You are on page 1of 36

Date

S/N Location

1 ZONE 1

2 ZONE 1

3 ZONE 5
4 ZONE 3

5 ZONE 1

6 ZONE 1
Prepared by RTO Representative:
Remark: Photo attached (1 page )

Photos taken on

RD259 PROPOSED BUS DEPOT AT LO

ON-GOING BACKFILLING WORKS BE


1 PHASE 1

RD259 PROPOSED BUS DEPOT AT LO


ON-GOING CBP WALL AT ZONE 5 PH

RD259 PROPOSED BUS DEPOT AT LO

ON-GOING 900MM WIDE RCU DRAIN B


RD276 Appointm

28/6/2014 SATURDAY

Chainage
RTO Representative: ALFREDO JR
to attached (1 page )

28/6/2014 SATURDAY

OSED BUS DEPOT AT LOYANG

ACKFILLING WORKS BESIDES UNDERGROUND FUEL TA

OSED BUS DEPOT AT LOYANG


BP WALL AT ZONE 5 PHASE 2 NEAR PASIR RIS DRIVE 3

OSED BUS DEPOT AT LOYANG

00MM WIDE RCU DRAIN BENCHING WORKS AT ZONE 1 P


C & V ENGINEER
Project Consultant Engineers GS
Maxwell House, # 09-04/05. 20, Max
Tel: 62260828 Fax:
Email : cveng0904@gmail.com

RD276 Appointment of Qualified Person ( Super


DAILY SITE R

Nature of works

ON-GOING BACKFILLING WORKS BESIDES


UNDERGROUND FUEL TANK AT ZONE 1 PHASE
1

ON-GOING REBAR WORKS FOR WALL


PARTITION AT UNDERGROUND FUEL TANK
AREA AT ZONE 1 PHASE 1

ON-GOING CBP WALL AT ZONE 5 PHASE 2


NEAR PASIR RIS DRIVE 3
ON-GOING LAYING OF SANITARY PIPES AT
ZONE 3 PHASE 2

ON-GOING 900MM WIDE RCU DRAIN BENCHING


WORKS AT ZONE 1 PHASE 1

ON-GOING PIPE TRENCH AT ZONE 1 PHASE 1


ALFREDO JR. ARIOS CLARO
(Name & signature)
RGROUND FUEL TANK AT ZONE
R PASIR RIS DRIVE 3

WORKS AT ZONE 1 PHASE 1


NEERING PTE LTD
ngineers GST. Reg. No. 198202518K
/05. 20, Maxwell Road, Singapore 069113
2260828 Fax: 62225645
gmail.com Website : www.cvconslt.com

on ( Supervision) For Proposed Bus Depot at Loy


AILY SITE REPORT

Time (Hrs) Weather


8-12AM

0800-1900

Condition 1-6PM
RE

0800-2000 RTO

Total

0800-2100
VISITOR AT SITE:

0800-1900

0830-2100
SITE MEETING (IF ANY)

0830-1900

HTC MANPOWER

Project Manager 1

Project Coordinator 1

Site Manager 1

Project Engineer 2

Planning Engineer 1
Architect

Consultant

QECP

Site Supervisor 4

Rigger Signalman 1

Checked by RE R
RD259 PROPO

ON-GOING RE
FUEL TANK AR

RD259 PROPO
ON-GOING LA

RD259 PROPO

ON-GOING PIP
SS ISO 9001:2008
FS 500171

at Loyang

Fine Drizzle Rain

Fine FINE Rain


WSHO 2

ECO 1

Safety Supervisor 1

Quantity Surveyor 1

SPRO 1
Surveyor 1

Tipper Truck Operator 1

Excavator Operator 12

Volvo Truck Operator 3

General Worker 44

TOTAL 78

d by RE Representative: Muthu Senthi


(Name & sign
9 PROPOSED BUS DEPOT AT LOYANG

OING REBAR WORKS FOR WALL PARTITION AT UNDER


TANK AREA AT ZONE 1 PHASE 1

9 PROPOSED BUS DEPOT AT LOYANG


OING LAYING OF SANITARY PIPES AT ZONE 3 PHASE 2

9 PROPOSED BUS DEPOT AT LOYANG

OING PIPE TRENCH AT ZONE 1 PHASE 1


S ISO 9001:2008 Certificate No:
FS 500171

3
MACHINERY

EXCAVATOR 10

GENERATOR 3

ROLLER (1&10
2
TONS)
SOIL DRILL
1
MACHINE

VOLVO TRUCK 2
TIPPER TRUCK 1

MOBILE CRANE 1

TOTAL 20

Muthu Senthil Kumar


(Name & signature)
RTITION AT UNDERGROUND
ONE 3 PHASE 2