Lko side wall 1st lift reinforcement , shuttring checking & concreting for
2 PE/GPL/P-2/STR/07/20/6165 02-08-20 VUP 58369 RHS 03-08-20 9:00 AM Done
VUP (MCW)
Middle wall 3rd lift reinforcement , shuttring checking & concreting for
3 PE/GPL/P-2/STR/07/20/6166 02-08-20 VUP 58369 RHS 03-08-20 10:00 AM Done
VUP (MCW)
Lko side wall 1st lift reinforcement , shuttring checking & concreting for
4 PE/GPL/P-2/STR/07/20/6167 02-08-20 VUP 58369 LHS 03-08-20 11:00 AM Done
VUP (MCW)
Both side wall 1st lift reinforcement , shuttring checking & concreting
5 PE/GPL/P-2/STR/07/20/6168 02-08-20 MNB 64690 RHS 03-08-20 3:00 PM Done
for MNB (MCW)
Lko , Gzp & Middle wall haunch reinforcement , shuttring checking &
7 PE/GPL/P-2/STR/07/20/6170 02-08-20 MNB 64690 LHS 03-08-20 10:00 AM Not Done
concreting for MNB (MCW)
8 PE/GPL/P-2/STR/07/20/6171 02-08-20 LVUP FDD checking of sub-base (GSB-1st) for LVUP (MCW) Top-1 68940 LHS 03-08-20 10:00 AM Done
9 PE/GPL/P-2/STR/07/20/6172 02-08-20 LVUP FDD & Level Checking On GSB TopLayer (MCW) Top 68940 LHS 03-08-20 11:30 AM Done
10 PE/GPL/P-2/STR/07/20/6173 02-08-20 LVUP Layout checking of Excavation with laying Pcc for LVUP (MCW) 68940 LHS 03-08-20 12:00 PM Done
A2 Side Layout checking of excavtion with laying pcc of Pile cap for
PE/GPL/P-2/STR/07/20/6178 02-08-20 MNB 77963 RHS 03-08-20 9:00 AM Not Done
MNB (MCW)
Page 1 of 1