You are on page 1of 3

12/3/13

Process Chains: Initial Data Loading - Order Fulfillment - SAP Library

Process Chains: Initial Data Loading


Technical name: 0SD_DLV_INIT_P01

Purpose
This process chain activates and fills all data targets for the scenario Delivery Service (display component Delivery Service (0SD_DLV), InfoArea Delivery Service (0SD_DLV)). With this process chain, the initial data set is updated (initialization of the delta process) in the data targets affected. The data loading processes and the associated activation of ODS objects can be scheduled in one step and monitored centrally in the log view. Individual scheduling and monitoring of InfoPackages does not apply, nor do activation of ODS objects and subsequent further posting in the data targets. Dependency Between Processes Step 1 2 2 2 2 3 4 5 6 7 8 9 10 11 12 Process Type Start process Initial Data Loading Load data InfoPackage 2LIS_11_V_SSL_INIT_R3 Load data InfoPackage 2LIS_11_VAITM_INIT_R3 Load data InfoPackage 2LIS_11_VASTH_INIT_R3 Load data InfoPackage 2LIS_11_VAHDR_INIT_R3 Activate 0DS data 0SD_O04 AND (and-process for activation 0SD_O01) Activate 0DS data 0SD_O02 Load data InfoPackage 80SD_O04_FULL_DATAMART Activate 0DS data 0SD_O01 Load data InfoPackage 80SD_O02_INIT_DATAMART Load data InfoPackage 80SD_O01_INIT_DATAMART AND (and-process for activation 0SD_O03) Activate 0DS data 0SD_O03 Load data InfoPackage 80SD_O03_INIT_DATAMART Successor 2 If successful, 3 If successful, 4 If successful, 5 If successful, 10 If successful, 10 If successful, 6 If successful, 7 If successful, 8 If successful, 9 If successful, 10 If successful, 10 If successful, 11 If successful, 12 -

help.sap.com/erp2005_ehp_04/helpdata/EN/fb/a31d6f20fdd848b42b8e136cc0e15f/content.htm?frameset=/EN/67/eecac778e50f4994e2f6686f3cbd3d/frameset.htm

1/3

12/3/13

Process Chains: Initial Data Loading - Order Fulfillment - SAP Library

This process chain has the following scheduling options: Delivered scheduling option: planned start: January 2, 2003 12:00 a.m. Variant setting for the start process: direct scheduling

Prerequisites
Beware of the following points during the transfer of the Business Content: 01. If you are using an SAP source system: 01. During the transfer, collect the process chain SD_DLV_INIT_P01 as usual with the necessary objects (or, where applicable, data flow before and/or after). 02. Beforehand, when assigning the source system, select the affected SAP source system and the SAP BW application component itself. 03. Transfer the collected objects. 01. If you are using more than one SAP source system (with identical SAP DataSources): 01. During the transfer, collect the process chain SD_DLV_INIT_P01 as usual with the necessary objects (or, where applicable, data flow before and/or after). 02. Beforehand, when assigning the source system, select the affected SAP source systems and the SAP BW application component itself.
help.sap.com/erp2005_ehp_04/helpdata/EN/fb/a31d6f20fdd848b42b8e136cc0e15f/content.htm?frameset=/EN/67/eecac778e50f4994e2f6686f3cbd3d/frameset.htm 2/3

12/3/13

Process Chains: Initial Data Loading - Order Fulfillment - SAP Library

03. Transfer the collected objects. Following the transfer of the process chain, the following postprocesses are required: 01. In the transaction Process Chains (RSPC), select your transferred process chain. 02. If you selected more than one SAP source system during the transfer, remove the link between the processes of type Load Data, which have InfoPackages with identical InfoSources, and the successors. Then add, for example, the process type AND and toggle this connection between the just-removed link. 03. Following the start process, several data loading processes from the SAP R/3 system are triggered in parallel. Check whether there are enough processes available in the source system. If necessary, modify the link to a sequential one. 04. Adjust the scheduling options of your start process to your requirements. To do this, double click on the process type Start. 05. If required, enhance the process chain with further processes, e.g. the setup of indices or the compression of InfoCubes. 06. Then save, check and activate the process chain and provide information, where applicable, about which server the process chain should be scheduled on. Then use the function Activate and Schedule to start the process chain according to your scheduling options. Following the successful run of this process chain, you can transfer the process chain Delta Data Loading (0SD_DLV_DELTA_P01) and, where applicable, adjust/enhance and activate/schedule it. This process chain supports SAP R/3 standard systems as of Release 4.0B.

help.sap.com/erp2005_ehp_04/helpdata/EN/fb/a31d6f20fdd848b42b8e136cc0e15f/content.htm?frameset=/EN/67/eecac778e50f4994e2f6686f3cbd3d/frameset.htm

3/3

You might also like