Summary of Inspection Request Form (IRF)

Updated : 08-02-2023 Inspection Date :08-02-2023

Sl No Date IRF No. Inpsection Date Inspection Time Location/Chainage Description of IRF

Main Bridge
1 07/02/2023 MTHL/PKG2/MB 12431 R1 08/02/2023 15:00 MP235 towards MP236 RHS Outer Inspection of Reinforcement and Cable ducts of Crash Barrier of 30 Mtr stretch from MP235 towards MP236 RHS Outer (Ch : 16+580 - 16+550)
2 07/02/2023 MTHL/PKG2/MB 12380 R2 08/02/2023 11:00 MP199 towards MP200 RHS Outer Inspection of Reinforcement and Cable ducts of Crash Barrier of 30 Mtr stretch from MP199 towards MP200 RHS Outer (Ch : 14+390 - 14+420)
3 07/02/2023 MTHL/PKG2/MB 12433 08/02/2023 9:00 MP 171 RHS Inspection of Reinforcement for pier cap at MP 171 RHS
4 07/02/2023 MTHL/PKG2/MB 12434 08/02/2023 9:30 MP 171 RHS Inspection of formwork for pier cap at MP 171 RHS
5 07/02/2023 MTHL/PKG2/MB 12435 08/02/2023 10:00 MP 171 RHS Inspection of pier cap concreting arrangements and pouring of concrete at MP 171 RHS
6 07/02/2023 MTHL/PKG2/MB 12436 08/02/2023 10:00 AMP 3 - AMP 4 Span Inspection of bottom soffit and permission for laying of reinforcement at AMP 3 - AMP 4 Span
7 07/02/2023 MTHL/PKG2/MB 12437 08/02/2023 10:00 MAP 6 to MAP 5 RHS Inspection of Crash Barrier Inserts, Formwork and Concreting of 30 m stretch from MAP 6 to MAP 5 LHS (Ch : 226 to 196)
8 07/02/2023 MTHL/PKG2/MB 12438 08/02/2023 10:00 MP 164 RHS Transverse stressing of tendons T01, T02, T03, T04 at Integral Pier head segment at MP 164 RHS
9 07/02/2023 MTHL/PKG2/MB 12439 08/02/2023 11:00 MP208 towards MP207 RHS Outer Inspection of Reinforcement and Cable ducts of Crash Barrier of 30 Mtr stretch from MP208 towards MP207 RHS Outer (Ch: 14+900 - 14+930)
10 07/02/2023 MTHL/PKG2/MB 12440 08/02/2023 11:00 MP208 towards MP209 RHS Outer Inspection of Reinforcement and Cable ducts of Crash Barrier of 30 Mtr stretch from MP208 towards MP209 RHS Outer (Ch: 14+960 - 14+930)
MP 240 RA
11 07/02/2023 MTHL/PKG2/MB 12441 08/02/2023 11:00 Inspection of formwork for pier 2nd & Final lift (RL 12.15 to 14.28)(total height = 2.13m) at MP 240 RA Substation
Substation

