Professional Documents
Culture Documents
1
1
REVISION
3, 5
2 24
21
7 10, 15
8, 18, 19 22 11, 12 17 23 13
20 9
14, 16
Project 1 2 3 4 5 6 7 8 9 10 11 12 Maintenance M004202 M004607 M004585 CSNHS-000800(256) M004202 Maintenance NH000-008502(153) M004425 NHS00-000100(298) M004586 M004586
County Cobb Cobb Cobb Cobb Cobb Cobb Douglas Newton Fulton Fulton Fulton Fulton Fulton
Event No Begin Date 431620 433368 437077 436980 438932 442679 442972 443111 431615 293144 376488 1/21/2014 2/18/2014 2/10/2014 2/27/2014 2/24/2014 3/2/2014 1/16/2014 5/3/2012 5/21/2013
End Date 3/5/2014 3/1/2014 3/10/2014 3/3/2014 3/5/2014 3/8/2014 3/6/2014 3/31/2014 5/30/2014
Start Time End Time 9pm 9pm 9pm 9pm 9pm 9pm 9pm 9am 9pm 9am 9am 9pm 5am 5am 5am 5am 5am 5am 5am 3pm 5am 3pm 3pm 5am
Cont. or Daily d d d d d d d d d d d d
Location I-575 NB from MP 0 (SR 5) to MP 6.3 (SR 92) I-285 WB from MP 22 (Northside Dr) to MP 12 (Hollowell Pkwy) I-285 WB @ I-75 I-75 NB about MP 268 (I-575) I-285 EB about MP 20 (I-75) I-285 NB/SB from MP 18 (Paces Ferry Exit) to MP 25 (Roswell Rd Exit) I-20 EB from MP 26 (Liberty Road) to MP 93.6 (SR 142) Sidney Marcus Blvd EB/WB from MP 1 (SR 400) to MP 2 (Buford Hwy) I-75 NB from MP 239 (Central Ave) to MP 256 (Mt Paran) Techwood Dr from 16th Street to 14th Street I-75/I-85 SB from MP 247 (Decatur St) to MP 248 (MLK Jr) I-75/I-85 NB from MP 248 (MLK Jr) to MP 249 (Pine St) SR 166 EB/WB from MP 22 (I-285) to MP 29 (I-75) Spur 14 NB/SB from MP 0 (I-285) to MP 2 (US 29) I-75/I-85 SB about MP 248 (MLK Jr) I-285 NB/SB from MP 62 (SR 279) to MP 0 (Washington Rd)
Lanes Affected one right ramp lane closed three left lanes closed one right ramp lane closed two right lanes closed right shoulder closed three left lanes closed one right lane closed with rolling closure one right lane closed HOV lane closed one right lane closed Right Shoulder closed three left lanes closed with traffic pacing One left Lane Closed
Work to be Preformed Lane Sweeping Operations Sign replacement Bridge Maintenance Bridge Painting Operations Geotechnical Borings Sign Replacement Lane Sweeping Operations Bridge Construction Sign replacement Sidewalk and retaining wall construction Bridge painting operations Construction Activities
409760 10/14/2013 6/30/2014 423266 430485 431896 431897 431902 431904 431911 431914 437570 440937 440939 12/6/2013 1/9/2014 3/31/2014 12/31/2014
13
Maintenance
Fulton
1/19/2014
3/7/2014
9pm
5am
Sweeping Operations
14 15 16
d d d
One left Lane Closed one right lane closed one right lane closed with rolling closure
Project 17 18 Maintenance
Event No Begin Date 443255 443260 443282 443699 431281 431284 431933 431934 431938 443149 443285 2/26/2014 3/1/2014 2/1/2014 3/1/2014 1/19/2014 1/19/2014 3/1/2014 3/2/2014
End Date 3/14/2014 3/1/2014 3/1/2014 3/1/2014 3/4/2014 3/2/2014 3/1/2014 3/2/2014
Start Time End Time 9am 6am 6am 9:30am 9pm 9pm 9am 6am 3pm 6pm 6pm 6pm 5am 5am 2pm 6pm
Cont. or Daily d d d d d d d d
Location
Lanes Affected
Work to be Preformed
SR 10 NB/SB from MP 1 (Freedom Pkwy) to one center lane closed replacing bridge striping MP 1.5 (Ralph McGill Blvd) SR 400 NB from MP 0(I-85) to MP 1 (Sidney two right lanes closed Concrete Placement Marcus Blvd) I-85 NB from MP 88 (SR 400) to MP 91 HOV and One lane closed Sign Structure Construction (Clairmont Rd) I-75 NB about MP 244 (University Ave) two right lanes closed Pavement work I-85 NB from MP 93.6 (Shallowford Rd) to One left Lane Closed Sweeping Operations MP 109.8 (Old Peachtree Rd) US 78 EB/WB from MP 0 (I-285) to MP 10 (Gwinnett Co Line) One left Lane Closed Sweeping Operations Guardrail repair Sign Structure Construction
I-285 SB from MP 45.7 (I-20 Entrence Left Ramp Lane Closed Ramp) to I-20 MP 67 (I-285 Exit Ramp) I-85 SB from MP 91 (Clairmont Rd) to MP 87 two right lanes closed (GA 400)