Name of the Project : Purvanchal Expressway (Package-ll)

Client : UPEIDA
Authority Engineer : Egis Date of Submission: 17-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 18-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/25313 17/09/20 L Kerb Laying of Kerb Casting (MCW) 40200 40410 210 LHS 18/09/20 11:30 AM 25146/13-09-20

25273/17-09-20
2 PE/GPL/P-2/HW/09/20/25314 17/09/20 Tack Coat Application of Tack Coat Over Prime Coat (MCW) 40200 40420 220 RHS 18/09/20 12:00 PM
25275/17-09-20

3 PE/GPL/P-2/HW/09/20/25315 17/09/20 DBM Laying & Level Cheking of DBM ( MCW) Top 40200 40420 220 RHS 18/09/20 12:30 PM 25314/18-09-20

4 PE/GPL/P-2/HW/09/20/25316 17/09/20 EmB FDD of Embankment (MCW) 5 42210 42300 90 LHS 18/09/20 2.45 PM 25201/15-09-20

5 PE/GPL/P-2/HW/09/20/25317 17/09/20 EmB FDD of Embankment (MCW) 10 43350 43480 130 BHS 18/09/20 4.30 PM 25229/16-09-20

6 PE/GPL/P-2/HW/09/20/25318 17/09/20 EmB FDD of Embankment (MCW) 9 45900 46000 100 BHS 18/09/20 3:30 PM 21510/21-05-20

12313/09-11-19
7 PE/GPL/P-2/HW/09/20/25319 17/09/20 WMM FDD & Level Checking On WMM Top Layer (MCW) Top 49570 49700 130 LHS 18/09/20 11:30 AM
25232/16-09-20
24705/28-08-20
8 PE/GPL/P-2/HW/09/20/25320 17/09/20 WMM Laying & Fdd testing of WMM (MCW) Top-1 49580 49700 120 RHS 18/09/20 2:30 PM
12230/07-11-19

9 PE/GPL/P-2/HW/09/20/25321 17/09/20 Back filling FDD Checking of Back Filling for Box Culvert A1(Lko) & A2(Gzp) 3 54940 BHS 18/09/20 10:00 AM 25234/16-09-20

10 PE/GPL/P-2/HW/09/20/25322 17/09/20 Back filling FDD Checking of Back Filling for Box Culvert A1(Lko) & A2(Gzp) 4 54940 BHS 18/09/20 4:30 PM 25284/17-09-20

18909/23-02-20
11 PE/GPL/P-2/HW/09/20/25323 17/09/20 Median Median Feeling 1 56000 56280 280 Median 18/09/20 11:00 AM
18977/24-02-20

12 PE/GPL/P-2/HW/09/20/25324 17/09/20 Shoulder FDD of Earthen shoulder 2 56000 56280 280 RHS 18/09/20 2:00 PM 25236/16-09-20

13 PE/GPL/P-2/HW/09/20/25325 17/09/20 Shoulder FDD of Earthen shoulder 2 56000 56280 280 LHS 18/09/20 12:00 AM 25237/16-09-20

14 PE/GPL/P-2/HW/09/20/25326 17/09/20 SG FDD & Level Cheking on Subgrade Top Layer (MCW) Top 56820 57000 180 BHS 18/09/20 3:00 PM 24988/07-09-20

15 PE/GPL/P-2/HW/09/20/25327 17/09/20 EmB FDD of Embankment (MCW) 21 63750 63800 50 BHS 18/09/20 12:40 PM 25286/17-09-20

16 PE/GPL/P-2/HW/09/20/25328 17/09/20 EmB FDD of Embankment (MCW) 23 64210 64260 50 LHS 18/09/20 5:30 PM 25288/17-09-20

17 PE/GPL/P-2/HW/09/20/25329 17/09/20 Shoulder FDD of Earthen shoulder 2 64520 64660 140 RHS 18/09/20 10:30 AM 25291/17-09-20

18 PE/GPL/P-2/HW/09/20/25330 17/09/20 Shoulder FDD of Earthen shoulder Top 64520 64660 140 LHS 18/09/20 12:00 AM 25291/17-09-20

19 PE/GPL/P-2/HW/09/20/25331 17/09/20 Median Median Feeling Top 64520 64660 140 Median 18/09/20 4:00 PM 25293/17-09-20

20 PE/GPL/P-2/HW/09/20/25332 17/09/20 Shoulder FDD of Earthen shoulder 2 65200 65250 50 RHS 18/09/20 10:00 AM 25248/16-09-20

21 PE/GPL/P-2/HW/09/20/25333 17/09/20 Shoulder FDD of Earthen shoulder Top 65200 65250 50 RHS 18/09/20 4:00 PM 25332/18-09-20

22 PE/GPL/P-2/HW/09/20/25334 17/09/20 Back filling FDD Checking of Back Filling For LVUP A1(Lko) 1 66762 BHS 18/09/20 3:30 PM

23 PE/GPL/P-2/HW/09/20/25335 17/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 3 66762 BHS 18/09/20 3.30 PM 25193/14-09-20

24 PE/GPL/P-2/HW/09/20/25336 17/09/20 EmB FDD of Embankment (MCW) 11 66900 67040 140 LHS 18/09/20 4:00 PM 24056/10-08-20

25 PE/GPL/P-2/HW/09/20/25337 17/09/20 Back filling FDD Checking of Back Filling For Box Culvert A1(Lko) 9 67880 BHS 18/09/20 10:45 AM 25301/17-09-20

26 PE/GPL/P-2/HW/09/20/25338 17/09/20 Back filling FDD Checking of Back Filling For Box Culvert A1(Lko) 10 67880 BHS 18/09/20 3:20 PM 25337/18-09-20

27 PE/GPL/P-2/HW/09/20/25339 17/09/20 Chute Drain Checking & Concreting of Wall for Chute Drain Wall 67970 68150 180 RHS 18/09/20 2:30 PM 25302/17-09-20

21979/30-05-20
28 PE/GPL/P-2/HW/09/20/25340 17/09/20 MBCB Installation of MBCB post on shoulder (MCW) Shoulder 69940 70470 530 RHS 18/09/20
22056/02-06-20

Page 1 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type

29 PE/GPL/P-2/HW/09/20/25341 17/09/20 Cross Road FDD Of Filling Of Layer In Cross Road 3 70542 18/09/20 2:15 PM 25303/17-09-20

30 PE/GPL/P-2/HW/09/20/25342 17/09/20 EmB FDD of Embankment (MCW) 28 71100 71220 120 RHS 18/09/20 3:00 PM 25305/17-09-20

31 PE/GPL/P-2/HW/09/20/25343 17/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 5 71840 BHS 18/09/20 11:00 AM 25306/17-09-20

32 PE/GPL/P-2/HW/09/20/25344 17/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 6 71840 BHS 18/09/20 3:00 PM 25343/18-09-20

33 PE/GPL/P-2/HW/09/20/25345 17/09/20 MBCB Installation of MBCB post on shoulder (MCW) Shoulder 71900 72760 860 RHS 18/09/20 4:00 PM

34 PE/GPL/P-2/HW/09/20/25346 17/09/20 MBCB Installation of MBCB post on median (MCW) Median 72500 72760 260 RHS 18/09/20 10:30 AM 14802/22-12-19

35 PE/GPL/P-2/HW/09/20/25347 17/09/20 Back filling FDD Checking of Back Filling For PUP A1(Lko) 4 72836 BHS 18/09/20 10:30 AM 25308/17-09-20

36 PE/GPL/P-2/HW/09/20/25348 17/09/20 Back filling FDD Checking of Back Filling For PUP A1(Lko) 5 72836 BHS 18/09/20 4:00 PM 25347/18-09-20

37 PE/GPL/P-2/HW/09/20/25349 17/09/20 Chute Drain Checking of Top pcc along the Chute Drain PCC 73300 73500 200 RHS 18/09/20 11:00 AM 24944/04-09-20

38 PE/GPL/P-2/HW/09/20/25350 17/09/20 Chute Drain Checking of Top pcc along the Chute Drain PCC 73460 73500 40 LHS 18/09/20 12:00 PM 23807/31-07-20

39 PE/GPL/P-2/HW/09/20/25351 17/09/20 Back filling FDD Checking of Back Filling For LVUP A1(Lko) & A2(Gzp) 5 73595 BHS 18/09/20 12:30 PM 25310/17-09-20

40 PE/GPL/P-2/HW/09/20/25352 17/09/20 Back filling FDD Checking of Back Filling For LVUP A1(Lko) & A2(Gzp) 6 73595 BHS 18/09/20 5:00 PM 25351/18-09-20

25269/16-09-20
41 PE/GPL/P-2/HW/09/20/25353 17/09/20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 77250 77320 70 RHS 18/09/20 3:00 PM
25270/16-09-20

42 PE/GPL/P-2/HW/09/20/25354 17/09/20 EmB FDD of Embankment (MCW) 29 77760 77780 20 BHS 18/09/20 3.30 PM 25271/16-09-20

Highway : (Service Road)


1 PE/GPL/P-2/SR/09/20/1920 17/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 64900 65150 250 LHS 18/09/20 5:00 PM 1451/03-06-20

2 PE/GPL/P-2/SR/09/20/1921 17/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 76200 76300 100 LHS 18/09/20 3:00 PM 690/28-04-20

3 PE/GPL/P-2/SR/09/20/1922 17/09/20 SG FDD of Subgrade (SR) Top-1 76300 76400 100 LHS 18/09/20 4:00 PM 694/29-04-20

4 PE/GPL/P-2/SR/09/20/1923 17/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 76900 77000 100 LHS 18/09/20 12:00 PM 1914/16-09-20

Lab :

1 PE/GPL/P-2/Lab/09/20/909 17/09/20 Core Test Core cutting of BC (MCW) 67150 67770 620 LHS 18/09/20 10:00 AM 25222/15-09-20

Structures : (MCW)
Lko side retaining wall 3rd lift reinforcement , shuttring checking &
1 PE/GPL/P-2/STR/09/20/6806 17/09/20 Retaining wall 42157 LHS 18/09/20 9:00 AM 6636/06-09-20
concreting for MNB (MCW)
Lko side retaining wall 3rd lift reinforcement , shuttring checking &
2 PE/GPL/P-2/STR/09/20/6807 17/09/20 Retaining wall 42437 LHS 18/09/20 10:00 AM 6677/08-09-20
concreting for PUP (MCW)
Both side Crash barrior reinforcement , shuttring checking &
3 PE/GPL/P-2/STR/09/20/6808 17/09/20 LVUP 63579 BHS 18/09/20 10:30 AM
concreting for LVUP (MCW)
Gzp side retaining wall 3rd lift reinforcement , shuttring checking &
4 PE/GPL/P-2/STR/09/20/6809 17/09/20 Retaining wall 65615 LHS 18/09/20 11:30 AM 6789/16-09-20
concreting for LVUP (MCW)
Lko side retaining wall 4th lift reinforcement , shuttring checking &
5 PE/GPL/P-2/STR/09/20/6810 17/09/20 Retaining wall 65615 RHS 18/09/20 12:00 PM 6570/31-08-20
concreting for LVUP (MCW)
Lko side retaining wall 3rd lift reinforcement , shuttring checking &
6 PE/GPL/P-2/STR/09/20/6811 17/09/20 Retaining wall 68323 RHS 18/09/20 12:00 PM 6769/15-09-20
concreting for VUP (MCW)
Lko side retaining wall 3rd lift reinforcement , shuttring checking &
7 PE/GPL/P-2/STR/09/20/6812 17/09/20 Retaining wall 70542 RHS 18/09/20 11:00 AM 6752/13-09-20
concreting for LVUP (MCW)
A1 side working pile no.21 final depth , reinforcement checking cage
8 PE/GPL/P-2/STR/09/20/6813 17/09/20 MNB 77963 LHS 18/09/20 12:00 PM
lowering with concreting for MNB (MCW)

Structures : (SR)
Raft reinforcement , shuttring checking & concreting for Box culvert
1 PE/GPL/P-2/STR-SR/09/20/0090 17/09/20 Box Culvert 43440 LHS 18/09/20 8:00 AM
(SR)
Page 2 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
A1 side working pile no.11 final depth , reinforcement checking cage
2 PE/GPL/P-2/STR-SR/09/20/0091 17/09/20 MNB 77952 RHS 18/09/20 12:00 PM
lowering with concreting for MNB (SR)

Page 3 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission:
EPC Contractor : Gayatri Projects Limited Date of Inspection:
RFI Reference Activity Details Location Inspection Required
Sl.No. Activity Length Side Remarks
No. Date Work Layer From To Date Time
Type
Highway : (MCW)
15 PE/GPL/P-2/HW/09/20/25286 16/09/20 EmB FDD of Embankment (MCW) 20 63750 63800 50 BHS 17/09/20 12:40 PM Approved

16 PE/GPL/P-2/HW/09/20/25287 16/09/20 Shoulder FDD of Earthen shoulder Top 63810 63970 160 RHS 17/09/20 3:30 PM Approved

17 PE/GPL/P-2/HW/09/20/25288 16/09/20 EmB FDD of Embankment (MCW) 22 64210 64260 50 LHS 17/09/20 10:00 AM Approved

18 PE/GPL/P-2/HW/09/20/25289 16/09/20 EmB FDD of Embankment (MCW) 23 64210 64260 50 LHS 17/09/20 5:30 PM Not Approved

19 PE/GPL/P-2/HW/09/20/25290 16/09/20 Shoulder FDD of Earthen shoulder Top 64270 64400 130 RHS 17/09/20 3:00 PM Approved

20 PE/GPL/P-2/HW/09/20/25291 16/09/20 Shoulder FDD of Earthen shoulder 1 64520 64660 140 RHS 17/09/20 10:30 AM Approved

21 PE/GPL/P-2/HW/09/20/25292 16/09/20 Shoulder FDD of Earthen shoulder 1 64520 64660 140 LHS 17/09/20 12:00 AM Approved

22 PE/GPL/P-2/HW/09/20/25293 16/09/20 Median Median Feeling 1 64520 64660 140 Median 17/09/20 4:00 PM Approved

23 PE/GPL/P-2/HW/09/20/25294 16/09/20 Median Median Feeling Top 65190 65250 60 Median 17/09/20 10:30 AM Approved

24 PE/GPL/P-2/HW/09/20/25295 16/09/20 Shoulder FDD of Earthen shoulder Top 65200 65250 50 LHS 17/09/20 12:20 PM Approved

25 PE/GPL/P-2/HW/09/20/25296 16/09/20 Shoulder FDD of Earthen shoulder 2 65200 65250 50 RHS 17/09/20 2:40 PM Not Approved

26 PE/GPL/P-2/HW/09/20/25297 16/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 3 66762 BHS 17/09/20 3.30 PM Not Approved

27 PE/GPL/P-2/HW/09/20/25298 16/09/20 EmB FDD of Embankment (MCW) 11 66900 67040 140 LHS 17/09/20 4:00 PM Not Approved

28 PE/GPL/P-2/HW/09/20/25299 16/09/20 EmB FDD of Embankment (MCW) 13 67050 67100 50 BHS 17/09/20 3:00 PM Not Approved

29 PE/GPL/P-2/HW/09/20/25300 16/09/20 Back filling FDD Checking of Back Filling For Box Culvert A1(Lko) 7 67880 BHS 17/09/20 10:45 AM Approved

30 PE/GPL/P-2/HW/09/20/25301 16/09/20 Back filling FDD Checking of Back Filling For Box Culvert A1(Lko) 8 67880 BHS 17/09/20 3:20 PM Approved

31 PE/GPL/P-2/HW/09/20/25302 16/09/20 Chute Drain Laying and level checking of Raft in Chute Drain Raft 67970 68150 180 RHS 17/09/20 2:30 PM Approved

32 PE/GPL/P-2/HW/09/20/25303 16/09/20 Cross Road FDD Of Filling Of Layer In Cross Road 2 70542 17/09/20 2:15 PM Approved

33 PE/GPL/P-2/HW/09/20/25304 16/09/20 EmB FDD of Embankment (MCW) 28 71100 71220 120 LHS 17/09/20 12:00 PM Approved

34 PE/GPL/P-2/HW/09/20/25305 16/09/20 EmB FDD of Embankment (MCW) 27 71100 71220 120 RHS 17/09/20 3:00 PM Approved

35 PE/GPL/P-2/HW/09/20/25306 16/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 4 71840 BHS 17/09/20 11:00 AM Approved

36 PE/GPL/P-2/HW/09/20/25307 16/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 5 71840 BHS 17/09/20 3:00 PM Not Approved

37 PE/GPL/P-2/HW/09/20/25308 16/09/20 Back filling FDD Checking of Back Filling For PUP A1(Lko) 3 72836 BHS 17/09/20 10:30 AM Approved

38 PE/GPL/P-2/HW/09/20/25309 16/09/20 Back filling FDD Checking of Back Filling For PUP A1(Lko) 4 72836 BHS 17/09/20 4:00 PM Not Approved

39 PE/GPL/P-2/HW/09/20/25310 16/09/20 Back filling FDD Checking of Back Filling For LVUP A1(Lko) & A2(Gzp) 4 73595 BHS 17/09/20 12:30 PM Approved

40 PE/GPL/P-2/HW/09/20/25311 16/09/20 Back filling FDD Checking of Back Filling For LVUP A1(Lko) & A2(Gzp) 5 73595 BHS 17/09/20 5:00 PM Not Approved

41 PE/GPL/P-2/HW/09/20/25312 16/09/20 EmB FDD of Embankment (MCW) 29 77760 77780 20 BHS 17/09/20 3.30 PM Not Approved

Highway : (Service Road)


1 PE/GPL/P-2/SR/09/20/1916 16/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 64900 65150 250 LHS 17/09/20 5:00 PM Not Approved

2 PE/GPL/P-2/SR/09/20/1917 16/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 76200 76300 100 LHS 17/09/20 3:00 PM Not Approved

3 PE/GPL/P-2/SR/09/20/1918 16/09/20 SG FDD of Subgrade (SR) Top-1 76300 76400 100 LHS 17/09/20 4:00 PM Not Approved

4 PE/GPL/P-2/SR/09/20/1919 16/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 76900 77000 100 LHS 17/09/20 12:00 PM Not Approved

Page 4 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission:
EPC Contractor : Gayatri Projects Limited Date of Inspection:
RFI Reference Activity Details Location Inspection Required
Sl.No. Activity Length Side Remarks
No. Date Work Layer From To Date Time
Type
Highway : (MCW)
17 PE/GPL/P-2/HW/09/20/25239 15/09/20 Shoulder FDD of Earthen shoulder Top 62720 63490 770 LHS 16/09/20 4:00 PM Approved
18 PE/GPL/P-2/HW/09/20/25240 15/09/20 EmB FDD of Embankment (MCW) 19 63750 63800 50 BHS 16/09/20 12:40 PM Approved
19 PE/GPL/P-2/HW/09/20/25241 15/09/20 Shoulder FDD of Earthen shoulder 2 63810 63970 160 RHS 16/09/20 3:30 PM Approved
20 PE/GPL/P-2/HW/09/20/25242 15/09/20 EmB FDD of Embankment (MCW) 21 64210 64260 50 BHS 16/09/20 2:00 AM Approved
21 PE/GPL/P-2/HW/09/20/25243 15/09/20 Median Median Feeling 1 64270 64400 130 Median 16/09/20 11:00 AM Approved

22 PE/GPL/P-2/HW/09/20/25244 15/09/20 Shoulder FDD of Earthen shoulder 2 64270 64400 130 RHS 16/09/20 3:00 PM Approved
23 PE/GPL/P-2/HW/09/20/25245 15/09/20 Shoulder FDD of Earthen shoulder 2 64270 64400 130 LHS 16/09/20 12:00 PM Approved
24 PE/GPL/P-2/HW/09/20/25246 15/09/20 Median Median Feeling 1 65190 65250 60 Median 16/09/20 10:30 AM Approved
25 PE/GPL/P-2/HW/09/20/25247 15/09/20 Shoulder FDD of Earthen shoulder 1 65200 65250 50 LHS 16/09/20 12:20 PM Approved
26 PE/GPL/P-2/HW/09/20/25248 15/09/20 Shoulder FDD of Earthen shoulder 1 65200 65250 50 RHS 16/09/20 2:40 PM Approved

27 PE/GPL/P-2/HW/09/20/25249 15/09/20 EmB FDD of Embankment (MCW) 11 66900 67040 140 LHS 16/09/20 4:00 PM Not Approved
28 PE/GPL/P-2/HW/09/20/25250 15/09/20 EmB FDD of Embankment (MCW) 13 67050 67100 50 BHS 16/09/20 3:00 PM Not Approved
29 PE/GPL/P-2/HW/09/20/25251 15/09/20 Tack Coat Application of Tack Coat Over DBM (MCW) 67150 67760 610 RHS 16/09/20 10:00 AM Approved
30 PE/GPL/P-2/HW/09/20/25252 15/09/20 BC Laying & Level Cheking of BC (MCW) Top 67150 67760 610 RHS 16/09/20 11:00 AM Approved
31 PE/GPL/P-2/HW/09/20/25253 15/09/20 Back filling FDD Checking of Back Filling For Box Culvert A1(Lko) 5 67880 BHS 16/09/20 10:45 AM Approved

