You are on page 1of 24

ALTRUIST

GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

AGS/SSI/20-21

04 MARCH 2022

GEOTECH
INVESTIGATION
REPORT
DESIGN, SUPPLY, ERECTION, TESTING AND
COMMISSIONING FOR 25KV OHE FOR
INCREASING SPEED POTENTIAL TO
160KMPH ON GHAZIABAD (EXCL)-DEEN
DAYAL UPADHAYA NAGAR(EXCL) UP & DN
MAIN LINE OF PRAYAGRAJ DIVISION (TOTAL
757 RKM/1655 TKM) (CH-1398/36-1398/40,
LOCATION- DANKAUR TSS)

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 0


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

ACKNOWLEDGEMENT

Project: - DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING FOR


25KV OHE FOR INCREASING SPEED POTENTIAL TO 160KMPH ON GHAZIABAD
(EXCL)-DEEN DAYAL UPADHAYA NAGAR(EXCL) UP & DN MAIN LINE OF
PRAYAGRAJ DIVISION (TOTAL 757 RKM/1655 TKM) (CH-1398/36-1398/40,
LOCATION- DANKAUR TSS)

Client: - RAILTRANZ CONSULTANCY PVT. LTD.


Order No: - _________________________________

We are thankful to RAILTRANZ CONSULTANCY PVT. LTD.


for providing us the opportunity to carry out these investigations. The co-operation
extended by their team and field staff during whole work is thankfully acknowledged.

ALTRUIST GEOTECHNICAL SERVICES Pvt. Ltd.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 1


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

INTRODUCTION
The object of the investigation was to assess the nature of soil strata and to find out
the Safe allowable pressure for the foundation soil. The report deals with the field
and laboratory investigation carried out. The Geo-technical study involved both field
and laboratory test to determine safe allowable pressure for the foundation soil. The
fieldwork consisted of borehole of 3.00 m depth. The boring points were decided in
consultation with Engineer-in-charge of the sites.

REFERENCES

IS: 2-1960
• Rules for Rounding off Numerical Values
IS: 1892-1974
• for field work including existent ground wat
IS: 2132-1986
• for sampling in Undisturbed and Disturbed form
IS: 2131-1981
• for Standard Penetration Test
IS: 2720
• for all laboratory tests on soil samples collected
IS: 6403-1981
• for determination of Bearing Capacity
IS: 8009(Part I)-1976
• for calculation of settlement of foundations
IS: 1904-1986
• for permissible maximum settlement, differential settlement and angular
distortion.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 2


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

FIELD INVESTIGATION

The field investigation work at this site was carried out on 26/02/2022. The following
investigation work was carried out three boreholes of diameter 150 mm were made
within the proposed layout of the structure. The boreholes are up to the depth of 3.00
meter.

Standard Penetration Test (SPT) was conducted in the boreholes at every 1.50 m
interval and change of strata as per specifications. Standard split spoon sampler
attached to lower end of drill rods was driven in the boreholes by means of standard
hammer of 63.50 kg falling freely from a height of 75 cm. The sampler was driven 45
cm as per specifications and number of blows required for each 15 cm penetration
was recorded. The number of blows for the first 15 cm penetration was not taken into
account as it is considered seating drive. The number of blows for next 30 cm
penetration was designated as SPT ‘N’ value. Wherever the total penetration was
less than 45 cm, the number of blows & the depth penetrated is incorporated in
respective bore logs. Disturbed Soil samples obtained from standard split spoon
sampler were collected in polythene bags of suitable size. These samples were
properly sealed, labelled, recorded and carefully transported to laboratory for testing.

Undisturbed Soil Samples (UDS) were collected from the boreholes at every 1.50
m interval & change of strata as per sampling specifications, in thin walled sampling
tubes of 100 mm dia. and 450 mm length. These sampling tubes after retrieval from
the boreholes were properly waxed and sealed at both ends. These were carefully
labelled and transported to the laboratory for testing. UDS wherever slipped during
lifting, were duly marked in the bore logs as well in the soil profile.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 3


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

LABORATORY TESTS

The following laboratory tests are conducted to determine the engineering


characteristics of sub-soils:

Natural moisture content is determined by oven drying method as per IS 2720


(Part II)-1973. The results are reported in results sheets attached.

Dry and Bulk density of soil strata is obtained using Shelby tubes in accordance
with IS 2720 (Part XXIX)-1975. The results are reported in results sheets attached.

