You are on page 1of 8

J- 3255

DAILY MANPOWER/EQUIPEMENTS REPORT

*MANPOWER STATUS

Saturday, June 29, 2013

DESCRIPTION

NO.

PREVIOUS
TOTAL
Manhours

SURVEYOR

M/D

254

2565

10

2575

GENERAL FORMAN

M/D

203

2060

10

2070

FOREMAN

M/D

262

2626

10

2636

LEAD MAN

M/D

1186

12064

70

12134

CLADDING FORMAN

M/D

130

STEEL ERECTOR

M/D

4696

RIGGERS

M/D

1033

WELDER

M/D

LABOR /HELPER

M/D

10

FLAGMAN

M/D

123

1290

30

1320

11

SCAFFOLDER

M/D

725

7510

50

7560

12

ClLADDING INSTALLER

M/D

70

4890

50

4940

13

DRIVER

M/D

210

3210

14

MAN LIFT OPERATOR

M/D

1745

17820

15

TRUCK OPERATOR

M/D

16

FORK LIFT OPERATOR

M/D

306

17

CRANE OPERATOR

M/D

18

WATER TANK DRIVER

M/D

DIRECT SUBTOTAL
TOTAL MANPOWER(DIRECT+INDIRECT)

288
264
229
242
279
277
251
294
51
136
208
144
242
124
124
2473

632

2717
2631
2248
2213
2044
2462
1880
2956
536
1370
1952
1312
2436
1250
1250
27531

UNIT

142

111

EXPAT
1
1
1
1
1

SAUDI

Manhour

M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D
M/D

SAUDI

Total
Manhours

INDIRECT
SITE MANAGER
HSE MANAGER
SENIOR CONSTRUCTION ENGINEER
MECHANICAL QA/QC INSPECTOR
PURCHASING OFFICER
PUBLIC RELATION OFFICER
QA/QC SUPERVISOR
SAFETY OFFICER
SAFETY ASSISTANT
SECRETARY
DOCUMENT CONTROLLER
QA/QC ASSISTANT
STORE KEEPER/TIME KEEPER
MALE NURSE
OFFICE BOY
INDIRECT SUBTOTAL
DIRECT

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

UNIT

EXPAT /
total
days

1
1

1
1
1
1
1
1
1
1
11
EXPAT

910

49192

24

10660

4
LOCAL

10
10
10
10
0
8
10
10
8
10
8
0
10
10
10
124
TOTAL

2727
2641
2258
2223
2044
2470
1890
2966
544
1380
1960
1312
2446
1260
1260
29381

910

256

49448

60

10720
0
0

18

3228

10

100

17920

3115

10

3125

1244

12815

40

12855

12187

253

0
130,727
158,258

70

714

0
131,441
160,822

DESCRIPTION

QTY

*EQUIPMENT STATUS

S.No.

NAMES

TOTAL Days previous


Hours.

Today hours

TOTAL

CRANES (XCMG)

25 TON

231

2328

10

2338

CRANES (SANY)

100TON

263

2620

2620

3
4
5
6
7
8
9
10
11
12
13
14
15
16

CRANES (SANY)
CRANES (XCMG)
CRANES(XCMG)
FORK LIFTS
FORK LIFTS
MAN LIFT
MAN LIFT
MAN LIFT
MAN LIFT
POWER GENERATOR
AIR COMPRESSOR
HEAVY TRUCK
WELDING MACHINE
FUIL TANK

75TON
70 TON
50 TON
16 TON
7 TON
40 M. Ht..
38 M. Ht..
27 M.Ht.
20 M.Ht.
150 KVA
Benzene Type
12 m.

1
0
2
0
1
2
3
4
0
1
2

232
213
476
102
250
551
421
795
118
210
258

2328
2120
4557
1030
2490
4110
4250
7920
1180
2040
2600

10
0
20
0
10
20
30
40
0
10
20

2338
2120
4577
1030
2500
4130
4280
7960
1180
2050
2620

17
18

WATER TANK
POWER GENERATOR

6 m3
50 KVA

YASREF / TECHINT-SP-3, YANBU


SULFUR STORAGE BUILDING

J-3255 C Daily Progress Report


DATE
13-September-2012

Senior Site Engineer

QA/QC

SITE MANAGER

Ahmad Ghazal

Nabeel Al-Share

ASHRAF
M.YOUSEF

HIGH WIND

Weather
Temperature

1. Manpower Status

2. Safety Mileage

Today

Category
Indirect

Category

HSE Manager

Irfan Ahmed

3. Major Areas of Concerns

M/H

Direct

IBSF

SULFUR STORAGE BUILDING ERECTION

Others

Total

4. Work Activities
Actual OF 29 JUN 2013

Plan for 30 JUN 2013

Steel Erection, Alignment, Finishing works Steel Erection, Alignment, Finishing works and
and Mat'ls Unloading
Mat'ls Unloading
SL#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

