SPS Technocrats Pvt.  Ltd. 
Office of Origin  #510 & 511, Fifth Floor 
JMD Megapolis 
Sector 48, Gurgaon 
Haryana 122018 

Contractr  Bhartia Infra Project Ltd. 
Construction of Double Lane Road from Lanka to Umrangso via 
Diyungmukh, Haflong Tiniali and Panimur in Assam under North 
Project  East Special Infrastructure Development Scheme (NE
(Job 
No. Umrangso_NESIDS_2019-
20_01)  

Report Title  Pavement Design Report 

Document No.  SPS/PAVE/GN/001 
Issue No. 
001 
Revision No. 
R0 

Status  Name  Date 

Approved By  Abhishek Kumar  02/03/202

Checked By  Arun Chauhan  01/03/202

Prepared By  Nikhil Nagpal  28/02/202


Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali and 
Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) (Job 
No. Umrangso_NESIDS_2019-20_01)  

 Pavement Design Report - Contents 

1.0  Introduction ............................................................................................................  

2.0  The Project Highway ..............................................................................................  

3.0  Engineering Surveys, Investigation and Analysis ..................................................  

3.1  Existing Pavement Condition: ...............................................................................  

3.1.1  Existing Crust Composition: .................................................................................. 3 

3.2  Traffic surveys and Analysis: .................................................................................. 11 

3.2.1  Traffic Survey Location: ......................................................................................... 11 

3.2.2 Baseline Traffic Characteristics .............................................................................. 12 

3.2.2.1  
. Average Daily Traffic (ADT) ...............................................................................
. 12 
3.2.2.2 . Annual Average Daily Traffic (AADT) ................................................................ 1

3.2.2.3 . Traffic Growth Rates .........................................................................................
... 15 
3.2.3 Axle Load Surveys & Analysis ................................................................................ 15 

3.3  Soil Investigations ................................................................................................... 17 

3.3.1  Existing subgrade soil ............................................................................................ 17 

4.0  Dalmia (Calcom) Cement Factory ......................................................................... 17 

5.0  Design of Flexible Pavement for Reconstruction of Existing Carriageway .......... 22 

5.1  Design Life .............................................................................................................. 22 

5.2  Design Traffic ......................................................................................................... 22 

5.2.1  Directional Distribution Factor: ............................................................................. 22 

5.2.2 Lane Distribution Factor: ....................................................................................... 22 

5.2.3 Base Year Commercial Traffic: .............................................................................. 22 

5.2.4 Traffic Growth Rates: ............................................................................................. 23 


Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali and 
Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) (Job 
No. Umrangso_NESIDS_2019-20_01)  

 Pavement Design Report - Contents 
5.2.5 Vehicle Damage Factor .......................................................................................... 23 

5.2.6 Design MSA ............................................................................................................ 23 

5.3  Flexible Pavement Design ...................................................................................... 24 

5.3.1  General .................................................................................................................... 24 

5.3.2 Allowable strains ..................................................................................................... 25 

5.3.3 Strain at critical locations from IITPAVE software ............................................... 26 

5.3.4 Proposed pavement design ..................................................................................... 27 

6.0  Summary of Proposed Pavement Design: .............................................................. 28 

List of Tables: 

Table 1: Existing Crust Composition………………………………………………….……….3 
Table 2: Traffic Survey Locations & Period of Survey…………………………….…………..11 
Table 3: Classification considered for counting traffic & PCU factors………………………12 
Table 4: Average Daily Traffic…………………………………………………………………..13 
Table 5: Annual Average Daily Traffic………………………………………………………….14 
Table 6: Traffic Growth rates……………………………………………………………………15 
Table 7: Axle Load Spectrum……………………………………………………………………15 
Table 8: Soil CBR Results……………………………………………………………………….17 
Table 9: Type of TCS……………………………………………………………………….……18 
Table 10: Vehicle Damage Factor (VDF)……………………………………………………….24 
Table 11: Cumulative Standard Axles (MSA)……………………………………………………24 
Table 12: Resilient Modulus od Pavement Materials…………………………………………..26 
Table 13: Pavement Design……………………………………………………………………...28 
Table 14: IIT PAVE Output……………………………………………………………………..29 
Table 15: Proposed Pavement Composition…………………………………………………….29 

Appendices 

Appendix 1 – Classified Traffic Volume Count 
Appendix 2 – Axle Load Survey 

ii 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Pavement Design Report 
1.0  Introduction  
The Ministry of Road Transport & Highways through Public Works Department, Bhartia 
Infra Project Ltd. (BIPL) is engaged in the development of Construction of “Double Lane 
Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali and Panimur in Assam 
under  North  East  Special  Infrastructure  Development  Scheme  (NESIDS)  (Job  No. 
Umrangso_NESIDS_2019-20_01)” of Double lane road with Paved Shoulder from Lanka to 
Umrangso. 

The Contractor, Bhartia Infra Project Ltd. has appointed “SPS Technocrats Pvt. Ltd.” as    
design consultants for providing necessary technical support.  This report highlights the 
“Pavement Design” undertaken for the project highway in greater details. 

2.0   The Project Highway 
The  site  of  the  project  comprises  the  section  Lanka  to  Umrangso  via  Diyungmukh, 
Haflong,  Tiniali  and  Panimur  in  Assam  under  North  East  Special  Infrasturcture 
Development  Scheme  (NESIDS)  (Job  No.  Umrangso_NESIDS_2019-20_01)  starts  at 
Lanka at existing km 0+000 and ends at Umrngso km 68+915. The total length of existing 
project highway is about 68.915km. 
The  carriageway  of  the  project  road  consists  of  intermediate  lane  and  two-lane 
configuration. The pavement is of bituminous but mostly in damaged condition. Some 
sections of the project road are in hilly & rolling terrain. At few locations, there are sub- 
standard curves. The Land pattern is mainly agriculture. Few numbers of built-up areas 
exist along the road sections. 

3.0  Engineering Surveys, Investigation and Analysis 
The following engineering surveys and investigations have been carried out on project road: 
• 
Existing Pavement Condition 
• 
Traffic Surveys 
• 
Soil Investigations of natural ground soil 

3.1  Existing Pavement Condition: 

Existing Pavement Condition is shown in the figure to understand the variation along the 
road: 

SPS TECHNOCRATS PVT. LTD.    1 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Pavement Condition at CH- 2+891  Pavement Condition at CH- 3+600 (Road Edge 
(BT Washout)  break) 

Pavement Condition at CH- 04+268  Pavement Condition at CH- 10+810 
(Pot holes)  (BT Washout & Pot holes) 

Pavement Condition at CH- 12+200  Pavement Condition a 
t CH - 17+200 
(Earthen (Maintenance) top washout)  (BT Washout) 

SPS TECHNOCRATS PVT. LTD.    2 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Pavement Condition at CH- 19+800  Pavement Condition at CH- 41+200 
(Pot holes)  (Bituminous layer washout and 
presence of dust on side trees) 

Existing bituminous  surface has been deteriorated  throughout the project  road  and 
granular layers are under distressed condition due to heavy loading and does not meet 
the IRC standards due to which the riding quality is very poor. Hence, reconstruction of 
complete stretch is recommended.  

3.1.1  Existing Crust Composition: 

Existing Crust Composition is shown in the following table to show the variation of 
crust thickness along the project stretch: 

Table 1: Existing Crust Composition 

Sl. No.  Chainage  Crust Composition  Remarks 


BT = 75 mm 
1.  WBM = 70 mm  The crust composition provided is 
0+050 
GSB = 80 mm  insufficient for the current loading. 
Subgrade = 200 mm 
BT=50 mm 
2.  WBM=100 mm  The crust composition provided is 
01+050 
GSB=65 mm  insufficient for the current loading. 
Subgrade=200 mm 
BT = 50mm 
WBM = 180mm  The crust composition provided is 
3.  2+050 
insufficient for the current loading. 
GSB = 20mm 
BT=45mm 
4.  WBM=100mm  Layers composition is not as per IRC 
3+075 
GSB=65mm  standards. 
WBM=200 
5.  4+075  BT=30mm  Layers composition is not as per IRC 

SPS TECHNOCRATS PVT. LTD.    3 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Sl. No.  Chainage  Crust Composition  Remarks 

GSB=70mm  standards. 
BT = 50 mm 
6.  Soil = 180 mm  Layers composition is not as per IRC 
5+075 
GSB = 50 mm  standards. 
WBM = 180 mm 
BT=35 mm 
The crust composition provided is 
7.  6+075 
WBM=300 mm  insufficient for the current loading. 

BT=70mm 
Layers composition is not as per IRC 
8.  7+175  Mix Soil=90mm 
standards. 
WBM=250mm 
BT=65mm 
9.  WBM=95mm  Multiple layers of maintenance works 
8+175 
BT=70mm  carried out with WBM. 
WBM=130mm 
BT=35 mm 
Layers composition is not as per IRC 
10.  9+175  GSB=70 mm 
standards. 
WBM=170 mm 
BT = 60 mm 
Soil = 70 mm 
Multiple layers of maintenance works 
11.  10+175  BT = 30 mm 
carried out with soil mix. 
WBM = 150 mm 
GSB = 100 mm 
BT=60 mm  The crust composition provided is 
12.  11+175 
WBM=120 mm  insufficient for the current loading. 

BT=45 mm 
The crust composition provided is 
13.  12+175 
WBM=170 mm  insufficient for the current loading. 

BT=30 mm 
Layers composition is not as per IRC 
14.  13+175  Soil=40 mm 
standards. 
GSB=70 mm 
BT=30 mm 
WBM=125 mm  The crust composition provided is 
15.  14+200 
insufficient for the current loading. 
GSB=170 mm 
BT = 30 mm 
WBM = 140 mm  The crust composition provided is 
16.  15+200 
insufficient for the current loading. 
GSB = 50 mm 
BT=40 mm  The crust composition provided is 
17.  16+200 
WBM=100 mm  insufficient for the current loading. 

