You are on page 1of 3

Construction of NH-56, 4-lane bypass connecting NH-56 at Km 17+400 and termina

Prad

Client : :National Highway Authority of India


Authority Engineer : :M/s Theme Engineering Services Pvt. Ltd.
EPC Contractor : :M/s PNC Infratech Ltd.

RFI Reference
S. No. Activity
No. Date
Type
A Highway
1
B Structures

1 10-Dec-22 ROB

2 11-Dec-22 ROB

3 11-Dec-22 ROB

4 11-Dec-22 VUP

5 11-Dec-22 VUP

6 11-Dec-22 VUP

1 QA/QC

10-Dec-22 Lab
ng NH-56 at Km 17+400 and terminating near Behta Village Road (bypass Chainage from Km
Pradesh (Lucknow) under NHDP Phase -VII “on EPC Mode

Authority of India
eering Services Pvt. Ltd.
( RFI SUMMARY )

Activity Details
Work

Checking of Post Reinforcement,shuttering & pouring of Concrete of Railing Bea


Span RP2-RA2.

Checking of reinforcement & shuttering & pouring of concrete of Transverse Sei


Arrester of LP2 - 2 Nos (A2 Portion).
Checking of reinforcement & shuttering & pouring of Concrete of Transverse Se
Arrester of RP2 - 2 Nos (A2Portion).
Checking of Reinforcement & shuttering & pouring of Concrete of Expansion Joi
RA2.
Checking of Reinforcement & shuttering & pouring of Concrete of Expansion Joi
LA1.
Checking of Reinforcement & shuttering & pouring of Concrete of Expansion Joi
LA2.

07 Days Cube Testing


(1)Ch-0+115 P2-A2 Span Hand Railing Bottom Beam of Grade M-40.
0.000 to Km 32.000/31.489 Average length 31.745 Km) in the State of Uttar

:
Date of Submission: 10-Dec-22
Date of Inspection: 11-Dec-22

Location Inspection Required


Remarks
From Date Time

10+827 11-Dec-22 10:00:00AM Mr.Ashis Tiwari

10+827 12-Dec-22 10:00 AM Mr.Ashish Kumar

10+827 12-Dec-22 10:00 AM Mr.Ashish Kumar

19+923 12-Dec-22 2:00 PM Mr.Arun Kumar

19+923 12-Dec-22 2:00 PM Mr.Arun Kumar

19+923 12-Dec-22 2:00 PM Mr.Arun Kumar

Lab 11-Dec-22 10:00 AM Mr.Yogesh Kumar Sharma