Project category Requested Completed Pending Pending due to # of Expansion sites 10 4 6 Media not available # of Rollout sites 1 1 0 # of Swap

sites 1 1 0 -

CMPak OMCR Daily Report_Day


Project Category: Expansion
S No. Site ID-Site Name 0357 1604 1170 1517 1510 1670 1091 1575 0275 1206 Current Configuration S220_220 S200_440 S243_060 S640_220 S200_440 S222_222 S000_666 S000_444 S030_440 S000_444 Proposed Configuration S220_666 S200_666 S243_060 S640_660 S200_660 S222_666 S000_666 S000_666 S030_660 S000_666 BSC E1 requirement met No No N/A Yes No No No No Yes Yes

1 2 3 4 5 6 7 8 9 10

HYDBSC16 HYDBSC16 HYDBSC16 HYDBSC16 HYDBSC18 HYDBSC15 HYDBSC19 HYDBSC16 HYDBSC16 HYDBSC19

Project Category: Rollout


S No. 1 2 3 4 5 Site ID-Site Name 3420 Current Configuration 000_444 BSC HYDBSC15 E1 requirement met Yes On site caller/Subcon Mujtaba (Huawei)

Project Category: Swap


S No. 1 Site ID-Site Name 2284 Current Configuration 000_444 BSC KHIBSC25 E1 requirement met 4 E1s On site caller/Subcon Asif Hameed / Huawei

TOP Issues & Risks


No. Top1 Top2 Top3 Issue/Risk Description

2 7

Daily Report_Day
On site caller/Subcon Caller no. Expansion DoneHard/Soft No No Yes / Hard Yes / Hard No No 03028267021 No No Yes / Hard Yes / Hard Remarks/Expansion not done due to

Khurram Shahzad (Netkom) Rab Dino (Highrise) Safeel (Huawei) Kamran Ali (Huawei) Kamran Ali (Huawei) Kamran Ali (Huawei) Mansoor (Highrise) Kamran Ali (Huawei) Kamran Ali (Huawei) Kamran Ali (Huawei) 03233749123

E1 not available E1 not available Site configured to S243_060 with a new RRU Site expanded to S640_660 E1 degraded E1 not available Site already configured S000_666 E1 degraded Site expanded to S030_660 Site expanded to S000_666

Caller no. Email

Integration Remarks Done Site configured but in halted state Yes

Caller no. 03333372629

Cutover Completed Yes

Remarks

Issue Owner

Current Handler

Target resolution date

Issue Status

3 7

CMPak OMCR Daily Report_Day


Project Category:
S No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 Site ID/Site Name 1563 2297 1604,1544,1545 Multiple Sites 1974 1792 1138 1329 1091,1099,0138,0209,0237 1466 1469 2232 0224,2116 BSC25 1355 1124 1792 0602 BSC26,BSC20 BSC26,BSC16 Multiple Sites

Auxillary
Caller Name/Dept-Company Dilshad (CMPAK) Gong (HW) Rab Dino (Highrise) Ahsan Naeem (HW) Shahid (Interses) Rizwan (LCC RF) Shahid (CMPAK) Shabi (CMPAK) Mansoor (Highrise) Waqar Abro (Huawei) Safeel (Huawei) Kaleem (EES) Abdus Sami (Huawei) Imran Manan (Huawei) Shafiqurrehman (Zong) Ziaurrehman (Zong) Aslam (Netkom) Shohaib (LCC RF) Shohaib (LCC RF) Saqib (Zong) Atif/Majid (Ericsson)

Pak OMCR Daily Report_Day


Reason for call Change polarity of alarms Status verification E1 verification for expansion WO verification Configuration verification Site troubleshooting from BSC Change polarity of alarms Change polarity of alarms E1 verification TCH availability Site status verification TRX power testing on site WO applied for swap Abis interface STM testing/GPRS testing Alarms verification Alarms verification Sector fluctuation troubleshooting on site Site status verification Stats query Alarms verification E1 verification