SPS TECHNOCRATS PVT. LTD.    4 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Sl. No.  Chainage  Crust Composition  Remarks 

GSB=120 mm 
BT= 30 mm 
18.  WBM=50 mm  Multiple layers of maintenance works 
17+200 
BT=15 mm  carried out. 
GSB=90 mm 
BT=30 mm 
GSB=110 mm  Layers composition is not as per IRC 
19.  18+200 
standards. 
Soil mix=120mm 
BT=25 mm  The crust composition provided is 
20.  19+200 
WBM=140 mm  insufficient for the current loading. 
BT = 25 mm 
GSB = 100 mm  The crust composition provided is 
21.  20+200 
insufficient for the current loading. 
WBM = 125 mm 
BT=50 mm 
WBM=100 mm 
22.  21+400  Soil Mix=140 mm  Multiple layers of maintenance works. 
BT=40 mm 
GSB=6 0mm 
BT=200 mm 
23.  WBM=100mm 
22+400  Multiple layers of maintenance works. 
GSB=80mm 
WBM=50mm 
BT=20 mm 
24.  GSB=50 mm  Multiple layers of maintenance works 
23+400 
BT=20mm  carried out with GSB. 
GSB=60mm 
25.  GSB=40 mm  Layers composition is not as per IRC 
24+400 
WBM=85mm  standards. 
BT = 40 mm 
GSB = 40 mm  The crust composition provided is 
26.  25+200 
insufficient for the current loading. 
WBM = 165 mm 
BT=50 mm 
Layers composition is not as per IRC 
27.  26+400  GSB=100 mm 
standards. 
WBM=100 mm 
BT=60 mm 
GSB=80 mm 
Multiple layers of maintenance works 
28.  27+400  WBM=70 mm 
carried out with WBM/GSB. 
GSB=130 mm 
WBM=90 mm 
29.  28+400  BT=50 mm  Layers composition is not as per IRC 

SPS TECHNOCRATS PVT. LTD.    5 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Sl. No.  Chainage  Crust Composition  Remarks 


Soil Mix=140 mm  stan 
dards. 
GSB=100 mm 
BT=60 mm  Layers composition is not as per IRC 
30.  29+400 
GSB=110 mm  standards. 
BT = 60 mm 
GSB = 70 mm 
Multiple layers of maintenance works 
31.  30+400  BT = 30 mm 
carried out with GSB. 
GSB = 130 mm 
WBM = 100 mm 
BT=30 mm 
WBM=45 mm 
Multiple layers of maintenance works 
32.  31+400  BT=25 mm 
carried out with WBM. 
GSB=70 mm 
WBM=80 mm 
BT=30 mm  The crust composition provided is 
33.  32+150 
WBM=90 mm  insufficient for the current loading. 

BT=20mm 
WBM=40 mm 
Multiple layers of maintenance works 
34.  33+100  GSB=80 mm 
carried out with WBM. 
BT=20 mm 
WBM=70 mm 
BT=20 mm 
The crust composition provided is 
35.  34+150  WBM=35 mm  insufficient for the current loading. 
GSB=110 mm 
BT = 20 mm 
The crust composition provided is 
36.  35+150  WBM = 40 mm  insufficient for the current loading. 
GSB = 80 mm 
BT=30 mm 
Layers composition is not as per IRC 
37.  36+100  GSB=90 mm 
standards. 
WBM=90 mm 
BT=30 mm 
Layers composition is not as per IRC 
38.  37+100  GSB=90 mm 
standards. 
WBM=200 mm 
BT=40 mm 
39.  WBM=90 mm  Multiple layers of maintenance works 
38+100 
GSB=100 mm  carried out with WBM. 
WBM=100 mm 
BT=30 mm  Layers composition is not as per IRC 
40.  39+100 
GSB=130 mm  standards 
41.  40+400  BT = 40 mm  The crust composition provided is 

SPS TECHNOCRATS PVT. LTD.    6 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Sl. No.  Chainage  Crust Composition  Remarks 


insufficient for the current loading. 
WBM = 140 mm 

BT=30 mm  The crust composition provided is 
42.  41+100 
WBM=140 mm  insufficient for the current loading. 

BT=30 mm 
The crust composition provided is 
43.  42+100  WBM=50 mm  insufficient for the current loading. 
GSB=70 mm 
GSB=60 mm 
The crust composition provided is 
44.  43+100 
WBM=140mm  insufficient for the current loading. 
BT=40 mm 
GSB=80 mm 
45.  44+100  BT=50 mm  Multiple layers of maintenance works. 
WBM=100 mm 
BT=30 mm 
GSB = 90 mm 
46.  Soil Mix = 80 mm  Multiple layers of maintenance works 
45+100 
GSB = 150 mm  carried out with GSB. 
WBM = 70 mm 
WBM=90 mm 
47.  Soil Mix =80 mm  Multiple layers of maintenance works 
46+100 
GSB=150 mm  carried out with WBM. 
WBM=70 mm 
GSB=140 mm 
The crust composition provided is 
48.  47+100 
WBM=90 mm  insufficient for the current loading. 

GSB=60 mm 
The crust composition provided is 
49.  48+100  WBM=150 mm 
insufficient for the current loading. 
Soil Mix=150 mm 
GSB=50 mm 
The crust composition provided is 
50.  49+100  WBM=70 mm  insufficient for the current loading. 

GSB = 80 mm 
The crust composition provided is 
51.  50+100  WBM = 120 mm  insufficient for the current loading. 
Soil Mix = 100 mm 
GSB=50 mm 
The crust composition provided is 
52.  51+100  WBM=140 mm 
insufficient for the current loading. 
Soil Mix=90 mm 

SPS TECHNOCRATS PVT. LTD.    7 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Sl. No.  Chainage  Crust Composition  Remarks 

GSB =70 mm  The crust composition provided is 
53.  52+100 
insufficient for the current loading. 
WBM=100 mm 
GSB=70 mm 
54.  WBM=180 mm  Multiple layers of maintenance works 
53+100 
GSB=70 mm  carried out with WBM. 
WBM=130mm 
GSB=100 mm  The crust composition provided is 
55.  54+100 
WBM=170 mm  insufficient for the current loading. 
WBM = 70 mm  The crust composition provided is 
56.  55+100 
Soil Mix = 110 mm  insufficient for the current loading. 
BT=25 mm 
Layers composition is not as per IRC 
57.  56+100  GSB=90 mm 
standards. 
Soil Mix=130 mm 
GSB=40 mm 
58.  Soil Mix =40 mm  Layers composition is not as per IRC 
57+500 
WBM=70 mm  standards. 
BT=40 mm 
GSB=40 mm 
59.  WBM=70 mm  Multiple layers of maintenance works 
58+500 
GSB=60 mm  carried out with WBM. 
WBM=130 mm 
GSB=50 mm 
60.  BT=20 mm  Multiple layers of maintenance works 
59+300 
GSB=40 mm  carried out with GSB. 
WBM=60 mm 
WBM = 170 mm  The crust composition provided is 
61.  60+000 
GSB = 80 mm  insufficient for the current loading. 
GSB=50 mm 
Layers composition is not as per IRC 
62.  61+000  BT=20 mm 
standards. 
WBM=170 mm 
GSB= 40 mm 
WBM=140 mm  Multiple layers of maintenance works 
63.  62+000 
carried out with GSB. 
GSB=70 mm 
GSB=60 mm 
Layers composition is not as per IRC 
64.  63+000  BT=15 mm 
standards. 
WBM=180 mm 
65.  64+000  GSB=70mm  The crust composition provided is 

SPS TECHNOCRATS PVT. LTD.    8 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Sl. No.  Chainage  Crust Composition  Remarks 


insufficient for the current loading. 
WBM=120mm 
GSB = 50 mm 
The crust composition provided is 
66.  65+000  BT = 70 mm 
insufficient for the current loading. 
WMM = 130 mm 
GSB=50 mm 
The crust composition provided is 
67.  66+000  BT=40mm 
insufficient for the current loading 
WMM=150mm 
GSB=70 mm 
The crust composition provided is 
68.  67+000  BT=50 mm 
insufficient for the current loading 
WBM=160 mm 
BT=40 mm 
WBM=150 mm  The crust composition provided is 
69.  68+000 
insufficient for the current loading. 
GSB=140 mm 
BT = 20 mm 
70.  WBM = 120 mm  Multiple layers of maintenance works 
68+850 
BT = 40 mm  carried out with GSB. 
GSB = 140 mm 

Test Pit-4 at Km 03+055  Test Pit-6 at Km 05+050 

SPS TECHNOCRATS PVT. LTD.    9 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Test Pit-13 at Km 12+175      Test Pit-16 at Km 15+200 

        Test Pit-58 at Km 57+500  Test Pit-62 at Km 61+000 

SPS TECHNOCRATS PVT. LTD.    10 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

was,,  №1515}  

Test Pit-55 at Km 54+100  Test Pit-70 at Km 68+850 

3.2    Traffic surveys and Analysis: 

3.2.1  Traffic Survey Location: 

The primary objective of traffic studies is to estimate the number of commercial vehicles 
that would likely ply on the project stretch for the purpose of flexible pavement design. 
Hence, the first step is to determine the base year traffic (AADT in 2020) and for this 
purpose CVC and Axle Load surveys have been conducted project at Km 02+425. The 
following table gives details of traffic survey conducted with location and period of survey. 
A key plan showing the Project Alignment is given below in Figure. 

Table 2: Traffic Survey Locations & Period of Survey 
Sr. 
Type of  Period 
No.  Duration  Location 
Survey  From  To 
Classified 
1  7 Days  KM 02+425   15-02-2020  21-02-2020 
Volume Count 
Axle Load 
2  1 Day   KM 02+425  17-02-2020  18-02-2020 
Survey 
The traffic surveys have been carried out as per IRC SP 19-2001. The following table 
presents the classification considered for counting the traffic and also presents Passenger 
Car unit (PCU): factors (based on IRC 64:1990) considered in the estimation of traffic 
volume. 