32 PE/GPL/P-2/HW/09/20/25254 15/09/20 Back filling FDD Checking of Back Filling For Box Culvert A1(Lko) 6 67880 BHS 16/09/20 3:20 PM Approved
33 PE/GPL/P-2/HW/09/20/25255 15/09/20 Turfing Checking of Grass Turfing Grass 67950 68010 60 RHS 16/09/20 2:40 PM Approved
34 PE/GPL/P-2/HW/09/20/25256 15/09/20 Turfing Checking of Grass Turfing Grass 67950 68020 70 LHS 16/09/20 3:00 PM Approved
35 PE/GPL/P-2/HW/09/20/25257 15/09/20 Chute Drain Layout Checking,Excavation & Laying Of Pcc For Chute Drain Pcc 67970 68150 180 RHS 16/09/20 2:30 PM Approved
36 PE/GPL/P-2/HW/09/20/25258 15/09/20 Turfing Checking of geocell & grass Turfing Geo 68010 68150 140 RHS 16/09/20 4:00 PM Approved

37 PE/GPL/P-2/HW/09/20/25259 15/09/20 Cross Road FDD Of Filling Of Layer In Cross Road 1 70542 16/09/20 2:15 PM Approved
38 PE/GPL/P-2/HW/09/20/25260 15/09/20 EmB FDD of Embankment (MCW) 27 71100 71220 120 LHS 16/09/20 12:00 PM Approved
39 PE/GPL/P-2/HW/09/20/25261 15/09/20 EmB FDD of Embankment (MCW) 26 71100 71220 120 RHS 16/09/20 3:00 PM Approved
40 PE/GPL/P-2/HW/09/20/25262 15/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 2 71840 BHS 16/09/20 11:00 AM Approved
41 PE/GPL/P-2/HW/09/20/25263 15/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 3 71840 BHS 16/09/20 3:00 PM Approved

42 PE/GPL/P-2/HW/09/20/25264 15/09/20 Back filling FDD Checking of Back Filling For PUP A1(Lko) 1 72836 BHS 16/09/20 10:30 AM Approved
43 PE/GPL/P-2/HW/09/20/25265 15/09/20 Back filling FDD Checking of Back Filling For PUP A1(Lko) 2 72836 BHS 16/09/20 4:00 PM Approved
44 PE/GPL/P-2/HW/09/20/25266 15/09/20 Back filling FDD Checking of Back Filling For LVUP A1(Lko) & A2(Gzp) 2 73595 BHS 16/09/20 12:30 PM Approved
45 PE/GPL/P-2/HW/09/20/25267 15/09/20 Back filling FDD Checking of Back Filling For LVUP A1(Lko) & A2(Gzp) 3 73595 BHS 16/09/20 5:00 PM Approved
46 PE/GPL/P-2/HW/09/20/25268 15/09/20 Mountable kerb Laying of Mountable Kerb (MCW) 77250 77320 70 LHS 16/09/20 10:45 AM Approved

47 PE/GPL/P-2/HW/09/20/25269 15/09/20 Mountable kerb Laying of Mountable Kerb (MCW) 77250 77320 70 RHS 16/09/20 2:30 PM Approved
48 PE/GPL/P-2/HW/09/20/25270 15/09/20 L Kerb Laying of Kerb Casting (MCW) 77250 77320 70 RHS 16/09/20 11:00 AM Approved
49 PE/GPL/P-2/HW/09/20/25271 15/09/20 EmB FDD of Embankment (MCW) 28 77760 77780 20 BHS 16/09/20 3.30 PM Approved

Highway : (Service Road)


1 PE/GPL/P-2/SR/09/20/1912 15/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 65550 65770 220 RHS 16/09/20 12:00 PM Approved

2 PE/GPL/P-2/SR/09/20/1913 15/09/20 EmB FDD of Embankment (SR) 2 71830 71900 70 LHS 16/09/20 12:00 PM Approved

3 PE/GPL/P-2/SR/09/20/1914 15/09/20 SG FDD of Subgrade (SR) Top-1 76900 77000 100 LHS 16/09/20 12:00 PM Approved

4 PE/GPL/P-2/SR/09/20/1915 15/09/20 EmB FDD of Embankment (SR) 6 77300 77400 100 RHS 16/09/20 3:00 PM Approved

Page 5 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 14-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 15-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/25197 14/09/20 L Kerb Laying of Kerb Casting (MCW) 40300 40420 120 RHS 15/09/20 2:00 PM 25112/12-09-20 Approved

2 PE/GPL/P-2/HW/09/20/25198 14/09/20 L Kerb Laying of Kerb Casting (MCW) 40200 40410 210 LHS 15/09/20 11:30 AM 25146/13-09-20 Not Approved

3 PE/GPL/P-2/HW/09/20/25199 14/09/20 WMM FDD & Level Checking On WMM Top Layer (MCW) Top 41970 42090 120 LHS 15/09/20 11:00 AM 25177/14-09-20 Not Approved

23787/31-07-20
4 PE/GPL/P-2/HW/09/20/25200 14/09/20 WMM Laying & Fdd testing of WMM (MCW) Top-1 41980 42040 60 RHS 15/09/20 2:15 PM Approved
21459/20-05-20

5 PE/GPL/P-2/HW/09/20/25201 14/09/20 EmB FDD of Embankment (MCW) 4 42210 42300 90 LHS 15/09/20 2.45 PM 25178/14-09-20 Approved

6 PE/GPL/P-2/HW/09/20/25202 14/09/20 EmB FDD of Embankment (MCW) 8 42210 42300 90 RHS 15/09/20 3.45 PM 25054/10-09-20 Not Approved

7 PE/GPL/P-2/HW/09/20/25203 14/09/20 EmB FDD of Embankment (MCW) 8 43350 43480 130 LHS 15/09/20 4.30 PM 25150/13-09-20 Approved

8 PE/GPL/P-2/HW/09/20/25204 14/09/20 Tack Coat Application of Tack Coat Over Prime Coat (MCW) 43800 44020 220 LHS 15/09/20 8:00 AM 25030/09-09-20 Approved

9 PE/GPL/P-2/HW/09/20/25205 14/09/20 DBM Laying & Level Cheking of DBM ( MCW) Top 43800 44020 220 LHS 15/09/20 8:30 AM 25204/15-09-20 Approved

10 PE/GPL/P-2/HW/09/20/25206 14/09/20 Tack Coat Application of Tack Coat Over Prime Coat (MCW) 43800 44030 230 RHS 15/09/20 10:00 AM 25029/09-09-20 Approved

11 PE/GPL/P-2/HW/09/20/25207 14/09/20 DBM Laying & Level Cheking of DBM ( MCW) Top 43800 44030 230 RHS 15/09/20 12:00 PM 25206/15-09-20 Approved

Laying of perforated pipe and geocomposite for Box Culvert A1(Lko)


12 PE/GPL/P-2/HW/09/20/25208 14/09/20 Back filling 54940 BHS 15/09/20 11:00 AM Approved
& A2(Gzp)

13 PE/GPL/P-2/HW/09/20/25209 14/09/20 Median Median Feeling Top 63810 63970 160 Median 15/09/20 4.30 PM 25190/14-09-20 Approved

25130/12-09-20
14 PE/GPL/P-2/HW/09/20/25210 14/09/20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 64060 64190 130 RHS 15/09/20 4:00 PM Approved
25165/13-09-20

15 PE/GPL/P-2/HW/09/20/25211 14/09/20 EmB FDD of Embankment (MCW) 20 64210 64260 50 BHS 15/09/20 2:00 AM 25192/14-09-20 Approved

16 PE/GPL/P-2/HW/09/20/25212 14/09/20 Shoulder FDD of Earthen shoulder 1 64270 64400 130 RHS 15/09/20 3:00 PM 23775/30-07-20 Approved

17 PE/GPL/P-2/HW/09/20/25213 14/09/20 Shoulder FDD of Earthen shoulder 1 64270 64400 130 LHS 15/09/20 12:00 PM Approved

18 PE/GPL/P-2/HW/09/20/25214 14/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 3 66762 BHS 15/09/20 3.30 PM 25193/14-09-20 Not Approved

19 PE/GPL/P-2/HW/09/20/25215 14/09/20 EmB FDD of Embankment (MCW) 8 67830 67870 40 BHS 15/09/20 3:00 PM 25169/13-09-20 Approved

20 PE/GPL/P-2/HW/09/20/25216 14/09/20 EmB FDD of Embankment (MCW) 25 71100 71220 120 RHS 15/09/20 3:00 PM 24898/01-09-20 Approved

21 PE/GPL/P-2/HW/09/20/25217 14/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 1 71840 BHS 15/09/20 11:00 AM Approved

22 PE/GPL/P-2/HW/09/20/25218 14/09/20 Back filling FDD Checking of Back Filling For PUP A1(Lko) 1 72836 BHS 15/09/20 10:30 AM Not Approved

23 PE/GPL/P-2/HW/09/20/25219 14/09/20 Back filling FDD Checking of Back Filling For LVUP A1(Lko) & A2(Gzp) 1 73595 BHS 15/09/20 12:30 PM Approved

24 PE/GPL/P-2/HW/09/20/25220 14/09/20 EmB FDD of Embankment (MCW) 28 77760 77780 20 BHS 15/09/20 3.30 PM 25145/12-09-20 Not Approved

25 PE/GPL/P-2/HW/09/20/25221 (Spot) 15/09/20 Tack Coat Application of Tack Coat Over DBM (MCW) 67150 67770 620 LHS 15/09/20 2:00 PM 16890/27-01-20 Approved

26 PE/GPL/P-2/HW/09/20/25222 (Spot) 15/09/20 BC Laying & Level Cheking of BC (MCW) Top 67150 67770 620 LHS 15/09/20 3:00 PM 25221/15-09-20 Approved

Highway : (Service Road)


1 PE/GPL/P-2/SR/09/20/1905 14/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 60770 61100 330 RHS 15/09/20 2:30 PM Approved

2 PE/GPL/P-2/SR/09/20/1906 14/09/20 SG FDD of Subgrade (SR) Top-1 63670 63780 110 LHS 15/09/20 3:00 PM 1892/13-09-20 Approved

3 PE/GPL/P-2/SR/09/20/1907 14/09/20 SG FDD of Subgrade (SR) Top-1 63800 63950 150 LHS 15/09/20 2:20 PM 1655/16-06-20 Approved

1487/06-06-20
4 PE/GPL/P-2/SR/09/20/1908 14/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 65550 65770 220 RHS 15/09/20 12:00 PM Not Approved
1501/07-06-20

5 PE/GPL/P-2/SR/09/20/1909 14/09/20 EmB FDD of Embankment (SR) 1 71830 71900 70 LHS 15/09/20 12:00 PM 1885/12-09-20 Approved

6 PE/GPL/P-2/SR/09/20/1910 14/09/20 SG FDD of Subgrade (SR) Top-1 76900 77000 100 LHS 15/09/20 12:00 PM 1878/11-09-20 Not Approved

Page 6 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type

7 PE/GPL/P-2/SR/09/20/1911 14/09/20 EmB FDD of Embankment (SR) 6 77300 77400 100 RHS 15/09/20 3:00 PM 1880/11-09-20 Not Approved

Page 7 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Lab :

1 PE/GPL/P-2/Lab/09/20/907 14/09/20 Core Test Core cutting of DBM (MCW) 55610 55900 290 LHS 15/09/20 10:00 AM Approved

2 PE/GPL/P-2/Lab/09/20/908 14/09/20 BA Sampling Sampling of Borrow Area-321 71900 RHS 15/09/20 11:30 AM Approved

Structures : (MCW)
Lko side retaining wall 2nd lift reinforcement , shuttring checking &
1 PE/GPL/P-2/STR/09/20/6769 14/09/20 Retaining wall 68323 RHS 15/09/20 10:00 AM 6385/22-08-20 Approved
concreting for VUP (MCW)

Both side wall 1st lift reinforcement , shuttring checking & concreting
2 PE/GPL/P-2/STR/09/20/6770 14/09/20 LVUP 68940 LHS 15/09/20 10:30 AM 6471/27-08-20 Not Approved
for LVUP (MCW)

Both side Haunch reinforcement , shuttring checking & concreting for


3 PE/GPL/P-2/STR/09/20/6771 14/09/20 LVUP 68940 RHS 15/09/20 11:00 AM 6498/28-08-20 Approved
LVUP (MCW)

4 PE/GPL/P-2/STR/09/20/6772 14/09/20 Retaining wall Gzp side retaining wall checking of Plate load test for VUP (MCW) 68323 LHS 15/09/20 11:00 AM Not Approved

Lko side retaining wall 4th lift reinforcement , shuttring checking &
5 PE/GPL/P-2/STR/09/20/6773 14/09/20 Retaining wall 70542 LHS 15/09/20 1:00 PM 6740/12-09-20 Not Approved
concreting for LVUP (MCW)

6 PE/GPL/P-2/STR/09/20/6774 14/09/20 MJB A1 to P1 Girder No.1 checking for Grouting for Major Bridge (MCW) 71367 LHS 15/09/20 11:30 AM Approved

7 PE/GPL/P-2/STR/09/20/6775 14/09/20 MJB A1 to P1 Girder No.2 checking for Grouting for Major Bridge (MCW) 71367 LHS 15/09/20 12:30 PM Approved

P1 to P2 Girder No. 26 shuttring checking & concreting of Major


8 PE/GPL/P-2/STR/09/20/6776 14/09/20 MJB 71367 RHS 15/09/20 1:30 PM Approved
Bridge (MCW)

P2 to P3 Girder No. 39 shuttring checking & concreting of Major


9 PE/GPL/P-2/STR/09/20/6777 14/09/20 MJB 71367 RHS 15/09/20 2:30 PM Not Approved
Bridge (MCW)

Lko side retaining wall raft reinforcement , shuttring checking &


10 PE/GPL/P-2/STR/09/20/6778 14/09/20 Retaining wall 71840 LHS 15/09/20 3:00 PM 5551/25-05-20 Approved
concreting for LVUP (MCW)

A1 side working pile no.19 final depth , reinforcement checking cage


11 PE/GPL/P-2/STR/09/20/6779 14/09/20 MNB 77963 LHS 15/09/20 12:00 PM Approved
lowering with concreting for MNB (MCW)

Gzp side wall 1st lift reinforcement , shuttring checking & concreting
12 PE/GPL/P-2/STR/09/20/6780 14/09/20 LVUP 79700 BHS 15/09/20 3:30 PM Approved
for LVUP (MCW)

Lko side wall 2nd lift reinforcement , shuttring checking & concreting
13 PE/GPL/P-2/STR/09/20/6781 14/09/20 LVUP 79700 LHS 15/09/20 4:00 PM 6719/10-09-20 Approved
for LVUP (MCW)

Ramp culvert at chainage 58+369 Diamond interchange location LKO


14 PE/GPL/P-2/STR/09/20/6782 14/09/20 RAMP 0+420 LHS 15/09/20 9:00 AM Approved
side Laying pcc for Box culvert

Ramp culvert at chainage 58+369 Diamond interchange location LKO


15 PE/GPL/P-2/STR/09/20/6783 14/09/20 RAMP 0+180 RHS 15/09/20 10:00 AM Approved
side Laying pcc for Box culvert

Structures : (SR)
Raft reinforcement , shuttring checking & concreting for Box culvert
1 PE/GPL/P-2/STR-SR/09/20/0079 14/09/20 Box Culvert 60519 RHS 15/09/20 8:00 AM Approved
(SR)

Raft reinforcement , shuttring checking & concreting for Box culvert


2 PE/GPL/P-2/STR-SR/09/20/0080 14/09/20 Box Culvert 79510 LHS 15/09/20 11:00 AM Approved
(SR)

A1 side working pile no.12 final depth , reinforcement checking cage


3 PE/GPL/P-2/STR-SR/09/20/0081 14/09/20 MNB 77952 RHS 15/09/20 1:00 PM In progress
lowering with concreting for MNB (SR)

Page 8 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 13-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 14-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/25176 13/09/20 L Kerb Laying of Kerb Casting (MCW) 40200 40420 220 RHS 14/09/20 2:00 PM Not Approved

2 PE/GPL/P-2/HW/09/20/25177 13/09/20 WMM Laying & Fdd testing of WMM (MCW) Top-1 41970 42090 120 LHS 14/09/20 11:00 AM Approved

3 PE/GPL/P-2/HW/09/20/25178 13/09/20 EmB FDD of Embankment (MCW) 3 42210 42300 90 LHS 14/09/20 2.45 PM Approved

4 PE/GPL/P-2/HW/09/20/25179 13/09/20 EmB FDD of Embankment (MCW) 8 42210 42300 90 RHS 14/09/20 3.45 PM Not Approved

5 PE/GPL/P-2/HW/09/20/25180 13/09/20 EmB FDD of Embankment (MCW) 8 43350 43480 130 RHS 14/09/20 4.30 PM Approved

6 PE/GPL/P-2/HW/09/20/25181 13/09/20 EmB-Back filling FDD of Embankment (MCW) (Lko-A1 &Lko-A2) 7 43480 43500 20 BHS 14/09/20 11.30 PM Not Approved

7 PE/GPL/P-2/HW/09/20/25182 13/09/20 EmB-Back filling FDD of Embankment (MCW) (Lko-A1 &Lko-A2) 8 43480 43500 20 BHS 14/09/20 4.30 PM Not Approved

8 PE/GPL/P-2/HW/09/20/25183 13/09/20 EmB FDD of Embankment (MCW) 9 45900 46000 100 BHS 14/09/20 3:00 PM Not Approved

9 PE/GPL/P-2/HW/09/20/25184 13/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 57250 57290 40 14/09/20 8:00 AM Not Approved

10 PE/GPL/P-2/HW/09/20/25185 13/09/20 Median Drain Excavation & Level Checking and laying of PCC in median drain Pcc 57290 57320 30 14/09/20 5:00 AM Not Approved

11 PE/GPL/P-2/HW/09/20/25186 13/09/20 Shoulder FDD of Earthen shoulder Top 63630 63740 110 RHS 14/09/20 2.45 PM Approved

12 PE/GPL/P-2/HW/09/20/25187 13/09/20 Shoulder FDD of Earthen shoulder Top 63630 63740 110 LHS 14/09/20 3.45 PM Approved

13 PE/GPL/P-2/HW/09/20/25188 13/09/20 EmB FDD of Embankment (MCW) 18 63750 63800 50 BHS 14/09/20 4.30 PM Approved

14 PE/GPL/P-2/HW/09/20/25189 13/09/20 Shoulder FDD of Earthen shoulder Top 63810 63970 160 LHS 14/09/20 11.30 PM Approved

15 PE/GPL/P-2/HW/09/20/25190 13/09/20 Median Median Feeling 1 63810 63970 160 14/09/20 4.30 PM Approved

16 PE/GPL/P-2/HW/09/20/25191 13/09/20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 64060 64200 140 LHS 14/09/20 4:00 PM Approved

17 PE/GPL/P-2/HW/09/20/25192 13/09/20 EmB FDD of Embankment (MCW) 19 64210 64260 50 BHS 14/09/20 2:00 AM Approved

18 PE/GPL/P-2/HW/09/20/25193 13/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 2 66762 BHS 14/09/20 3.30 PM Approved

19 PE/GPL/P-2/HW/09/20/25194 13/09/20 EmB FDD of Embankment (MCW) 8 67830 67870 40 BHS 14/09/20 3:00 PM Not Approved

20 PE/GPL/P-2/HW/09/20/25195 13/09/20 EmB FDD of Embankment (MCW) 25 71100 71220 120 RHS 14/09/20 3:00 PM Not Approved

21 PE/GPL/P-2/HW/09/20/25196 13/09/20 EmB FDD of Embankment (MCW) 28 77760 77780 20 BHS 14/09/20 3.30 PM Not Approved

Highway : (Service Road)


1 PE/GPL/P-2/SR/09/20/1899 13/09/20 EmB FDD of Embankment (SR) 1 71830 71950 120 LHS 14/09/20 12:00 PM Not Approved

2 PE/GPL/P-2/SR/09/20/1900 13/09/20 SG FDD of Subgrade (SR) Top-1 75200 75350 150 LHS 14/09/20 3:00 PM Approved

3 PE/GPL/P-2/SR/09/20/1901 13/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 75700 75800 100 LHS 14/09/20 12:00 PM Not Approved

4 PE/GPL/P-2/SR/09/20/1902 13/09/20 EmB FDD of Embankment (SR) 6 77200 77300 100 RHS 14/09/20 12:00 PM Not Approved

5 PE/GPL/P-2/SR/09/20/1903 13/09/20 EmB FDD of Embankment (SR) 6 77300 77400 100 RHS 14/09/20 3:00 PM Not Approved

6 PE/GPL/P-2/SR/09/20/1904 13/09/20 EmB FDD of Embankment (SR) 6 77400 77500 100 RHS 14/09/20 12:00 PM Approved

Page 9 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Lab :

1 PE/GPL/P-2/Lab/09/20/905 13/09/20 Water Sampling Ice Water Sampling For Third Party Testing(Anees Ice Factory) Jagdispur (BHEL) 14/09/20 10:00 AM Approved

Anchorages wedge Ancirate C Type 3 Sampling for Third Party


2 PE/GPL/P-2/Lab/09/20/906 13/09/20 Sampling Camp-3 14/09/20 11:30 AM Approved
Testing

Structures : (MCW)
Lko side wall 1st lift reinforcement , shuttring checking & concreting
1 PE/GPL/P-2/STR/09/20/6758 13/09/20 LVUP 68940 LHS 14/09/20 10:30 AM Not Approved
for LVUP (MCW)

2 PE/GPL/P-2/STR/09/20/6759 13/09/20 MJB P1 to P2 Girder No.21 checking for Grouting for Major Bridge (MCW) 71367 LHS 14/09/20 11:30 AM Approved

