MRCI Sites Location Owner/Contact Acres Zoning Environmental Status Rdwy Rail Available Utilities next steps/who

Brownfield sites (rating)* access access W G E WW


and cross reference*
1. Sharon Steel East (1) Lowellville David Gennaro, 6065 Arrel-Smith 17 Ind. May need assessment yes yes Y Y Y Y Owner address/ Lowellville Done
Rd., Lowellville, Oh. 330-536-6910 Proposed site plan/ G. Diorio Done
2. Sharon Steel West (3) Lowellville same as above 81.4 Ind. Phase I on part of site limited no N N Y N
3. CASTLO East (1) Struthers CASTLO CIC, 100 S. Bridge Street, 40 Ind. VAP yes yes Y Y Y Y Proposed site plan/Castlo, Corridor
Trans/Infra #5 and # 7 Struthers, Ohio 44471 330- No Further Action w/siding Manager Done
750-1361
4. CASTLO West (1) Struthers CASTLO CIC, 100 S. Bridge Street, 5 Ind. Being remediated yes yes Y Y Y Y
Struthers, Oh. 44471 80 Phase II completed w/siding Remediation app. pending owner
approval
5. ASTRO West (1) Struthers Astro Development LLC 27.5 Ind. VAP NFA yes yes Nb Y Y Nb Additional info. re: utilities/ Astro and
Trans/Infra #1, #2, #7 Bob Cene Jr., Astro Shapes Corp., Nb -nearby Struthers
65 Main Street, Struthers, Ohio
44471. 330-755-1414

6. Yo. Sheet & Tube East Campbell City of Campbell, Mayor John Dill, 30 Ind. VAP Remediation yes yes Y Y Y Y Environment status of various
(1) Trans/Infra. # 1, #3, #4 351 Tenney Ave., Campbell, Ohio underway on 8 acres, parcels/Campbell Done
44505. Ph. 330-755-1451
Casey Industrial Park, 275 Kappa 60 Phase 2 completed on Remediation app. pending owner
Dr., Pittsburgh, Pa. 15238 40 acres approval.
Ph. 412-963-1111

7. Yo.Sheet & Tube West Youngstown/ Sherman International, 367 107 Ind. needs assessment limited yes Y Y Y n Contact Yo. Re: status of acquistion/
(3) Trans./Infra. #9 Campbell Mansfield Ave., Pittsburgh, Pa. Corridor Manager No progress
412-928-2880
8. Republic Steel (3) Youngstown RSA 17 Ind. needs assessment yes no Y Y Y Y Owner info./Youngstown
9. Wean Building (1) Youngstown Gearmar Properties 8 Ind. VAP Phase II yes yes Y Y Y Y Demo. Status/Youngstown
10. V & M Star Site (1) Yo./Girard City of Youngstown, Office of 80 Ind. needs assessment yes yes Y Y Y Y aceage/Youngstown Done
Trans/Infra. #6, #10 Economic Development, 20 Federal
Street, Suite M8, Youngstown, Ohio
44503
11. Girard Leatherworks Girard Navy Friends 14 Ind. needs assessment yes no Y Y Y Y Owner info., status. Initiative working
(3) with Girard legal counsel.
12. US Steel (3) McDonald US Steel Real Estate, 600 Grant St. 70 Heavy needs access/assess yes yes w/ Y Y Y Y Meeting with US Steel re: access,
Trans/Infra. #8 Suite 1683, Pittsburgh, Pa. 15219- man.. siding assessment on July 27, 2009
2800, Att: Joe Curro 412-433- /McDonald.Corridor Manager Done,
7996 awating response
13. Standard Slag McDonald Lafarge, 6205 Newton Falls Bailey 175 Lt. man. needs assessment limited yes Y Y Y Y
(Lafarge) (3)Trans/Infra. #8 Rd. Warren, Oh. 44481 Tim
Page 330-393-5656
MRCI Sites Location Owner/Contact Acres Zoning Environmental Status Rdwy Rail Available Utilities Next steps/Who
W G E WW
14. Mahoningside (1) Warren City of Warren, Mayor Mike 6 Ind./ undergoing VAP yes yes Y Y Y Y Provide comprehensive plan/Warren
O'Brien, 391 Mahoning Avenue, Comm. remediation
Warren, Ohio, 44483

