.C. (M-20)
ABUTMENT B) ABUTMENT CAP, - R.C.C. (M-30)
& DIRT WALL
U/S D/S
C) RETURN WALL - P.C.C. (M-20)
12. TYPE OF SUPERSTRUCTURE - R.C.C. SOLID SLAB (M-30)

TO AMARWARA
13. WEARING COAT - 75 MM R.C.C. WEARING COAT
14. APPROACH SLAB - R.C.C. M-30
15. R.C.C. RAILING - R.C.C. M-30
16. DESIGN LOADING - ONE LANE OF CLASS 70R FOR EVERY TWO
LANES WITH ONE LANE OF CLASS A FOR THE
REMAINING LANES, IF ANY, OR ONE LANE OF
CLASS A FOR EACH LANE.
17. SOIL BEARING CAPACITY - ABUTMENT - 20 T/ SQ.M.
- PIER - 30 T/SQ.M.
500

500

18. SEISMIC ZONE - III


19. ALL DIMENSIONS ARE GIVEN IN MM UNLESS SPECIFIED.
20. THE FOUNDATION DEPTH IF INCREASES UP TO 1.0M THE SAME DESIGN MAY
BE FOLLOWED AND IF MORE THAN 1.0M THAN REFER THE DESIGNER.
21. DRAWING NOT TO SCALE.

DRAFT FOR APPROVAL


CLIENT :-
AMARWADA - RAMGARH ROAD
Executive Engineer M/s RAJARAM CONSTRUCTION
ISSUED ON 28-12-2019
MP PWD Division GENERAL ARRANGEMENT DRAWING BRIDGE ENGINEER TEAM LEADER
CHHINDWARA APPD : REVISION - CH.- 3+735
SAWYTECH ENGINEERING SERVICES
Scale : NTS DRAWN BY A.A.R Dwg No. : MPPWDC / AR / 01