SPS TECHNOCRATS PVT. LTD.    11 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Samelangso 

naha Gaon  】 

«'  〝  {  }.  Nelllé ~  PROJE ・  START OF 


【  .             CH  ~ 
04—000 
【 * 

Raja Gaon 

Ro‘r’f’gagorz’lh‘  Dongkamukam  
w,  " 
LOCATI
TRAFFIC  2+450  ,
ON 
B'phu.  ~ `D 川 ]
ヽ  ai 
Pamdkhèr  

Багато 
Urnr  National Park 
`  Ntanki 
ぬ  ..
__  _ 
Sohkyr‘nphor  】
 
  —
цммпэзо  
Kh‥腎 hnat  ~ 
,  
'  ss+91 Malbgn

‥  ^  __  〉 
〟  5  g  f 
I  PROJET 

!:! 
Mopad  Malîong  〕  N 貞己‥ー 

Table 3: Classification considered for counting traffic & PCU factors 
PCU Values 
Car  1.0   2W  0.50 
Mini-Bus  1.5   3W  1.00 
Pvt. Bus  3.0   Tractor with  4.50 
Govt. Bus  3.0   Tractor without  1.50 
LCV  1.5   Cycle  0.50 
2 Axle  3.0   Rickshaw  2.00 
3 Axle  3.0   Animal Drawn  6.00 
4-6 Axle  4.5 
>=7 Axle  4.5 

3.2.2  Baseline Traffic Characteristics 
•    Average Daily Tra ffic (ADT ) 
The CVC conducted at Km 02+425 is analysed in order to obtain the following traffic 
characteristics and detailed CVC Analysis is attached in Annexure-1: 

•   Annual Average Daily Traffic (AADT) 
•  Traffic Growth Rates 

3.2.2.1  Average Daily Traffic (ADT) 

The CVC survey was conducted continuously between 8.00 AM on the start date to 8.00 
AM on the concluding date. Following table presents summary of total traffic observed at 
the count locations. 

SPS TECHNOCRATS PVT. LTD.    12 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Table 4: Average Daily Traffic 
Sl. 
ADT (In  nos.)  ADT (In PCU) 
No  Vehicle Type 
Km 02+425  Km 02+425 
1  Car  807  807 
2  Mini-Bus  42  63 
3  Pvt. Bus  48  144 
4  Govt. Bus  9  27 
5  LCV  300  450 
6  2 Axle  142  425 
7  3 Axle  126  377 
8  4-6 Axle  169  762 
9  >=7 Axle  0  2 
10  2W  2628  1314 
11  3W  629  629 
12  Tractor with Trailer  41  183 
13  Tractor without 
6  9 
Trailer 
14  Cycle  634  317 
15  Rickshaw  13  27 
16  Animal Drawn  5  30 
Total  5601  5568 

Daily Variafion of Traffic  I  Nos  I  PGU 
8000 



の 

e437 
ADT (pcu/nos) 

5879  439  040  58025907  56665867 


5455 
ぁ 



。 讐 
 

IGN“… 
Wednesday 
5 蝿鞄叩 3  №           I       I       l   I        
Day of Survey 
Saturday  Sunday  Monday  Tuesday  Thursday  Friday 

Figure 1:Daily Variation of Traffic 

SPS TECHNOCRATS PVT. LTD.    13 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

paul: cowboemou 

169 
/—впг 

069 
>=) vx|s 

Figure 2:Composition of Traffic 

3.2.2.2  Annual Average Daily Traffic (AADT) 

Annual Average Daily Traffic is estimated for the project stretch and the following table 
presents the AADT values. 

Table 5: Annual Average Daily Traffic 

Sl.  AADT (In nos.)  AADT (In PCU) 


Vehicle Type 
No  Km 02+425  Km 02+425 
1  Car  787  787 
2  Mini-Bus  43  64 
3  Pvt. Bus  49  146 
4  Govt. Bus  9  27 
5  LCV  304  456 
6  2 Axle  143  430 
7  3 Axle  127  382 
8  4-6 Axle  171  772 
9  >=7 Axle  0  2 
10  2W  2563  1282 
11  3W  636  636 
12  Tractor with 
41  185 
Trailer 
13  Tractor without 
6  9 
Trailer 
14  Cycle  634  317 
SPS TECHNOCRATS PVT. LTD. 

  14 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Sl.  AADT (In nos.)  AADT (In PCU) 


Vehicle Type 
No  Km 02+425  Km 02+425 
15  Rickshaw  13  27 
16  Animal Drawn  5  30 
Total  5533  5552 

3.2.2.3  Traffic Growth Rates 

Traffic Growth rates for different class of vehicles based upon economic factors have been 
estimated and presented in the following Table.  

    Table 6: Traffic Growth rates 
Upto 
2029-  Beyond 
2023  2024-2028  2034-2038 
2033  2038 
Car  9.6%  8.3%  7.2%  6.45%  5.8% 
Bus/Mini Bus  9.05%  7.85%  6.8%  6.1%  5.5% 
LCV  8.45%  7.3%  6.3%  5.7%  5.1% 
2A Trucks  8.25%  7.15%  6.2%  5.55%  5% 
3A Trucks  8.6%  7.45%  6.45%  5.8%  5.2% 
MAV  7.95%  6.9%  5.95%  5.35%  5% 

3.2.3  Axle Load Surveys & Analysis 

Axle  load  survey  was  carried  out  to  get  the  spectrum  of  vehicle  loading  pattern  of 
commercial vehicles to estimate the repetitions of single, tandem and Tridem axles in each 
direction expected during the design period. The survey is carried out at one location using 
portable weigh pads, for 24 hrs. duration. Axle loads of 2 & 3 axle trucks, and multi axle 
trucks are recorded on random basis and are presented in Annexure 2. The Axle load 
frequency data & analysis is presented in Table 7. 

Table 7: Axle Load Spectrum 
% of Vehicles 
Lanka - Umrangso  Umrangso - Lanka 
Load (KN) 
Single  Tandem  Tridem  Single  Tandem  Tridem Axle 
Axle  Axle  Axle  Axle  Axle 
0-85  78.57  66.67  0.00  63.64  15.91  100.00 
85-95  2.38  15.87  0.00  5.45  2.27  0.00 
95-105  0.00  0.00  0.00  2.73  0  0.00 
105-115  1.19  0.00  0.00  5.45  0  0.00 
115-125  3.57  0.00  0.00  0.00  1.14  0.00 
SPS TECHNOCRATS PVT. LTD. 

  15 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

% of Vehicles 
Lanka - Umrangso  Umrangso - Lanka 
Load (KN) 
Single  Tandem  Tridem  Single  Tandem 
Axle  Axle  Axle  Tridem Axle 
Axle  Axle 
125-135 
3.57  0.00  0.00  1.82  0  0.00 
135-145  0.00  0.00  0.00  0.91  0  0.00 
145-155  3.57  0.00  0.00  0.00  0  0.00 
155-165  0.00  0.00  0.00  3.64  0  0.00 
165-175  3.57  0.00  0.00  1.82  0  0.00 
175-185  1.19  1.59  0.00  0.00  1.14  0.00 
185-195  0.00  0.00  0.00  1.82  0  0.00 
195-205  2.38  1.59  0.00  2.73  0  0.00 
205-215  0.00  1.59  0.00  1.82  2.27  0.00 
215-225  0.00  1.59  0.00  4.55  1.14  0.00 
225-235  0.00  0.00  0.00  3.64  0  0.00 
235-245  0.00  0.00  0.00  0.00  1.14  0.00 
245-255  0.00  1.59  0.00  0.00  1.14  0.00 
255-265  0.00  0.00  0.00  0.00  1.14  0.00 
265-275  0.00  0.00  0.00  0.00  0  0.00 
275-285  0.00  1.59  0.00  0.00  2.27  0.00 
285-295  0.00  0.00  0.00  0.00  3.41  0.00 
295-305  0.00  0.00  0.00  0.00  0  0.00 
305-315  0.00  1.59  0.00  0.00  0  0.00 
315-325  0.00  3.17  0.00  0.00  2.27  0.00 
325-335  0.00  1.59  0.00  0.00  1.14  0.00 
335-345  0.00  0.00  0.00  0.00  6.82  0.00 
345-355  0.00  0.00  0.00  0.00  10.23  0.00 
355-365  0.00  1.59  0.00  0.00  4.55  0.00 
365-375  0.00  0.00  0.00  0.00  14.77  0.00 
375-385  0.00  0.00  0.00  0.00  7.95  0.00 
385-395  0.00  0.00  0.00  0.00  12.50  0.00 
395-405  0.00  0.00  0.00  0.00  6.82  0.00 
100.00  100.00  0.00  100.00  100.00  100.00 

SPS TECHNOCRATS PVT. LTD.    16 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

3.3 Soil Investigations 

Pavement design is done based on the effective CBR of the subgrade. Effective CBR of the 
subgrade has been derived based on the investigation of subgrade soil samples. 

3.3.1  Existing subgrade soil 

The samples were collected from the test pits in order to study the laboratory characteristics 
of the existing subgrade soil samples. The laboratory tests carried out includes - Grain size 
distribution, Atterberg limits, Modified compaction test and summary of test results is given 
below: 

Table 8: Soil CBR Results 
Sl No. 
Location  CBR (Soaked) 

5+000  8.12 
2  10+000  8.42 
3  15+000  9.23 
4  20+000  8.40 
5  25+000  8.44 
6  30+000  8.02 
7  35+000  9.33 
8  40+000  8.08 
9  45+000  8.15 
10  50+000  8.27 
11  55+000  8.39 
12  60+000  9.35 
13  65+000  8.26 
14  68+000  8.17 

4 days soaked CBR for existing subgrade sample varies from 8.02% to 9.35%, hence 90th 
percentile value comes out to be 8.16%. Based on the results of these investigations, a 
design CBR of 8% is adopted and the design traffic of 20 Million standard axles (MSA) is 
expected at its design period of 10 years.  

