Improvement and Maintenance of the National Road 13 South, Section 4 (Length 78 km) from (km 268+000) to (km 346+000) in Khammouane Province
RFI Summary
Month: 24/1/2022
Chainage Length Inspection Inspection Name of the Witness by
RFI No. Milestone Description Side Contact No Remarks Status
From To (m) Date Time Contact person ISWS
I.Highway:
NR13SP4/HW/2384 MS15 Construction for Sub Base of Widening 338+000 338+500 LHS 500 1/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2386 MS15 Scratch of Existing Pavements 334+100 334+500 RHS 400 2/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2387 MS15 Construction for Top Base Course 334+100 334+500 RHS 400 2/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2388 MS14 Filling Hole on the Road Manternance 340+000 346+000 6,000 2/1/2024 8 am -17 pm Mr.Khamhou 2056806346
NR13SP4/HW/2389 MS15 Scratch of Existing Pavements 334+500 334+800 RHS 300 3/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2390 MS15 Construction for Top Base Course 334+500 334+800 RHS 300 3/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2393 MS15 Scratch of Existing Pavements 334+800 335+200 RHS 400 4/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2394 MS15 Construction for Top Base Course 334+800 335+200 RHS 400 4/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2398 MS15 Construction for Sub Base of Widening 337+500 338+000 RHS 500 4/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2399 MS15 Construction for Sub Base of Widening 337+500 338+000 LHS 500 4/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2400 MS15 Construction for Sub Base of Widening 340+000 340+500 LHS 500 4/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2401 MS15 Commone Excavation for DUA Drainage 337+300 337+410 RHS 110 4/1/2024 8:30AM Mr.Khamhou 2056806346
NR13SP4/HW/2402 MS15 Scratch of Existing Pavements 334+100 334+500 LHS 400 5/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2403 MS15 Construction for Top Base Course 334+100 334+500 LHS 400 5/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2404 MS14 Construction for Sub Base of Widening 340+000 340+500 LHS 500 5/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2407 MS15 Commone Excavation for Ditches U Ditch 337+400 337+450 LHS 50 5/1/2024 9:30AM Mr.Khamhou 2056806346
NR13SP4/HW/2408 MS14 Clearing and Grubbing 340+000 341+000 RHS 1000 5/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2409 MS14 Commone Excavation for Widening 340+000 341+000 RHS 1000 5/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2410 MS15 Scratch of Existing Pavements 334+500 335+200 LHS 700 6/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2411 MS15 Construction for Top Base Course 334+500 335+200 LHS 700 6/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2412 MS14 Construction for Sub Base of Widening 340+000 340+500 LHS 500 6/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2414 MS15 Clearing and Grubbing 340+000 341+000 RHS 1000 6/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2415 MS15 Commone Excavation for Widening 340+000 341+000 RHS 1000 6/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2417 MS15 Scratch of Existing Pavements 334+800 335+200 LHS 400 7/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2418 MS15 Construction for Top Base Course 334+800 335+200 LHS 400 7/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2419 MS15 Clearing and Grubbing 340+000 341+000 RHS 1000 7/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2420 MS15 Commone Excavation for Ditches U Ditch 336+500 337+000 LHS 500 7/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2422 MS15 Spraying for Prime Coat (MC70) 334+100 335+200 RHS 1100 7/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2423 MS15 Scratch of Existing Pavements 335+200 335+500 RHS 300 8/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2424 MS15 Construction for Top Base Course 335+200 335+500 RHS 300 8/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2425 MS15 Construction for Sub Base of Widening 340+000 340+500 RHS 500 8/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2426 MS15 Spraying for Prime Coat (MC70) 335+000 335+200 RHS 200 8/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2427 MS15 Construction for Base Course junction 334+950 LHS 8/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2429 MS15 Scratch of Existing Pavements 335+500 335+800 RHS 300 9/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2430 MS15 Construction for Top Base Course 335+500 335+800 RHS 300 9/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
Unsuccessful
construction area on 08-
NR13SP4/HW/2431 MS15 Construction for Sub Base of Widening 340+000 340+500 RHS 500 9/1/2024 8 am -17 pm Mr. Souliyanh 2098219622 01-2024 and continue to
have request on 09-01-
2024
Construction for Top Embankment of
NR13SP4/HW/2432 MS14 336+500 337+000 LHS 500 9/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
Widening