12 07/02/2023 MTHL/PKG2/MB 12442 08/02/2023 11:30 MP 240 RA Inspection of Concreting arrangments and pouring of concrete for Pier 2nd & Final lift at MP 240 RA Substation
Substation
13 07/02/2023 MTHL/PKG2/MB 12443 08/02/2023 14:00 MP198 towards MP199 RHS outer Inspection of Insert Plate, Formwork and Concreting of Crash Barrier of 30 Mtr stretch from MP198 towards MP199 RHS outer (CH 14+330 - 14+360)
14 07/02/2023 MTHL/PKG2/MB 12444 08/02/2023 14:00 MP 164 LHS Transverse stressing of tendons T01, T02, T03, T04 at Integral Pier head segment at MP 164 LHS
15 07/02/2023 MTHL/PKG2/MB 12445 08/02/2023 15:00 AMP 9 Inspection of reinforcement, formwork & concreting of seismic stopper at AMP 9
16 07/02/2023 MTHL/PKG2/MB 12446 08/02/2023 17:00 MAP 6 to MAP 5 LHS Inspection of Crash Barrier Inserts, Formwork and Concreting of 30 m stretch from MAP 6 to MAP 5 LHS (Ch : 226 to 196)
17 08/02/2023 MTHL/PKG2/MB 12432 R1 08/02/2023 12:00 MP255 towards MP253 RHS Outer Inspection of Reinforcement and Cable ducts of Crash Barrier of 30 Mtr stretch from MP255 towards MP253 RHS Outer (Ch : 17+555 - 17+525)
18 08/02/2023 MTHL/PKG2/MB 12407 R2 08/02/2023 14:00 MP247 towards MP246 RHS Outer Inspection of Formwork and Concreting of Crash Barrier of 30m stretch from MP247 towards MP246 RHS Outer (Ch: 17+221 - 17+191)
19 08/02/2023 MTHL/PKG2/MB 12412 R1 08/02/2023 11:00 MP246 towards MP247 RHS Median Inspection of Reinforcement and Cable ducts of Crash Barrier of 30 Mtr stretch from MP246 towards MP247 RHS Median (Ch : 17+161 - 17+191)
20 08/02/2023 MTHL/PKG2/MB 12413 R1 08/02/2023 11:00 MP251 towards MP250 RHS Outer Inspection of Reinforcement and Cable ducts of Crash Barrier of 60 Mtr stretch from MP251 towards MP250 RHS Outer (Ch : 17+435 - 17+375 )
21 08/02/2023 MTHL/PKG2/MB 12414 R1 08/02/2023 14:00 MP249 towards MP250 RHS Outer Inspection of Reinforcement and Cable ducts of Crash Barrier of 38 Mtr stretch from MP249 towards MP250 RHS Outer (Ch : 17+375 - 17+337)
22 08/02/2023 MTHL/PKG2/MB 12430 R1 08/02/2023 11:00 MP251 towards MP250 RHS Median Inspection of Reinforcement and Cable ducts of Crash Barrier of 30m stretch from MP251 towards MP250 RHS Median (Ch: 17+435 - 17+405)
23 08/02/2023 MTHL/PKG2/MB 12447 08/02/2023 12:00 MP255 towards MP253 RHS Median Inspection of Formwork and Concreting of Crash Barrier of 30m stretch from MP255 towards MP253 RHS Median (Ch: 17+586 - 17+556)
24 08/02/2023 MTHL/PKG2/MB 12448 08/02/2023 17:00 MP257 towards MP256 RHS Outer Inspection of Formwork and Concreting of Crash Barrier of 30m stretch from MP257 towards MP256 RHS Outer (Ch: 17+660-17+630)
25 08/02/2023 MTHL/PKG2/MB 12449 08/02/2023 17:00 MP256 towards MP257 RHS Median Inspection of Formwork and Concreting of Crash Barrier of 14m stretch from MP256 towards MP257 RHS Median (Ch: 17+630 - 17+616)
26 08/02/2023 MTHL/PKG2/MB 12450 08/02/2023 17:00 MP246 towards MP245 RHS Median Inspection of Formwork and Concreting of Crash Barrier of 14m stretch from MP246 towards MP245 RHS Median (Ch: 17+131 - 17+161)
Casting Yard
27 07/02/2023 MTHL/PKG2/CY 9122 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S62MP 160-161 LHS
28 07/02/2023 MTHL/PKG2/CY 9123 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S63MP 160-161 LHS
29 07/02/2023 MTHL/PKG2/CY 9124 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S64MP 160-161 LHS
30 07/02/2023 MTHL/PKG2/CY 9125 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S65MP 160-161 LHS
31 07/02/2023 MTHL/PKG2/CY 9126 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S66MP 160-161 LHS
32 07/02/2023 MTHL/PKG2/CY 9127 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S67MP 160-161 LHS
33 07/02/2023 MTHL/PKG2/CY 9128 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S68MP 160-161 LHS
34 07/02/2023 MTHL/PKG2/CY 9129 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S69MP 160-161 LHS
35 07/02/2023 MTHL/PKG2/CY 9130 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S70MP 160-161 LHS
36 07/02/2023 MTHL/PKG2/CY 9131 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S71MP 160-161 LHS
37 07/02/2023 MTHL/PKG2/CY 9132 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S72MP 160-161 LHS
38 07/02/2023 MTHL/PKG2/CY 9133 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S73MP 160-161 LHS
39 07/02/2023 MTHL/PKG2/CY 9134 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S74MP 160-161 LHS
40 07/02/2023 MTHL/PKG2/CY 9135 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S75MP 160-161 LHS
41 07/02/2023 MTHL/PKG2/CY 9136 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S76MP 160-161 LHS
42 07/02/2023 MTHL/PKG2/CY 9137 08/02/2023 16:00 Casting Yard Bay 3 Post pour of segment concrete S77MP 160-161 LHS
43 07/02/2023 MTHL/PKG2/CY 9138 08/02/2023 18:00 Casting Yard Bay 3 Reinforcement cage and PT profile of segment S61 MP 170-171 LHS
44 07/02/2023 MTHL/PKG2/CY 9139 08/02/2023 18:00 Casting Yard Bay 1 Reinforcement cage and PT profile of segment S71 MP 170-171 RHS
45 07/02/2023 MTHL/PKG2/CY 9140 08/02/2023 22:00 Casting Yard Bay 2 Survey, formwork checking & concreting of segment S44 MP 168-169 RHS
46 07/02/2023 MTHL/PKG2/CY 9141 08/02/2023 23:00 Casting Yard Bay 1 Survey, formwork checking & concreting of segment S71 MP 170-171 RHS