GRIDLINE

PIECE MARK #

YASREF / TECHINT-SP-3, YANBU


COKE STORAGE BUILDING

J-3255 B Daily Progress Report


DATE
Senior Site Engineer

QA/QC

SITE MANAGER

Ahmad Ghazal

Nabeel AlShare

ASHRAF
M.YOUSEF

13-September-2012
Weather
Temperature

1. Manpower Status

2. Safety Mileage

Today
Category

Category

3. Major Areas of Concerns


M/H

Indirect

COKE STORAGE BUILDING


ERECTION

IBSF
Others

Total

4. Work Activities

SL#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Actual OF 29 JUN 2013

Plan for 30 JUN 2013

Steel Erection,Truss Assembly and


Mat'ls Unloading

Steel Erection,Truss Assembly and


Mat'ls Unloading

GRIDLINE
E/A 30/31
A 31/32
A 31/32
A 31/32
A 31/32
A 32/33
A 32/33
A 11/12
A 11/12
A 11/12

PU 52
GI 98
SR 26
SR 31
SR 25
GI 106
SR 26
SR 32
SR 28
SR 27

PIECE MARK #
(8 PCS)
(18 PCS)
( 2 PCS )
( 2 PCS )
( 14 PCS )
(4 PCS )
(6 PCS)
(2 PCS)
(2 PCS)
(8 PCS)

41
42
43
44
45
46
47
48
49
50
51
52
53
54

J-3255C, DAILY PROGRESS REPORT


AS OF 29 JUN 2013
1. SULFUR STORAGE BUILDING ERECTION & DELIVERY
PREVIOUSE TODA
Remaining
DELIVER
TOTAL
Progres
DELIVER TOTAL
LY
Y
Qty. to
Y AS OF
Erected
s%
Y TODAY Delivered
ERECTED Erected
Erect
yesterday

S.No.

Description

Total
Qty.

COLUMNS

254.640

228.497

228.497

26.143

89.73%

254.640

254.640

TRUSS FRAMES

370.440

324.560

324.560

45.880

87.61%

370.440

370.440

BEAMS

93.800

78.139

78.139

15.661

83.30%

93.400

93.400

ROOF HORIZONTAL BRACE

53.880

42.627

42.627

11.253

79.11%

53.850

53.850

ROOF STRUTS

95.200

74.217

74.217

20.983

77.96%

95.020

95.020

VERTICAL BRACE

21.820

13.212

13.212

8.608

60.55%

21.730

21.730

ANGLES

16.520

9.980

9.980

6.540

60.41%

16.520

16.520

FASTENER

16.300

11.410

11.410

4.890

70.00%

16.290

16.290

MISC.

1.220

1.220

1.220

10 CF-CHANNELS / EAVE STRUTS 8.020

3.324

3.324

4.696

41.45%

8.020

8.020

11

GIRT

65.940

31.164

33.036

32.904

50.10%

65.940

65.940

12

SAG RODS

8.950

5.835

5.907

3.043

66.00%

8.910

8.910

13

FRAME

12.230

11.694

11.694

0.536

95.62%

12.230

12.230

14

POST

8.500

7.088

7.088

1.412

83.39%

8.500

8.500

15

JACK BEAM

5.320

1.071

1.071

4.249

20.13%

5.320

5.320

16

RAFTER

7.790

2.036

#REF!

#REF!

#REF!

7.790

7.790

17

PURLINS

160.560

122.860

123.532

37.028

76.94%

160.560

160.560

18

Grating

17.620

0.034

0.034

17.586

0.19%

17.620

17.620

19

Handrails

12.410

3.028

3.028

9.382

24.40%

11.450

11.450

20

Safety Gate

0.090

0.020

0.020

21

Ladder

1.980

0.917

0.917

1.063

46.31%

1.980

1.980

22

Bracket

1.910

1.365

1.365

0.545

71.47%

1.910

1.910

#REF!

#REF!

TOTAL STEEL Materials #######


23

ANCHOR BOLT

973.058

0.000

26.470

26.470

0.875

1,233.360
100.00%

0.000

1233.360

26.470

26.470

3.900

3.900

4.920

4.920

44.610

44.610

CLADDING MATERIALS.
24

Angles For Sheeting

3.900

25

Trims

4.930

26

Roof Panel

44.610

27

Side Wall Panel

15.840

15.840

15.840

28

End Wall Panel

7.130

7.130

7.130

TOTAL CLADDING MAT. 76.410


GRAND TOTAL

#######

22.410

49.755

102.870

102.870

#REF!

1,336.230

1336.230

AS OF 29 JUN 2013
2. COKE STORAGE BUILDING ERECTION & DELIVERY
PREVIOUSEL
Y ERECTED

TODAY
Erected

TOTAL
Erected

Remaining Qty.
Progress %
to Erect

S.No.

