UNIVERSITI TEKNOLOGI MARA FINAL EXAMINATION

COURSE COURSE CODE EXAMINATION TIME

BUILDING PATHOLOGY AND CONTROL II BSB555 JUNE 2012 3 HOURS

INSTRUCTIONS TO CANDIDATES 1. This question paper consists of two (2) parts: PART A (1 Question) PART B (4 Questions)

2.

Answer four (4) questions only. Answer the question from Part A and three (3) questions from Part B in a separate Answer Booklet. Start each answer on a new page. Do not bring any material into the examination room unless permission is given by the invigilator. Please check to make sure that this examination pack consists of: i) ii) the Question Paper two Answer Booklets - provided by the Faculty

3.

4.

DO NOT TURN THIS PAGE UNTIL YOU ARE TOLD TO DO SO


This examination paper consists of 4 printed pages
Hak Cipta Universiti Teknologi MARA CONFIDENTIAL

CONFIDENTIAL

AP/JUN 2012/BSB555

PART A

QUESTION 1 A new township has been proposed to develop on a vacant land located 5 km away from city centre. The vacant land is currently surrounded by housing estates and commercial area. One of the development conditions is to provide Environmental Impact Assessment (EIA) report. With appropriate example, analyse on the land used information that need to be considered in EIA report. (25 marks)

Hak Cipta Universiti Teknologi MARA

CONFIDENTIAL

CONFIDENTIAL

AP/JUN2012/BSB555

PARTB

QUESTION 1 a) As a Buiding Surveyor Consultant, you are required to describe four (4) types of survey that are normally practised for industrial properties in Malaysia. (16 marks) b) Discuss the possible causes of the following defects and propose appropriate rectification works; i) Rotten timber window frames ii) Apron crack at car porch iii) Ceiling dampness in kitchen (9 marks)

QUESTION 2 The existing mosque is found to have major defects due to leaking at roof cover in main prayer hall. After a few weeks the leakage has created defective to roof timber structure. With the aid of sketches explain in detail work method statement for repairing works of the roof structure. (25 marks)

QUESTION 3 a) Explain the means of space, light and ventilation in accordance to the requirement stated in Uniform Building By Laws 1984 for the following ; i) Natural lighting and ventilation ii) Minimum area of rooms in residential building (10 marks) b) Explain the process and procedure in issuing Certificate of Completion and Compliance (CCC) to a building owner (15 marks)

Hak Cipta Universiti Teknologi MARA

CONFIDENTIAL

CONFIDENTIAL

AP/JUN 2012/BSB555

QUESTION 4 a) En Amir has engaged you as a Building Surveyor to assess on the condition of his single storey bungalow. You are required to prepare a checklist and explain the process of implementing a comprehensive condition survey report. (20 marks) b) Explain on cost implication for repairing works. (5 marks)

END OF QUESTION PAPER