P1 to P2 Girder No. 26 shuttring checking & concreting of Major


3 PE/GPL/P-2/STR/09/20/6760 13/09/20 MJB 71367 RHS 14/09/20 12:30 PM Not Approved
Bridge (MCW)

P3 side working pile no.2 final depth , reinforcement checking cage


4 PE/GPL/P-2/STR/09/20/6761 13/09/20 MJB 71367 RHS 14/09/20 11:00 AM Approved
lowering with concreting for MJB (MCW)

P2 to P3 Girder no.39 profiling & reinforcement checking for Major


5 PE/GPL/P-2/STR/09/20/6762 13/09/20 MJB 71367 RHS 14/09/20 12:00 PM Approved
Bridge (MCW)

A1 Side Abutment Layout and level checking of pedestal & bearing


6 PE/GPL/P-2/STR/09/20/6763 13/09/20 MJB 71367 LHS 14/09/20 1:00 PM Not Approved
for Major Bridge (MCW)

A1 side aAbutment cap pedestal reinforcement , shuttring checking &


7 PE/GPL/P-2/STR/09/20/6764 13/09/20 MJB 71367 LHS 14/09/20 2:00 PM Not Approved
concreting for Major Bridge (MCW)

Lko side retaining wall raft reinforcement , shuttring checking &


8 PE/GPL/P-2/STR/09/20/6765 13/09/20 Retaining wall 71840 LHS 14/09/20 3:00 PM Not Approved
concreting for LVUP (MCW)

9 PE/GPL/P-2/STR/09/20/6766 13/09/20 Retaining wall Gzp side retaining wall checking of Plate load test for VUP (MCW) 77804 RHS 14/09/20 11:00 AM Not Approved

Gzp side wall 1st lift reinforcement , shuttring checking & concreting
10 PE/GPL/P-2/STR/09/20/6767 13/09/20 LVUP 79700 BHS 14/09/20 3:30 PM Not Approved
for LVUP (MCW)

Lko side wall 2nd lift reinforcement , shuttring checking & concreting
11 PE/GPL/P-2/STR/09/20/6768 13/09/20 LVUP 79700 LHS 14/09/20 4:00 PM Not Approved
for LVUP (MCW)

Structures : (SR)

1 PE/GPL/P-2/STR-SR/09/20/0074 13/09/20 Box Culvert Layout checking of excavation with laying pcc for Box culvert (SR) 44610 LHS 14/09/20 10:00 AM Approved

2 PE/GPL/P-2/STR-SR/09/20/0075 13/09/20 Box Culvert Layout checking of excavation with laying pcc for Box culvert (SR) 44975 LHS 14/09/20 11:00 AM Approved

Raft reinforcement , shuttring checking & concreting for Box culvert


3 PE/GPL/P-2/STR-SR/09/20/0076 13/09/20 Box Culvert 60519 LHS 14/09/20 8:00 AM Not Approved
(SR)

4 PE/GPL/P-2/STR-SR/09/20/0077 13/09/20 Box Culvert Layout checking of excavation with laying pcc for Box culvert (SR) 77526 LHS 14/09/20 11:00 AM Approved

Lko,Gzp side haunch & wall 1st reinforcement , shuttring checking &
5 PE/GPL/P-2/STR-SR/09/20/0078 13/09/20 MNB 68815 LHS 14/09/20 10:00 AM Not Approved
concreting for MNB (SR)

Page 10 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 12-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 13-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/25146 12/09/20 WMM FDD & Level Checking On WMM Top Layer (MCW) Top 40200 40410 210 LHS 13/09/20 11:00 AM Approved

2 PE/GPL/P-2/HW/09/20/25147 12/09/20 L Kerb Laying of Kerb Casting (MCW) 40200 40420 220 RHS 13/09/20 2:00 PM Not Approved

3 PE/GPL/P-2/HW/09/20/25148 12/09/20 EmB FDD of Embankment (MCW) 3 42210 42300 90 LHS 13/09/20 2.45 PM Not Approved

4 PE/GPL/P-2/HW/09/20/25149 12/09/20 EmB FDD of Embankment (MCW) 8 42210 42300 90 RHS 13/09/20 3.45 PM Not Approved

5 PE/GPL/P-2/HW/09/20/25150 12/09/20 EmB FDD of Embankment (MCW) 7 43350 43480 130 BHS 13/09/20 4:30 PM Approved

6 PE/GPL/P-2/HW/09/20/25151 12/09/20 EmB-Back filling FDD of Embankment (MCW) (Lko-A1 &Lko-A2) 5 43480 43500 20 BHS 13/09/20 11.30 AM Approved

7 PE/GPL/P-2/HW/09/20/25152 12/09/20 EmB-Back filling FDD of Embankment (MCW) (Lko-A1 &Lko-A2) 6 43480 43500 20 BHS 13/09/20 4.30 PM Approved

8 PE/GPL/P-2/HW/09/20/25153 12/09/20 EmB FDD of Embankment (MCW) 9 45900 46000 100 BHS 13/09/20 4:00 PM Not Approved

9 PE/GPL/P-2/HW/09/20/25154 12/09/20 Chute Drain Laying and level checking of Raft in Chute Drain Raft 48200 48300 100 LHS 13/09/20 12.30 PM Approved

10 PE/GPL/P-2/HW/09/20/25155 12/09/20 Chute Drain Laying and level checking of Raft in Chute Drain Raft 48300 48440 140 LHS 13/09/20 11.30 AM Approved

11 PE/GPL/P-2/HW/09/20/25156 12/09/20 Chute Drain Laying and level checking of Raft in Chute Drain Raft 52000 52200 200 RHS 13/09/20 11.40 PM Approved

12 PE/GPL/P-2/HW/09/20/25157 12/09/20 Chute Drain Checking Of Wall For Chute Drain Wall 52040 52120 80 LHS 13/09/20 11:00 AM Approved

13 PE/GPL/P-2/HW/09/20/25158 12/09/20 Tack Coat Application of Tack Coat Over Prime Coat (MCW) 55610 55900 290 LHS 13/09/20 10:00 AM Approved

14 PE/GPL/P-2/HW/09/20/25159 12/09/20 DBM Laying & Level Cheking of DBM ( MCW) Top 55610 55900 290 LHS 13/09/20 11:00 AM Approved

15 PE/GPL/P-2/HW/09/20/25160 12/09/20 Median Drain Laying and level checking of Raft in Median drain Raft 57250 57290 40 Median 13/09/20 3.30 PM Approved

16 PE/GPL/P-2/HW/09/20/25161 12/09/20 Median Median Feeling Top 63630 63740 110 13/09/20 5:00 PM Approved

17 PE/GPL/P-2/HW/09/20/25162 12/09/20 EmB FDD of Embankment (MCW) 17 63750 63800 50 BHS 13/09/20 4:00 PM Approved

18 PE/GPL/P-2/HW/09/20/25163 12/09/20 Shoulder FDD of Earthen shoulder 2 63810 63970 160 RHS 13/09/20 2.45 PM Not Approved

19 PE/GPL/P-2/HW/09/20/25164 12/09/20 Shoulder FDD of Earthen shoulder 1 63810 63970 160 LHS 13/09/20 3.45 PM Approved

20 PE/GPL/P-2/HW/09/20/25165 12/09/20 L Kerb Laying of Kerb Casting (MCW) 64060 64200 140 RHS 13/09/20 5:30 PM Approved

21 PE/GPL/P-2/HW/09/20/25166 12/09/20 EmB FDD of Embankment (MCW) 18 64210 64260 50 BHS 13/09/20 11.30 AM Approved

22 PE/GPL/P-2/HW/09/20/25167 12/09/20 Back filling FDD Checking of Back Filling For LVUP A2(Gzp) 1 66762 BHS 13/09/20 3.30 PM Approved

23 PE/GPL/P-2/HW/09/20/25168 12/09/20 EmB FDD of Embankment (MCW) 12 67050 67100 50 BHS 13/09/20 4.30 PM Approved

24 PE/GPL/P-2/HW/09/20/25169 12/09/20 EmB FDD of Embankment (MCW) 7 67830 67870 40 BHS 13/09/20 3:00 PM Approved

25 PE/GPL/P-2/HW/09/20/25170 12/09/20 Tack Coat Application of Tack Coat Over Prime Coat (MCW) 69250 69360 110 RHS 13/09/20 9:00 AM Approved

26 PE/GPL/P-2/HW/09/20/25171 12/09/20 DBM Laying & Level Cheking of DBM ( MCW) Top 69250 69360 110 RHS 13/09/20 9.30 AM Approved

27 PE/GPL/P-2/HW/09/20/25172 12/09/20 Shoulder FDD of Earthen shoulder 2 71000 71080 80 RHS 13/09/20 3:00 PM Approved

28 PE/GPL/P-2/HW/09/20/25173 12/09/20 Median Median Feeling 1 71000 71080 80 13/09/20 4:00 PM Approved

29 PE/GPL/P-2/HW/09/20/25174 12/09/20 EmB FDD of Embankment (MCW) 25 71100 71220 120 RHS 13/09/20 3:00 PM Not Approved

30 PE/GPL/P-2/HW/09/20/25175 12/09/20 EmB FDD of Embankment (MCW) 28 77760 77780 20 BHS 13/09/20 3:00 PM Not Approved

Page 11 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (Service Road)
1 PE/GPL/P-2/SR/09/20/1892 12/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 63650 63780 130 RHS 13/09/20 11:00 AM Approved

2 PE/GPL/P-2/SR/09/20/1893 12/09/20 EmB FDD of Embankment (SR) 1 71830 71950 120 LHS 13/09/20 12:00 PM Not Approved

3 PE/GPL/P-2/SR/09/20/1894 12/09/20 SG FDD of Subgrade (SR) Top-1 75200 75350 150 LHS 13/09/20 3:00 PM Not Approved

4 PE/GPL/P-2/SR/09/20/1895 12/09/20 SG FDD of Subgrade (SR) Top-1 75700 75800 100 LHS 13/09/20 12:00 PM Approved

5 PE/GPL/P-2/SR/09/20/1896 12/09/20 EmB FDD of Embankment (SR) 6 77200 77300 100 RHS 13/09/20 11:00 AM Not Approved

6 PE/GPL/P-2/SR/09/20/1897 12/09/20 EmB FDD of Embankment (SR) 6 77300 77400 100 RHS 13/09/20 12:00 PM Not Approved

7 PE/GPL/P-2/SR/09/20/1898 12/09/20 EmB FDD of Embankment (SR) 6 77400 77500 100 RHS 13/09/20 3:00 PM Not Approved

Page 12 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Lab :

1 PE/GPL/P-2/Lab/09/20/904 Spot 12/09/20 Core Test Core cutting of DBM (MCW) 55680 55900 220 RHS 13/09/20 11:00 AM Approved

Structures : (MCW)
Wall final lift , Haunch , Bracket & slab reinforcement , shuttring
1 PE/GPL/P-2/STR/09/20/6749 12/09/20 PUP 45770 RHS 13/09/20 2:00 PM Approved
checking & concreting for PUP (MCW)

Both side wall 1st lift reinforcement , shuttring checking & concreting
2 PE/GPL/P-2/STR/09/20/6750 12/09/20 LVUP 68940 LHS 13/09/20 10:30 AM Not Approved
for LVUP (MCW)

Lko side retaining wall 4th Lift reinforcement , shuttring checking &
3 PE/GPL/P-2/STR/09/20/6751 12/09/20 Retaining wall 70542 LHS 13/09/20 11:30 AM Not Approved
concreting for LVUP (MCW)

Lko side retaining wall 2nd Lift reinforcement , shuttring checking &
4 PE/GPL/P-2/STR/09/20/6752 12/09/20 Retaining wall 70542 RHS 13/09/20 12:30 PM Approved
concreting for LVUP (MCW)

5 PE/GPL/P-2/STR/09/20/6753 12/09/20 MJB P1 to P2 Girder No. 21 checking for grouting of Major Bridge (MCW) 71367 LHS 13/09/20 1:00 PM Not Approved

P1 to P2 Girder No. 26 shuttring checking & concreting of Major


6 PE/GPL/P-2/STR/09/20/6754 12/09/20 MJB 71367 RHS 13/09/20 2:00 PM Not Approved
Bridge (MCW)

7 PE/GPL/P-2/STR/09/20/6755 12/09/20 Retaining wall Gzp side retaining wall checking of Plate load test for VUP (MCW) 77804 RHS 13/09/20 11:00 AM Not Approved

A1 side working pile no.19 final depth , reinforcement checking cage


8 PE/GPL/P-2/STR/09/20/6756 12/09/20 MNB 77963 LHS 13/09/20 12:00 PM Not Approved
lowering with concreting for MNB (MCW)

Lko side wall 3rd lift reinforcement , shuttring checking & concreting
9 PE/GPL/P-2/STR/09/20/6757 12/09/20 LVUP 79700 RHS 13/09/20 1:00 PM Approved
for LVUP (MCW)

Structures : (SR)
Lko,Gzp side haunch & wall 1st reinforcement , shuttring checking &
1 PE/GPL/P-2/STR-SR/09/20/0072 12/09/20 MNB 68815 LHS 13/09/20 10:00 AM Not Approved
concreting for MNB (SR)

2 PE/GPL/P-2/STR-SR/09/20/0073 12/09/20 MNB A1 & A2 side Layout checking for pile formation Level for MNB (SR) 77952 RHS 13/09/20 11:00 AM Approved

Page 13 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 11-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 12-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/25110 11/09/20 WMM FDD & Level Checking On WMM Top Layer (MCW) Top 40200 40420 220 LHS 12/09/20 10:00 AM Not Approved

2 PE/GPL/P-2/HW/09/20/25111 11/09/20 L Kerb Laying of Kerb Casting (MCW) 40200 40420 220 RHS 12/09/20 2:00 PM Not Approved

3 PE/GPL/P-2/HW/09/20/25112 11/09/20 WMM FDD & Level Checking On WMM Top Layer (MCW) Top 40200 40420 220 RHS 12/09/20 10:00 AM Approved

4 PE/GPL/P-2/HW/09/20/25113 11/09/20 EmB FDD of Embankment (MCW) 2 42210 42300 90 LHS 12/09/20 2.45 PM Approved

5 PE/GPL/P-2/HW/09/20/25114 11/09/20 EmB FDD of Embankment (MCW) 8 42210 42300 90 RHS 12/09/20 3.45 PM Not Approved

6 PE/GPL/P-2/HW/09/20/25115 11/09/20 EmB FDD of Embankment (MCW) 6 43350 43480 130 BHS 12/09/20 4.30 PM Approved

7 PE/GPL/P-2/HW/09/20/25116 11/09/20 EmB-Back filling FDD of Embankment (MCW) (Lko-A1 &Lko-A2) 3 43480 43500 20 BHS 12/09/20 11.30 AM Approved

8 PE/GPL/P-2/HW/09/20/25117 11/09/20 EmB-Back filling FDD of Embankment (MCW) (Lko-A1 &Lko-A2) 4 43480 43500 20 BHS 12/09/20 4.30 PM Approved

9 PE/GPL/P-2/HW/09/20/25118 11/09/20 Chute Drain Layout Checking & Laying Of PCC For Chute Drain PCC 44420 44560 140 LHS 12/09/20 12.30PM Approved

10 PE/GPL/P-2/HW/09/20/25119 11/09/20 EmB FDD of Embankment (MCW) 9 45900 46000 100 BHS 12/09/20 3:00 PM Not Approved

11 PE/GPL/P-2/HW/09/20/25120 11/09/20 Chute Drain Layout Checking & Laying Of PCC For Chute Drain PCC 48200 48300 100 LHS 12/09/20 12:00 PM Approved

12 PE/GPL/P-2/HW/09/20/25121 11/09/20 Chute Drain Layout Checking & Laying Of PCC For Chute Drain PCC 48300 48440 140 LHS 12/09/20 12.30 PM Approved

13 PE/GPL/P-2/HW/09/20/25122 11/09/20 Chute Drain Layout Checking & Laying Of PCC For Chute Drain PCC 52000 52200 200 RHS 12/09/20 11.40 AM Approved

14 PE/GPL/P-2/HW/09/20/25123 11/09/20 Chute Drain Laying and level checking of Raft in Chute Drain Raft 52040 52120 80 LHS 12/09/20 11:00 AM Approved

15 PE/GPL/P-2/HW/09/20/25124 11/09/20 Median Drain Excavation & Level Checking and laying of PCC in median drain PCC 57260 57290 30 12/09/20 2:00 PM Approved

16 PE/GPL/P-2/HW/09/20/25125 11/09/20 SG FDD & Level Cheking on Subgrade Top Layer (MCW) Top 59800 59890 90 RHS 12/09/20 4.30 PM Approved

17 PE/GPL/P-2/HW/09/20/25126 11/09/20 Shoulder FDD of Earthen shoulder 2 62720 63100 380 RHS 12/09/20 10:00 AM Approved

18 PE/GPL/P-2/HW/09/20/25127 11/09/20 EmB FDD of Embankment (MCW) 16 63750 63800 50 BHS 12/09/20 2:00 PM Approved

19 PE/GPL/P-2/HW/09/20/25128 11/09/20 Shoulder FDD of Earthen shoulder 1 63810 63970 160 RHS 12/09/20 10:00 AM Approved

20 PE/GPL/P-2/HW/09/20/25129 11/09/20 Mountable Kerb Laying of Mountable Kerb (MCW) 64060 64190 130 LHS 12/09/20 2.45 PM Approved

21 PE/GPL/P-2/HW/09/20/25130 11/09/20 Mountable Kerb Laying of Mountable Kerb (MCW) 64060 64190 130 RHS 12/09/20 3.45 PM Approved

22 PE/GPL/P-2/HW/09/20/25131 11/09/20 L Kerb Laying of Kerb Casting (MCW) 64060 64200 140 RHS 12/09/20 4.30 PM Not Approved

23 PE/GPL/P-2/HW/09/20/25132 11/09/20 EmB FDD of Embankment (MCW) 7 66690 66740 50 RHS 12/09/20 4.30 PM Approved

24 PE/GPL/P-2/HW/09/20/25133 11/09/20 EmB FDD of Embankment (MCW) 7 66700 66740 40 LHS 12/09/20 4:00 PM Approved

25 PE/GPL/P-2/HW/09/20/25134 11/09/20 EmB FDD of Embankment (MCW) 7 66800 66900 100 LHS 12/09/20 5:00 PM Not Approved

26 PE/GPL/P-2/HW/09/20/25135 11/09/20 Tack Coat Tack coat over DBM for BC trial patch 67800 12/09/20 10:00 AM Approved

27 PE/GPL/P-2/HW/09/20/25136 11/09/20 BC Laying of BC trial patch 67800 12/09/20 11:00 AM Approved

28 PE/GPL/P-2/HW/09/20/25137 11/09/20 EmB FDD of Embankment (MCW) 7 67830 67870 40 BHS 12/09/20 5:00 PM Not Approved

29 PE/GPL/P-2/HW/09/20/25138 11/09/20 Side Slope Checking Of Side Slope (MCW) 67940 68180 240 LHS 12/09/20 4:00 PM Approved

30 PE/GPL/P-2/HW/09/20/25139 11/09/20 Tack Coat Application of Tack Coat Over Prime Coat (MCW) 69250 69360 110 LHS 12/09/20 9:00 AM Approved

31 PE/GPL/P-2/HW/09/20/25140 11/09/20 DBM Laying & Level Cheking of DBM ( MCW) Top 69250 69360 110 LHS 12/09/20 9 30 AM Approved
Page 14 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type

32 PE/GPL/P-2/HW/09/20/25141 11/09/20 Tack Coat Application of Tack Coat Over Prime Coat (MCW) 69250 69360 110 RHS 12/09/20 9:00 AM Not Approved

33 PE/GPL/P-2/HW/09/20/25142 11/09/20 DBM Laying & Level Cheking of DBM ( MCW) Top 69250 69360 110 RHS 12/09/20 9. 30 AM Not Approved

34 PE/GPL/P-2/HW/09/20/25143 11/09/20 Shoulder FDD of Earthen shoulder Top 71500 71770 270 RHS 12/09/20 1:00 PM Approved

35 PE/GPL/P-2/HW/09/20/25144 11/09/20 Shoulder FDD of Earthen shoulder Top 71500 71780 280 LHS 12/09/20 11:00 AM Approved

35 PE/GPL/P-2/HW/09/20/25145 11/09/20 EmB FDD of Embankment (MCW) 27 77760 77780 20 BHS 12/09/20 12:00 PM Approved

Highway : (Service Road)


1 PE/GPL/P-2/SR/09/20/1883 11/09/20 EmB FDD of Embankment (SR) 2 61500 61680 180 RHS 12/09/20 2:00 PM Approved

2 PE/GPL/P-2/SR/09/20/1884 11/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 63800 63950 150 RHS 12/09/20 3:00 PM Not Approved

3 PE/GPL/P-2/SR/09/20/1885 11/09/20 OGL FDD of OGL (SR) 71830 71900 70 LHS 12/09/20 10:00 AM Approved

4 PE/GPL/P-2/SR/09/20/1886 11/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 74900 75000 100 LHS 12/09/20 12:00 PM Approved

5 PE/GPL/P-2/SR/09/20/1887 11/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 75200 75350 150 LHS 12/09/20 3:00 PM Approved

6 PE/GPL/P-2/SR/09/20/1888 11/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 75700 75800 100 LHS 12/09/20 12:00 PM Approved

7 PE/GPL/P-2/SR/09/20/1889 11/09/20 EmB FDD of Embankment (SR) 6 77200 77300 100 RHS 12/09/20 3.30 PM Not Approved

8 PE/GPL/P-2/SR/09/20/1890 11/09/20 EmB FDD of Embankment (SR) 6 77300 77400 100 RHS 12/09/20 4:00 PM Not Approved

9 PE/GPL/P-2/SR/09/20/1891 11/09/20 EmB FDD of Embankment (SR) 6 77400 77500 100 RHS 12/09/20 5:00 PM Not Approved

Page 15 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Structures : (MCW)
LKO side retaining wall 3rd reinforcement , shuttring checking &
1 PE/GPL/P-2/STR/09/20/6737 11/09/20 Retaining wall 42157 LHS 12/09/20 11:00 AM Not Approved
concreting for MNB (MCW)