NR13SP4/HW/2426 MS15 Scratch of Existing Pavements 335+500 335+800 RHS 300 11/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2427 MS15 Construction for Top Base Course 335+800 336+000 RHS 200 11/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2428 MS15 Construction for Top Sub Base 337+000 337+500 RHS 500 11/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2432 MS15 Scratch of Existing Pavements 335+200 335+800 LHS 600 12/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2433 MS15 Construction for Top Base Course 335+200 336+000 LHS 600 12/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2434 MS15 Spraying for Prime Coat (MC70) 334+100 335+200 LHS 1100 12/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
Construction for Top Embankment of
NR13SP4/HW/2435 MS14 340+500 341+000 RHS 500 12/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
Widening
NR13SP4/HW/2437 MS15 Scratch of Existing Pavements 336+000 336+500 LHS 500 13/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2438 MS15 Construction for Top Base Course 336+000 336+500 LHS 500 13/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2439 MS15 Spraying for Prime Coat (MC70) 335+200 335+800 RHS 600 13/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2442 MS14 Clearing and Grubbing 341+000 342+000 LHS 1000 13/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2443 MS14 Commone Excavation for Ditches U Ditch 341+000 341+500 LHS 500 13/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2444 MS15 Scratch of Existing Pavements 336+500 337+000 LHS 500 14/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2445 MS15 Construction for Top Base Course 336+300 336+500 RHS 200 14/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2446 MS15 Construction for Top Base Course 335+800 336+200 LHS 400 14/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2452 MS15 Scratch of Existing Pavements 336+000 336+300 LHS 300 15/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2453 MS15 Construction for Top Base Course 336+000 336+300 LHS 300 15/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2456 MS15 Spraying for Prime Coat (MC70) 335+800 336+500 RHS 700 15/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2457 MS15 Scratch of Existing Pavements 336+300 336+500 LHS 200 16/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2458 MS15 Construction for Top Base Course 336+300 336+500 LHS 200 16/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2465 MS15 Scratch of Existing Pavements 336+500 336+700 RHS 200 17/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2466 MS15 Construction for Top Base Course 336+500 336+700 RHS 200 17/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2467 MS14 Construction for Sub Bse of Widening 341+000 342+000 RHS 1000 17/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2469 MS14 Clearing and Grubbing 342+000 343+000 RHS 1000 17/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2470 MS14 Commone Excavation for Widening 342+000 342+500 RHS 500 17/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2472 MS15 Construction for Base Course junction 336+340 LHS 18/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2473 MS15 Construction for Base Course junction 335+950 RHS 18/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2479 MS15 Spraying for Prime Coat (MC70) 336+000 336+500 LHS 500 18/1/2024 10:00 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2480 MS14 Commone Excavation for Widening 342+700 342+800 RHS 100 19/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2484 MS15 Scratch of Existing Pavements 338+000 338+300 RHS 300 20/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2485 MS15 Construction for Top Base Course 338+000 338+300 RHS 300 20/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2489 MS15 Spraying for Prime Coat (MC70) junction 336+340 LHS 20/1/2024 10:00 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2490 MS15 Scratch of Existing Pavements 338+300 338+600 RHS 300 21/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2491 MS15 Construction for Top Base Course 338+300 338+600 RHS 300 21/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2496 MS15 Scratch of Existing Pavements 338+000 338+500 LHS 500 22/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2497 MS15 Construction for Top Base Course 338+000 338+500 LHS 500 22/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2502 MS15 Scratch of Existing Pavements 338+500 338+600 LHS 100 23/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2503 MS15 Construction for Top Base Course 338+500 338+600 LHS 100 23/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2508 MS15 Commone Excavation for Drainage 339+000 339+500 LHS 500 23/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2511 MS15 Scratch of Existing Pavements 338+300 338+800 RHS 500 24/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2512 MS15 Construction for Top Base Course 338+300 338+800 RHS 500 24/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2523 MS15 Commone Excavation for Drainage 339+500 340+000 LHS 500 28/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2524 MS15 Commone Excavation for Drainage 339+000 340+000 RHS 1000 27/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
