Professional Documents
Culture Documents
CUSTOMER TERMINATION POINTS TP No. SERVICE DESCRIPTION TP01 TP02 TP03 TP04 TP05 TP06 TP07 TP08 TP09 TP10 TP11 PUMP SUCTION PUMP DISCHARGE CASING DRAIN WITH VALVE AND BLIND FLANGE WARM-UP CONNECTION WITH VALVE AND BLIND FLANGE COOLING WATER INLET COOLING WATER OUTLET PLAN 65 DRAIN (NDE) PLAN 65 DRAIN (DE) BASE PLATE DRAIN PLAN 53C DRAIN (NDE) PLAN 53C DRAIN (DE)
DIWAKAR SOLAR PROJECT AT ASKANDRA RAJASTHAN CUST. P.O. NO.: SERVICE: HEAT TRANSFER FLUID PUMP INSTALLED AT: PUMP OEM: SULZER PUMPS (I) LTD. SULZER ORDER NO.: (Q/0100099805-0010)
IDENTIFICATION NUMBERS
SULZER SERIAL NO. CUSTOMER TAG NO'S PUMP DRIVER -
.
.
. .
MODIFIED
FORMAT . . DESIGN GROUP SUBSTITUTE FOR . .
. .
CHECKED
. .
APPROVED
1:1
REV. MODIFICATION
SEP. PARTS LIST REPLACED BY .
HZB 303-720
PUMP
CHECKED: APPROVED:
COPYRIGHT (DATE OF DRAWING) SULZER PUMPS ALL RIGHTS RESERVED. NO PART OF THIS DRAWING MAY BE REPRODUCED, DISTRIBUTED, OR TRANSMITTED IN ANY FORM OR BY ANY MEANS, ELECTRONIC OR MECHANICAL, INCLUDING PHOTOCOPYING AND RECORDING, WITHOUT THE EXPRESS PRIOR WRITTEN CONSENT OF SULZER PUMPS
c
E PGA1000998050010-01 1 / 1
OPERATING DATA
SCALE : NTS
REFERENCE DRAWINGS
IF IN DOUBT ASK ALL DIMENSIONS ARE IN mm UNLESS OTHERWISE SPECIFIED