P1 to A2 Girder no. 1 (G1) shuttring checking & concreting for MNB


2 PE/GPL/P-2/STR/09/20/6738 11/09/20 MNB 65952 LHS 12/09/20 2:00 PM Approved
(MCW)

Both side wall 1st lift reinforcement , shuttring checking & concreting
3 PE/GPL/P-2/STR/09/20/6739 11/09/20 LVUP 68940 LHS 12/09/20 12:00 PM Not Approved
for LVUP (MCW)

LKO side retaining wall 3rd reinforcement , shuttring checking &


4 PE/GPL/P-2/STR/09/20/6740 11/09/20 Retaining wall 70542 LHS 12/09/20 1:00 PM Approved
concreting for LVUP (MCW)

5 PE/GPL/P-2/STR/09/20/6741 11/09/20 MJB P1 to P2 Girder No.21 checking of grouting for Major Bridge (MCW) 71367 LHS 12/09/20 3:00 PM Not Approved

P1 to P2 girder no.-26 Profiling & reinforcement checking for Major


6 PE/GPL/P-2/STR/09/20/6742 11/09/20 MJB 71367 RHS 12/09/20 10:00 AM Approved
Bridge (MCW)

P3 side working pile no.1 final depth , reinforcement checking cage


7 PE/GPL/P-2/STR/09/20/6743 11/09/20 MJB 71367 RHS 12/09/20 11:00 AM Approved
lowering with concreting for MJB (MCW)

Gzp side retaining wall final lift reinforcement , shuttring checking &
8 PE/GPL/P-2/STR/09/20/6744 11/09/20 Retaining wall 73595 RHS 12/09/20 12:00 PM Not Approved
concreting for LVUP (MCW)

Lko side retaining wall 4th lift reinforcement , shuttring checking &
9 PE/GPL/P-2/STR/09/20/6745 11/09/20 Retaining wall 73595 LHS 12/09/20 1:00 PM Not Approved
concreting for LVUP (MCW)

Both side median wall 3rd lift reinforcement , shuttring checking &
10 PE/GPL/P-2/STR/09/20/6746 11/09/20 PUP 74148 12/09/20 2:00 PM Not Approved
concreting for PUP(MCW)

A1 side working pile no.19 final depth , reinforcement checking cage


11 PE/GPL/P-2/STR/09/20/6747 11/09/20 MNB 77963 LHS 12/09/20 11:00 AM In Progress
lowering with concreting for MNB (MCW)

A1 to A2 girder No. 06 shuttring checking & concreting for MNB


12 PE/GPL/P-2/STR/09/20/6748 11/09/20 MNB 77963 LHS 12/09/20 3:30 PM Approved
(MCW)

Structures : (SR)
Raft reinforcement , shuttring checking & concreting for Box culvert
1 PE/GPL/P-2/STR-SR/09/20/0069 11/09/20 Box Culvert 41610 LHS 12/09/20 8:00 AM Not Approved
(SR)

2 PE/GPL/P-2/STR-SR/09/20/0070 11/09/20 Box Culvert Layout checking of excavation with laying pcc for Box culvert (SR) 44650 LHS 12/09/20 9:00 AM Not Approved

3 PE/GPL/P-2/STR-SR/09/20/0071 11/09/20 Box Culvert Layout checking of excavation with laying pcc for Box culvert (SR) 45020 LHS 12/09/20 10:00 AM Not Approved

Page 16 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 10-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 11-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/25082 10/09/20 WMM FDD & Level Checking On WMM Top Layer (MCW) Top 40200 40420 220 RHS 11/09/20 10:00 AM Not Approved

2 PE/GPL/P-2/HW/09/20/25083 10/09/20 EmB FDD of Embankment (MCW) 1 42210 42300 90 LHS 11/09/20 2.45 PM Approved

3 PE/GPL/P-2/HW/09/20/25084 10/09/20 EmB FDD of Embankment (MCW) 8 42210 42300 90 RHS 11/09/20 3.45 PM Fail

4 PE/GPL/P-2/HW/09/20/25085 10/09/20 EmB FDD of Embankment (MCW) 5 43350 43480 130 BHS 11/09/20 4:00 PM Approved

5 PE/GPL/P-2/HW/09/20/25086 10/09/20 EmB FDD of Embankment (MCW) 1 43480 43500 20 BHS 11/09/20 11.30 AM Approved

6 PE/GPL/P-2/HW/09/20/25087 10/09/20 EmB FDD of Embankment (MCW) 2 43480 43500 20 BHS 11/09/20 4.30 PM Approved

7 PE/GPL/P-2/HW/09/20/25088 10/09/20 Chute Drain Layout Checking & Laying Of PCC For Chute Drain Pcc 44420 44560 140 LHS 11/09/20 3.30 PM Not Approved

8 PE/GPL/P-2/HW/09/20/25089 10/09/20 Chute Drain Layout Checking & Laying Of PCC For Chute Drain Pcc 44660 44740 80 RHS 11/09/20 12.30 PM Approved

9 PE/GPL/P-2/HW/09/20/25090 10/09/20 SG FDD of Subgrade (MCW) Top-1 46170 46210 40 BHS 11/09/20 4:00 PM Approved

10 PE/GPL/P-2/HW/09/20/25091 10/09/20 Chute Drain Layout Checking & Laying Of PCC For Chute Drain pCC 52000 52200 200 RHS 11/09/20 11.40 AM Not Approved

11 PE/GPL/P-2/HW/09/20/25092 10/09/20 Chute Drain Laying and level checking of Raft in Chute Drain Raft 52040 52120 80 LHS 11/09/20 11:00 AM Not Approved

12 PE/GPL/P-2/HW/09/20/25093 10/09/20 Chute Drain Laying and level checking of Raft in Chute Drain Raft 52300 52420 120 RHS 11/09/20 12:00 PM Approved

13 PE/GPL/P-2/HW/09/20/25094 10/09/20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 55750 55810 60 LHS 11/09/20 11:00 AM Approved

14 PE/GPL/P-2/HW/09/20/25095 10/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 57210 57250 40 11/09/20 3:00 PM Approved

15 PE/GPL/P-2/HW/09/20/25096 10/09/20 Shoulder FDD of Earthen shoulder 1 62720 63100 380 RHS 11/09/20 11:00 AM Approved

16 PE/GPL/P-2/HW/09/20/25097 10/09/20 Shoulder FDD of Earthen shoulder 2 62720 63500 780 LHS 11/09/20 2.45 PM Approved

17 PE/GPL/P-2/HW/09/20/25098 10/09/20 EmB FDD of Embankment (MCW) 15 63750 63800 50 BHS 11/09/20 3.45 PM Approved

18 PE/GPL/P-2/HW/09/20/25099 10/09/20 EmB FDD of Embankment (MCW) 10 66900 67040 140 RHS 11/09/20 5:00 PM Approved

19 PE/GPL/P-2/HW/09/20/25100 10/09/20 EmB FDD of Embankment (MCW) 11 67050 67100 50 BHS 11/09/20 4.30 PM Approved

20 PE/GPL/P-2/HW/09/20/25101 10/09/20 Shoulder FDD of Earthen shoulder 2 71000 71080 80 LHS 11/09/20 4:00 PM Approved

21 PE/GPL/P-2/HW/09/20/25102 10/09/20 Shoulder FDD of Earthen shoulder 1 71000 71080 80 RHS 11/09/20 4:00 PM Approved

22 PE/GPL/P-2/HW/09/20/25103 10/09/20 Median Median Feeling 1 71000 71080 80 11/09/20 4:00 PM Not Approved

23 PE/GPL/P-2/HW/09/20/25104 10/09/20 EmB FDD of Embankment (MCW) 25 71100 71220 120 RHS 11/09/20 4:00 PM Not Approved

24 PE/GPL/P-2/HW/09/20/25105 10/09/20 Shoulder FDD of Earthen shoulder Top 71500 71770 270 RHS 11/09/20 1:00 PM Not Approved

25 PE/GPL/P-2/HW/09/20/25106 10/09/20 Shoulder FDD of Earthen shoulder Top 71500 71780 280 LHS 11/09/20 11:00 AM Not Approved

26 PE/GPL/P-2/HW/09/20/25107 10/09/20 EmB FDD of Embankment (MCW) 26 77760 77780 20 BHS 11/09/20 5:00 PM Approved

27 PE/GPL/P-2/HW/09/20/25108 Spot 11/09/20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 69250 69350 100 LHS 11/09/20 3:00 PM Approved

28 PE/GPL/P-2/HW/09/20/25109 Spot 11/09/20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 69250 69340 90 RHS 11/09/20 3:00 PM Approved

Page 17 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (Service Road)
1 PE/GPL/P-2/SR/09/20/1872 10/09/20 EmB FDD of Embankment (SR) 2 60900 61100 200 RHS 11/09/20 2:00 PM Approved

2 PE/GPL/P-2/SR/09/20/1873 10/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 61330 61460 130 RHS 11/09/20 3:00 PM Approved

3 PE/GPL/P-2/SR/09/20/1874 10/09/20 OGL FDD of OGL (SR) 71830 71950 120 LHS 11/09/20 10:00 AM Not Approved

4 PE/GPL/P-2/SR/09/20/1875 10/09/20 SG FDD of Subgrade (SR) Top-1 74900 75000 100 LHS 11/09/20 12:00 PM Approved

5 PE/GPL/P-2/SR/09/20/1876 10/09/20 EmB FDD of Embankment (SR) 5 75200 75350 150 LHS 11/09/20 3:00 PM Approved

6 PE/GPL/P-2/SR/09/20/1877 10/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 75700 75800 100 LHS 11/09/20 12:00 PM Not Approved

7 PE/GPL/P-2/SR/09/20/1878 10/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 76900 77000 100 LHS 11/09/20 3.30 PM Approved

8 PE/GPL/P-2/SR/09/20/1879 10/09/20 EmB FDD of Embankment (SR) 5 77200 77300 100 RHS 11/09/20 4:00 PM Approved

9 PE/GPL/P-2/SR/09/20/1880 10/09/20 EmB FDD of Embankment (SR) 5 77300 77400 100 RHS 11/09/20 4.30 PM Approved

10 PE/GPL/P-2/SR/09/20/1881 10/09/20 EmB FDD of Embankment (SR) 6 77400 77500 100 RHS 11/09/20 4:00 PM Not Approved

11 PE/GPL/P-2/SR/09/20/1882 10/09/20 GSB FDD & Level Checking On GSB Top Layer (SR) Top 77000 77100 100 LHS 11/09/20 4:00 PM Approved

Page 18 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Structures : (MCW)
Gzp side retaining wall layout checking of excavation with laying pcc
1 PE/GPL/P-2/STR/09/20/6722 10/09/20 Retaining wall 59030 LHS 11/09/20 10:00 AM Approved
for MNB (MCW)

Lko side retaining wall 6th lift reinforcement , shuttring checking &
2 PE/GPL/P-2/STR/09/20/6723 10/09/20 Retaining wall 64467 BHS 11/09/20 12:00 PM Approved
concreting for LVUP(MCW)

P1 to A2 Girder no. 1 (G1) profiling & reinforcement checking for MNB


3 PE/GPL/P-2/STR/09/20/6724 10/09/20 MNB 65952 LHS 11/09/20 1:00 PM Approved
(MCW)

P1 to A2 Girder no. 1 (G1) shuttring checking & concreting for MNB


4 PE/GPL/P-2/STR/09/20/6725 10/09/20 MNB 65952 LHS 11/09/20 2:00 PM Not Approved
(MCW)

Lko side retaining wall 3rd lift reinforcement , shuttring checking &
5 PE/GPL/P-2/STR/09/20/6726 10/09/20 Retaining wall 70542 LHS 11/09/20 11:00 AM Not Approved
concreting for LVUP(MCW)

Lko side retaining wall 1st lift reinforcement , shuttring checking &
6 PE/GPL/P-2/STR/09/20/6727 10/09/20 Retaining wall 70542 RHS 11/09/20 12:00 PM Approved
concreting for LVUP(MCW)

7 PE/GPL/P-2/STR/09/20/6728 10/09/20 MJB P1 to P2 Girder No.18 checking of grouting for Major Bridge (MCW) 71367 LHS 11/09/20 1:00 PM Approved

8 PE/GPL/P-2/STR/09/20/6729 10/09/20 MJB P1 to P2 Girder No.19 checking of grouting for Major Bridge (MCW) 71367 LHS 11/09/20 2:00 PM Approved

9 PE/GPL/P-2/STR/09/20/6730 10/09/20 MJB P1 to P2 Girder No.20 checking of grouting for Major Bridge (MCW) 71367 LHS 11/09/20 3:00 PM Approved

P2 to P3 girder no.-38 Profiling & reinforcement checking for Major


10 PE/GPL/P-2/STR/09/20/6731 10/09/20 MJB 71367 RHS 11/09/20 10:00 AM Approved
Bridge (MCW)

P2 to P3 girder no.-38 shuttring checking & concreting for Major


11 PE/GPL/P-2/STR/09/20/6732 10/09/20 MJB 71367 RHS 11/09/20 4:30 PM Approved
Bridge (MCW)

A1 to A2 girder No. 06 shuttring checking & concreting for MNB


12 PE/GPL/P-2/STR/09/20/6733 10/09/20 MNB 77963 RHS 11/09/20 3:30 PM Not Approved
(MCW)

A1 side working pile no.5 final depth , reinforcement checking cage


13 PE/GPL/P-2/STR/09/20/6734 10/09/20 MNB 77963 LHS 11/09/20 11:00 AM Approved
lowering with concreting for MNB (MCW)

Ramp culvert at chainage 58+369 Diamond interchange location


14 PE/GPL/P-2/STR/09/20/6735 10/09/20 RAMP 0+420 LHS 11/09/20 9:00 AM Approved
LKO side OGL recording & Excavation

Ramp culvert at chainage 58+369 Diamond interchange location


15 PE/GPL/P-2/STR/09/20/6736 10/09/20 RAMP 0+180 RHS 11/09/20 10:00 AM Approved
LKO side OGL recording & Excavation

Structures : (SR)

1 PE/GPL/P-2/STR-SR/09/20/0066 10/09/20 Box Culvert Layout checking of excavation with laying pcc for Box culvert (SR) 43440 LHS 11/09/20 8:00 AM Approved

2 PE/GPL/P-2/STR-SR/09/20/0067 10/09/20 Box Culvert Layout checking of excavation with laying pcc for Box culvert (SR) 48772 RHS 11/09/20 10:00 AM Approved

3 PE/GPL/P-2/STR-SR/09/20/0068 10/09/20 Box Culvert Layout checking of excavation with laying pcc for Box culvert (SR) 60550 RHS 11/09/20 11:00 AM Approved

Page 19 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 9-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 10-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/25054 09/09/20 EmB FDD of Embankment (MCW) 7 42210 42300 90 RHS 10/09/20 2:45 PM 3260/07-03-19 Approved

2 PE/GPL/P-2/HW/09/20/25055 09/09/20 EmB FDD of Embankment (MCW) 25 42300 42400 100 BHS 10/09/20 3:00 PM 22669/15-06-20 Not Approved

25026/09-09-20
3 PE/GPL/P-2/HW/09/20/25056 09/09/20 EmB FDD of Embankment (MCW) 5 43350 43480 130 BHS 10/09/20 3:30 PM Not Approved
24980/07-09-20

4 PE/GPL/P-2/HW/09/20/25057 09/09/20 EmB FDD of Embankment (MCW) Top-1 46200 46210 10 BHS 10/09/20 12:00 PM Approved

5 PE/GPL/P-2/HW/09/20/25058 09/09/20 EmB FDD & Level Checking On Embankment Top Layer (MCW) Top 46200 46210 10 BHS 10/09/20 3:00 PM 25057/10-09-20 Approved

6 PE/GPL/P-2/HW/09/20/25059 09/09/20 Chute Drain Checking & Concreting of Wall for Chute Drain Wall 48500 48560 60 RHS 10/09/20 3:00 PM 24535/24-08-20 Not Approved

7 PE/GPL/P-2/HW/09/20/25060 09/09/20 Chute Drain Checking & Concreting of raft for Chute Drain Raft 52040 52120 80 LHS 10/09/20 11:00 AM 25008/08-09-20 Not Approved

8 PE/GPL/P-2/HW/09/20/25061 09/09/20 Chute Drain Checking & Concreting of Wall for Chute Drain Wall 52120 52220 100 LHS 10/09/20 11:30 AM 25035/09-09-20 Approved

Layout & Level Checking,Excavation & Laying Of Pcc For Chute


9 PE/GPL/P-2/HW/09/20/25062 09/09/20 Chute Drain Pcc 52300 52420 120 RHS 10/09/20 12:00 PM Approved
Drain
25039/09-09-20
10 PE/GPL/P-2/HW/09/20/25063 09/09/20 WMM FDD & Level Checking On WMM Top Layer (MCW) Top 55750 55810 60 LHS 10/09/20 10:00 AM Approved
23347/18-07-20

11 PE/GPL/P-2/HW/09/20/25064 09/09/20 Mountable Kerb Laying of Mountable Kerb (MCW) 55750 55810 60 LHS 10/09/20 10:30 AM 25063/10-09-20 Approved

12 PE/GPL/P-2/HW/09/20/25065 09/09/20 L Kerb Laying of Kerb Casting (MCW) 55750 55810 60 LHS 10/09/20 11:00 AM 25063/10-09-20 Approved

13 PE/GPL/P-2/HW/09/20/25066 09/09/20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 55750 55810 60 LHS 10/09/20 4:00 PM 25063/10-09-20 Not Approved

14 PE/GPL/P-2/HW/09/20/25067 09/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 57210 57250 40 Median 10/09/20 3:00 PM 24989/07-09-20 Not Approved

15 PE/GPL/P-2/HW/09/20/25068 09/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 59800 59900 100 BHS 10/09/20 3:30 PM 25040/09-09-20 Not Approved

21608/23-05-20
16 PE/GPL/P-2/HW/09/20/25069 09/09/20 Shoulder FDD of Earthen shoulder 1 62720 63100 380 LHS 10/09/20 11:00 AM Approved
21660/25-05-20

17 PE/GPL/P-2/HW/09/20/25070 09/09/20 Shoulder FDD of Earthen shoulder 2 63630 63740 110 LHS 10/09/20 12:00 PM 25014/08-09-20 Approved

18 PE/GPL/P-2/HW/09/20/25071 09/09/20 Chute Drain Checking of Top pcc along the Chute Drain Pcc 70220 70480 260 LHS 10/09/20 10:30 AM 25017/08-09-20 Approved

19 PE/GPL/P-2/HW/09/20/25072 09/09/20 Shoulder FDD of Earthen shoulder 1 71000 71080 80 LHS 10/09/20 11:00 AM 24680/27-08-20 Approved

20 PE/GPL/P-2/HW/09/20/25073 09/09/20 EmB FDD of Embankment (MCW) 26 71100 71220 120 LHS 10/09/20 3:30 PM 25018/08-09-20 Approved

21 PE/GPL/P-2/HW/09/20/25074 09/09/20 EmB FDD of Embankment (MCW) 25 71100 71220 120 RHS 10/09/20 4:00 PM 24898/01-09-20 Not Approved

22 PE/GPL/P-2/HW/09/20/25075 09/09/20 Shoulder FDD of Earthen shoulder 2 71500 71760 260 RHS 10/09/20 2:00 PM 25043/09-09-20 Approved

23 PE/GPL/P-2/HW/09/20/25076 09/09/20 Shoulder FDD of Earthen shoulder 2 71500 71760 260 LHS 10/09/20 11:30 AM 25044/09-09-20 Approved

24 PE/GPL/P-2/HW/09/20/25077 09/09/20 Shoulder FDD of Earthen shoulder Top 72240 72360 120 LHS 10/09/20 12:30 PM 25046/09-09-20 Approved

25 PE/GPL/P-2/HW/09/20/25078 09/09/20 Shoulder FDD of Earthen shoulder Top 72240 72360 120 RHS 10/09/20 11:30 AM 25047/09-09-20 Approved

26 PE/GPL/P-2/HW/09/20/25079 09/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 76369 76379 10 Median 10/09/20 11:00 AM 25050/09-09-20 Approved

27 PE/GPL/P-2/HW/09/20/25080 09/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 76381 76400 19 Median 10/09/20 11:30 AM 25051/09-09-20 Approved

28 PE/GPL/P-2/HW/09/20/25081 09/09/20 EmB FDD of Embankment (MCW) 26 77760 77780 20 BHS 10/09/20 4:30 PM 25053/09-09-20 Not Approved

Page 20 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (Service Road)
1 PE/GPL/P-2/SR/09/20/1859 09/09/20 OGL FDD of OGL (SR) 69000 69300 300 RHS 10/09/20 4:00 PM Not Approved

2 PE/GPL/P-2/SR/09/20/1860 09/09/20 OGL FDD of OGL (SR) 71830 71900 70 LHS 10/09/20 10:00 AM Not Approved

3 PE/GPL/P-2/SR/09/20/1861 09/09/20 GSB FDD & Level Checking On GSB Top Layer (MCW) Top 74730 74800 70 LHS 10/09/20 3:00 PM 1764/07-08-20 Approved

4 PE/GPL/P-2/SR/09/20/1862 09/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 74900 75000 100 LHS 10/09/20 12:00 PM 1851/09-09-20 Approved

5 PE/GPL/P-2/SR/09/20/1863 09/09/20 SG FDD of Subgrade (SR) Top-1 75000 75200 200 LHS 10/09/20 11:30 AM 1852/09-09-20 Approved