4.0  Dalmia (Calcom) Cement Factory 
The site of the project comprises of the section Lanka – Diyungmukh – Panimur – 29 Kilo – 
Umrangso starts at Lanka Tinali at existing km 0/000 and ends at Umrangshu Tinali at km 
68/915. The total length of existing project highway is about 68.915 km. 
The  carriageway  of  the  project  road  consists  of  intermediate  lane  configuration.  The 
pavement is of bituminous; but mostly in severely damaged condition. Some sections of the 
project road fall under rolling and hilly terrain. The curves along the project road are mostly 

SPS TECHNOCRATS PVT. LTD.    17 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

sub-standard. Several sections of the existing road have formerly been a part of multiple 
different undertakings, resulting in large variation in the pavement layers around the project.  
The pavement quality is very poor at most of the locations, with many potholes and ravelling 
cracks etc. along the project stretch; which had resulted in very poor riding quality along the 
project road. 

(a) Ch. Km 13+800 (Bituminous  (b) Ch. Km 18+200 (BT layer 
layer has been eroded)           washout) 

It shall be noted that between Km 20 to Km 30, the existing road is mostly earth topped with 
embedded  stones;  which  is  due  to  the  maintenance  work  being  carried  out  by  Dalmia 
Cement, Umrangso. Earth topping with embedded stone allow the movement of vehicles for 
short duration (2-3 months), but once the monsoon season starts earthen roads gets eroded 
and  the  potholes  will  once  again  reveal  and  above  maintenance  technique  is  not 
environmentally friendly. 

(a) Ch. Km 25+200 (Earth-topped  (b) Ch. Km 29+600 (Earth-topped 

SPS TECHNOCRATS PVT. LTD.    18 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Road found from Km 20-30Km)  Road found from Km 20-30Km) 

Dalmia (Calcom) Cement, Umrangso 
Calcom Cement India Ltd. (CCIL), a subsidiary of Dalmia Cement (Bharat) Limited, is engaged in 
the business of manufacturing cement. Its plant is located in North East India with a total installed 
capacity of 1.72 million tons per annum of grinding capacity. 
The cement factory lies within the project road at Km 64-65. In the wake of the employment 
generated by the factory, a small settlement has flourished around the region. This indicates that the 
factory has become an essential part of the local economy. 

(a) Area surrounding the Dalmia  Conveyor belt pas  sing over the 


(b) 
cement factory  project road into the Dalmia factory 

Dalmia is one of the biggest suppliers of cement in the North-Eastern India. The cement 
factory sends large batches of cement bags via Lanka loaded in trucks. These trucks are 
mostly overloaded. This has resulted in the existing pavement to undergo several forms of 
distresses including rutting, fatigue, crack formations, potholes etc. along the whole project 
road. This is evident from the fact that it takes an average travel time of 4 hrs to reach 
Umrangso via. Lanka. 

Protest carried out by the Local People: 
The  locals  of  Lanka  and  nearby  towns  have  expressed  their  dissatisfaction  with  the 
movement of these heavy vehicles in the area in the form of rallies, filing of police complaints 
etc. This has come to attention through direct conversation with them as well as through 
various news articles over the years. 

1. Rally against bad roads in Dima Hasao: [Assam Times - Aug 3, 2013] 
SPS TECHNOCRATS PVT. LTD.    19 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

“Hundreds  of  students  participate  in  the  protest  rally  against  bad  road  condition  in 
Umrangso town in Dima Hasao on Friday 2 August '13.” 
“The protesters demanded immediate repair of Umrangso-Lanka road, Umrangso-Jowai 
road, Umrangso-Haflong road and other roads connecting the town with different parts of 
the district.” 
“The protesters also blamed Dalmia Cement Company in Umrangso for plying heavy and 
overloaded vehicles on the already damaged roads. It is to be noted that construction work of 
Dalmia Cement is underway in the town.” 

Figure 3: Protest carried out by hundreds of students against overloaded vehicle 
movement 
2.  People suffer due to poor roads in Dima Hasao: [The Sentinel - Sep 17, 2017] 

“The conscious people of Dima Hasao opined that though road was always considered to 
play a pivotal role in developing socio-economic condition of the society, in Dima Hasao 
the poor condition of roads has deterred the developments of the district.” 
“Condition of Haflong Lanka and also Haflong-Umrangsu has now become pathetic and it 
has become a daily affair for passengers from Lanka and Umrangsu to remain stranded for 
hours as very often loaded trucks get stuck at places near Gurubari and Junula.”  
3.  Protest over bad roads: [The Telegraph - Jun 5, 2018] 

“The villagers of Lower Muolhoi in Dima Hasao district of south Assam on Monday 
protested against the deplorable condition of roads in and around Haflong town, the district 
headquarters.” – Samsul Alam 
“The North Eastern Council (NEC) had earlier constructed the 6km Lower Haflong- 
Songpijang bypass via Lower Muolhoi decades ago to give relief to the traffic congestion at 
Haflong town. But since then, the road has never been repaired. Now it is in a deplorable 
condition.  The  villagers  have  approached  the  public  works  department  several  times. 

SPS TECHNOCRATS PVT. LTD.    20 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Officials of the department had visited the site in 2017 and assured the villagers that the 
road would be repaired immediate but nothing has been done.” – Lema Khavom, the NC 
Hills Autonomous Council member from Haflong constituency. 
Current Situation: 

During the site investigation; it was observed that the pavement condition was at poor state; 
which was due to the excessive loading carried out by the commercial vehicles. Preliminary 
maintenance works are being carried out at some stretches; which are just a temporary 
solution for the pavement. 
The ongoing partial repair has also widened the road, as can be seen in the following 
pictures. This has facilitated the flow of traffic in the area, however as pointed out earlier, it 
is only temporary and will result in trucks getting stuck, overtopping etc. in monsoons. 

(a) Earth dumped on the road for levelling (b)Earthen dumped are used to cover the 
(Dalmia Cement)  potholes as well as widen the carriageway 

 (c)  Earth  being  rolled  and  compacted  by (d)  Water  sprinkler  facilitate  easy 


to 
backhoe loader and roller (Road Maintenance compaction  (Road  Maintenance  and 

SPS TECHNOCRATS PVT. LTD.    21 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

and widening work underway by Dalmia)  widening work underway by Dalmia) 

5.0  Design of Flexible Pavement for Reconstruction of Existing 
Carriageway  
The design shall involve the consideration of the following input variables: 
1. 
Design Life 
2.   Design  Traffic 
•  CVC 
•  Axle Load  
3.   Effective CBR of subgrade 

5.1  Design Life 
The following design life has been adopted for different layers.  
For BT Layers  
:  10 Years (2022 to 2032) 
For Base/Sub-base Layers  :  10 Years (2022 to 2032) 
5.2 
Design Traffic 
The traffic loading in terms of the cumulative number of standard axles for the given period 
has been computed using the following relationship: 

where, Ns  
is cumulative number of standard axles for the period under consideration. 
GR i 
ADTi   is average daily traffic for vehicle category "i" in the initial year. 
is growth rate for vehicle category, "i".  
VDFi   is vehicle damage factor in terms of equivalent number standard axles for vehicle 
category, "i". 
DL  is design life in year. 
5.2.1  Directional Distribution Factor:  
The value of 0.50 has been adopted as the directional distribution factor. 

5.2.2  Lane Distribution Factor: 
The value of 0.50 has been adopted as the lane distribution factor. 

5.2.3  Base Year Commercial Traffic:  
The base-year (2020) annual average daily traffic (AADT) is presented in the Table 5.   

SPS TECHNOCRATS PVT. LTD.    22 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

5.2.4  Traffic Growth Rates:  
The detailed analysis of vehicle wise growth factors is presented in the Table 6.  

5.2.5  Vehicle Damage Factor 

Axle load survey was carried out to get the spectrum of vehicle loading pattern and also to 
arrive at Vehicle Damage Factor (VDF). The survey is carried out using portable weigh 
pads, for 24 hrs duration. The vehicle damage factor (VDF) has been calculated using the 
equations given in section 4.4, IRC: 37-2018. The Axle load frequency data & analysis is 
presented in Appendix 2, of the present report:     
Table 10: Vehicle Damage Factor (VDF) 
Total 
Sample Sample  Lanka-Umrangso  Umrangso-LankaAdopted 
Type of Vehicle no. of 
size   (%)  No. of Veh.  VDF   No. of Veh.  VDF VDF 
Vehicle
LCV  288  51  17.7%  20  0.32  31  2.56  2.56 
2-Axle Truck  146  125  85.6%  60  3.96  65  17.62  17.62 
3-Axle Truck  110  83  75.5%  33  2.23  50  28.81  28.81 
Multi-Axle Truck 109  89  81.7%  32  9.95  57  22.47  22.47 
Bus  108  32  29.6%  16  0.34  16  0.33  0.34 

5.2.6  Design MSA 

Based on the vehicle damage factors and the projected traffic volumes, the traffic loading in 
terms of cumulative number of equivalent 8.16 t standard axle loads have been computed 
for the design period and shown in the following tables. 
Table 11: Cumulative Standard Axles (MSA) 
Cumulative 
Year  Truck  ESA in million 
Bus  LCV 
2Axle  3Axle  MAV  Year wise 
VDF  0.34  2.56  17.62  28.81  22.47 
2020  58  304  143  127  172  0.990 
2021  63  329  155  138  186  1.072  1.072 
2022  69  357  168  150  200  1.161  2.233 
2023  75  387  182  163  216  1.257  3.490 
2024  82  420  197  177  233  1.361  4.851 
2025  88  451  211  190  250  1.459  6.310 
2026  95  484  226  204  267  1.564  7.874 
2027  103  519  242  220  285  1.676  9.549 
2028  111  557  260  236  305  1.796  11.345 
SPS TECHNOCRATS PVT. LTD. 