15. Direct International (2) Newton Falls Direct International,Inc., 1536 First 30 Ind. needs assessment yes no Y Y Y Y Meeting with owner/ Haney, Corridor
Street, Newton Falls, Oh. 44444 Manager
Danny White, Ph. 330-872-1138

* Sites are cross referenced to related Trans./Infrastructure Projects

Feasibility Ratings; (1) Project is currnetly being implemented or could be implemented within three years; (2) Project could be implemented within three to five
years; (3) Project could be implemented in five plus years. Feasibility Rating is based upon following factors: community support, comprehensive plan, project status,
site ownership, environmental status, zoning, cost of project, availibility and timing of financial resources (state/federal), and availability of local match. As
circumstances change feasibility rating will be adjusted, as necessary.
MRCI Sites Location Owner/Contact Est. Project Cost Funding secured Funding Source(s) Status/Next Steps/Who
Trans./Infrastructure (Rating)
1. MRCO Lower Connector Bridge (1) Struthers City of Struthers, 6 Elm $2,358,000 Yes Federal appropriation, Needs Casey Industrial Park cooperation for .3
Brownfield #5, #6 St. Struthers, Ohio FHWY, STP, Stimulus acres for construction. City working on agreement
44471 Ph.
330-755-2181
Project designed and under final ODOT review. Sale- Dec. 09, Construction-2010
2. Cene Way Roadway Ext. (1) Struthers City of Struthers, 6 Elm $397,500 Yes OPWC/Local Struthers working with NS to resolve crossing issue.
Brownfield #5 St. Struthers, Ohio
44471
Ph. 330-755-2181
Project to extend Cene Way to Lower Connector Bridge site completed except for construction of rr crossing.
3. Sanitary Lift Station (1) Campbell City of Campbell, 351 $700,000 Partial 80% Federal Approp. City attempting to obtain ownership from Sherman
Brownfield #6 Tenney Ave., Campbell, OPWC International to proceed.
Oh. 44505 Ph.
330-755-1451
Rehabilitate sanitary lift station and related sanitary improvements in MRCO area serving existing and potential businesses.
4. MRCO/Campbell Roadway (1) Campbell City of Campbell, 351 $850,000 Partial - 629 Funds $235,000, 629 Funds Funding application pending with District 6 OPWC
Brownfield #6 Tenney Ave., Campbell, $750,000 (road/utility) (committed) Committee. Did not receive OPWC funding. Filed
Oh. 44505 Ph. $485,000 (2200' road $615,000, OPWC pre-app. for ARC funding for roadway only. ODOD
330-755-1451 only) 629 commitment extended to October 2010.

Design and construction of 2600' of roadway extention with gas, water, sanitary sewers to improve access and facilitate further development.
5. Castlo Infrastructure Imp. (1) Struthers CASTLO CIC, 120 S. $4,047,680 No. Jobs Ready Sites CASTLO expected to file JRS application later in 2009.
Brownfield #3 Bridge Street, Struthers,
Ohio 44471 Ph.
330-750-1363
Infrastructure improvements, including buildings, roadway construction and utility extensions to a 40 acre VAP remediated site.
6. Lower Division St. Bridge (2) Youngstown Mah.Co./Youngstown $3,000,000 No Fed.Trans.Bill or Initiative to support if Fed.Trans.Bill Application
Brownfield #10 County Eng. Asso pending for County Eng. Asso. Funding/Mahoning
County Engineer.
Project would provide additional access to former Ohio Works property to facilitate V&M Star and other development projects.
7. Intermodal Facility (2) Struthers Western Reserve Port $4,000,000 No ODOD Distribution Consider alternative site in Girard/Weathersfield,if
Authority and Logistics Program feasible/Jim Pirko, Corridor Manager