6 PE/GPL/P-2/SR/09/20/1864 09/09/20 EmB FDD of Embankment (SR) 5 75200 75350 150 LHS 10/09/20 3:00 PM 1853/09-09-20 Not Approved

7 PE/GPL/P-2/SR/09/20/1865 09/09/20 SG FDD of Subgrade (SR) Top-1 75350 75700 350 LHS 10/09/20 12:30 PM 1854/09-09-20 Approved

8 PE/GPL/P-2/SR/09/20/1866 09/09/20 EmB FDD of Embankment (SR) 3 75700 75800 100 LHS 10/09/20 11:00 AM 1855/09-09-20 Approved

9 PE/GPL/P-2/SR/09/20/1867 09/09/20 EmB FDD of Embankment (SR) 14 76900 77000 100 LHS 10/09/20 3:00 PM 1856/09-09-20 Approved

10 PE/GPL/P-2/SR/09/20/1868 09/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 77000 77100 100 LHS 10/09/20 4:00 PM 1831/04-09-20 Approved

11 PE/GPL/P-2/SR/09/20/1869 09/09/20 EmB FDD of Embankment (SR) 5 77200 77300 100 RHS 10/09/20 3:30 PM 1857/09-09-20 Not Approved

12 PE/GPL/P-2/SR/09/20/1870 09/09/20 EmB FDD of Embankment (SR) 5 77300 77400 100 RHS 10/09/20 3:30 PM 1858/09-09-20 Not Approved

13 PE/GPL/P-2/SR/09/20/1871 09/09/20 EmB FDD of Embankment (SR) 6 77400 77500 100 RHS 10/09/20 10:00 AM 1841/06-09-20 Not Approved

Lab :
1 PE/GPL/P-2/Lab/09/20/903 09/09/20 BA Sampling Sampling of Borrow Area-320 71900 RHS 10/09/20 11:00 AM Approved

Page 21 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Structures : (MCW)
LKO side retaining wall raft reinforcement , shuttring checking &
1 PE/GPL/P-2/STR/09/20/6702 09/09/20 Retaining wall 42157 RHS 10/09/20 11:00 AM 6551/31-08-20 Approved
concreting for MNB (MCW)

LKO side retaining wall 3rd lift reinforcement , shuttring checking &
2 PE/GPL/P-2/STR/09/20/6703 09/09/20 Retaining wall 42437 RHS 10/09/20 10:00 AM 6457/27-08-20 Approved
concreting forPUP (MCW)

GZP side retaining wall 6th lift reinforcement , shuttring checking &
3 PE/GPL/P-2/STR/09/20/6704 09/09/20 Retaining wall 42437 RHS 10/09/20 11:30 AM 6361/21-08-20 Approved
concreting forPUP (MCW)

both side Median wall final lift reinforcement , shuttring checking &
4 PE/GPL/P-2/STR/09/20/6705 09/09/20 PUP 42437 10/09/20 3:00 PM 6360/21-08-20 Approved
concreting forPUP (MCW)

GZp haunch reinforcement , shuttring checking & concreting for MNB


5 PE/GPL/P-2/STR/09/20/6706 09/09/20 MNB 52920 LHS 10/09/20 2:00 PM 6540/30-08-20 Approved
(MCW)

Lko haunch reinforcement , shuttring checking & concreting for MNB


6 PE/GPL/P-2/STR/09/20/6707 09/09/20 MNB 52920 LHS 10/09/20 3:00 PM 6540/30-08-20 Approved
(MCW)

GZP side retaining wall 3rd lift reinforcement , shuttring checking &
7 PE/GPL/P-2/STR/09/20/6708 09/09/20 Retaining wall 54135 RHS 10/09/20 4:00 PM 6563/31-08-20 Approved
concreting for MNB (MCW)

GZP side retaining wall 5th lift reinforcement , shuttring checking &
8 PE/GPL/P-2/STR/09/20/6709 09/09/20 Retaining wall 55218 LHS 10/09/20 5:00 PM 6564/31-08-20 Approved
concreting for MNB(MCW)

GZP side retaining wall 4th lift reinforcement , shuttring checking &
9 PE/GPL/P-2/STR/09/20/6710 09/09/20 Retaining wall 55218 RHS 10/09/20 3:30 PM 6565/31-08-20 Approved
concreting for MNB(MCW)

A1 Side abutment cap reinforcement , shuttring checking & concreting


10 PE/GPL/P-2/STR/09/20/6711 09/09/20 MNB 65952 LHS 10/09/20 12:00 PM Approved
for MNB (MCW)

P1 to A2 Girder no. 1 (G1) profiling & reinforcement checking for MNB


11 PE/GPL/P-2/STR/09/20/6712 09/09/20 MNB 65952 LHS 10/09/20 1:00 PM Not Approved
(MCW)

P1 to A2 Girder no. 1 (G1) shuttring checking & concreting for MNB


12 PE/GPL/P-2/STR/09/20/6713 09/09/20 MNB 65952 LHS 10/09/20 2:00 PM Not Approved
(MCW)

13 PE/GPL/P-2/STR/09/20/6714 09/09/20 MJB P1 to P2 Girder No.15 checking of grouting for Major Bridge (MCW) 71367 LHS 10/09/20 3:00 PM Approved

14 PE/GPL/P-2/STR/09/20/6715 09/09/20 MJB P1 to P2 Girder No.16 checking of grouting for Major Bridge (MCW) 71367 LHS 10/09/20 4:00 PM Approved

15 PE/GPL/P-2/STR/09/20/6716 09/09/20 MJB P1 to P2 Girder No.17 checking of grouting for Major Bridge (MCW) 71367 LHS 10/09/20 5:00 PM Approved

P1 to P2 girder No. 25 shuttring checking & concreting for MJB


16 PE/GPL/P-2/STR/09/20/6717 09/09/20 MJB 71367 RHS 10/09/20 3:00 PM Repeated
(MCW)

A1 to A2 girder No. 06 profiling & reinforcement checking for MNB


17 PE/GPL/P-2/STR/09/20/6718 09/09/20 MNB 77963 RHS 10/09/20 3:30 PM Approved
(MCW)

Lko side wall 1st lift reinforcement , shuttring checking & concreting
18 PE/GPL/P-2/STR/09/20/6719 09/09/20 LVUP 79700 LHS 10/09/20 11:30 AM Approved
for LVUP(MCW)

Ramp culvert at chainage 58+369 Diamond interchange location LKO


19 PE/GPL/P-2/STR/09/20/6720 09/09/20 RAMP 0+180 RHS 10/09/20 10:00 AM Not Approved
side OGL recording & Excavation

Ramp culvert at chainage 58+369 Diamond interchange location LKO


20 PE/GPL/P-2/STR/09/20/6721 09/09/20 RAMP 0+420 LHS 10/09/20 9:00 AM Not Approved
side OGL recording & Excavation

Page 22 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 8-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 9-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/25026 08/09/20 EmB FDD of Embankment (MCW) 4 43350 43480 130 LHS 09/09/20 3:30 PM 21110/09-05-20 Approved

24849/31-08-20
2 PE/GPL/P-2/HW/09/20/25027 08/09/20 Mountable Kerb Laying of Mountable Kerb (MCW) 43800 44030 230 RHS 09/09/20 11:30 AM Approved
22378/10-06-20
24849/31-08-20
3 PE/GPL/P-2/HW/09/20/25028 08/09/20 L Kerb Laying of Kerb Casting (MCW) 43800 44030 230 RHS 09/09/20 10:00 AM Approved
22378/10-06-20
24849/31-08-20
4 PE/GPL/P-2/HW/09/20/25029 08/09/20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 43800 44030 230 RHS 09/09/20 3:00 PM Approved
22378/10-06-20

5 PE/GPL/P-2/HW/09/20/25030 08/09/20 Prime Coat Application Of Prime Coat Over WMM Top (MCW) 43800 44020 220 LHS 09/09/20 2:00 PM 24848/31-08-20 Approved

6 PE/GPL/P-2/HW/09/20/25031 08/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 25 46221 BHS 09/09/20 10:00 AM 25007/08-09-20 Approved

7 PE/GPL/P-2/HW/09/20/25032 08/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 26 46221 BHS 09/09/20 4:00 PM 25031/09-09-20 Approved

8 PE/GPL/P-2/HW/09/20/25033 08/09/20 Chute Drain Checking & Concreting of Wall for Chute Drain Wall 48500 48560 60 RHS 09/09/20 3:00 PM 24535/24-08-20 Not Approved

12230/07-11-19
9 PE/GPL/P-2/HW/09/20/25034 08/09/20 WMM Laying & Fdd testing of WMM (MCW) Top-1 49580 49700 120 LHS 09/09/20 2:15 PM Fail
24705/28-08-20

10 PE/GPL/P-2/HW/09/20/25035 08/09/20 Chute Drain Checking & Concreting of raft for Chute Drain Raft 52120 52220 100 LHS 09/09/20 11:00 AM 25008/08-09-20 Approved

11 PE/GPL/P-2/HW/09/20/25036 08/09/20 EmB FDD of Embankment (MCW) 18 55320 55450 130 LHS 09/09/20 4:00 PM 24986/07-09-20 Not Approved

12 PE/GPL/P-2/HW/09/20/25037 08/09/20 EmB FDD of Embankment (MCW) 20 55400 55450 50 RHS 09/09/20 5:00 PM 13129/25-11-19 Not Approved

13 PE/GPL/P-2/HW/09/20/25038 08/09/20 SG FDD of Subgrade (MCW) Top-1 55450 55500 50 BHS 09/09/20 2:40 PM 20859/30-04-20 Not Approved

14 PE/GPL/P-2/HW/09/20/25039 08/09/20 WMM Laying & Fdd testing of WMM (MCW) Top-1 55750 55790 40 LHS 09/09/20 10:00 AM 21772/27-05-20 Approved

22554/12-06-20
15 PE/GPL/P-2/HW/09/20/25040 08/09/20 SG FDD of Subgrade (MCW) Top-1 59800 59900 100 BHS 09/09/20 3:30 PM Approved
20832/30-04-20

16 PE/GPL/P-2/HW/09/20/25041 08/09/20 Shoulder FDD of Earthen shoulder 1 63100 63490 390 LHS 09/09/20 11:00 AM 21746/26-05-20 Approved

17 PE/GPL/P-2/HW/09/20/25042 08/09/20 Shoulder FDD of Earthen shoulder 2 63630 63740 110 RHS 09/09/20 12:00 PM 25016/08-09-20 Approved

18 PE/GPL/P-2/HW/09/20/25043 08/09/20 Shoulder FDD of Earthen shoulder 1 71500 71760 260 RHS 09/09/20 2:00 PM 22762/19-06-20 Approved

19 PE/GPL/P-2/HW/09/20/25044 08/09/20 Shoulder FDD of Earthen shoulder 1 71500 71760 260 LHS 09/09/20 11:30 AM 22762/19-06-20 Approved

20 PE/GPL/P-2/HW/09/20/25045 08/09/20 Median Median filling Top 71500 71600 100 Median 09/09/20 11:00 AM 24959/05-09-20 Approved

21 PE/GPL/P-2/HW/09/20/25046 08/09/20 Shoulder FDD of Earthen shoulder 2 72240 72360 120 LHS 09/09/20 12:30 PM 24975/06-09-20 Approved

22 PE/GPL/P-2/HW/09/20/25047 08/09/20 Shoulder FDD of Earthen shoulder 2 72240 72360 120 RHS 09/09/20 11:30 AM 24976/06-09-20 Approved

18937, 19005,
23 PE/GPL/P-2/HW/09/20/25048 08/09/20 DBM-Surface Surface irregularities of DBM Top 74860 75660 800 RHS 09/09/20 4:00 PM Approved
19007,19199
19186/26-02-20
24 PE/GPL/P-2/HW/09/20/25049 08/09/20 DBM-Surface Surface irregularities of DBM Top 74870 75660 790 LHS 09/09/20 12:00 PM Approved
19277/27-02-20

25 PE/GPL/P-2/HW/09/20/25050 08/09/20 Median Drain Laying and level checking of Raft in Median drain Raft 76369 76379 10 Median 09/09/20 11:00 AM 24731/28-08-20 Approved

26 PE/GPL/P-2/HW/09/20/25051 08/09/20 Median Drain Checking & Concreting of raft for Median Drain Raft 76381 76400 19 Median 09/09/20 11:30 AM 24732/28-08-20 Approved

27 PE/GPL/P-2/HW/09/20/25052 08/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 76600 76660 60 Median 09/09/20 10:30 AM 24733/28-08-20 Approved

28 PE/GPL/P-2/HW/09/20/25053 08/09/20 EmB FDD of Embankment (MCW) 25 77760 77780 20 BHS 09/09/20 4:30 PM 25025/08-09-20 Approved

Page 23 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (Service Road)
1 PE/GPL/P-2/SR/09/20/1851 08/09/20 EmB FDD of Embankment (SR) 5 74900 75000 100 LHS 09/09/20 12:00 PM 1845/08-09-20 Approved

2 PE/GPL/P-2/SR/09/20/1852 08/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 75000 75200 200 LHS 09/09/20 11:30 AM 1773/10-08-20 Approved

3 PE/GPL/P-2/SR/09/20/1853 08/09/20 EmB FDD of Embankment (SR) 4 75200 75350 150 LHS 09/09/20 3:00 PM 1757/04-08-20 Approved

4 PE/GPL/P-2/SR/09/20/1854 08/09/20 EmB FDD & Level Checking On Embankment Top Layer (SR) Top 75350 75700 350 LHS 09/09/20 12:30 PM Approved

5 PE/GPL/P-2/SR/09/20/1855 08/09/20 EmB FDD of Embankment (SR) 2 75700 75800 100 LHS 09/09/20 11:00 AM 1847/08-09-20 Approved

6 PE/GPL/P-2/SR/09/20/1856 08/09/20 EmB FDD of Embankment (SR) 13 76900 77000 100 LHS 09/09/20 3:00 PM 1838/06-09-20 Approved

7 PE/GPL/P-2/SR/09/20/1857 08/09/20 EmB FDD of Embankment (SR) 4 77200 77300 100 RHS 09/09/20 3:30 PM 1828/03-09-20 Approved

8 PE/GPL/P-2/SR/09/20/1858 08/09/20 EmB FDD of Embankment (SR) 4 77300 77400 100 RHS 09/09/20 3:30 PM 1829/03-09-20 Approved

Lab :
1 PE/GPL/P-2/Lab/09/20/900 08/09/20 BA Sampling Sampling of Borrow Area-319 41400 LHS 09/09/20 11:00 AM Approved

2 PE/GPL/P-2/Lab/09/20/901 08/09/20 Core Test Core cutting of DBM (MCW) 47280 47530 250 RHS 09/09/20 10:00 AM 24855/31-08-20 Hold

3 PE/GPL/P-2/Lab/09/20/902 08/09/20 Core Test Core cutting of DBM (MCW) 47280 47530 250 LHS 09/09/20 11:30 AM 24814/30-08-20 Hold

Page 24 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Structures : (MCW)
Gzp side retaining wall 4th lift reinforcement , shuttring checking &
1 PE/GPL/P-2/STR/09/20/6685 08/09/20 Retaining wall 64467 LHS 09/09/20 11:30 AM 6488/28-08-20 Approved
concreting for LVUP(MCW)

Both side retaining wall 5th lift reinforcement , shuttring checking &
2 PE/GPL/P-2/STR/09/20/6686 08/09/20 Retaining wall 64467 RHS 09/09/20 3:00 PM 6611/03-09-20 Approved
concreting for LVUP(MCW)

A1 side Abutment cap layout & level checking of pedestal & Jack
3 PE/GPL/P-2/STR/09/20/6687 08/09/20 MNB 65952 LHS 09/09/20 11:00 AM Approved
Location for MNB (MCW)

A1 Side abutment cap reinforcement , shuttring checking & concreting


4 PE/GPL/P-2/STR/09/20/6688 08/09/20 MNB 65952 LHS 09/09/20 12:00 PM Not Approved
for MNB (MCW)

P1 to A2 Girder no. 1 (G1) profiling & reinforcement checking for MNB


5 PE/GPL/P-2/STR/09/20/6689 08/09/20 MNB 65952 LHS 09/09/20 1:00 PM Not Approved
(MCW)

P1 to A2 Girder no. 1 (G1) shuttring checking & concreting for MNB


6 PE/GPL/P-2/STR/09/20/6690 08/09/20 MNB 65952 LHS 09/09/20 2:00 PM Not Approved
(MCW)

Lko side retaining wall raft reinforcement . shutring checkng &


7 PE/GPL/P-2/STR/09/20/6691 08/09/20 Retaining wall 70542 RHS 09/09/20 3:00 PM 6599/02-09-20 Approved
concreting for LVUP (MCW)

Lko side retaining wall 2nd lift reinforcement . shutring checkng &
8 PE/GPL/P-2/STR/09/20/6692 08/09/20 Retaining wall 70542 LHS 09/09/20 4:00 PM 6598/02-09-20 Approved
concreting for LVUP (MCW)

Median wall 4th lift reinforcement , shuttring checking & concreting for
9 PE/GPL/P-2/STR/09/20/6693 08/09/20 LVUP 70542 09/09/20 10:00 AM 6472/27-08-20 Approved
LVUP(MCW)

10 PE/GPL/P-2/STR/09/20/6694 08/09/20 MJB P1 to P2 Girder No.15 checking of grouting for Major Bridge (MCW) 71367 LHS 09/09/20 3:00 PM Not Approved

11 PE/GPL/P-2/STR/09/20/6695 08/09/20 MJB P1 to P2 Girder No.16 checking of grouting for Major Bridge (MCW) 71367 LHS 09/09/20 4:00 PM Not Approved

12 PE/GPL/P-2/STR/09/20/6696 08/09/20 MJB P1 to P2 Girder No.17 checking of grouting for Major Bridge (MCW) 71367 LHS 09/09/20 5:00 PM Not Approved

P1 to P2 girder No. 25 shuttring checking & concreting for MJB


13 PE/GPL/P-2/STR/09/20/6697 08/09/20 MJB 71367 RHS 09/09/20 3:00 PM Approved
(MCW)

14 PE/GPL/P-2/STR/09/20/6698 08/09/20 MJB A1 to P1 Girder No. 7 checking of stressing for Major Bridge (MCW) 71367 LHS 09/09/20 2:00 PM Approved

P2 to P3 girder No. 38 profiling & reinforcement checking for MJB


15 PE/GPL/P-2/STR/09/20/6699 08/09/20 MJB 71367 RHS 09/09/20 3:30 PM Not Approved
(MCW)

A1 side working pile No.21 final depth , reinforcement checking cage


16 PE/GPL/P-2/STR/09/20/6700 08/09/20 MNB 77963 LHS 09/09/20 3:30 PM Not Approved
lowering with concreting for MNB (MCW)

Lko side wall 3rd lift reinforcement , shuttring checking & concreting
17 PE/GPL/P-2/STR/09/20/6701 08/09/20 LVUP 79700 RHS 09/09/20 10:30 AM 6650/06-09-20 Not Approved
for LVUP(MCW)

Structures : (Service Road)

1 PE/GPL/P-2/STR-SR/09/20/0064 08/09/20 MNB Layout checking of excavation with laying pcc for MNB (SR) 54168 LHS 09/09/20 10:00 AM Approved

2 PE/GPL/P-2/STR-SR/09/20/0065 08/09/20 MNB Raft reinforcement , shuttring checking & concreting for MNB (SR) 61284 RHS 09/09/20 9:00 AM Approved

Page 25 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 7-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 8-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/25000 07/09/20 EmB FDD of Embankment (MCW) 25 42300 42400 100 BHS 08/09/20 3:00 PM 22669/15-06-20 Not Approved

2 PE/GPL/P-2/HW/09/20/25001 07/09/20 EmB FDD of Embankment (MCW) 5 43350 43480 130 BHS 08/09/20 3:30 PM 24980/07-09-20 Not Approved

3 PE/GPL/P-2/HW/09/20/25002 07/09/20 Mountable Kerb Laying of Mountable Kerb (MCW) 43800 44020 220 LHS 08/09/20 11:30 AM 24848/31-08-20 Approved

4 PE/GPL/P-2/HW/09/20/25003 07/09/20 L Kerb Laying of Kerb Casting (MCW) 43800 44020 220 LHS 08/09/20 10:00 AM 24848/31-08-20 Approved

5 PE/GPL/P-2/HW/09/20/25004 07/09/20 EmB FDD of Embankment (MCW) Top-1 46170 46200 30 BHS 08/09/20 9:30 AM 24982/07-09-20 Approved

6 PE/GPL/P-2/HW/09/20/25005 07/09/20 EmB FDD & Level Checking On Embankment Top Layer (MCW) Top 46170 46200 30 BHS 08/09/20 2:40 PM 25004/08-09-20 Approved

7 PE/GPL/P-2/HW/09/20/25006 07/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 23 46221 BHS 08/09/20 10:00 AM 24984/07-09-20 Approved

8 PE/GPL/P-2/HW/09/20/25007 07/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 24 46221 BHS 08/09/20 4:00 PM 25006/0-09-20 Approved

Layout & Level Checking,Excavation & Laying Of Pcc For Chute


9 PE/GPL/P-2/HW/09/20/25008 07/09/20 Chute Drain Pcc 52040 52220 180 LHS 08/09/20 11:00 AM Approved
Drain

10 PE/GPL/P-2/HW/09/20/25009 07/09/20 EmB FDD of Embankment (MCW) 18 55320 55450 130 LHS 08/09/20 4:00 PM 24986/07-09-20 Not Approved

