You are on page 1of 3

JCE / Quotation .

We wish to thank you for the opportunity to quote for the work associated with the above mentioned project. Please do not hesitate to contact the undersigned, should you have any queries.

Yours faithfully,

PROPRIETARY NOTICE The information contained in the quotation in its entirety is of a commercial and/or financial nature. It is considered confidential information and the property of The information is furnished in confidence to our Clients for the sole purpose of quotation e aluation. The information contained in this quotation may not !e reproduced or used !y our Client in "hole or in part for any purpose other than stated a!o e and# upon request# the recipient a$rees to return this quotation to

Engineering & Design

I.P.F_3.1-QUOTATION

Approved by the Managing Member

13 !1 "!1#

Page 1 o$ 3

%ev & "

JCE / Quotation .
1 SCOPE OF SERVICES The following will be included !.! !.& !.!.0 "ite #isit $ %easurements. 'pdate of (sometric )rawings complete with *+%,s and "upports where required. "tatic Pipe "tress .nalysis purely based on the requirements of ."%/ *-!.-. )etailed "tress .nalysis 1eport in order to confirm all wall thicknesses, forces2moments on no33les2connection and supports, stresses on the piping as well as displacements of the piping including a set of 4aesar (( (sometric )rawings showing node numbers and the a5is set for reference to the results. 'pdate of %7). "quad 4heck and (mplementation of marking up 4omments. /ngineering .pproval of (sometric )rawings.

!.6 !.8 !.9

EXCLUSIONS The following will be e5cluded &.! &.& &.&.0 &.6 .ny meetings. This quotation does not include .(. approval and inspection costs. .ny forms of )ynamic or #ibration .nalysis. Wind, "ettlement, *last and "eismic :oads. .ny item, discipline or responsibility not specifically mentioned in this ;uotation.

SCHEDULE -.! -.& The duration of work will be appro5imately Two <&= working Weeks, provided that an official order and all required information 2 drawings are received. The work is to be scheduled for e5ecution after receipt of an order to suit ongoing operations>

Engineering & Design


I.P.F_3.1-QUOTATION

Approved by the Managing Member

13 !1 "!1#

Page " o$ 3

%ev & "

JCE / Quotation .
4 PRICE 0.! The following rates will apply as specified below, e5cluding #alue .dded Ta5 <#.T=.
Item Se rvice Number Unit Price 1 1 1 1 1 Hours 1 1 1 1 1 Total Cost 1 Price -

5 6.! 6.&
6.-

GENERAL CONDITIONS OF QUOTATION This ;uotation shall be #alid for -? <Thirty= days from )ate of (ssue, where after it shall be "ubject to 4onfirmation. 1eserves the 1ight to .lter the ;uotation to cater for 4osts (ncurred during the /5ecution of the Project for any Work outside the +riginal "cope of "ervices.
shall have no :iability in 4ontract or :egally for :oss of Profit, *usiness or any 4onsequential )amage2:osses

6 8.!

COMMUNICATION .ll correspondence regarding any 4ontractual and Technical matters shall be addressed to

@@@@@@@@@@@@@@@@@@ (Bus !"ss M#!#$"%&

@@@@@@@@@@@@@@@@@@@ (E!$ !""% !$ #!' D"s $!&

Engineering & Design


I.P.F_3.1-QUOTATION

Approved by the Managing Member

13 !1 "!1#

Page 3 o$ 3

%ev & "