  23 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

Truck  ESA in million 
Year  Bus  LCV 
2Axle  3Axle  MAV  Year wise Cumulative 
VDF  0.34  2.56  17.62  28.81  22.47 
2029  119  598  278  253  326  1.925  13.270 
2030  127  635  295  270  345  2.044  15.315 
2031  136  675  314  287  366  2.171  17.486 
2032  145  718  333  306  388  2.306  19.792 
2033  155  763  354  325  411  2.449  22.242 
2034  166  811  376  346  435  2.602  24.843 
2035  176  857  397  367  458  2.747  27.590 
2036  187  906  419  388  483  2.900  30.490 
2037  198  958  442  410  509  3.062  33.552 
2038  210  1012  466  434  536  3.233  36.785 
2039  223  1070  492  459  565  3.413  40.198 
2040  235  1125  517  483  593  3.587  43.785 
2041  248  1182  543  508  622  3.769  47.553 
2042  262  1242  570  535  654  3.960  51.514 
2043  276  1306  598  563  686  4.161  55.675 
2044  291  1372  628  592  721  4.373  60.048 
2045  307  1442  660  623  757  4.595  64.643 
2046  324  1516  693  655  794  4.828  69.471 
2047  342  1593  727  689  834  5.074  74.544 
2048  361  1674  764  725  876  5.331  79.876 
2049  381  1760  802  762  920  5.602  85.478 
2050  402  1850  842  802  966  5.887  91.364 

5.3  Flexible Pavement Design  

5.3.1  General 

For the given traffic volume, which is expected in the design life, there can be large number 
of combinations for the pavement depending on the availability of materials. A strong 
subgrade  and  a  strong  base  along  with  fatigue  and  rut  resistant  bituminous  are  very 
important for a good performing pavement.  

With every load repetition, flexible pavements are subjected to compression/tension at 
different layers. Fatigue and rutting, induced by traffic repetitions, are generally the main 
modes of pavement failures. The tensile strain at the bottom of the bituminous layer, and 
the compressive strain on the subgrade are generally considered to be indicative parameters 
for fatigue and rutting failures respectively. The pavement crust is to be such that the tensile 
SPS TECH
NOCRATS 
PVT. LTD. 
  24 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

strain at the bottom of the bituminous layer and compressive strain on the top of subgrade 
are to be less than the allowable strains.  

Allowable strains for the expected traffic are calculated using the fatigue and rutting models 
given IRC 37:2018 (Equation 3.4). With the assumed pavement crust, the strains at critical 
locations are calculated using IIT PAVE software. The adequacy of the design is checked by 
comparing  these  strains with  allowable  strains  as  predicted  by  the  fatigue  and  rutting 
models. A satisfactory pavement design is achieved through iterative process by varying 
layer thickness/ pavement layer materials.  

The various parameters governing the design are given below.  
        Table 12: Resilient Modulus od Pavement Materials 
Layer  Resilient Modulus (Mpa)  Remarks 
0.64 
Subgrade 
MRSUB  =  17.6 x (CBR)  Equation 6.2 of IRC:37- 
2018 
 x MRSUB 
0.45 

Unbound granular layer  MRGSB  =  0.2 x h  Equation 7.1 of IRC:37- 


(GSB+WMM)  2018   Table 9.2 
Bituminous Layer 
3000  IRC:37-2018 – 
(VG40) 

Poisson's Ratio (μ) of subgrade    :  0.35 
Poisson's Ratio (μ) of GSB/WMM   :  0.35 
Poisson's Ratio (μ) of BT layers   :  0.35 

5.3.2  Allowable strains 

Fatigue Model 
As per equation 6.1, & 6.3 IRC:37-2018 fatigue life in number of standard axles is given 
3.89 
below:  [1/ɛ   
-04 
t]  *[1/M Rm] 0.854  ability 

Nf = 0.5161*C*10 

 ,  M = 4.84(Vb / (Vb+Va)-0.69)  90  %  Reli 

C= 10 
Where, 
Nf 
: Fatigue life in number of standard axles 
MR 
: Resilient modulus of the bituminous layer 
Va  
: Volume of air voids  
Vb  
: Volume of bitumen  
εt  
: Allowable horizontal tensile strain at the bottom of the BT 

Rutting  Model 

SPS TECHNOCRATS PVT. LTD.    25 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

As per equation 6.5, IRC:37-2018 rut life in number of standard axles is given below: 
[1/ɛ   
NR = 1.41 x 10 -08  4.5337 
v]  90 % reliability 
Where, 
N  : Number of cumulative standard axles 
εv   : Allowable vertical compressive strain on subgrade 

5.3.3  Strain at critical locations from IITPAVE software 

The strains at the following 3 critical locations are computed from IITPAVE software with 
the various material properties given above like resilient modulus, Poisson's ratio, layer 
thickness etc. 
At the bottom of BT layer  
- Centre of wheel assembly 
At the bottom of BT layer   - Centre of wheel 
At the top of subgrade  
- Centre of wheel assembly 

Dual wheel  of mm…… la
mam 

T       伽 劇 雌 bottom yer 

The various input parameters considered are given below: 
Tyre Pressure    - 
Wheel load  -  20 KN 
Wheel Assembly  - 
0.56 MPa  0 
Dual 
Average Annual pavement temperature - 35 C 

The adequacy of the assumed thickness is checked by comparing the strains computed with 
IITPAVE software with allowable strains as predicted by the fatigue and rutting models. A 
satisfactory  pavement  design  is  achieved  through  iterative  process  by  varying  layer 
thickness/ pavement layer materials. 

SPS TECHNOCRATS PVT. LTD.    26 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

5.3.4  Proposed pavement design 

The proposed crust thickness, corresponding allowable strains from fatigue/rutting models 
and computed strains from IITPAVE software are given below. 
Table 13: Pavement Design 
Design Period 
10 Years 
Design Traffic for Bituminous layers (MSA)  20 
Design Traffic for Base and Sub-base layers (MSA)  20 
Effective CBR of Subgrade  8 
Grade of Bitumen 
vg40 

Pavement Crust (mm) 
Granular Subbase (GSB) 
250 
Wet Mix Macadam (WMM) 
250 
Dense Bituminous Macadam (DBM) 
60 
Bituminous Concrete (BC) 
60  40 

Resilient Modulus in Mpa of 
Subgrade  66. 
Base course (WMM+GSB)  218.30 
Bituminous Layers (DBM & BC)  3000.00 

Poissons Ratio (μ) of 
Subgrade  0.35 
Base course (WMM+GSB)  0.35 
Bituminous Layers (DBM & BC)  0.35 

Allowable Strains 
Volume of air voids (Va)  3.00 
Volume of Bitumen (Vb)  13.00 
-6 
"C" Value  3.92 
-6 
Horizontal tensile strain at the bottom of DBM layer    257.08E-06 
Vertical strain at top of subgrade (εv)  454.95E-06 

Computed strains from IITPAVE software 
Horizontal tensile strain at the bottom of DBM layer  250.0 x 10  
Vertical strain at top of subgrade (εv)  346.1 x 10  
SPS TECHNOCRATS PVT. LTD.    27 
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tiniali 
and Panimur in Assam under North East Special Infrastructure Development Scheme (NESIDS) 
(Job No. Umrangso_NESIDS_2019-20_01)  

Pavement Design Report 

The computed strains from IITPAVE software are less than the allowable strains from 
fatigue and rutting models. Hence, adopted crust thickness is safe. The input data and output 
from IITPAVE software are given below: 

Table 14: IIT PAVE Output 

N。. c: 〕ョ】re: 丘 
ョ  ヨ~~~.~~ 
E 7 ョ工ュ e ョ mm  ~. 5~.35r 3
=; 7 ョー JE ョ  5 
=}… mes; ュロョ
〔〝ユ_k〝e ョョ e ョ  d 側 2~~~~.~~  5~~.~
ss  〔】rz~` ミ р…… ミ  
…… 
DJ ョニ
〟  g"ョ Ee
ョー  附 z R 
ー  эщщ  ep 銅  … 
~.~~【~.〕755E~~~ ~
ユ~~.~~  ‥5 磁 E~~~ ~.「653E~~~【~.  …… ~~~【~.^5…ヨ三【~丘 _~.」Ea~‥【~丘 

~.~~【~.」「55E
〕~~.~ 縄~~【~. `_~a‥【~」【~.3 上ヨ髑 E【~」【~.  一 ~.髑 5 ろヨ E〟~~ー~.「2 ヨ.L ー~ „…на 
ユ~~.~~  ー
~」  55.~~【~.  Emo ~.  縄~~ ~.  56 ォ~~【~. ~.453~E〟~。ー~.」435E ー~三 ~.
ョ ~. 
。」鮑鮑絢~髑』~沁肝械 。.     
^~~.~~こ 」55 ~~【~.  【~」 髑鱒…僻仇 
ュ:」E*~~【~. 
.ao  【~  ~ ヨ  …,… cama ~
~a ユ E【~^  〉「髑ニ【~^  ~.3~」ヨ
.  E〟~。 r (”肝 ~三 

„…… _ ……‚оз 
~. 

6.0   Summary of Proposed Pavement Design: 
The proposed crust composition based on the above results is given in the Table below:  

Table 15: Proposed Pavement Composition 
Pavement Layer  As per 
Design 
Bituminous Concrete (BC)  40 mm 
Dense Bituminous Macadam (DBM)  60 mm 
Wet mix macadam (WMM)  250 mm 
Granular Sub Base I (GSB I)  100 mm 
Granular Sub Base II (GSB II) *  150 mm 

*Note: Granular Sub Base has been provided in two layers and GSB II (bottom layer) will extend 
up to the edge of the drain in built up locations and up to the side slope (1:2) in open country 
terrain. 

SPS TECHNOCRATS PVT. LTD.    28 
Annexure-1 
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .

Nam L 0 2
10 
e  0
Secti 2
11 
on 0 
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
00 
D
a
DirecU Sunny 
tion
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

T
r
ai
le


11

  12

  13 2

  14 2

  15

  16

  17

  18

  19

 20

  21

 22

 23

 00

  01

1207
Trailer

1
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 
2
09  -  RoadL 0
10  Nam 0 2
e  0 
11  Secti
12  on
Locat
13 
ion
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
00 
D
a
DirecU Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle
2

2

11 21 

  
21 
  

   18 

  
2
   0 

  
18 
  

   2

 20
17 
  

 22 10 

13 
 23

 00

  
4

272
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .
-  L
Nam 0 2
10 
e  0
Secti 2
11 
on 0 
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecU Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Tr
ail
er 

11

  

  

  

  

  

  

  

  

 20

  

 22

 23

 00 1
 
  

1516
358
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .

Nam L 0 2
10 
e  0
Secti 2
11 
on 0 
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecU Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

2
7
 
4
0
 
4
11 0
 
   3
0
    
2
   6
 
   3
2
    
2
   9
 
   2
9
    
2
 20 9
 
   2
2
 22  
2
 23 4
 
 00
6
    
380
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road 2
-  L
Nam 0 0 
10 

Secti
11 
on
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecU Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

T
r
ai
le

3

11
4
2
  12
1
  13 1

  14

  15

  16
1
  17

  18

  19
1
 20
2
  21

 22

 23

 00
1320
  01
Trailer

4
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .

Nam L 0 2
10 
e  0
Secti 2
11 
on 0 
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecU Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle
1
1

9
11 0 

  12 7

  13

  14 3

  15
2
  16 2 

  17
1
  18 5 


  19


 20


  21


 22


 23


 00


  01
3

1307
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .

Nam L 0 2
10 
e  0
Secti 2
11 
on 0 
13 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecU Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

8
Axle A

11

  

  

  

  

  

  

  

  

 20

  

 22

 23

 00

  
1308
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .

Nam L 0 2
10 
e  0
Secti 2
11 
on 0 
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
00 
D
a
DirecL Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle 2
3
 

1
4
11  
2
  12 4
 
  13

  14 1
9
  15  
2
  16 8
 
  17

  18 2
1
  19  
2
 20 3
 
  21
2
 22 3
 
 23
1
 00 9
 
  01
280
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 
2
09  -  RoadL 0
10  Nam 0 2
e  0 
11  Secti
12  on
Locat
13 
ion
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
00 
D
a
DirecL Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle 2
0
 
2
2
 
2
11 0
 
   2
2
    
2
   3
 
   2
0
    

   1
6
    

   1
7
 20  
2
   4
 
 22
1
 23 8
 
 00
8
    
270
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .
-  L
Nam 0 2
10 
e  0
Secti 2
11 
on 0 
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecL Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle Tr
ail
er 

1
11 1

   4

  

  

  

  

  

1
  

  

 20

  

 22

 23

 00

  
Traile

4
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .

Nam L 0 2
10 
e  0
Secti 2
11 
on 0 
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecL Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle Tr
ail
er 


2

11

  
1
  

  

  

   3

  

  

  

1
 20
1
  

 22

 00

  

 02
Traile

3
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road 2
-  L
Nam 0 0 
10 

Secti
11 
on
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecL Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle

11

  12

  13

  14
1
  15 2 

1
  16

  17

3
  18

1
  19
3
2
 20

  21

 22

 23

 00

  01
331
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .

Nam L 0 2
10 
e  0
Secti 2
11 
on 0 
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecL Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Tr
ail
er 

11

  

  
2
 
  

   8
 
  

  

  

  

 20

  

 22

 24

 00
1
  
1395
298
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Road .

Nam L 0 2
10 
e  0
Secti 2
11 
on 0 
12 
Locat
ion
13 
m)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
DirecL Sunn
tion y 
to)

TIME(
hr)

C
ar

i.T
ra
FroJ Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle Tr
ail
er 

3
11

  

  
1
  

  

  

  

  

  

 20
1
  

 22

 00

  

 02
Traile

Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Roa .

d  L
0 2
10 
me 0
Secti 2
11 
on 0 
12 
Loca
tion
13 
(km)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
00 
D
a
Dire B Sunny 
ctio

TIME
(hr)

C
a
r/ 
ri.
T
Fro Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

17

2
0

11
2
    0

   

    19

   
2
    4

   

    19

   
2
  20 0

   

  22 19

  23
16

  00

19
   

2530
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 
2
09  -  Roa L 0
10  d  0 2
me 0 
11  Secti
12  on
Loca
13 
tion
(km)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
00 
D
a
Dire B Sunn
ctio y 

TIME
(hr)

C
a
r/ 
ri.
T
Fro Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle
4

4

11 4

   
4
    3 

   
4
    1 

    4

   
3
    4 

    4

  

    4

  
2
   8 

2
  

   
1
2

542
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Roa .
-  L
d  0 2
10 
me 0
Secti 2
11 
on 0 
12 
Loca
tion
13 
(km)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
Dire B Sunn
ctio y 

TIME
(hr)

C
a
r/ 
ri.
T
Fro Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle Tr
ail
er 

11 3 

    1 

    1 

    1 

    4 

    2 
5
   

   

   

  

   

  

  

  

   
Traile

5
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Roa .
-  L
d  0 2
10 
me 0
Secti 2
11 
on 0 
12 
Loca
tion
13 
(km)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
Dire B Sunn
ctio y 

TIME
(hr)

C
a
r/ 
ri.
T
Fro Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle A
xl

2
11

   

   

   

   

   

   

   

   

  

   

  
2
  

  

   
2973
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Roa 2
-  L
d  0 0 
10 
me
Secti
11 
on
12 
Loca
tion
13 
(km)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
Dire B Sunn
ctio y 

TIME
(hr)

C
a
r/ 
ri.
T
Fro Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle
1
8
8
 

2
4
11 5
 
   
1
    8
7
     

   
2
    1
5
     

    2
1
    7
 
  20

    2
5
  22 1
 
  23
2
  00 2
1
     
2648
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Roa .
-  L
d  0 2
10 
me 0
Secti 2
11 
on 0 
12 
Loca
tion
13 
(km)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
Dire B Sunn
ctio y 

TIME
(hr)

C
a
r/ 
ri.
T
Fro Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle 4
2
 
5
0
 
4
3
11  
5
    2
 
   
5
    1 

   
5
    1 
4
    3
 
    3
0
     
4
   0
 
    4
4
    
3
   0
 
   2
2
     
584
Appendix1 

Construction of Doub
le Lane Road from La
nka to Umrangso via 
Diyungmukh, Haflong 
Tiniali and Panimur in 
Assam under North E
ast 

Special Infrastructure 
Development Scheme 
(NESIDS) (Job No. U
mrangso_ NESIDS_20
08  19-20_01) 

09  Roa .
-  L
d  0 2
10 
me 0
Secti 2
11 
on 0 
13 
Loca
tion
13 
(km)
14 

15 
16 

17 
18 

19 
20 

21 
22 

23 
D
a
Dire B Sunn
ctio y 

TIME
(hr)

C
a
r/ 
ri.
T
Fro Cycl
WithoAnim
m uteCycl
al 
e
Ricks
Draw
haw

Axle
39 

51 

53 
11

    46 

    46 

   
43 
   

    41 

    46 

    32 

   
37 
  
44 
   

23 
  

  

10 
  

   
19 
599
Annexure-2 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in Assam un
der 
North East Special Infra
structure Development 
Scheme (NESIDS) (Job 
Type  4th Axle  No. Umrangso_ NESIDS
_2019-20_01) - Axle Loa
d Survey 
Data at 02+425KM 

D 17-
i Feb-
202

Axle
Sl. Empty ad Commod
),
No. Axle nes) ity Type 
Loaded
2) 3 Weigh
r t
d
 
A
x
l
e
 

FOOD 
1 3 AS EMP
.
PEOPL  09 TY 

2 1 AS EMP
. 01 TY 

3 4 AS PASS
. 02 ENG
ER 
4 1 AS EMP
. 01 TY 

5 0 AS WOO
. 9597D 

6 1 AS EMPT
. 3359Y 

7 AS CONK
4011REET 

8 1 AS CEME
9 5999NT 

9 3 AS STON
. 3761E 

10 3 AS EMPT
. 2889Y 

11
AS CEME
0795NT 

12
4 AS PASSE
1081NGER 

13 AS HOU
01 SE IT
EM 
14 1 AS VEGIT
. 3648ABLE 

15 4 AS PASSE
. 3878NGER 

16 AS CON
01 KRE
ET 
17 1 AS
18 . 5213MATE
1 RIAL 
. AS
6624

19 2 AS PASSE
. 3471NGER 

20 5 AS PASSE
. 7701NGER 

21 AS CONK
0763REET 

22 AS CONK
2421REET 

23 3 AS PASSE
. 6570NGER 

24 4 AS WOO
. 3720D 

25 1 AS WO
. 01 OD 

26 2 AS PASSE
. 4158NGER 

27 1 AS WO
. 01 OD 

28 9 AS CEME
. 7584NT 

29 2 AS CEME
4 9341NT 

30 AS CEME
0207NT 

31 4 AS VEGIT
. 8230ABLE 

32 WB CEME
0096NT 

33 2 AS EMPT
. 9700Y 

34 AS CONK
6569REET 

35 AS CONK
2557REET 
36 AS CONK
8314REET 

37 1 AS MATA
1 0670RIAL 

38 WB MATA
1475RIAL 

39 WB MATA
3299RIAL 

40 AS EMPT
1659Y 
41 1 45.22AS 09 0
. 922 
CEME
NT
42 4 AS PASSE
. 2003NGER 
43 1 1 AS CEME
. 7 1292NT 
44 3 AS PADD
. 0620Y 
45 AS EMPT
2986Y 
46 1 AS CEM
. 01 ENT 
47 4 AS PASSE
. 1523NGER 
48 1 42.11
NL 08 6
. 678 
CEME
NT
49 1 46. AS 0
. 64 1 
CEME
NT
50 1 WB CEME
. 0028NT 
51 1 AS CEM
. 01 ENT 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in Assam un
der 
North East Special Infra
structure Development 
Scheme (NESIDS) (Job 
Type  4th Axle  No. Umrangso_ NESIDS
_2019-20_01) - Axle Loa
d Survey 
Data at 02+425KM 