the work it is not ready
on 27/1/2024 and
NR13SP4/HW/2525 MS15 Commone Excavation for Drainage 339+000 340+000 RHS 1000 28/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
Continue to have plan on
28/1/2024
NR13SP4/HW/2526 MS15 Spraying for Prime Coat (MC70) 336+300 336+500 RHS 200 29/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2527 MS15 Spraying for Prime Coat (MC70) 338+000 338+500 LHS 500 29/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2531 MS15 Scratch of Existing Pavements 338+800 339+000 RHS 200 30/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2532 MS15 Construction for Top Base Course 338+800 339+000 RHS 200 30/1/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2536 MS14 Commone Excavation for Ditches U Ditch 340+000 340+200 LHS 200 31/1/2024 8 am - 17 pm Mr.Khamhou 2056806346
Paving Asphalt Concrete for Binder
NR13SP4/HW/2537 MS15 336+350 31/1/2024 8 am - 17 pm Mr. Souliyanh 2098219622
Course Course junction
NR13SP4/HW/2542 MS14 Construction for Sub Base of Widening 336+000 336+500 LHS 500 1/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2543 MS15 Spraying for Prime Coat (MC70) 338+500 339+000 LHS 500 1/2/2024 11:00 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2547 MS15 Spraying for Prime Coat (MC70) 338+000 338+500 RHS 500 2/2/2024 11:00 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2552 MS15 Spraying for Prime Coat (MC70) 338+500 339+000 RHS 500 3/2/2024 11:00 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2564 MS15 Commone Excavation for Drainage 337+500 338+000 RHS 500 5/2/2024 08:30AM Mr. Souliyanh 2098219622
NR13SP4/HW/2565 MS15 Scratch of Existing Pavements 336+500 336+800 LHS 300 6/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2566 MS15 Construction for Top Base Course 336+500 336+800 LHS 300 6/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2567 MS15 Construction for Sub Base of Widening 337+000 337+500 LHS 500 6/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2570 MS14 Clearing and Grubbing 343+000 344+000 RHS 1000 6/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2572 MS15 Scratch of Existing Pavements 336+800 337+000 LHS 300 7/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2573 MS15 Construction for Top Base Course 336+800 337+000 LHS 300 7/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2574 MS14 Construction for Sub Base of Widening 341+500 342+000 RHS 500 7/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2576 MS15 Scratch of Existing Pavements 336+800 337+000 RHS 300 8/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2577 MS15 Construction for Top Base Course 336+800 337+000 RHS 300 8/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2582 MS15 Construction for Top Base Course 337+000 337+500 LHS 500 10/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2583 MS14 Construction for Sub Base of Widening 342+000 342+500 RHS 500 10/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2585 MS15 Scratch of Existing Pavements 337+000 337+500 LHS 500 11/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
Unsuccessful
construction area on 10-
NR13SP4/HW/2586 MS15 Construction for Top Base Course 337+000 337+500 LHS 500 11/2/2024 8 am -17 pm Mr. Souliyanh 2098219622 2-2024 and continue to
have request on 11-2-
2024
NR13SP4/HW/2587 MS14 Construction for Sub Base of Widening 342+000 342+500 LHS 500 11/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
Unsuccessful
construction area on 10-
Construction for Top Sub Grade of
NR13SP4/HW/2588 MS14 343+000 343+500 RHS 500 11/2/2024 8 am -17 pm Mr. Souliyanh 2098219622 2-2024 and continue to
Widening
have request on 11-2-
2024
NR13SP4/HW/2589 MS10 Installation for Traffic Signages Post 322+300 323+000 BHS 700 11/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2590 MS15 Scratch of Existing Pavements 337+500 338+000 RHS 500 12/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2591 MS15 Construction for Top Base Course 337+500 338+000 RHS 500 12/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2592 MS14 Construction for Sub Base of Widening 342+500 343+000 RHS 500 12/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2593 MS10 Installation for Traffic Signages Post 323+000 324+000 BHS 1000 12/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2596 MS14 Commone Excavation for U Ditches 340+800 340+850 RHS 50 12/2/2024 08:30AM Mr. Souliyanh 2056806346
Unsuccessful
construction area on 12-
NR13SP4/HW/2597 MS14 Construction for Sub Base of Widening 342+500 343+000 RHS 500 13/2/2024 8 am -17 pm Mr. Souliyanh 2098219622 2-2024 and continue to
have request on 13-2-
2024