Description

Total Qty.

1
2
3
4
5
6

COLUMNS
TRUSS FRAMES
BEAMS
ROOF HORIZONTAL BRACE
FLANGE BRACE
VERTICAL BRACE
Rafter
ROOF STRUTS
ANGLES
FASTENER
MISC.
CF-CHANNELS / EAVE STRUTS
GIRT
SAG RODS
FRAME
POST
JACK BEAM
PURLINS

1011.350
1237.430
139.190
136.030
32.100
91.060
13.880
376.860
12.210
43.750
13.500
12.760
174.340
19.910
17.910
9.450
4.160
335.670

823.720
1016.210
59.629
97.906
7.063
50.550

823.720
1016.210
59.629
97.906
7.063
50.550

187.630
221.220
79.561
38.124
25.037
40.510

297.410
2.092
19.03

297.410
2.092
19.030

79.450
10.118
24.720

81.45%
82.12%
42.84%
71.97%
22.00%
55.51%
0.00%
78.92%
17.13%
43.50%

3.160
84.972
6.982
7.844
3.546
0.000
206.471

9.600
89.368
12.928
10.066
5.904
129.199

Grating
Handrails
Safety Gate
Ladder
Bracket

43.340

0.000

0.000

23.860

0.000

0.160

7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

ANCHOR BOLT

DELIVERY
TODAY

TOTAL
Delivered

898.690
1087.600
81.920
131.930
23.800
86.470

898.690
1087.600
81.920
131.930
23.800
86.470

24.76%
48.74%
35.07%
43.80%
37.52%

376.620
11.220
43.750
13.480
9.410
137.190
19.910
8.960
4.430

376.620
11.220
43.750
13.480
9.410
137.190
19.910
8.960
4.430

61.51%

322.610

322.610

41.750

41.750

0.000

22.760

22.760

0.000

0.000

0.110

0.110

2.710

0.000

0.000

1.360

1.360

1.570

0.236

0.236

TOTAL STEEL MATERIALS 3753.200


23

DELIVERY AS OF
yesterday

53.990

3.160
83.100
6.910
7.844
3.546
0.000
205.799

2,684.205

1.872
0.072

0.672

2.616

53.99

1.334

2686.821 1,066.379
53.990

0.000

15.03%

1.190

3,325.160

100.00%

53.990

1.190
0.000

3325.160
53.990

CLADDING MATERIALS.
24
25
26
27
28
29

ANGLES FOR SHEETING


TRIMS
SKY LIGHT
ROOF PANEL
SIDE WALL PANEL
END WALL PANEL
TOTAL CLADDING MAT.
TOTAL

0.740

0.740

0.740

11.480

12.330

12.330

9.160

9.160

9.160

86.390

89.510

89.510

39.050

44.260

44.260

95.870

96.700

96.700

242.690
4049.880

252.700
3631.850

252.700
3631.850

2,738.195

2.616

2740.811 1,309.069

67.68%

0.000

J-3255C, CLADDING DAILY PROGRESS REPORT


AS OF 29 JUN 2013
SULFUR STORAGE BUILDING CLADDING INSTALLATION
S.No.
2
3
4
5
6
7
8

CLADDING
MATERIALS.
ROOF PANEL
SIDE WALL PANEL
END WALL PANEL
Angles For Sheeting
Trims
GUTTER

TOTAL Qty. TOTAL


M. TONS. Qty. SQ. M.

TODAY
Installed

PREVIOUSELY TOTAL
Installed
Installed

Remaining Qty.
to Install

Progress DELIVERY
%
Status M.T.

7.130

21046.31
6709.73
2715.02

3.900

N/A

3.900

4.930

N/A

4.920

590 L.M.

590 L.M.

44.610
15.840

76.410

15,725.080

15,725.080

5,321.230

74.72%

44.610
15.840
7.130

J-3255B, CLADDING DAILY PROGRESS REPORT


AS OF 29 JUN 2013
COKE STORAGE BUILDING CLADDING INSTALLATION
S.No.
2
3
4
5
6
7
8

CLADDING
MATERIALS.

TOTAL Qty. TOTAL


M. TONS. Qty. SQ. M.

ROOF PANEL
SIDE WALL PANEL
END WALL PANEL
Angles For Sheeting
Trims
GUTTER
TOTAL CLADDING

TODAY
Installed

PREVIOUSELY TOTAL
Installed
Installed

Remaining Qty.
to Install

Progress DELIVERY
%
Status M.T.

95.870

41686
7097.82
5153.3

0.740

N/A

0.740

11.480

N/A

11.480

86.390
39.050

651.44

5,584.435

6,235.875

35,450.125

17.59%

86.390
39.050
95.870

1030 L. M.
233.530