D 17-
i Feb-
202

Axle
Sl. Empty ad Commod
),
No. Axle nes) ity Type 
Loaded
2) 3 Weigh
r t
d
 
A
x
l
e
 
52 1 1 AS CEME
. 6 6927NT 
53 1 1 AS CEM
. 6 05 ENT 
54 1 AS CEME
. 1443NT 
55 1 AS BRIC
9 02 KS 
56 1 1 AS IRON 
. 2 0670
57 AS EMP
09 TY 

58 1 1 AS CEME
. 7 7899NT 
59 1 AS CEME
. 1402NT 
60 1 1 AS SWE
. 6 02 ET 
61 5 AS EMP
. 02 TY 

62 1 1 AS CEME
. 4 8833NT 
63 4 AS PAD
. 02 DY 
64 4 AS PASS
. 12 ENG
ER 
65 1 AS SWEE
. 8319T 
66 3 AS EMPT
. 5999Y 

67 1 1 AS CONK
. 3 4280REET 
68 3 A PAS
. S SEN
GER 
69 3 MN EMPT
. 7199

70 3 AS NUR
. 01 SUR

71 1 1 AS CEM
. 9 09 ENT 
72 1 1 AS CEM
. 9 01 ENT 
73 1 AS CEME
. 6612NT 
74 AS EMPT
9298Y 
75 4 AS AA
. 01 TA 
76 1 AS CONK
. 9299REET 
77 3 AS EMPT
. 4637Y 

78 4 AS01C
EMPTY 
. C

79 3 AS02EMPT
. 1681Y 

80 3 AS01EMPT
. 1833Y 

81 1 A KH
. S AR
NI 
82 WB EMPT
6570Y 

83 WB EMPT
1465Y 
84
WB16EMPT
3620Y 

85 AS01EMPT
1346Y 

86 1 32.19AS 187
. 921 
KOYL
A
87 4 AS PASSE
. 4879NGER 
88 4 AS02VEGIT
. 1796ABLE 
89 3 AS05WOLD 
. 0121
90 4 AS EMP
. 09 TY 

91 AS09EMPT
4842Y 
92 AS EMP
09 TY 

93 AS09EMPT
9981Y 
94 1 AS02GUPTA 
3 8846SWEET

95 3 AS PARC
. 1121HUN 
96 AS EMP
09 TY 
97 3 AS09PARC
. 1312HUN 
98 1 3 AS02PARC
. . 4111HUN 
99 1 3 WB65PARC
. . 7273HUN 
100 1 43.21AS01 6
. 689 
CONK
REET
101 1 AS09CONK
. 0112REET 
102 2 AS02EMPT
. 0862Y 

103 1 9 AS01SHAK
. . 1749KER 
104 1 1 AS18CONK
. 7 4129REET 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in Assam un
der 
North East Special Infra
structure Development 
Scheme (NESIDS) (Job 
Type  4th Axle  No. Umrangso_ NESIDS
_2019-20_01) - Axle Loa
d Survey 
Data at 02+425KM 

D 17-
i Feb-
202

Axle
Sl. Empty ad Commod
),
No. Axle nes) ity Type 
Loaded
2) 3 Weigh
r t
d
 
A
x
l
e
 
105 1 1 AS CON
. 7 18 KRE
ET 
106 1 1 AS01CONK
. 6 7026REET 
107 1 AS PAS
. 02 SEN
GER 
108 1 45.68AS01 5
. 148 
CONK
REET
109 1 AS CONK
. 2573REET 
110 1 AS CON
. 09 KRE
ET 
111 1 33.33AS03 4
. 838 
CONK
REET
112 1 37.36AS09 2
. 121 
CONK
REET
113 1 NL01CONK
. 6157REET 
114 1 46.68AS01 7
. 117 
CONK
REET
115 1 1 AS01GUD S
. 6 9221WEET 
116 1 1 AS19CONK
. 7 4941REET 
117 AS EMPT
1771Y 
118 1 AS17CONK
. 8987REET 
119 1 1 AS01CONK
. 6 8087REET 
120 1 AS02CONK
. 8041REET 

121 1 2 AS25CONK
. 0 1553REET 
122 4 AS25EMPT
. 9203Y 

123 1 AS25CONK
. 1121REET 
124 1 1 AS02S
CLOT
. 4 2113H 
125 1 AS25GUD S
. 2981WEET 
126 1 30.20AS09 8
. 629 
CONK
REET
127 1 9 AS25CLOT
. . 2118H 
128 4 AS25EMPT
. 1672Y 

129 3 AS25EMPT
. 2811Y 

130 4 AS25EMPT
. 9781Y 

131 1 AS25CONK
. 1525REET 
132 1 AS CON
. 25 KRE
ET 
133 1 1 AS09CONK
. 9 6629REET 
134 1 46.33AS01 2
. 501 
CONK
REET
135 3 AS EMP
. 01 TY 

136 1 45.58AS01 9
. 913 
CONK
REET
137 4 AS01EMPT
. 5541Y 

138 3 AS25WOO
. 0125D 
139 1 A CO
. S NK
REE

140 5 AS04EMPT
. 4124Y 

141 1 36.77AS09 3
. 819 
CONK
REET
142 1 41.30AS25 1
. 995 
CONK
REET
143 1 44.60AS09 2
. 585 
CONK
REET
144 A EM
S PT

145 1 42.61AS25 0
. 685 
CONK
REET
146 1 A CO
. S NK
RE
ET 
147 1 32.68AS 01 4
. 449 
CONK
REET
148 1 AS01CONK
. 4174REET 
149 1 1 AS25CONK
. 8 2817REET 
150 4 88 EM
. 95 PTY 

151 AS21EMPT
3865Y 

152 1 41.25AS01 2
. 301 
CONK
REET
153 1 AS CON
. 01 KRE
ET 
154 1 1 AS CONK
. 7 8472REET 
155 1 42.13AS01 7
. 891 
CONK
REET
156 1 47.63AS01 3
. 812 
CONK
REET
157 1 1 AS CONK
. 7 4116REET 
158 1 AS01CONK
. 1286REET 
159 1 AS CONK
. 3801REET 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in Assam un
der 
North East Special Infra
structure Development 
Scheme (NESIDS) (Job 
Type  4th Axle  No. Umrangso_ NESIDS
_2019-20_01) - Axle Loa
d Survey 
Data at 02+425KM 

D 17-
i Feb-
202

Axle
Sl. Empty ad Commod
),
No. Axle nes) ity Type 
Loaded
2) 3 Weigh
r t
d
 
A
x
l
e
 
160 1 A/ KO
. F YL

161 1 1 AS01CONK
. 9 7218REET 
162 1 2 AS01CONK
. 1 8527REET 
163 1 2 AS01CONK
. 5 3274REET 
164 1 2 AS01CONK
. 1 3381REET 
165 1 1 AS01CONK
. 9 2111REET 
166 1 39.82AS01 1
. 294 
CONK
REET
167 1 50.21AS09 2
. 592 
CONK
REET
168 1 59 CON
. 96 KRE
ET 
169 1 AS25CONK
. 6641REET 
170 1 AS09CONK
. 9742REET 
171 1 37.93AS02 7
. 891 
CONK
REET
172 1 2  AS25
CONK
. 0 6005REET 
173 1 AS01CONK
. 3717REET 
174 1 AS25CONK
. 1329REET 
175 1 14.60AS02 1
. 421 
CONK
REET
176 1 AS CON
. 02 KRE
ET 
177 1 3 AS CON
. . 02 KRE
ET 
178 1 AS01KOYL
. 3957A 
179 1 AS CON
. 01 KRE
ET 
180 1 AS CON
. 09 KRE
ET 
181 1 AS01CONK
. 8251REET 
182 1 41.73AS01 2
. 424 
CONK
REET
183 1 8 AS09BAAS 
. . 9783
184 1 AS01ELETR
. 8597ONICS 
185 1 AS CON
. 09 KRE
ET 
186 1 1 AS23PETR
. 1 9057OL 
187 AS09EMPT
2067Y 

188 1 45.98AS11 4
. 768 
CONK
REET
189 1 46.20AS09 8
. 489 
CONK
REET
190 3 AS02PASSE
. 9448NGER 
191 1 AS CON
. 01 KRE
ET 
192 1 44.67AS02 5
. 877 
CONK
REET
193 1 46.87AS09 2
. 218 
PARC
HUN
194 1 44.34AS09 0
. 935 
CONK
REET
195 1 43.42AS 09 8
. 312 
CONK
REET
196 1 47.80AS01 2
. 711 
CONK
REET
197 1 48.12AS01 1
. 161 
CONK
REET
198 1 40.87AS09 7
. 231 
CONK
REET
199 4 AS01EMPT
. 3561Y 

200 3 AS02PASSE
. 6575NGER 
201 1 46.64AS01 8
. 571 
CONK
REET
202 1 AS CONK
. 8473REET 
203 AS07EMPT
0005Y 

204 1 2 AS09CONK
. 5 8041REET 
205 1 9 AS09WOO
. . 5888D 
206 1 AS01CONK
. 1662REET 
207 1 1 AS BO
. 0 14 RA 
208 5 AS09GING
. 7515AR 
209 1 2 AS01CONK
. 2 9144REET 
210 AS01EMPT
2469Y 

211 1 41.80AS02 6
. 236 
CONK
REET
212 4 AS GIN
. 01 GAR 
213 3 AS23EMPT
. 9052Y 

214 1 87 CON
. 47 KRE
ET 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in Assam un
der 
North East Special Infra
structure Development 
Scheme (NESIDS) (Job 
No. Umrangso_ NESIDS
_2019-20_01) - Axle Loa
d Survey 
Data at 02+425KM 

D 17-
i Feb-
202

Sl. E
m Gross 

No. Loaded
Axle 4th Weigh
Commod
(2) e t ity Type 
215 1 AS01CONK
. 9450REET 
216 AS02PASSE
0969NGER 
217 3 AS07EMPT
. 7259Y 

218 AS09PASSE
7045NGER 
219 1 1 50 SOI
. 6 80 L 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in 
Assam under North Eas
t Special Infrastructure 
Development Scheme (
NESIDS) (Job No. Umra
4th  ngso_ NESIDS_2019- 
Type  3rd Axle 
Axle  20_01) - Axle Load Surv
ey Data at 02+425KM 

Dir 17-
ec Feb-
tio 2020 
n  

Sl. Empty Commodi


),
No. ty Type 
Axle6th
Axle
Loaded
2) Weigh
t

1 7 NAUG
. OAN 

2 4 LANK
. A 

3 3 LANK
. A 

4 1 LANK
9 A 

5 3 LANK
. A 

6 3 LANK
. A 

7 4 LANK
. A 

8 3 LANK
. A 

9 2 LANK
. A 

10 3 LANK
. A 

11 4 DIBU 
.