11 PE/GPL/P-2/HW/09/20/25010 07/09/20 EmB FDD of Embankment (MCW) 20 55320 55400 80 RHS 08/09/20 5:00 PM 13129/25-11-19 Approved

12 PE/GPL/P-2/HW/09/20/25011 07/09/20 SG FDD of Subgrade (MCW) Top-1 55450 55500 50 BHS 08/09/20 2:40 PM 20859/30-04-20 Not Approved

13 PE/GPL/P-2/HW/09/20/25012 07/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 57210 57250 40 Median 08/09/20 3:00 PM 24989/07-09-20 Not Approved

22554/12-06-20
14 PE/GPL/P-2/HW/09/20/25013 07/09/20 SG FDD of Subgrade (MCW) Top-1 59800 59900 100 BHS 08/09/20 3:30 PM Not Approved
20832/30-04-20

15 PE/GPL/P-2/HW/09/20/25014 07/09/20 Shoulder FDD of Earthen shoulder 1 63630 63740 110 LHS 08/09/20 11:00 AM 23351/18-07-20 Approved

16 PE/GPL/P-2/HW/09/20/25015 07/09/20 Median Median filling 1 63630 63740 110 Median 08/09/20 2:00 PM 23305/17-07-20 Approved

17 PE/GPL/P-2/HW/09/20/25016 07/09/20 Shoulder FDD of Earthen shoulder 1 63630 63740 110 RHS 08/09/20 12:00 PM 23352/18-07-20 Approved

18 PE/GPL/P-2/HW/09/20/25017 07/09/20 Chute Drain Checking & Concreting of Wall for Chute Drain Wall 70220 70480 260 LHS 08/09/20 11:30 AM 24781/29-08-20 Approved

19 PE/GPL/P-2/HW/09/20/25018 07/09/20 EmB FDD of Embankment (MCW) 25 71100 71220 120 LHS 08/09/20 11:30 AM 24992/07-09-20 Approved

20 PE/GPL/P-2/HW/09/20/25019 07/09/20 Shoulder FDD of Earthen shoulder 1 71500 71760 260 RHS 08/09/20 2:00 PM 22762/19-06-20 Not Approved

21 PE/GPL/P-2/HW/09/20/25020 07/09/20 Shoulder FDD of Earthen shoulder 1 71500 71760 260 LHS 08/09/20 11:30 AM 22762/19-06-20 Not Approved

22 PE/GPL/P-2/HW/09/20/25021 07/09/20 Median Median filling Top 71500 71600 100 Median 08/09/20 11:00 AM 24959/05-09-20 Not Approved

23 PE/GPL/P-2/HW/09/20/25022 07/09/20 Shoulder FDD of Earthen shoulder 2 72240 72360 120 LHS 08/09/20 12:30 PM 24975/06-09-20 Not Approved

24 PE/GPL/P-2/HW/09/20/25023 07/09/20 Shoulder FDD of Earthen shoulder 2 72240 72360 120 RHS 08/09/20 11:30 AM 24976/06-09-20 Not Approved

19186/26-02-20
25 PE/GPL/P-2/HW/09/20/25024 07/09/20 DBM-Surface Surface irregularities of DBM Top 74830 74850 20 BHS 08/09/20 12:00 PM Not Approved
19277/27-02-20

Page 26 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type

26 PE/GPL/P-2/HW/09/20/25025 07/09/20 EmB FDD of Embankment (MCW) 24 77760 77780 20 BHS 08/09/20 4:30 PM 24999/07-09-20 Approved

Highway : (Service Road)


1 PE/GPL/P-2/SR/09/20/1845 07/09/20 EmB FDD of Embankment (SR) 4 74900 75000 100 LHS 08/09/20 12:00 PM 1788/17-08-20 Approved

2 PE/GPL/P-2/SR/09/20/1846 07/09/20 EmB FDD of Embankment (SR) 4 75200 75350 150 LHS 08/09/20 3:00 PM 1757/04-08-20 Not Approved

3 PE/GPL/P-2/SR/09/20/1847 07/09/20 EmB FDD of Embankment (SR) 1 75700 75800 100 LHS 08/09/20 11:00 AM 1750/22-07-20 Approved

4 PE/GPL/P-2/SR/09/20/1848 07/09/20 EmB FDD of Embankment (SR) 13 76900 77000 100 LHS 08/09/20 3:00 PM 1838/06-09-20 Not Approved

5 PE/GPL/P-2/SR/09/20/1849 07/09/20 EmB FDD of Embankment (SR) 4 77200 77300 100 RHS 08/09/20 3:30 PM 1828/03-09-20 Not Approved

6 PE/GPL/P-2/SR/09/20/1850 07/09/20 EmB FDD of Embankment (SR) 4 77300 77400 100 RHS 08/09/20 3:30 PM 1829/03-09-20 Not Approved

Lab :
1 PE/GPL/P-2/Lab/09/20/897 07/09/20 BA Sampling Sampling of Borrow Area-318 41500 LHS 08/09/20 11:00 AM Approved

2 PE/GPL/P-2/Lab/09/20/898 07/09/20 BA Sampling Sampling of Borrow Area-317 66500 LHS 08/09/20 10:00 AM Approved

3 PE/GPL/P-2/Lab/09/20/899 07/09/20 Core Test Core cutting of DBM (MCW) 68980 69250 270 LHS 08/09/20 11:30 AM 24779/29-08-20 Approved

Structures : (MCW)
Gzp side retaining wall layout checking of excavation with laying pcc
1 PE/GPL/P-2/STR/09/20/6676 07/09/20 Retaining wall 42157 LHS 08/09/20 11:00 AM Approved
for MNB (MCW)

Lko side retaining wall 2nd lift reinforcement , shuttring checking &
2 PE/GPL/P-2/STR/09/20/6677 07/09/20 Retaining wall 42437 LHS 08/09/20 10:00 AM Approved
concreting for PUP (MCW)

Gzp side retaining wall layout checking of excavation with laying pcc
3 PE/GPL/P-2/STR/09/20/6678 07/09/20 Retaining wall 59030 RHS 08/09/20 11:30 AM Approved
for MNB (MCW)

P1 to P2 girder No. 25 shuttring checking & concreting for MJB


4 PE/GPL/P-2/STR/09/20/6679 07/09/20 MJB 71367 RHS 08/09/20 3:00 PM Not Approved
(MCW)

5 PE/GPL/P-2/STR/09/20/6680 07/09/20 MJB A1 to P1 Girder No. 7 checking of stressing for Major Bridge (MCW) 71367 LHS 08/09/20 2:00 PM Not Approved

6 PE/GPL/P-2/STR/09/20/6681 07/09/20 MJB P1 to P2 Girder No.15 checking of grouting for Major Bridge (MCW) 71367 LHS 08/09/20 3:00 PM Not Approved

7 PE/GPL/P-2/STR/09/20/6682 07/09/20 MJB P1 to P2 Girder No.16 checking of grouting for Major Bridge (MCW) 71367 LHS 08/09/20 4:00 PM Not Approved

8 PE/GPL/P-2/STR/09/20/6683 07/09/20 MJB P1 to P2 Girder No.17 checking of grouting for Major Bridge (MCW) 71367 LHS 08/09/20 5:00 PM Not Approved

A1 side working pile No.21 final depth , reinforcement checking cage


9 PE/GPL/P-2/STR/09/20/6684 07/09/20 MNB 77963 LHS 08/09/20 3:30 PM In Progress
lowering with concreting for MNB (MCW)

Structures : (Service Road)

1 PE/GPL/P-2/STR-SR/09/20/0061 07/09/20 Box Culvert Layout checking of excavation with laying pcc for Box Culvert (SR) 41610 LHS 08/09/20 10:00 AM Approved

2 PE/GPL/P-2/STR-SR/09/20/0062 07/09/20 MNB Raft reinforcement , shuttring checking & concreting for MNB (SR) 61284 RHS 08/09/20 9:00 AM Not Approved

3 PE/GPL/P-2/STR-SR/09/20/0063 07/09/20 Box Culvert Layout checking of excavation with laying pcc for Box Culvert (SR) 72320 LHS 08/09/20 11:00 AM Not Approved

Page 27 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 6-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 7-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/24979 06/09/20 EmB FDD of Embankment (MCW) 25 42300 42400 100 BHS 07/09/20 3:00 PM 22669/15-06-20 Not Approved

2 PE/GPL/P-2/HW/09/20/24980 06/09/20 EmB FDD of Embankment (MCW) 4 43350 43480 130 RHS 07/09/20 3:30 PM 21110/09-05-20 Approved

3 PE/GPL/P-2/HW/09/20/24981 06/09/20 EmB FDD of Embankment (MCW) 25 46170 46200 30 BHS 07/09/20 9:30 AM 24967/06-09-20 Approved

4 PE/GPL/P-2/HW/09/20/24982 06/09/20 EmB FDD of Embankment (MCW) 26 46170 46200 30 BHS 07/09/20 2:40 PM 24981/07-09-20 Approved

5 PE/GPL/P-2/HW/09/20/24983 06/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) `21 46221 BHS 07/09/20 10:00 AM 24970/06-09-20 Approved

6 PE/GPL/P-2/HW/09/20/24984 06/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 22 46221 BHS 07/09/20 4:00 PM 24983/07-09-20 Approved

Layout & Level Checking,Excavation & Laying Of Pcc For Chute


7 PE/GPL/P-2/HW/09/20/24985 06/09/20 Chute Drain Pcc 52040 52220 180 LHS 07/09/20 11:00 AM Not Approved
Drain

8 PE/GPL/P-2/HW/09/20/24986 06/09/20 EmB FDD of Embankment (MCW) 17 55320 55450 130 LHS 07/09/20 4:00 PM 16305/28-11-19 Approved

9 PE/GPL/P-2/HW/09/20/24987 06/09/20 EmB FDD of Embankment (MCW) 20 55320 55450 130 RHS 07/09/20 5:00 PM 13129/25-11-19 Not Approved

24618/26-08-20
10 PE/GPL/P-2/HW/09/20/24988 06/09/20 SG FDD of Subgrade (MCW) Top-1 56820 57000 180 BHS 07/09/20 2:40 PM Approved
24670/27-08-20
24895/01-09-20
11 PE/GPL/P-2/HW/09/20/24989 06/09/20 Median Drain Checking & Concreting of raft for Median Drain Raft 57210 57250 40 Median 07/09/20 3:00 PM Approved
24971/06-09-20
22554/12-06-20
12 PE/GPL/P-2/HW/09/20/24990 06/09/20 SG FDD of Subgrade (MCW) Top-1 59800 59900 100 LHS 07/09/20 3:30 PM Not Approved
20832/30-04-20
22554/12-06-20
13 PE/GPL/P-2/HW/09/20/24991 06/09/20 SG FDD of Subgrade (MCW) Top-1 59800 59900 100 RHS 07/09/20 5:30 PM Not Approved
20832/30-04-20

14 PE/GPL/P-2/HW/09/20/24992 06/09/20 EmB FDD of Embankment (MCW) 24 71100 71220 120 LHS 07/09/20 11:30 AM 24584/25-08-20 Approved

15 PE/GPL/P-2/HW/09/20/24993 06/09/20 Shoulder FDD of Earthen shoulder 1 71500 71760 260 RHS 07/09/20 2:00 PM 22762/19-06-20 Not Approved

16 PE/GPL/P-2/HW/09/20/24994 06/09/20 Shoulder FDD of Earthen shoulder 1 71500 71760 260 LHS 07/09/20 11:30 AM 22762/19-06-20 Not Approved

17 PE/GPL/P-2/HW/09/20/24995 06/09/20 Median Median filling Top 71500 71600 100 Median 07/09/20 11:00 AM 24959/05-09-20 Not Approved

18 PE/GPL/P-2/HW/09/20/24996 06/09/20 Shoulder FDD of Earthen shoulder 2 72240 72360 120 LHS 07/09/20 12:30 PM 24975/06-09-20 Not Approved

19 PE/GPL/P-2/HW/09/20/24997 06/09/20 Shoulder FDD of Earthen shoulder 2 72240 72360 120 RHS 07/09/20 11:30 AM 24976/06-09-20 Not Approved

20 PE/GPL/P-2/HW/09/20/24998 06/09/20 EmB FDD of Embankment (MCW) 14 74830 74850 20 BHS 07/09/20 12:00 PM 24977/06-09-20 Approved

21 PE/GPL/P-2/HW/09/20/24999 06/09/20 EmB FDD of Embankment (MCW) 23 77760 77780 20 BHS 07/09/20 4:30 PM 24978/06-09-20 Approved

Highway : (Service Road)


1 PE/GPL/P-2/SR/09/20/1842 06/09/20 EmB FDD of Embankment (SR) 13 76900 77000 100 LHS 07/09/20 3:00 PM 1838/06-09-20 Not Approved

2 PE/GPL/P-2/SR/09/20/1843 06/09/20 EmB FDD of Embankment (SR) 4 77200 77300 100 RHS 07/09/20 3:30 PM 1828/03-09-20 Not Approved

3 PE/GPL/P-2/SR/09/20/1844 06/09/20 EmB FDD of Embankment (SR) 4 77300 77400 100 RHS 07/09/20 3:30 PM 1829/03-09-20 Not Approved

Lab :
1 PE/GPL/P-2/Lab/09/20/894 06/09/20 Core Test Core cutting of DBM (MCW) 69950 70000 50 RHS 07/09/20 10:00 AM 16321/12-01-20 Approved

2 PE/GPL/P-2/Lab/09/20/895 06/09/20 Core Test Core cutting of DBM (MCW) 70970 71080 110 LHS 07/09/20 11:00 AM 24873/31-08-20 Approved

3 PE/GPL/P-2/Lab/09/20/896 06/09/20 Core Test Core cutting of DBM (MCW) 70970 71080 110 RHS 07/09/20 11:30 AM 24871/31-08-20 Approved
Page 28 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type

Page 29 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Structures : (MCW)
Lko side retaining wall 2nd lift reinforcement , shuttring checking &
1 PE/GPL/P-2/STR/09/20/6651 06/09/20 Retaining wall 42157 LHS 07/09/20 9:00 AM 6552/31-08-20 Approved
concreting for MNB (MCW)

Gzp side retaining wall layout checking of excavation with laying pcc
2 PE/GPL/P-2/STR/09/20/6652 06/09/20 Retaining wall 42157 LHS 07/09/20 11:00 AM Not Approved
for MNB (MCW)

Lko side retaining wall 3rd lift reinforcement , shuttring checking &
3 PE/GPL/P-2/STR/09/20/6653 06/09/20 Retaining wall 42437 RHS 07/09/20 10:00 AM 6457/27-08-20 Not Approved
concreting for PUP (MCW)

Gzp side wall 1st lift reinforcement , shuttring checking & concreting
4 PE/GPL/P-2/STR/09/20/6654 06/09/20 MNB 50916 LHS 07/09/20 10:30 AM 6105/28-07-20 Approved
for MNB (MCW)

Middle wall haunch reinforcement , shuttring checking & concreting


5 PE/GPL/P-2/STR/09/20/6655 06/09/20 MNB 50916 LHS 07/09/20 11:30 AM 6020/19-07-20 Approved
for MNB (MCW)

Lko side haunch reinforcement , shuttring checking & concreting for


6 PE/GPL/P-2/STR/09/20/6656 06/09/20 MNB 52920 LHS 07/09/20 12:30 PM 6540/30-08-20 Not Approved
MNB (MCW)

Gzp side haunch reinforcement , shuttring checking & concreting for


7 PE/GPL/P-2/STR/09/20/6657 06/09/20 MNB 52920 LHS 07/09/20 2:00 PM 6540/30-08-20 Not Approved
MNB (MCW)

Lko side retaining wall raft reinforcement . shutring checkng &


8 PE/GPL/P-2/STR/09/20/6658 06/09/20 Retaining wall 70542 RHS 07/09/20 3:00 PM 6599/02-09-20 Not Approved
concreting for LVUP (MCW)

Lko side retaining wall 2nd lift reinforcement . shutring checkng &
9 PE/GPL/P-2/STR/09/20/6659 06/09/20 Retaining wall 70542 LHS 07/09/20 4:00 PM 6598/02-09-20 Not Approved
concreting for LVUP (MCW)

P1 to P2 girder No. 25 Profiling & reinforcement checking for MJB


10 PE/GPL/P-2/STR/09/20/6660 06/09/20 MJB 71367 RHS 07/09/20 3:00 PM Approved
(MCW)

P2 to P5 girder No. 37 Shuttering checking & Concreting for Major


11 PE/GPL/P-2/STR/09/20/6661 06/09/20 MJB 71367 RHS 07/09/20 10:00 AM Approved
Bridge (MCW)

12 PE/GPL/P-2/STR/09/20/6662 06/09/20 MJB A1 to P1 Girder No. 5 checking of stressing for Major Bridge (MCW) 71367 LHS 07/09/20 11:30 AM Approved

13 PE/GPL/P-2/STR/09/20/6663 06/09/20 MJB A1 to P1 Girder No. 6 checking of stressing for Major Bridge (MCW) 71367 LHS 07/09/20 12:30 PM Approved

14 PE/GPL/P-2/STR/09/20/6664 06/09/20 MJB A1 to P1 Girder No. 7 checking of stressing for Major Bridge (MCW) 71367 LHS 07/09/20 2:00 PM Not Approved

Gzp side Retaining wall 1st lift reinforcement , shuttring checking &
15 PE/GPL/P-2/STR/09/20/6665 06/09/20 Retaining wall 72836 RHS 07/09/20 9:00 AM 5539/24-05-20 Approved
concreting for PUP (MCW)

Gzp side Retaining wall 3rd lift reinforcement , shuttring checking &
16 PE/GPL/P-2/STR/09/20/6666 06/09/20 Retaining wall 72836 LHS 07/09/20 9:30 AM 6481/27-08-20 Approved
concreting for PUP (MCW)

Lko side Retaining wall 2nd lift reinforcement , shuttring checking &
17 PE/GPL/P-2/STR/09/20/6667 06/09/20 Retaining wall 73595 RHS 07/09/20 11:00 AM 6527/29-08-20 Approved
concreting for LVUP (MCW)

Both side Median wall final lift reinforcement , shuttring checking &
18 PE/GPL/P-2/STR/09/20/6668 06/09/20 LVUP 73595 07/09/20 12:00 PM 5738/16-06-20 Approved
concreting for LVUP (MCW)

Gzp side Retaining wall final lift reinforcement , shuttring checking &
19 PE/GPL/P-2/STR/09/20/6669 06/09/20 Retaining wall 73595 RHS 07/09/20 10:00 AM 4103/14-01-20 Not Approved
concreting for LVUP (MCW)

Lko side Retaining wall final lift reinforcement , shuttring checking &
20 PE/GPL/P-2/STR/09/20/6670 06/09/20 Retaining wall 74148 LHS 07/09/20 1:00 PM 6231/08-08-20 Approved
concreting for PUP (MCW)

Both side Median wall 2nd lift reinforcement , shuttring checking &
21 PE/GPL/P-2/STR/09/20/6671 06/09/20 LVUP 74148 07/09/20 2:00 PM 6232/08-08-20 Approved
concreting for PUP (MCW)

22 PE/GPL/P-2/STR/09/20/6672 06/09/20 MNB A2 side pile intigrity test checking for MNB (MCW) 77963 LHS 07/09/20 4:00 PM Approved

A2 side reaction pile final depth , reinforcement checking cage


23 PE/GPL/P-2/STR/09/20/6673 06/09/20 MNB 77963 RHS 07/09/20 3:00 PM Approved
lowering with concreting for MNB (MCW)

A1 side working pile No.21 final depth , reinforcement checking cage


24 PE/GPL/P-2/STR/09/20/6674 06/09/20 MNB 77963 LHS 07/09/20 3:30 PM In Progress
lowering with concreting for MNB (MCW)

Lko side Retaining wall 2nd lift reinforcement , shuttring checking &
25 PE/GPL/P-2/STR/09/20/6675 06/09/20 Retaining wall 78667 LHS 07/09/20 4:30 PM Approved
concreting for PUP (MCW)

Structures : (Service Road)

1 PE/GPL/P-2/STR-SR/09/20/0059 06/09/20 MNB Raft reinforcement , shuttring checking & concreting for MNB (SR) 61284 RHS 07/09/20 9:00 AM Not Approved

Page 30 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type

2 PE/GPL/P-2/STR-SR/09/20/0060 06/09/20 Box Culvert Layout checking of excavation with laying pcc for Box Culvert (SR) 64239 LHS 07/09/20 10:00 AM Approved

Page 31 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 5-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 6-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)

1 PE/GPL/P-2/HW/09/20/24965 05/09/20 EmB FDD of Embankment (MCW) 25 42300 42400 100 BHS 06/09/20 3:00 PM 22669/15-06-20 Not Approved

2 PE/GPL/P-2/HW/09/20/24966 05/09/20 EmB FDD of Embankment (MCW) 17 43500 43650 150 BHS 06/09/20 2:40 PM 24197/16-08-20 Approved

3 PE/GPL/P-2/HW/09/20/24967 05/09/20 EmB FDD of Embankment (MCW) 24 46170 46200 30 BHS 06/09/20 9:30 AM 24935/04-09-20 Approved

4 PE/GPL/P-2/HW/09/20/24968 05/09/20 EmB FDD of Embankment (MCW) 25 46170 46200 30 BHS 06/09/20 2:40 PM 24967/06-09-20 Not Approved

5 PE/GPL/P-2/HW/09/20/24969 05/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 19 46221 BHS 06/09/20 10:00 AM 24955/05-09-20 Approved

6 PE/GPL/P-2/HW/09/20/24970 05/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 20 46221 BHS 06/09/20 4:00 PM 24969/06-09-20 Approved

