Write XML file

1 Substructure 0.00 Page Amount

2A Frame 0.00 Page Amount

2B Upper floors 0.00 Page Amount

2C Roof

Included in: Page

2C Roof 0.00 Amount

2D Stairs 0.00 Page Amount

2E External walls 0.00 Page Amount

2F Windows and external doors 0.00 Page Amount

2G Internal walls and partitions

Page

2G Internal walls and 2H Internal doors 3A Wall finishes partitions 0.00 0.00 Amount Page Amount Page Amount

3B Floor finishes 0.00 Page Amount 0.00

3C Ceiling finishes

Page

3C Ceiling finishes 0.00 Amount

4 Fittings

5A Sanitary appliances 5B Services equipment 5C Disposal installations 0.00 0.00 0.00 Amount Page Amount Page Amount Page

Page

5C Disposal installations 0.00 Amount

5D Water installations 5E Heat source 0.00 Page Amount Page Amount

5F Space heating and 5G Ventilating systems air treatment 0.00 0.00 Page Amount Page

5G Ventilating systems 5H Electrical installations 0.00 Amount Page Amount

5I Gas installations 0.00 Page Amount

5J Lift and conveyor 5K Protective installations installations 0.00 0.00 Page Amount Page

5K Protective installations

5L Communications 5M Special installations installations 0.00 0.00 Page Amount Page Amount

5N Builder's work in 5O Builder's profit and connection attendance 0.00 0.00 Page Amount Page

Amount

5O Builder's profit and 6A Site works attendance 0.00 Amount Page Amount

6B Drainage 0.00 Page Amount 0.00

6C External services 0.00 Page Amount

6D Minor building works

Page

6D Minor building works 0.00 Amount

7 Preliminaries 0.00 Page Amount

8 Contingencies 0.00 Page Amount

Contract Sum 0.00