NAME OF WORK: "Investigation and construction of lift schemes to lift water from GNSS to HNSS".
I GRAVITY
TUNNEL-I PH-I DELIVERY 56.634 3.875 Tunnel of Dia 7.5 m 38
CANAL
Kaletivagu
GRAVITY CANAL Tunnel Exit 56.634 6.450 Gravity canal 64
reservoir
14 mm & 20
Kallurupalli veligallu
III PUMP HOUSE-III + 341.860 + 422.530 43.891 14.640 99.500 6.140 9 55.260 3.0 mm & 18 mm 3 145
new tank Reservoir
& 16 mm
veligallu 12 mm & 16
IV PUMP HOUSE-IV Pedderu Tank + 412.875 + 491.220 22.653 15.020 96.500 4.900 6 29.400 2.8 2 148
Reservoir mm & 14 mm
12 mm & 14
V PUMP HOUSE-V Pedderu Tank Nayuni Cheruru + 477.875 + 535.100 22.653 6.160 66.500 3.750 6 22.500 2.8 2 61
mm
Punganur 12 mm & 20
Nayuni
VI PUMP HOUSE-VI Branch Canal @ + 528.935 + 621.320 22.653 13.800 109.000 5.530 6 33.180 2.8 mm & 18 mm 2 136
Cheruru
KM 79.600 & 14 mm
754.000
NAME OF WORK: "Investigation and construction of lift schemes to lift water from GNSS to HNSS".
PART-2
12 mm & 18
Surabhi Tank + 320.595 9.910 12.250 95.500 3.33 4 13.32 2.50 mm & 16 mm & 1 91
14 mm
near Tanks 1 & 2 + 382.170 0.566 4.730 94.500 0.38 2 0.76 0.65 9 mm & 6 mm 1 35
2 PUMP HOUSE- + 295.545
II Gaddamavar
ipalli Gondhi Tank + 301.100 0.566 3.980 12.500 0.06 2 0.12 0.65 9 mm & 6 mm 1 10