WRPAuthority has filed Letter of Intent with ODOD under Distribution/Logistics Program. Estimate based on clean site with service rail access.
8. McDonald Roadway (3) McDonald Village of McDonald, 451 $1,500,000 No Secure r/w easement to dedicate roadway/McDonald
Brownfield #12, #13 Ohio Ave., McDonald, Provide available site profile info./McDonald
Ohio 44437
Project involves construction of approximately 7,500 ft. of industrial roadway along the east side of the railroad tracks from bridge area near McDonald Steel to Liberty Street Viaduct.
MRCI Sites Location Owner/Contact Est. Project Cost Funding secured Funding Source(s) Status/Next Steps/Who
9. MRCO Roadway (3) Campbell/ Sherman International/ $750,000 roadway, No
Brownfield # 7 Youngstown Allied $2,000,000 bridge
Project would extend existing roadway east along the river from Campbell to the Center Street Bridge in Youngstown

10. US 442 (S. State Street) (1) Girard City of Girard, 100 W. $2,200,000 Yes MPO, State, Construction; Spring 2010
Main st., Girrard, Oh. Stimulus, MPO
44420 Enhancement
Project is related to Brownfield #10 and Env. Enhancement #4
MRCI Sites Location Owner/Contact Accessible Est. Project Cost Funding source(s) Next Steps/Who
Env. Enhancement/Rec. (rating)
1. Girard Lowland West (1) Girard mixed public/private Yes Prepare site map/John Bralich, Done. PSU Studio project
Project would establish a passive recreation area along river in area of dam and viaduct and possible put-in/take-out location for water craft.
2. Woodland/Hadnet Bluff (1) Youngstown Youngstown Yes Meet with nonprofits/city/Manager, PSU project
Project would enhance area from Cedar St. to Market Street by thinning vegetation to create downtown vista and establish permaculture vegetation City owns
property along South Ave./Hadnet and north side of Woodland. Cityscapes and MRC have indicated support for the project.
3. Covelli Center (1) Youngstown Youngstown Yes Meet with nonprofits/city/Manager, PSU project
Project would establish a passive recreation area and section of Youngstown bike trail adjacent to railroad tracks/river. Area has also been suggested for site of train depot if rail service is to be restored in
Youngstown.
4. 422 Gateway Enhancement (2) Youngstown/Girard public right-of-way Yes Meet with nonprofits and city/Corridor Manager
Project would enhance Route 442 corridor from 711 connector into Girard through tree and permaculture planting and demolition. Former Brier Hill Office to be demolished.

5. Newton Fall River Launches (2) Newton Falls private Secure site access/Trumbull Metro Parks
Launch sites adjacent to covered bridge and dam are privately owned.

6. Lowellville River Launch (1) Lowellville public/ private Yes Owner info. and access or ownership/Lowellville
Prepare site map/John Bralich Done
Potential launch sites are immediately adjacent to bridge. East site is publicly owned, west site privately owned.

7. Mahoning River Water Trail (2) Various sites in Non-profit/ public accessible Id. publicly or non-profit owned sites/Scott Hill. Scott
Trumbull Co. locations need Hill to assist in identifying same for other possible water
identified. launch sites. Secure West Park Ave. site,Trumbull
Metro. Parks
Canoe/rafting course between Newton Falls and Warren. Trumbull Metro Parks control considerable land along river to facilitate the project.

8. Niles River Launch (2) City of Niles public/ private Yes Prepare site map/John Bralich Done
Project would establish water launch site on the south side of the river just east of Main Street Bridge in the vicinity of First and Brown Streets. City and Ohio Edison own property along the river.

9. Niles/Warren Bikeway Link (3) Niles/Warren railroad right- of- way Yes Obtain proposed route/Trumbull Metro Parks
Project would link Warren and Niles Bikeways that are being constructed in 2009. Project distance is approximately one mile in the City of Niles and 7 miles in Warren. Project in Trumbull Metro Parks
Comprehensive Plan. Trumbull Metro Parks to be lead agency.
10. Youngstown Bikeway Project Youngstown City of Youngstown Partly $10,000,000 Submitted as
(3) Federal Trans.
Earmark.
Preliminary conceptual design undergoing revision. Project would run from Mill Creek east to vicinity of South Ave./Crab Creek.

11. McDonald Bikeway (3) Village of McDonald multiple owners Partly Provide comprehensive plan. Done
Project would link to Niles Bikeway and in Village Comprehensive Plan. Right-of way issues in Weathersfield need resolved.