NR13SP4/HW/2598 MS10 Installation for Traffic Signages Post 324+000 325+000 BHS 1000 13/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2600 MS15 Spraying for Prime Coat (MC70) 336+500 337+000 LHS 500 13/2/2024 10:00 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2603 MS10 Installation for Traffic Signages Post 325+000 326+000 BHS 1000 14/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2605 MS15 Scratch of Existing Pavements 337+500 338+000 LHS 500 15/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2606 MS15 Construction for Top Base Course 337+500 338+000 LHS 500 15/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2607 MS10 Installation for Traffic Signages Post 326+000 327+000 BHS 1000 15/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2608 MS14 Clearing and Grubbing 343+000 344+000 LHS 1000 15/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2609 MS14 Commone Excavation for Widening 343+000 343+500 LHS 500 15/2/2024 08:30AM Mr. Souliyanh 2056806346
NR13SP4/HW/2614 MS15 Construction for Top Base Course 339+000 339+300 RHS 300 16/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2615 MS10 Installation for Traffic Signages Post 327+000 328+200 BHS 1200 16/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2616 MS14 Commone Excavation for Widening 343+500 344+000 LHS 500 16/2/2024 08:30AM Mr. Souliyanh 2056806346
NR13SP4/HW/2619 MS15 Scratch of Existing Pavements 339+300 339+600 RHS 300 17/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2620 MS15 Construction for Top Base Course 339+300 339+600 RHS 300 17/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2621 MS14 Commone Excavation for Widening 343+500 344+000 LHS 500 17/2/2024 08:30AM Mr. Souliyanh 2056806346
NR13SP4/HW/2623 MS15 Spraying for Prime Coat (MC70) 336+500 337+000 LHS 500 18/2/2024 10:00 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2624 MS15 Scratch of Existing Pavements 339+000 339+500 LHS 500 18/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2625 MS15 Construction for Top Base Course 339+000 339+500 LHS 500 18/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2628 MS14 Clearing and Grubbing 344+000 345+000 LHS 1000 18/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2629 MS14 Commone Excavation for Widening 344+000 344+500 LHS 500 18/2/2024 8 am -17 pm Mr. Souliyanh 2056806346
NR13SP4/HW/2631 MS15 Scratch of Existing Pavements 339+500 339+800 LHS 300 19/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2632 MS15 Construction for Top Base Course 339+500 339+800 LHS 300 19/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2634 MS14 Commone Excavation for Widening 344+500 344+600 LHS 100 19/2/2024 8 am -17 pm Mr. Souliyanh 2056806346
NR13SP4/HW/2636 MS15 Scratch of Existing Pavements 339+600 340+000 RHS 400 20/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2637 MS15 Construction for Top Base Course 339+600 340+000 RHS 400 20/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2641 MS15 Scratch of Existing Pavements 339+800 340+000 LHS 200 21/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2642 MS15 Construction for Top Base Course 339+800 340+000 LHS 201 21/2/2024 9 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2645 MS15 Spraying for Prime Coat (MC70) 337+000 338+000 LHS 1000 21/2/2024 8:20 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2648 MS14 Commone Excavation for Ditches 340+400 340+600 LHS 200 22/2/2024 08:30AM Mr. Souliyanh 2056806346
NR13SP4/HW/2651 MS14 Construction for Sub Base of Widening 343+500 344+000 LHS 500 23/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2653 MS14 Spraying for Prime Coat (MC70) 339+000 340+000 RHS 1000 23/2/2024 8:20 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2659 MS14 Construction for Sub Base of Widening 344+000 344+500 LHS 500 26/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
Construction for Sub Grade Layer 1 of
NR13SP4/HW/2660 MS14 344+000 344+500 RHS 500 26/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
Widening
NR13SP4/HW/2662 MS14 Clearing and Grubbing 344+000 345+000 LHS 1000 26/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2663 MS14 Spraying for Prime Coat (MC70) 339+500 340+000 LHS 500 27/2/2024 8:20 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2665 MS14 Scratch of Existing Pavements 341+000 341+500 RHS 500 27/2/2024 8 am - 17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2666 MS14 Construction for Top Base Course 341+000 341+500 RHS 500 27/2/2024 9 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2667 MS14 Construction for Sub Base of Widening 344+000 344+500 RHS 500 27/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2673 MS14 Construction for Top Base Course 341+500 341+800 RHS 300 28/2/2024 9 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2676 MS14 Scratch of Existing Pavements 341+800 342+000 RHS 200 29/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2677 MS14 Construction for Top Base Course 341+800 342+000 RHS 200 29/2/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2679 MS14 Commone Excavation for Ditches 342+000 342+500 RHS 200 29/2/2024 8:00:00 Mr. Souliyanh 2056806346
