You are on page 1of 30

PROPOSED EXTENSION, A&A TO EXISTING

Date 12/28/2015

S/N Location GRIDLINE

1 BESIDE GATE 2
2

3 BESIDE GATE 2
Prepared by RTO Representative:
PROPOSED EXTENSION, A&A TO EXISTI

Remark: Photo attached (1 page )

Photos taken on: 26 DECEMBER 2015 Saturday

SUNLOVE ABODE AT BUANGKOK VIEW

Static Load Test at Zone 3


SUNLOVE ABODE AT BUANGKOK VIEW

Complete INSTALLATION OF ACCESS GATE NEA


OCCUPIED HALF LANE OF THE ROAD APPROVE
C & V ENGINEERING P
Project Consultant Engineers GST. Reg. No. 19
Maxwell House, # 09-04/05. 20, Maxwell Road, Sing
Tel: 62260828 Fax: 62225645
Email : cveng0904@gmail.com Website : www

STING 7-STOREY HOME TO BECOME 8-STOREY

DAILY SITE REPORT

Nature of works Time (Hrs)

On Going Jack-In Pile at Zone 2 0830-1900


Static Load Test at Zone 3 0830-1900

Complete Installation Gate 0830-1800


ALFREDO JR. ARIOS CLARO
(Name & signature)
C & V ENGINEERING P
Project Consultant Engineers GST. Reg. No. 19
Maxwell House, # 09-04/05. 20, Maxwell Road, Sing
Tel: 62260828 Fax: 62225645
Email : cveng0904@gmail.com Website : www

EXISTING 7-STOREY HOME TO BECOME 8-STORE


HEALTHCARE FACILITIE

aturday
TE NEAR ZONE 2, HK
PROVED BY IMH
G PTE LTD
o. 198202518K
Singapore 069113
SS ISO 900

www.cvconslt.com

REY NURSING HOME WITH SUPERVISORY HEAL

RT

Weather 8-12AM Fine Drizzle

Condition 1-6PM Fine FINE


RTO

Total

VISITOR AT SITE:

SITE MEETING (IF ANY)


HK MANPOWER

Project
1 WSHO/ECO 1
Manager

Project Safety
1 1
Coordinator Supervisor

Const. Quantity
1
Manager Surveyor

Engineer 1 SPRO

Planning
Surveyor
Engineer

Tipper Truck
Architect
Operator
Excavator
Consultant
Operator

QECP JACKPILE 1

Site Supervisor 2 General Worker 4

Rigger SUBCON
5
Signalman WORKER

TOTAL 18
G PTE LTD
o. 198202518K
Singapore 069113
SS ISO 900

www.cvconslt.com

TOREY NURSING HOME WITH SUPERVISORY


LITIES

SUNLOVE ABODE AT BUANGKOK VIEW

Jack in Pile at Zone 2


SUNLOVE ABODE AT BUANGKOK VIEW

Free Bore at Zone 2


SS ISO 9001:2008 Certificate No:
FS 500171

RY HEALTHCARE FACILITIES

Rain Remarks

Rain
1

1
HK MACHINERIES

EXCAVATOR 1

GENERATOR 1

SCISSOR LIFT 1
TOTAL 3
SS ISO 9001:2008 Certificate No:
FS 500171

SORY

GKOK VIEW
GKOK VIEW
STATUS OF MICROPILE AND JACK-IN PILE WORKS @ SUNLOVE BUANGKOK GREEN
DATE: 22 DEC. 2015

ZONE 1 ZONE 2 ZONE 3

MICROPILES 50 NOS. 74 NOS. xxx

JACK-IN PILES 43 NOS. 117 NOS. 22 NOS

MICROPILES JACK-IN PILES


MICROPILES JACK-IN PILES Z1 + Z2 + Z1 + Z2 +
Z1 + Z2 + Z3 Z1 + Z2 + Z3 Z3 Z3
TOTAL NUMBER 124 182 TOTAL NUMBER 124 182
TOTAL NUMBER 50 + 48= 98 43 + 66 = 22 = 131 % DONE TO DATE 79.032% 71.978%
DONE TO DATE
TOTAL BALANCED OF 124-98= 26 NOS. 182-131= 51 NOS.
WORKS