S/N Location
1 ZONE 1
2 ZONE 1
3 ZONE 5
4 ZONE 3
5 ZONE 1
6 ZONE 1
Prepared by RTO Representative:
Remark: Photo attached (1 page )
Photos taken on
28/6/2014 SATURDAY
Chainage
RTO Representative: ALFREDO JR
to attached (1 page )
28/6/2014 SATURDAY
Nature of works
0800-1900
Condition 1-6PM
RE
0800-2000 RTO
Total
0800-2100
VISITOR AT SITE:
0800-1900
0830-2100
SITE MEETING (IF ANY)
0830-1900
HTC MANPOWER
Project Manager 1
Project Coordinator 1
Site Manager 1
Project Engineer 2
Planning Engineer 1
Architect
Consultant
QECP
Site Supervisor 4
Rigger Signalman 1
Checked by RE R
RD259 PROPO
ON-GOING RE
FUEL TANK AR
RD259 PROPO
ON-GOING LA
RD259 PROPO
ON-GOING PIP
SS ISO 9001:2008
FS 500171
at Loyang
ECO 1
Safety Supervisor 1
Quantity Surveyor 1
SPRO 1
Surveyor 1
Excavator Operator 12
General Worker 44
TOTAL 78
3
MACHINERY
EXCAVATOR 10
GENERATOR 3
ROLLER (1&10
2
TONS)
SOIL DRILL
1
MACHINE
VOLVO TRUCK 2
TIPPER TRUCK 1
MOBILE CRANE 1
TOTAL 20