You are on page 1of 5

Pages 1 through 339 redacted for the following reasons: ---------------------------S. 12 S.

12 , 15

1 JAG-2013-00258

Considerations
COST C.1 C.2 C.3 C.4 C.5 ProximitytoCourtstobeservedbyOCC(exclusiveofCarbonFootprint) LikelihoodtoAchieve360cellswithinCurrentEstimate CostofLandPurchase/Lease CostofBuilding(exclusiveofsitedevelopmentcosts) ImpactonAnnualOperatingCosts(excludingcostofland)

C.6 SiteDevelopmentCostsandRestraints(needforspecialfoundations,construction,drainage, relocations,anddemolitions) C.7 ENVIRONMENTAL E.1 NotinALR OffSiteDevelopmentCosts(eg.roadexpansions,bridges,walkways,servicelineextensions)

E.2 EnvironmentalImplications(MinimalNegativeImpactonair,land,waterconditions,including noiseandlightpollution) E.3 E.4 E.5 SCHEDULE NotWithinEnvironmentallySensitiveArea GreenBuildingOpportunitiesandAbilitytoAchieveLEEDGold CarbonFootprint(TrafficImpact,TravelDistancesforStaff,Services)

S.1 ScheduleImpact(ExclusiveofTimetoZoneandPurchase;e.g.Siteremediation,demolition, permits,andlegalchallenges) S.2 S.3 TimelinessofZoning TimelinessofPurchase/Lease

2 JAG-2013-00258

PROVINCIALIMPLICATIONS P.1 P.2

ProbablepositiveoutcomeofFirstNationsStrengthofClaimAnalysis ConsistentwithCapitalAssetManagementPlan

MUNICIPALIMPLICATIONS M.1

LikelihoodofAppropriateZoningincludingconsiderationforpublicacceptance

M.2 CommunityImpactProximitytoSchools/EducationFacilities,DaycareCentres&Residential Areas M.3 M.4 M.5 ConsistentwithCommunityPlan(Municipalbenefit) FinancialBenefittoMunicipality(grants/grantsinlieu) CompatibilitywithNeighbours(Architectural,Functional)

TECHNICAL T.1 T.2 T.3 T.4 T.5

MinimumSize(Buildingfootprint,publicandstaffparking) SiteConfiguration(includingbuildablearea,abilitytoexpand,allowsflexibledesign) Geotechnical(includingfloodplains,soilbearing,drainage,terrain/slopeconditions) ServicestoSite(power,water,septic,vehicularaccess,telephone/radioreception) AbilitytoAchieveFacilityDesignCriteria

OPERATIONAL O.1 O.2 O.3 O.4 O.5 AvailabilityofSecondaryAccess(highwayclosure,naturaldisaster,etc) AbilitytoAchieveThreatPerimeterBuffer AccesstoMajorArterial(AccessforStaffandServices) ProximitytoEmergencyServices AvailabilityofProfessionalStaff(Psych,Dental,Doctor,Nurse)

3 JAG-2013-00258

4 JAG-2013-00258

5 JAG-2013-00258

You might also like