NR13SP4/HW/2680 MS14 Scratch of Existing Pavements 341+000 341+500 LHS 500 1/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2681 MS14 Construction for Top Base Course 341+000 341+500 LHS 500 1/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
Construction for Embankment layer 2 of
NR13SP4/HW/2682 MS14 344+000 345+740 RHS 840 1/3/2024 8:00 am Mr. Souliyanh 2098219622
Widening
NR13SP4/HW/2683 MS14 Scratch of Existing Pavements 341+500 342+000 LHS 500 2/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2684 MS14 Construction for Top Base Course 341+500 342+000 LHS 500 2/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2685 MS14 Commone Excavation for Ditches 342+000 343+000 LHS 200 2/3/2024 8:00:00 Mr. Souliyanh 2056806346
NR13SP4/HW/2689 MS10 Installlation for bus shelter 318+900 RHS 2/3/2024 9:00 AM Mr. Khamhou 2056806346
NR13SP4/HW/2690 MS10 Installlation for bus shelter 319+100 LHS 2/3/2024 10:00AM Mr. Khamhou 2056806346
NR13SP4/HW/2691 MS14 Scratch of Existing Pavements 342+000 342+500 LHS 500 3/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2692 MS14 Construction for Top Base Course 342+000 342+500 LHS 500 3/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
Construction for Base Course layer 1 of
NR13SP4/HW/2693 MS14 342+500 343+000 RHS 500 3/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
Widening
NR13SP4/HW/2694 MS14 Construction for Base Course of Widening 342+500 343+000 LHS 500 3/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2695 MS14 Commone Excavation for U Ditches 343+000 343+500 LHS 500 3/3/2024 8:00:00 Mr. Souliyanh 2056806346
NR13SP4/HW/2691 MS14 Scratch of Existing Pavements 342+500 343+000 LHS 500 4/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2692 MS14 Construction for Top Base Course 342+500 343+000 LHS 500 4/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2696 MS14 Construction for Embankment Layer 5 344+900 345+740 RHS 840 4/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2697 MS14 Scratch of Existing Pavements 342+000 342+500 RHS 500 5/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2698 MS14 Construction for Top Base Course 342+000 342+500 RHS 500 5/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2700 MS14 Commone Excavation for U Ditches 340+900 341+000 RHS 200 5/3/2024 8:00 AM Mr. Souliyanh 2056806346
NR13SP4/HW/2701 MS14 Spraying for Prime Coat (MC70) 341+000 342+000 RHS 500 5/3/2024 10:30 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2704 MS14 Scratch of Existing Pavements 342+000 342+500 RHS 500 6/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2705 MS14 Construction for Top Base Course 342+000 342+500 RHS 500 6/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2706 MS14 Construction for Sub Base of Widening 344+000 344+500 LHS 500 6/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2709 MS14 Commone Excavation for Ditches 343+000 343+500 RHS 500 6/3/2024 8:00:00 Mr. Souliyanh 2056806346
NR13SP4/HW/2711 MS14 Construction for Existing ground 344+900 345+740 LHS 840 6/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2716 MS14 Spraying for Prime Coat (MC70) 342+000 342+500 RHS 500 7/3/2024 10:30 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2718 MS8 Installlation for bus shelter 318+900 RHS 7/3/2024 9:00 AM Mr. Khamhou 2056806346
NR13SP4/HW/2719 MS8 Installlation for bus shelter 319+100 LHS 7/3/2024 10:00AM Mr. Khamhou 2056806346
Contruction for Embankment (Round
NR13SP4/HW/2720 MS10 323+600 7/3/2024 8:00 AM Mr. Souliyanh 2056806346
about Maintainance)
NR13SP4/HW/2721 MS14 Scratch of Existing Pavements 342+500 343+000 RHS 500 8/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2722 MS14 Construction for Top Base Course 342+500 343+000 RHS 500 8/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2724 MS14 Spraying for Prime Coat (MC70) 342+000 342+500 RHS 500 8/3/2024 10:30 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2728 MS14 Spraying for Prime Coat (MC70) 341+000 342+000 LHS 500 9/3/2024 8:00 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2729 MS14 Scratch of Existing Pavements 342+500 343+000 LHS 500 10/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2730 MS14 Construction for Top Base Course 342+500 343+000 LHS 500 10/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
Paving Asphalt Concrete for Binder
NR13SP4/HW/2731 MS14 341+500 342+000 RHS 500 10/3/2024 8:00 AM Mr. Souliyanh 2098219622
Course
NR13SP4/HW/2732 MS14 Commone Excavation for U Ditches 340+000 340+500 RHS 500 10/3/2024 8:00 AM Mr. Souliyanh 2056806346
NR13SP4/HW/2735 MS14 Spraying for Prime Coat (MC70) 341+500 342+500 LHS 1000 11/3/2024 9:30 AM Mr. Souliyanh 2098219622
NR13SP4/HW/2736 MS14 Scratch of Existing Pavements 342+500 343+000 RHS 500 11/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2737 MS14 Construction for Top Base Course 342+500 343+000 RHS 500 11/3/2024 8 am -17 pm Mr. Souliyanh 2098219622
NR13SP4/HW/2739 MS14 Commone Excavation for U Ditches 340+000 340+500 RHS 500 11/3/2024 8:00 AM Mr. Souliyanh 2056806346