You are on page 1of 5

1

R M SETTER L

6 nR
DELAY BLOCK FAST

nRTD
+

SPEED

- CONTROLLER STOP

hrnc
+/-10V

nACT
3 6 4

6
nACT
-120RPM

0.0V

MV3

NLC
NLC

5 nACT
+21RPM

2
10.0V

SPEED SIGNAL
0 -3600 RPM = 0 - 10.8 V DRUM PR.

umin

1. 2. 3. 4.

SLOW RATE AT NR > 2850 RPM & DN/DT OPERATED TSE INFLUENCE ON ; umin = 30 C => 10.0 V => 600 RPM2 STOPPING OF nRTD on GCB OPEN AND NR < nRTD by 45 RPM. STOPPING OF SPEED SETPOIN CONTROL ON ( NR > 2850 RPM AND NR RAISED AND TSE ON AND FAULTED IN GCB OPEN CONDITION) OR STOP COMMAND FROM SGC TURBINE. TRACKING IN SYNCHRONIZED CONDITION IF FREQUENCY WITHIN LIMIT AND LOAD CONTROLLER OR PRESSURE CONTROLLER IN ACTION. FAST CALIBRATION DURING TRACKING CONDITION OR TURBINE TRIP.

5. 6.

SPEED CONTROLLER CIRCUIT

1
R

CMC RUNBACK

6 PR
M
SETTER L

OR DELAY BLOCK FAST

PRTD
+
+ MIN PR

STOP

5 1
CMC
R 10.0V

7 PRf PRP
r

10
R

2
10.0V MIN

PRMAX
L MV3

DP/DT
L

umin 3 Lmin
+ -

PACT

4
hRPC

LOAD SIGNALS
+

LOAD
CONTROLLER +1V

5% DROOP

NACT

8
1. 2. 3. 4. 5.
CMC ON GRADIENT ENABLING WHEN GCB CLOSED AND (LOAD CONTROLLER IN ACTION OR PRESSURE CONTROLLER IN INITIAL PR. MODE). TSE ON AND NOT FAULTED. LOAD GRADIENT ON. (TSE ON AND FAULTED) OR STOP COMMAND FROM SGC OR SETPT. RAISED WITH CMC ON.

6.
7. 8. 9. 10.

FOLLOW ABOVE CONDITION.


FREQUENCY INFLUENCE ON. INITIAL PR. MODE SELECTED. LOAD CONTROLLER OFF. LIMIT PR MODE SELECTED

LOAD CONTROLLER CIRCUIT

SET PR.

3.0 V

+
ACTUAL PR. 0.4 V INITIAL PR. MODE

hRPrc

PRESSURE CONTROLLER CIRCUIT

hRPc hRNc

hRmin
M A X M I N M I

hR
ADMISSION CONTROLLER PLUNGER

hRPrc

COIL ON

COLLINS 1
+ COLLINS 2

I N

AND

10 V

O. S. C. EHC O/P AT 100 % P.B ON

NO FAULT IN COLLINS

CONTROL TRANSFER OF EHC CONTROLLERS

ADMISSION RANGE

TURBINE RANGE

MSV 1 M 1

MCV M 1

HPC M 1

HPS S 1

IPS S

PER

PER

PER

PER

PER

uAmin

lAmin

uTmin

LTmin

PU

PL

DESIGN OF TSE UNIT (STAGE I, 3 X 200 MW )

TSE FAULT BS SIMULATION/TEST SELECT TUR SELECT ADM

&

> =1
TEST TURBINE

K
PU

MW

S
ANALOG

PACT PL

> =1
PACT>2%

CALCULATION CIRCUIT

&

TEST

TURBINE U

MW

&

ANALOG CALCULATION CIRCUIT

NACT L

&
TEST MSV/MCV U ANALOG CALCULATION NACT L

MW

CIRCUIT

CHANGE OVER LOGIC FOR TSE INDICATOR

You might also like