12 3 LANK
. A 

13 2 LANK
. A 

14 4 AS 20 1
. 954 
NAUG
OAN
15 3 LANK
. A 

16 1 LANK
. A 

17 5 LANK
. A 

18 0 LANK
. A 

19 3 LANK
. A 

20 4 LAN
. KA 

21 1 LANK
6 A 

22 1 LANK
5 A 

23 3 LANK
. A 

24 1 LUMBD
1 ING 

25 1 DAB
8 KA 

26 1 HOJ
1 AI 

272 9 HOJA
. I 

28 3 LANK
. A 

29 4 LAN
. KA 

30 5 LANK
. A 

31 6 JAGI R
. OAD 

32 5 LANK
. A 

33 5 LANK
. A 

34 3 LANK
. A 

35 4 LANK
. A 

362 1 HOJA
0 I 

37 4 LANK
. A 

38 2 LANK
. A 

39 6 LAN
. KA 

40 4 AS 09 
.
LANK
A
41 4 LANK
. A 

42 3 LANK
. A 

43 4 LAN
. KA 

44 4 LANK
. A 

45 3 LAN
. KA 

46 4 LANK
. A 

47 4 LAN
  KA 

48 3 LANK
. A 

49 1. 1 LAN
1. 5 KA 
2
2
50 1 LANK
. A 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in 
Assam under North Eas
t Special Infrastructure 
Development Scheme (
NESIDS) (Job No. Umra
4th  ngso_ NESIDS_2019- 
Type  3rd Axle 
Axle  20_01) - Axle Load Surv
ey Data at 02+425KM 

Dir 17-
ec Feb-
tio 2020 
n  

Sl. Empty Commodi


),
No. ty Type 
Axle6th
Axle
Loaded
2) Weigh
t

51 1 LANK
. A 

52 4 LAN
. KA 

53 3 LAN
. KA 

54 3 LAN
. KA 

55 3 LAN
. KA 

56 3 LAN
. KA 

57 2 LANK
. A 

58 4 LANK
. A 

59 4 LANK
. A 

60 3 LANK
. A 

61 4 LANK
. A 

62 1 AS 02 
  5223 
LANK
A
63 9 LANK
. A 

64 7   DIBU 
. 09
749

65 7 LALBA
. GAN 

66 1 LALB
5 AGAN 

672 8 DIBU 
.

68 3 LANK
. A 

69 3 LANK
. A 

70 4 GAUW
. HATI 

71 1 LANK
. A 

72 6 LANK
. A 

73 3 LANK
. A 

74 4 LANK
. A 

75 4 LANK
. A 

76 3 LANK
. A 

77 1 CALC
4 UM 

78 4 LANK
. A 

79 4 LANK
. A 

80 4 LANK
. A 

81 3 LANK
. A 

82 3 LANK
. A 

83 1. 2 LAN
1. 1 KA 
2
2
84 1 3 LANK
. . A 
1
.
2
2
85   AS 02 88
95 
LALBA
GAN
86 1 1 LANK
. 5 A 
1
.
2
2
87 3 LAN
. KA 

88 3 CALC
. UM 

89 3 LANK
. A 

90 2 LANK
. A 

91 1. 1 LANK
1. 7 A 
2
2
92 4 DAL
. MIA 
93 4 LANK
. A 

94 4 LAN
. KA 

95 2 LANK
. A 

96 1 1 HOJ
. 0 AI 
1
.
2
2
97 4 LANK
. A 

98 4 LANK
. A 

99 3 CALC
. UM 

100
3 1 DABK
0 A 

101
3 3 CALC
. UM 

102
3 4 LANK
. A 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in 
Assam under North Eas
t Special Infrastructure 
Development Scheme (
NESIDS) (Job No. Umra
4th  ngso_ NESIDS_2019- 
Type  3rd Axle 
Axle  20_01) - Axle Load Surv
ey Data at 02+425KM 

Dir 17-
ec Feb-
tio 2020 
n  

Sl. Empty Commodi


),
No. ty Type 
Axle6th
Axle
Loaded
2) Weigh
t

103
3 4 LANK
. A 

104
3 4 LANK
. A 

105
2 3 CALC
. UM 

106
3 4 CALC
. UM 

107
3 1 LAN
1 KA 

108
3 LANK

109
3 4 CALC
. UM 

110
2 4 CALC
. UM 

111
3 3 LANK
. A 

112
4 3 CALC
. UM 

113
4 2 LANK
. A 

114
4 LANK

115
4 3 LANK
. A 
116
4 CALC
UM 

117
2 1 DAB
2 KA 

118
4 3 CALC
. UM 

119
2 3 LANK
. A 

120
2 1 LANK
6 A 

121
2 1 LANK
1 A 

122
3 1 LANK
5 A 

123
4 4 LANK
. A 

124
2 3 LANK
. A 

125
2 3 LAN
. KA 

126
2 1 LANK
6 A 

127
3 4 LANK
. A 

128
4 3 CALC
. UM 

129
2 4 LAN
. KA 

130
4 3 LANK
. A 

131
2 4 LANK
. A 

132
2 3 LANK
. A 

133
3 1 LAN
6 KA 

134
2 4 CALC
. UM 

135
3 3 CALC
. UM 

136
3 3 CALC
. UM 

137
4 3 CALC
. UM 

138 2 NAVG
. OAN 

139 2 NAVG
. OAN 

140
2 8 AS 18 4
  446 
NAVG
OAN
141
2 4 CALC
. UM 

142
2 2 CALC
. UM 

143
2 4 CALC
. UM 

144
2 3 CALC
. UM 

145
3 3 CALC
. UM 

146
2 4 CALC
. UM 

147 1 JHIRKIT
. TLING 
148 1 NAVG
. OAN 

149
3 4 CALC
. UM 

150 3 TEJPU
. R 

151
3 4 CALC
. UM 

152
3 4 NAVG
. OAN 

153 0 NAVG
. OAN 

154 3 LANK
. A 

155
3 3 LANK
. A 

156
2 4 CALC
. UM 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in 
Assam under North Eas
t Special Infrastructure 
Development Scheme (
NESIDS) (Job No. Umra
ngso_ NESIDS_2019- 
20_01) - Axle Load Surv
ey Data at 02+425KM 

Dir 17-
ec Feb-
tio 2020 
n  

V h
e i
c
l
e
 
A
x
Sl.Configur
Empty Commodi
No. ), 3rd 6th ty Type 
Axle e
Loaded Weigh
2) t
157
2 3 LANK
. A 

158
4 1. 1 LANK
1. 4 A 
2
2
159
2 3 LANK
. A 

160 2 LANK
. A 

161
2 4 LANK
. A 
Appendix 2 

Construction of Double 
Lane Road from Lanka t
o Umrangso via Diyung
mukh, Haflong Tiniali an
d Panimur in Assam 
under North East Specia
l Infrastructure Develop
ment Scheme (NESIDS) (
Job No. Umrangso_ NES
VDF  VDF  IDS_2019-20_01) - Axle 
Load Survey Summary 

Location 02+425KM 

Type
Total
Sampl Umra
Vehicle Ad
o.eSample ngso opt
(%) -
Lank ed 
a  V
N D
Tandem 
Tridem Axle  Single Axle 
Axle 
N
L
C 2.5
V 6 
 

2-
Axle 17.
Truck 62 

3-
Axle 28.
Truck 81 

Multi-
Axle 22.
uck 47 

B
u 0.3
s 4 
 

% of Vehicles 

Load
L U
N) 
a m
n
k


U
m
r
a
n
g
s

T
A
x
r
a
n
g
s
o
 
-
 
L
a
n
k
a
 

Tridem
0-85
10
0.0

85-95
0.
0

95-105
0.
0

105-
115 0
.
0

115- 0
125 .
0

125-
135 0
.
0

135-
145 0
.
0

145-
155 0
.
0

155-
165 0
.
0

165-
175 0
.
0

175-
185 0
.
0

185-
195 0
.
0

195-
205 0
.
0

205-
215 0
.
0

215-
225 0
.
0

225-
235 0
.
0

235-
245 0
.
0

245-
255 0
.
0

255-
265
0.00

265-
275 0
.
0

275-
285 0
.
0

285-
295 0
.
0

295-
305 0
.
0

305-
315 0
.
0

315-
325 0
.
0

325-
335 0
.
0

335-
345 0
.
0

345-
355 0
.
0

355-
365 0
.
0

365-
375 0
.
0

375-
385 0
.
0

385-
395 0
.
0

395-
405 0
.
0

100.00
100 1 100
.00 0 .00 
0
.
0
0
 

You might also like