7 PE/GPL/P-2/HW/09/20/24971 05/09/20 Median Drain Excavation & Level Checking and laying of PCC in median drain Pcc 57220 57260 40 Median 06/09/20 3:00 PM Approved

8 PE/GPL/P-2/HW/09/20/24972 05/09/20 L Kerb Laying of Kerb Casting (MCW) 69280 69350 70 RHS 06/09/20 3:00 PM 24865/31-08-20 Approved

9 PE/GPL/P-2/HW/09/20/24973 05/09/20 Mountable Kerb Laying of Mountable Kerb (MCW) 69250 69350 100 LHS 06/09/20 11:00 AM 24865/31-08-20 Approved

10 PE/GPL/P-2/HW/09/20/24974 05/09/20 Shoulder FDD of Earthen shoulder 1 71500 71760 260 RHS 06/09/20 2:00 PM 22762/19-06-20 Not Approved

11 PE/GPL/P-2/HW/09/20/24975 05/09/20 Shoulder FDD of Earthen shoulder 1 72240 72360 120 LHS 06/09/20 12:30 PM 22441/10-06-20 Approved

12 PE/GPL/P-2/HW/09/20/24976 05/09/20 Shoulder FDD of Earthen shoulder 1 72240 72360 120 RHS 06/09/20 11:30 AM 22441/10-06-20 Approved

13 PE/GPL/P-2/HW/09/20/24977 05/09/20 EmB FDD of Embankment (MCW) 13 74830 74850 20 BHS 06/09/20 12:00 PM 24962/05-09-20 Approved

14 PE/GPL/P-2/HW/09/20/24978 05/09/20 EmB FDD of Embankment (MCW) 22 77760 77780 20 BHS 06/09/20 4:30 PM 24963/05-09-20 Approved

Highway : (Service Road)

1 PE/GPL/P-2/SR/09/20/1838 05/09/20 EmB FDD of Embankment (SR) 12 76900 77000 100 LHS 06/09/20 3:00 PM 1816/01-09-20 Approved

2 PE/GPL/P-2/SR/09/20/1839 05/09/20 EmB FDD of Embankment (SR) 4 77200 77300 100 RHS 06/09/20 3:30 PM 1828/03-09-20 Not Approved

3 PE/GPL/P-2/SR/09/20/1840 05/09/20 EmB FDD of Embankment (SR) 4 77300 77400 100 RHS 06/09/20 3:30 PM 1829/03-09-20 Not Approved

4 PE/GPL/P-2/SR/09/20/1841 05/09/20 EmB FDD of Embankment (SR) 5 77400 77500 100 RHS 06/09/20 2:40 PM 1833/04-09-20 Approved

Page 32 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Structures : (MCW)
Lko side retaining wall 2nd lift reinforcement , shuttring checking &
1 PE/GPL/P-2/STR/09/20/6636 05/09/20 Retaining wall 42157 LHS 06/09/20 9:00 AM 6552/31-08-20 Approved
concreting for MNB (MCW)

Lko side retaining wall 2nd lift reinforcement , shuttring checking &
2 PE/GPL/P-2/STR/09/20/6637 05/09/20 Retaining wall 42437 LHS 06/09/20 10:00 AM 6553/31-08-20 Not Approved
concreting for PUP (MCW)

Lko side retaining wall 3rd lift reinforcement , shuttring checking &
3 PE/GPL/P-2/STR/09/20/6638 05/09/20 Retaining wall 42437 RHS 06/09/20 10:00 AM 6457/27-08-20 Not Approved
concreting for PUP (MCW)

Gzp side retaining wall 3rd lift reinforcement , shuttring checking &
4 PE/GPL/P-2/STR/09/20/6639 05/09/20 Retaining wall 48958 RHS 06/09/20 12:00 PM 6462/27-08-20 Approved
concreting for LVUP(MCW)

Gzp side retaining wall 3rd lift reinforcement , shuttring checking &
5 PE/GPL/P-2/STR/09/20/6640 05/09/20 Retaining wall 48958 LHS 06/09/20 12:00 PM 6463/27-08-20 Approved
concreting for LVUP (MCW)

Gzp side retaining wall 3rd lift reinforcement , shuttring checking &
6 PE/GPL/P-2/STR/09/20/6641 05/09/20 Retaining wall 51867 RHS 06/09/20 2:00 PM 4438/06-02-20 Approved
concreting for LVUP (MCW)

Lko side retaining wall 3rd lift reinforcement , shuttring checking &
7 PE/GPL/P-2/STR/09/20/6642 05/09/20 Retaining wall 51867 RHS 06/09/20 2:30 PM 4437-06-02-20 Approved
concreting for LVUP (MCW)

Both side Median wall 3rd lift reinforcement , shuttring checking &
8 PE/GPL/P-2/STR/09/20/6643 05/09/20 MNB 51867 BHS 06/09/20 3:00 PM 6559/31-08-20 Approved
concreting for LVUP (MCW)

Lko side retaining wall 2nd lift reinforcement , shuttring checking &
9 PE/GPL/P-2/STR/09/20/6644 05/09/20 Retaining wall 61200 LHS 06/09/20 10:00 AM 5825/27-06-20 Approved
concreting for MNB (MCW)

10 PE/GPL/P-2/STR/09/20/6645 05/09/20 MJB P5 to P4 girder no. 57 checking for Grouting for MJB (MCW) 71367 RHS 06/09/20 1:00 PM Approved

11 PE/GPL/P-2/STR/09/20/6646 05/09/20 MJB P5 to P4 girder no.58 checking for Grouting for MJB (MCW) 71367 RHS 06/09/20 2:00 PM Approved

12 PE/GPL/P-2/STR/09/20/6647 05/09/20 MJB P5 to P4 girder no. 59 checking for Grouting for MJB (MCW) 71367 RHS 06/09/20 3:00 PM Approved

P1 to P2 girder No. 24 Shuttering checking & Concreting for Major


13 PE/GPL/P-2/STR/09/20/6648 05/09/20 MJB 71367 RHS 06/09/20 10:00 AM Approved
Bridge (MCW)

A1 side working pile no.17 final depth , reinforcement checking cage


14 PE/GPL/P-2/STR/09/20/6649 05/09/20 MNB 77963 LHS 06/09/20 3:00 PM Approved
lowering with concreting for MNB (MCW)

Lko side wall 2nd lift reinforcement , shuttring checking & concreting
15 PE/GPL/P-2/STR/09/20/6650 05/09/20 LVUP 79700 RHS 06/09/20 4:00 PM 6610/02-09-20 Approved
for LVUP (MCW)

Structures : (Service Road)

1 PE/GPL/P-2/STR-SR/09/20/0058 05/09/20 MNB Raft reinforcement , shuttring checking & concreting for MNB (SR) 61284 RHS 06/09/20 9:00 AM Not Approved

Page 33 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 4-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 5-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/24950 04/09/20 EmB FDD of Embankment (MCW) 25 42300 42400 100 BHS 05/09/20 3:00 PM 22669/15-06-20 Not Approved

2 PE/GPL/P-2/HW/09/20/24951 04/09/20 EmB FDD of Embankment (MCW) 17 43500 43650 150 BHS 05/09/20 2:40 PM 24197/16-08-20 Not Approved

3 PE/GPL/P-2/HW/09/20/24952 04/09/20 EmB FDD of Embankment (MCW) 24 46170 46200 30 BHS 05/09/20 9:30 AM 24935/04-09-20 Not Approved

4 PE/GPL/P-2/HW/09/20/24953 04/09/20 EmB FDD of Embankment (MCW) 25 46170 46200 30 BHS 05/09/20 2:40 PM 24952/05-09-20 Not Approved

5 PE/GPL/P-2/HW/09/20/24954 04/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 17 46221 BHS 05/09/20 10:00 AM 24937/04-09-20 Approved

6 PE/GPL/P-2/HW/09/20/24955 04/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 18 46221 BHS 05/09/20 4:00 PM 24954/05-09-20 Approved

7 PE/GPL/P-2/HW/09/20/24956 04/09/20 Back filling FDD Checking of Back Filling for Box Culvert A1(Lko) & A2(Gzp) 12 53900 BHS 05/09/20 10:30 AM 24857/31-08-20 Approved

8 PE/GPL/P-2/HW/09/20/24957 04/09/20 Side Slope Checking Of Side Slope (MCW) 70000 70100 100 RHS 05/09/20 12:30 PM 21979/30-05-20 Approved

9 PE/GPL/P-2/HW/09/20/24958 04/09/20 EmB FDD of Embankment (MCW) 24 71100 71220 120 LHS 05/09/20 11:30 AM 24584/25-08-20 Not Approved

22763/19-06-20
10 PE/GPL/P-2/HW/09/20/24959 04/09/20 Median Median filling 1 71500 71600 100 Median 05/09/20 2:00 PM Approved
22778/20-06-20

11 PE/GPL/P-2/HW/09/20/24960 04/09/20 Median Median filling Top 71600 71760 160 Median 05/09/20 2:00 PM 24916/02-09-20 Approved

12 PE/GPL/P-2/HW/09/20/24961 04/09/20 Median Median filling Top 72240 72350 110 Median 05/09/20 12:00 PM 24391/20-08-20 Approved

13 PE/GPL/P-2/HW/09/20/24962 04/09/20 EmB FDD of Embankment (MCW) 12 74830 74850 20 BHS 05/09/20 12:00 PM 24945/04-09-20 Approved

14 PE/GPL/P-2/HW/09/20/24963 04/09/20 EmB FDD of Embankment (MCW) 21 77760 77780 20 BHS 05/09/20 4:30 PM 24946/04-09-20 Approved

15 PE/GPL/P-2/HW/09/20/24964 04/09/20 Shoulder FDD of Earthen shoulder Top 78250 78580 330 RHS 05/09/20 11:00 AM 24883/31-08-20 Approved

Highway : (Service Road)

1 PE/GPL/P-2/SR/09/20/1834 04/09/20 EmB FDD of Embankment (SR) 12 76900 77000 100 LHS 05/09/20 3:00 PM 1816/01-09-20 Not Approved

2 PE/GPL/P-2/SR/09/20/1835 04/09/20 EmB FDD of Embankment (SR) 4 77200 77300 100 RHS 05/09/20 3:30 PM 1828/03-09-20 Not Approved

3 PE/GPL/P-2/SR/09/20/1836 04/09/20 EmB FDD of Embankment (SR) 4 77300 77400 100 RHS 05/09/20 3:30 PM 1829/03-09-20 Not Approved

4 PE/GPL/P-2/SR/09/20/1837 04/09/20 EmB FDD of Embankment (SR) 5 77400 77500 100 RHS 05/09/20 2:40 PM 1833/04-09-20 Not Approved

Lab :
1 PE/GPL/P-2/Lab/09/20/891 04/09/20 Core Test Core cutting of DBM (MCW) 68170 68250 80 RHS 05/09/20 10:00 AM 24828/30-08-20 Approved

2 PE/GPL/P-2/Lab/09/20/892 04/09/20 Core Test Core cutting of DBM (MCW) 68180 68250 70 LHS 05/09/20 12:00 AM 24830/30-08-20 Approved

3 PE/GPL/P-2/Lab/09/20/893 04/09/20 BA Sampling Sampling of Borrow Area-316 79600 LHS 05/09/20 11:00 AM Approved

Page 34 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Structures : (MCW)

1 PE/GPL/P-2/STR/09/20/6626 04/09/20 MJB P5 to P4 girder no. 65 checking for Grouting for MJB (MCW) 71367 RHS 05/09/20 12:00 PM Approved

2 PE/GPL/P-2/STR/09/20/6627 04/09/20 MJB P5 to P4 girder no. 64 checking for Grouting for MJB (MCW) 71367 RHS 05/09/20 1:00 PM Approved

3 PE/GPL/P-2/STR/09/20/6628 04/09/20 MJB P5 to P4 girder no. 60 checking for Grouting for MJB (MCW) 71367 RHS 05/09/20 2:00 PM Approved

4 PE/GPL/P-2/STR/09/20/6629 04/09/20 MJB P5 to P4 girder no. 61 checking for Grouting for MJB (MCW) 71367 RHS 05/09/20 3:00 PM Approved

5 PE/GPL/P-2/STR/09/20/6630 04/09/20 MJB P5 to P4 girder no. 62 checking for Grouting for MJB (MCW) 71367 RHS 05/09/20 4:00 PM Approved

P1 to P2 girder No. 24 profiling & reinforcement checking for Major


6 PE/GPL/P-2/STR/09/20/6631 04/09/20 MJB 71367 RHS 05/09/20 10:00 AM Approved
Bridge (MCW)

P2 to P3 girder No. 37 profiling & reinforcement checking for Major


7 PE/GPL/P-2/STR/09/20/6632 04/09/20 MJB 71367 RHS 05/09/20 11:00 AM Approved
Bridge (MCW)

8 PE/GPL/P-2/STR/09/20/6633 04/09/20 MJB A1 to P1 Girder no.3 checking of stressing for Major Bridge (MCW) 71367 LHS 05/09/20 12:00 PM Approved

9 PE/GPL/P-2/STR/09/20/6634 04/09/20 MJB A1 to P1 Girder no.4 checking of stressing for Major Bridge (MCW) 71367 LHS 05/09/20 10:00 AM Approved

10 PE/GPL/P-2/STR/09/20/6635 04/09/20 MNB A1 to A2 girder no. 5 shuttring checking & concreting for MNB (MCW) 77963 LHS 05/09/20 11:00 AM Approved

Structures : (Service Road)

1 PE/GPL/P-2/STR-SR/09/20/0057 04/09/20 MNB Raft reinforcement , shuttring checking & concreting for MNB (SR) 68815 LHS 05/09/20 9:00 AM Approved

Page 35 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 3-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 4-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/24934 03/09/20 EmB FDD of Embankment (MCW) 22 46170 46200 30 BHS 04/09/20 9:30 AM 24906/02-09-20 Approved

2 PE/GPL/P-2/HW/09/20/24935 03/09/20 EmB FDD of Embankment (MCW) 23 46170 46200 30 BHS 04/09/20 2:40 PM 24923/03-09-20 Approved

3 PE/GPL/P-2/HW/09/20/24936 03/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 15 46221 BHS 04/09/20 10:00 AM 24909/02-09-20 Approved

4 PE/GPL/P-2/HW/09/20/24937 03/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 16 46221 BHS 04/09/20 4:00 PM 24925/03-09-20 Approved

5 PE/GPL/P-2/HW/09/20/24938 03/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 46873 46930 57 Median 04/09/20 12:30 PM 24927/03-09-20 Approved

6 PE/GPL/P-2/HW/09/20/24939 03/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 57180 57190 10 Median 04/09/20 2:40 PM 24823/30-08-20 Approved

7 PE/GPL/P-2/HW/09/20/24940 03/09/20 Median Drain Excavation & Level Checking and laying of PCC in median drain Pcc 57220 57260 40 Median 04/09/20 3:00 PM Not Approved

24098/11-08-20
8 PE/GPL/P-2/HW/09/20/24941 03/09/20 Turfing Checking of geocell & grass Turfing Geo 65790 65830 40 LHS 04/09/20 11:00 AM Approved
24897/01-09-20

9 PE/GPL/P-2/HW/09/20/24942 03/09/20 Median Median filling Top 71600 71760 160 Median 04/09/20 2:00 PM 24916/02-09-20 Not Approved

10 PE/GPL/P-2/HW/09/20/24943 03/09/20 Median Median filling Top 72240 72350 110 Median 04/09/20 12:00 PM 24391/20-08-20 Not Approved

11 PE/GPL/P-2/HW/09/20/24944 03/09/20 Chute Drain Checking & Concreting of Wall for Chute Drain Wall 73300 73500 200 RHS 04/09/20 11:00 AM 24930/03-09-20 Approved

12 PE/GPL/P-2/HW/09/20/24945 03/09/20 EmB FDD of Embankment (MCW) 11 74830 74850 20 BHS 04/09/20 12:00 PM 24931/03-09-20 Approved

13 PE/GPL/P-2/HW/09/20/24946 03/09/20 EmB FDD of Embankment (MCW) 20 77760 77780 20 BHS 04/09/20 4:30 PM 24882/30-08-20 Approved

14 PE/GPL/P-2/HW/09/20/24947 03/09/20 Shoulder FDD of Earthen shoulder Top 78250 78580 330 RHS 04/09/20 11:00 AM 24883/31-08-20 Not Approved

15 PE/GPL/P-2/HW/09/20/24948 (Spot) 04/09/20 L kerb Laying of Kerb Casting (MCW) 69250 69350 100 LHS 04/09/20 12:30 PM 24864/31-08-20 Approved

16 PE/GPL/P-2/HW/09/20/24949 (Spot) 04/09/20 Mountable Kerb Laying of Mountable Kerb (MCW) 69250 69360 110 LHS 04/09/20 4:20 PM 24864/31-08-20 Approved

Highway : (Service Road)

1 PE/GPL/P-2/SR/09/20/1830 03/09/20 EmB FDD of Embankment (SR) 12 76900 77000 100 LHS 04/09/20 3:00 PM 1816/01-09-20 Not Approved

2 PE/GPL/P-2/SR/09/20/1831 03/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 77000 77100 100 LHS 04/09/20 2:40 PM 1778/12-08-20 Not Approved

3 PE/GPL/P-2/SR/09/20/1832 03/09/20 EmB FDD of Embankment (SR) 4 77200 77300 100 RHS 04/09/20 3:30 PM 1828/03-09-20 Not Approved

4 PE/GPL/P-2/SR/09/20/1833 03/09/20 EmB FDD of Embankment (SR) 4 77400 77500 100 RHS 04/09/20 3:30 PM 1829/03-09-20 Approved

Structures : (MCW)

1 PE/GPL/P-2/STR/09/20/6621 03/09/20 Box Culvert Layout checking of excavation with laying pcc for Box culvert (MCW) 61690 BHS 04/09/20 10:00 AM Approved

Lko Side retaining wall 3rd lift reinforcement , shuutring checking &
2 PE/GPL/P-2/STR/09/20/6622 03/09/20 Retaining wall 65615 RHS 04/09/20 11:00 AM Not Approved
concreting for LVUP(MCW)

Lko Side retaining wall 2nd lift reinforcement , shuutring checking &
3 PE/GPL/P-2/STR/09/20/6623 03/09/20 Retaining wall 65615 LHS 04/09/20 12:00 PM Not Approved
concreting for LVUP(MCW)

4 PE/GPL/P-2/STR/09/20/6624 03/09/20 MNB A1 to A2 girder no. 5 shuttring checking & concreting for MNB (MCW) 77963 LHS 04/09/20 10:00 AM Not Approved

Page 36 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type

A1 side working pile no.18 final depth , reinforcement checking cage


5 PE/GPL/P-2/STR/09/20/6625 03/09/20 MNB 77963 LHS 04/09/20 11:00 AM Approved
lowering with concreting for MNB (MCW)

Page 37 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 2-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 3-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/24923 02/09/20 EmB FDD of Embankment (MCW) 22 46170 46200 30 BHS 03/09/20 12:30 PM 24906/02-09-20 Not Approved

2 PE/GPL/P-2/HW/09/20/24924 02/09/20 EmB FDD of Embankment (MCW) 23 46170 46200 30 BHS 03/09/20 5:00 PM 24923/03-09-20 Not Approved

3 PE/GPL/P-2/HW/09/20/24925 02/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 15 46221 BHS 03/09/20 10:00 AM 24909/02-09-20 Not Approved

4 PE/GPL/P-2/HW/09/20/24926 02/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 16 46221 BHS 03/09/20 4:00 PM 24925/03-09-20 Not Approved

5 PE/GPL/P-2/HW/09/20/24927 02/09/20 Median Drain Checking & Concreting of raft for Median Drain Raft 46873 46930 57 Median 03/09/20 3:45 PM 24910/02-09-20 Approved

6 PE/GPL/P-2/HW/09/20/24928 02/09/20 Median Median filling Top 71600 71760 160 Median 03/09/20 2:00 PM 24916/02-09-20 Not Approved

7 PE/GPL/P-2/HW/09/20/24929 02/09/20 Median Median filling Top 72240 72350 110 Median 03/09/20 12:00 PM 24391/20-08-20 Not Approved

8 PE/GPL/P-2/HW/09/20/24930 02/09/20 Chute Drain Checking & Concreting of raft for Chute Drain Raft 73300 73500 200 RHS 03/09/20 11:00 AM 17008/29-01-20 Approved

9 PE/GPL/P-2/HW/09/20/24931 02/09/20 EmB FDD of Embankment (MCW) 10 74830 74850 20 BHS 03/09/20 12:00 PM 24899/31-08-20 Approved

10 PE/GPL/P-2/HW/09/20/24932 02/09/20 EmB FDD of Embankment (MCW) 20 77760 77780 20 BHS 03/09/20 4:30 PM 24882/30-08-20 Not Approved

11 PE/GPL/P-2/HW/09/20/24933 02/09/20 Shoulder FDD of Earthen shoulder Top 78250 78580 330 RHS 03/09/20 11:00 AM 24883/31-08-20 Not Approved

Highway : (Service Road)


1 PE/GPL/P-2/SR/09/20/1825 02/09/20 EmB FDD of Embankment (SR) 12 76900 77000 100 LHS 03/09/20 3:00 PM 1816/01-09-20 Not Approved

2 PE/GPL/P-2/SR/09/20/1826 02/09/20 EmB FDD of Embankment (SR) 2 76980 77100 120 RHS 03/09/20 12:00 PM 1791/18-08-20 Not Approved

3 PE/GPL/P-2/SR/09/20/1827 02/09/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 77000 77100 100 LHS 03/09/20 2:40 PM 1778/12-08-20 Not Approved

4 PE/GPL/P-2/SR/09/20/1828 02/09/20 EmB FDD of Embankment (SR) 3 77200 77300 100 RHS 03/09/20 3:30 PM 1812/30-08-20 Approved

5 PE/GPL/P-2/SR/09/20/1829 02/09/20 EmB FDD of Embankment (SR) 3 77300 77500 200 RHS 03/09/20 3:30 PM 1815/31-08-20 Approved

Structures : (MCW)
Gzp side retaining wall 4th lift reinforcement , shuttring checking &
1 PE/GPL/P-2/STR/09/20/6611 02/09/20 Retaining wall 64467 LHS 03/09/20 12:00 PM Approved
concreting for LVUP (MCW)

2 PE/GPL/P-2/STR/09/20/6612 02/09/20 MJB P5 to P4 girder no. 57 checking for Grouting for MJB (MCW) 71367 RHS 03/09/20 12:00 PM Not Approved

3 PE/GPL/P-2/STR/09/20/6613 02/09/20 MJB P5 to P4 girder no. 58 checking for Grouting for MJB (MCW) 71367 RHS 03/09/20 1:00 PM Not Approved

4 PE/GPL/P-2/STR/09/20/6614 02/09/20 MJB P5 to P4 girder no. 59 checking for Grouting for MJB (MCW) 71367 RHS 03/09/20 2:00 PM Not Approved

5 PE/GPL/P-2/STR/09/20/6615 02/09/20 MJB P5 to P4 girder no. 60 checking for Grouting for MJB (MCW) 71367 RHS 03/09/20 3:00 PM Not Approved

6 PE/GPL/P-2/STR/09/20/6616 02/09/20 MJB P5 to P4 girder no. 61 checking for Grouting for MJB (MCW) 71367 RHS 03/09/20 4:00 PM Not Approved

7 PE/GPL/P-2/STR/09/20/6617 02/09/20 MJB P5 to P4 girder no. 62 checking for Grouting for MJB (MCW) 71367 RHS 03/09/20 5:00 PM Not Approved

P1 to P2 girder No. 24 Profiling & reinforcement checking for MJB


8 PE/GPL/P-2/STR/09/20/6618 02/09/20 MJB 71367 RHS 03/09/20 3:00 PM Not Approved
(MCW)

A1 side working pile no.18 final depth , reinforcement checking cage


9 PE/GPL/P-2/STR/09/20/6619 02/09/20 MNB 77963 LHS 03/09/20 11:00 AM In Progress
lowering with concreting for MNB (MCW)

Page 38 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type

A1 to A2 girder no.05profiling & reinforcement checking for MNB


10 PE/GPL/P-2/STR/09/20/6620 02/09/20 MNB 77963 LHS 03/09/20 10:00 AM Approved
(MCW)

Page 39 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 1-Sep-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 2-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/24906 01/09/20 EmB FDD of Embankment (MCW) 21 46170 46200 30 BHS 02/09/20 12:30 PM 24892/01-09-20 Approved

2 PE/GPL/P-2/HW/09/20/24907 01/09/20 EmB FDD of Embankment (MCW) 22 46170 46200 30 BHS 02/09/20 5:00 PM 24906/02-09-20 Not Approved

3 PE/GPL/P-2/HW/09/20/24908 01/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 13 46221 BHS 02/09/20 10:00 AM 24894/01-09-20 Approved

4 PE/GPL/P-2/HW/09/20/24909 01/09/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 14 46221 BHS 02/09/20 4:00 PM 24908/02-09-20 Approved

5 PE/GPL/P-2/HW/09/20/24910 01/09/20 Median Drain Excavation & Level Checking and laying of PCC in median drain Pcc 46873 46930 57 Median 02/09/20 3:45 PM Approved

6 PE/GPL/P-2/HW/09/20/24911 01/09/20 Back filling FDD Checking of Back Filling for Box Culvert A1(Lko) & A2(Gzp) 12 53900 BHS 02/09/20 10:30 AM 24857/31-08-20 Not Approved

7 PE/GPL/P-2/HW/09/20/24912 01/09/20 Median Drain Shuttering checking & concreting for median drain wall Wall 57180 57190 10 Median 02/09/20 4:30 PM 24823/30-08-20 Not Approved

8 PE/GPL/P-2/HW/09/20/24913 01/09/20 Median Drain Excavation & Level Checking and laying of PCC in median drain Pcc 57220 57240 20 Median 02/09/20 3:30 PM Not Approved

9 PE/GPL/P-2/HW/09/20/24914 01/09/20 EmB FDD of Embankment (MCW) 15 63750 63800 50 BHS 02/09/20 5:30 PM 22968/03-07-20 Not Approved

10 PE/GPL/P-2/HW/09/20/24915 01/09/20 EmB FDD of Embankment (MCW) 24 71100 71220 120 LHS 02/09/20 11:30 AM 24584/25-08-20 Not Approved

22763/19-06-20
11 PE/GPL/P-2/HW/09/20/24916 01/09/20 Median Median filling 1 71600 71760 160 Median 02/09/20 2:00 PM Approved
22778/20-06-20

12 PE/GPL/P-2/HW/09/20/24917 01/09/20 Median Median filling Top 72240 72350 110 Median 02/09/20 12:00 PM 24391/20-08-20 Not Approved

13 PE/GPL/P-2/HW/09/20/24918 01/09/20 Chute Drain Layout Checking,Excavation & Laying Of Pcc For Chute Drain Pcc 73300 73500 200 RHS 02/09/20 11:00 AM 17008/29-01-20 Approved

14 PE/GPL/P-2/HW/09/20/24919 01/09/20 EmB FDD of Embankment (MCW) 10 74830 74850 20 BHS 02/09/20 12:00 PM 24899/31-08-20 Not Approved

15 PE/GPL/P-2/HW/09/20/24920 01/09/20 EmB FDD of Embankment (MCW) 20 77760 77780 20 BHS 02/09/20 4:30 PM 24882/30-08-20 Not Approved

16 PE/GPL/P-2/HW/09/20/24921 01/09/20 Shoulder FDD of Earthen shoulder Top 78250 78580 330 RHS 02/09/20 11:00 AM 24883/31-08-20 Not Approved

17 PE/GPL/P-2/HW/09/20/24922 01/09/20 Shoulder FDD of Earthen shoulder Top 78250 78580 330 LHS 02/09/20 12:30 PM 24884/31-08-20 Approved

Highway : (Service Road)

1 PE/GPL/P-2/SR/09/20/1821 01/09/20 EmB FDD of Embankment (SR) 12 76900 77000 100 LHS 02/09/20 3:00 PM 1816/01-09-20 Not Approved

2 PE/GPL/P-2/SR/09/20/1822 01/09/20 EmB FDD of Embankment (SR) 2 76980 77100 120 RHS 02/09/20 12:00 PM 1791/18-08-20 Not Approved

3 PE/GPL/P-2/SR/09/20/1823 01/09/20 EmB FDD of Embankment (SR) 3 77100 77300 200 RHS 02/09/20 3:30 PM 1812/30-08-20 Not Approved

4 PE/GPL/P-2/SR/09/20/1824 01/09/20 EmB FDD of Embankment (SR) 3 77300 77500 200 RHS 02/09/20 3:30 PM 1815/31-08-20 Not Approved

Page 40 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Lab :
1 PE/GPL/P-2/Lab/09/20/883 01/09/20 Core Test Core cutting of DBM (MCW) 44430 44440 10 LHS 02/09/20 12:00 PM 24748/29-08-20 Approved

2 PE/GPL/P-2/Lab/09/20/884 01/09/20 Core Test Core cutting of DBM (MCW) 44610 44620 10 LHS 02/09/20 12:30 PM 24750/29-08-20 Approved

3 PE/GPL/P-2/Lab/09/20/885 01/09/20 Core Test Core cutting of DBM (MCW) 44710 44715 5 LHS 02/09/20 9:30 AM 24803/30-08-20 Approved

4 PE/GPL/P-2/Lab/09/20/886 01/09/20 Core Test Core cutting of DBM (MCW) 44975 44980 5 LHS 02/09/20 11:00 AM 24805/30-08-20 Approved

5 PE/GPL/P-2/Lab/09/20/887 01/09/20 Core Test Core cutting of DBM (MCW) 49200 49220 20 LHS 02/09/20 11:30 AM 24819/30-08-20 Approved

6 PE/GPL/P-2/Lab/09/20/888 01/09/20 Core Test Core cutting of DBM (MCW) 51260 51280 20 RHS 02/09/20 9:00 AM 24763/29-08-20 Approved

7 PE/GPL/P-2/Lab/09/20/889 01/09/20 Core Test Core cutting of DBM (MCW) 65190 65250 60 LHS 02/09/20 10:00 AM 24772/29-08-20 Approved

8 PE/GPL/P-2/Lab/09/20/890 01/09/20 Core Test Core cutting of DBM (MCW) 65200 65250 50 RHS 02/09/20 10:30 AM 24774/29-08-20 Approved

Structures : (MCW)
Lko side retaining wall 2nd lift reinforcement , shuttring checking &
1 PE/GPL/P-2/STR/09/20/6597 01/09/20 Retaining wall 42157 LHS 02/09/20 9:00 AM 6552/31-08-20 Not Approved
concreting for MNB (MCW)

Lko side retaining wall 1st lift reinforcement , shuttring checking &
2 PE/GPL/P-2/STR/09/20/6598 01/09/20 Retaining wall 70542 LHS 02/09/20 10:00 AM 6422/24-08-20 Approved
concreting for LVUP (MCW)

Lko side retaining wall layout checking of excavation with laying pcc
3 PE/GPL/P-2/STR/09/20/6599 01/09/20 Retaining wall 70542 RHS 02/09/20 11:00 AM Approved
for LVUP (MCW)

4 PE/GPL/P-2/STR/09/20/6600 01/09/20 MJB P5 to P4 girder no. 63 checking for Grouting for MJB (MCW) 71367 RHS 02/09/20 12:00 PM Approved

5 PE/GPL/P-2/STR/09/20/6601 01/09/20 MJB P5 to P4 girder no. 64 checking for Grouting for MJB (MCW) 71367 RHS 02/09/20 1:00 PM Not Approved

6 PE/GPL/P-2/STR/09/20/6602 01/09/20 MJB P5 to P4 girder no. 65 checking for Grouting for MJB (MCW) 71367 RHS 02/09/20 2:00 PM Not Approved

7 PE/GPL/P-2/STR/09/20/6603 01/09/20 MJB A1 to P1 Girder No. 3 checking of stressing for Major Bridge (MCW) 71367 LHS 02/09/20 2:30 PM Not Approved

8 PE/GPL/P-2/STR/09/20/6604 01/09/20 MJB A1 to P1 Girder No. 4 checking of stressing for Major Bridge (MCW) 71367 LHS 02/09/20 4:00 PM Not Approved

P1 to P2 girder No. 24 Profiling & reinforcement checking for MJB


9 PE/GPL/P-2/STR/09/20/6605 01/09/20 MJB 71367 RHS 02/09/20 3:00 PM Not Approved
(MCW)

Gzp side retaining wall 1st lift reinforcement , shuttring checking &
10 PE/GPL/P-2/STR/09/20/6606 01/09/20 Retaining wall 72836 RHS 02/09/20 9:00 AM 5539/24-05-20 Not Approved
concreting for PUP (MCW)

Lko side retaining wall 2nd lift reinforcement , shuttring checking &
11 PE/GPL/P-2/STR/09/20/6607 01/09/20 Retaining wall 73595 RHS 02/09/20 10:00 AM 6527/29-08-20 Approved
concreting for LVUP (MCW)

A1 side working pile no.16 final depth , reinforcement checking cage


12 PE/GPL/P-2/STR/09/20/6608 01/09/20 MNB 77963 LHS 02/09/20 12:00 PM Approved
lowering with concreting for MNB (MCW)

A1 side working pile no.18 final depth , reinforcement checking cage


13 PE/GPL/P-2/STR/09/20/6609 01/09/20 MNB 77963 LHS 02/09/20 1:00 PM In Progress
lowering with concreting for MNB (MCW)

Lko side wall 1st lift reinforcement , shuttring checking & concreting
14 PE/GPL/P-2/STR/09/20/6610 01/09/20 LVUP 79700 RHS 02/09/20 11:00 AM 6511/28-08-20 Approved
for LVUP (MCW)

Structures : (Service Road)

1 PE/GPL/P-2/STR-SR/09/20/0056 01/09/20 MNB Raft reinforcement , shuttring checking & concreting for MNB (SR) 68815 LHS 02/09/20 8:00 AM Not Approved

Page 41 of 43
Name of the Project : Purvanchal Expressway (Package-ll)
Client : UPEIDA
Authority Engineer : Egis Date of Submission: 31-Aug-20
EPC Contractor : Gayatri Projects Limited Date of Inspection: 1-Sep-20
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Highway : (MCW)
1 PE/GPL/P-2/HW/09/20/24888 31/08/20 Shoulder FDD of Earthen shoulder Top 40620 40700 80 LHS 01/09/20 12:30 PM 23512/25-07-20 Not Approved

2 PE/GPL/P-2/HW/09/20/24889 31/08/20 Shoulder FDD of Earthen shoulder 1 40620 40750 130 RHS 01/09/20 3:45 PM 21182/12-05-20 Approved

3 PE/GPL/P-2/HW/09/20/24890 31/08/20 EmB FDD of Embankment (MCW) 25 42300 42400 100 BHS 01/09/20 4:30 PM 22669/15-06-20 Not Approved

4 PE/GPL/P-2/HW/09/20/24891 31/08/20 EmB FDD of Embankment (MCW) 19 46170 46200 30 BHS 01/09/20 9:30 AM 24850/31-08-20 Approved

5 PE/GPL/P-2/HW/09/20/24892 31/08/20 EmB FDD of Embankment (MCW) 20 46170 46200 30 BHS 01/09/20 4:00 PM 24891/31-08-20 Approved

6 PE/GPL/P-2/HW/09/20/24893 31/08/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 11 46221 BHS 01/09/20 10:00 AM 24852/31-08-20 Approved

7 PE/GPL/P-2/HW/09/20/24894 31/08/20 Back filling FDD Checking of Back Filling For VUP A1 (Lko) 12 46221 BHS 01/09/20 4:00 PM 24893/31-08-20 Approved

8 PE/GPL/P-2/HW/09/20/24895 31/08/20 Median Drain Excavation & Level Checking and laying of PCC in median drain Pcc 57210 57220 10 Median 01/09/20 3:30 PM Approved

9 PE/GPL/P-2/HW/09/20/24896 31/08/20 EmB FDD of Embankment (MCW) 15 63750 63800 50 BHS 01/09/20 5:30 PM 22968/03-07-20 Not Approved

10 PE/GPL/P-2/HW/09/20/24897 31/08/20 Side Slope Checking Of Side Slope (MCW) 65800 65850 50 LHS 01/09/20 11:00 AM 24098/11-08-20 Approved

24059/10-08-20
11 PE/GPL/P-2/HW/09/20/24898 31/08/20 EmB FDD of Embankment (MCW) 24 71100 71220 120 RHS 01/09/20 11:30 AM Approved
24584/25-08-20

12 PE/GPL/P-2/HW/09/20/24899 31/08/20 EmB FDD of Embankment (MCW) 9 74830 74850 20 BHS 01/09/20 12:00 PM 24877/31-08-20 Approved

13 PE/GPL/P-2/HW/09/20/24900 31/08/20 Turfing Checking of geocell & grass Turfing Geo 75360 75500 140 RHS 01/09/20 4:00 PM 24344/19-08-20 Approved

23781/30-07-20
14 PE/GPL/P-2/HW/09/20/24901 31/08/20 Turfing Checking of geocell & grass Turfing Geo 75440 75560 120 LHS 01/09/20 10:00 AM Approved
24395/20-08-20

15 PE/GPL/P-2/HW/09/20/24902 31/08/20 Chute Drain Checking & Concreting of raft for Chute Drain Raft 75830 75970 140 RHS 01/09/20 2:15 PM 24879/31-08-20 Approved

16 PE/GPL/P-2/HW/09/20/24903 31/08/20 EmB FDD of Embankment (MCW) 20 77760 77780 20 BHS 01/09/20 4:30 PM 24882/30-08-20 Not Approved

17 PE/GPL/P-2/HW/09/20/24904 31/08/20 Shoulder FDD of Earthen shoulder Top 78250 78580 330 RHS 01/09/20 11:00 AM 24883/31-08-20 Not Approved

18 PE/GPL/P-2/HW/09/20/24905 31/08/20 Shoulder FDD of Earthen shoulder Top 78250 78580 330 LHS 01/09/20 12:30 PM 24884/31-08-20 Not Approved

Highway : (Service Road)

1 PE/GPL/P-2/SR/09/20/1816 31/08/20 EmB FDD of Embankment (SR) 11 76900 77000 100 LHS 01/09/20 3:00 PM 1745/18-07-20 Approved

2 PE/GPL/P-2/SR/09/20/1817 31/08/20 EmB FDD of Embankment (SR) 2 76980 77100 120 RHS 01/09/20 12:00 PM 1791/18-08-20 Not Approved

3 PE/GPL/P-2/SR/09/20/1818 31/08/20 SG FDD & Level Cheking on Subgrade Top Layer (SR) Top 77000 77100 100 LHS 01/09/20 2:40 PM 1778/12-08-20 Not Approved

4 PE/GPL/P-2/SR/09/20/1819 31/08/20 EmB FDD of Embankment (SR) 3 77100 77300 200 RHS 01/09/20 3:30 PM 1812/30-08-20 Not Approved

5 PE/GPL/P-2/SR/09/20/1820 31/08/20 EmB FDD of Embankment (SR) 3 77300 77500 200 RHS 01/09/20 3:30 PM 1815/31-08-20 Not Approved

Page 42 of 43
RFI Reference Activity Details Location Inspection Required Previous
Sl.No. Activity Length Side Layer Remarks
No. Date Work Layer From To Date Time Details
Type
Lab :
1 PE/GPL/P-2/Lab/09/20/875 31/08/20 Core Test Core cutting of DBM (MCW) 42700 42710 10 LHS 01/09/20 12:00 PM 24744/29-08-20 Approved

2 PE/GPL/P-2/Lab/09/20/876 31/08/20 Core Test Core cutting of DBM (MCW) 42700 42710 10 RHS 01/09/20 12:30 PM 24746/29-08-20 Approved

3 PE/GPL/P-2/Lab/09/20/877 31/08/20 Core Test Core cutting of DBM (MCW) 63630 63740 110 LHS 01/09/20 9:00 AM 24623/26-08-20 Approved

4 PE/GPL/P-2/Lab/09/20/878 31/08/20 Core Test Core cutting of DBM (MCW) 63630 63740 110 RHS 01/09/20 9:30 AM 24625/26-08-20 Approved

5 PE/GPL/P-2/Lab/09/20/879 31/08/20 Core Test Core cutting of DBM (MCW) 64270 64400 130 LHS 01/09/20 11:00 AM 24718/28-08-20 Approved

6 PE/GPL/P-2/Lab/09/20/880 31/08/20 Core Test Core cutting of DBM (MCW) 64270 64400 130 RHS 01/09/20 11:30 AM 24720/28-08-20 Approved

7 PE/GPL/P-2/Lab/09/20/881 31/08/20 Core Test Core cutting of DBM (MCW) 64520 64660 140 LHS 01/09/20 10:00 AM 24673/27-08-20 Approved

8 PE/GPL/P-2/Lab/09/20/882 31/08/20 Core Test Core cutting of DBM (MCW) 64520 64660 140 RHS 01/09/20 10:30 AM 24675/27-08-20 Approved

Structures : (MCW)
Both side crash Barrior reinforcement , shuttring checking for LVUP
1 PE/GPL/P-2/STR/09/20/6589 31/08/20 LVUP 64467 BHS 01/09/20 11:00 AM Approved
(MCW)

2 PE/GPL/P-2/STR/09/20/6590 31/08/20 MJB P5 to P4 girder no. 63 checking for Grouting for MJB (MCW) 71367 RHS 01/09/20 12:00 PM 6455/27-08-20 Not Approved

3 PE/GPL/P-2/STR/09/20/6591 31/08/20 MJB P5 to P4 girder no. 64 checking for Grouting for MJB (MCW) 71367 RHS 01/09/20 1:00 PM 6456/27-08-20 Not Approved

4 PE/GPL/P-2/STR/09/20/6592 31/08/20 MJB P5 to P4 girder no. 65 checking for Grouting for MJB (MCW) 71367 RHS 01/09/20 2:00 PM 6457/27-08-20 Not Approved

5 PE/GPL/P-2/STR/09/20/6593 31/08/20 MJB A1 to P1 girder No. 01checking of stressing for Major Bridge (MCW) 71367 LHS 01/09/20 3:00 PM Approved

6 PE/GPL/P-2/STR/09/20/6594 31/08/20 MJB A1 to P1 girder No. 02checking of stressing for Major Bridge (MCW) 71367 LHS 01/09/20 4:00 PM Approved

A1 side working pile no.16 final depth , reinforcement checking cage


7 PE/GPL/P-2/STR/09/20/6595 31/08/20 MNB 77963 LHS 01/09/20 10:00 AM 6535/30-08-20 In Progress
lowering with concreting for MNB (MCW)

A1 side working pile no.18 final depth , reinforcement checking cage


8 PE/GPL/P-2/STR/09/20/6596 31/08/20 MNB 77963 LHS 01/09/20 11:00 AM 6536/30-08-20 In Progress
lowering with concreting for MNB (MCW)

Structures : (Service Road)

1 PE/GPL/P-2/STR-SR/09/20/0055 31/08/20 MNB Raft reinforcement , shuttring checking & concreting for MNB (SR) 68815 LHS 01/09/20 8:00 AM Not Approved