Particle Size Analysis test by hydrometer methods performed in accordance with


IS 2720 (Part IV) - 1965 on the part of soil samples obtained after the sieve analysis.
The results are reported in results sheets attached.

Atterberg Limits’ tests are performed in accordance with IS 2720 (Part V) - 1985
and results are reported in results sheets attached.

Specific Gravity tests are performed in accordance with IS 2720 (Part III Section1)
-1980 and the results are reported in results sheets attached.

Triaxial Compression Test under Unconsolidated Un-drained (UU) condition as per


IS: 2720 (Part-XI)-2011 are performed on the undisturbed soil samples obtained
during the field investigation. The results are reported in results sheets attached.

Direct Shear Test is performed as per IS 2720 (Part XIII)-2015 on the undisturbed
soil samples obtained during the field investigation. The results and the density of
samples are reported in results sheets attached.

Consolidation Test is performed as per IS 2720 (Part XV)-1986, on the


undisturbed soil samples obtained during the field investigation. The results in the
form of compression index (Cc) are reported in results sheets attached.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 4


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

INTERPRETATION OF THE LAB TEST RESULTS

GENERAL NATURE OF SOIL STRATA

The results of lab tests and bore hole log charts of bore hole indicate that the strata
at the site is found to comprise non-cohesive soil throughout the borehole explored.

The non-cohesive type soil is found to comprise of silty sand soil belonging to ‘SM’
type soil group of IS classification.

The results of classification tests indicate that the natural soil stratum
present at the Site is found to comprise of coarse-grained soils (sandy soil)
only within explored depth.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 5


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

FIELD INVESTIGATION DATA

CONSISTENCY ON THE BASIS OF S.P.T. VALUES

PENETRATION RESISTANCE AT SITE DURING INVESTIGATION

B.H. NO. NON - COHESIVE SOIL COHESIVE SOIL


SPT VALUES DESCRIPTION SPT VALUES DESCRIPTION
Min. Max. Min. Max.
MEDIUM -
7 13 -
8 14 MEDIUM - -
9 11 MEDIUM - -

WATER TABLE

BOREHOLE NO RL OF WL DEPTH RL OF WATER DATE OF


BOREHOLE WRT TABLE INVESTIGATION
BOREHOLE

7 - NOT MET - 26/02/2022


8 - NOT MET - 26/02/2022
9 - NOT MET - 26/02/2022

Water table is not found throughout borehole explored. However, for calculation
purpose water table at 3.00 meter below NGL has been adopted for calculations.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 6


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

CALCULATION METHODOLOGY

----------------------------Bearing Capacity based on Shear Analysis ------------------------------


TYPE OF SHEAR FAILURE Condition as per Void Ratio (e)
General Shear Failure 𝑒𝑒 < 0.55
Local Shear Failure 𝑒𝑒 > 0.75
Intermediate Value 0.55 < 𝑒𝑒 < 0.75

--------------------------------------------- (GENERAL SHEAR) --------------------------------------------


𝟏𝟏
𝒒𝒒𝒏𝒏𝒏𝒏 = 𝒄𝒄𝑵𝑵𝑪𝑪 𝑺𝑺𝑪𝑪 𝒅𝒅𝒄𝒄 𝒊𝒊𝒄𝒄 + 𝒒𝒒�𝑵𝑵𝒒𝒒 − 𝟏𝟏�𝑺𝑺𝒒𝒒 𝒅𝒅𝒒𝒒 𝒊𝒊𝒒𝒒 + 𝑩𝑩𝑩𝑩𝑵𝑵𝜸𝜸 𝑺𝑺𝜸𝜸 𝒅𝒅𝜸𝜸 𝒊𝒊𝜸𝜸 × 𝑾𝑾′ .
𝟐𝟐

---------------------------------------------- (LOCAL SHEAR) ----------------------------------------------


𝟐𝟐 𝟏𝟏
𝒒𝒒′𝒏𝒏𝒏𝒏 = 𝒄𝒄𝑵𝑵′𝑪𝑪 𝑺𝑺𝑪𝑪 𝒅𝒅𝒄𝒄 𝒊𝒊𝒄𝒄 + 𝒒𝒒�𝑵𝑵′𝒒𝒒 − 𝟏𝟏�𝑺𝑺𝒒𝒒 𝒅𝒅𝒒𝒒 𝒊𝒊𝒒𝒒 + 𝑩𝑩𝑩𝑩𝑵𝑵′𝜸𝜸 𝑺𝑺𝜸𝜸 𝒅𝒅𝜸𝜸 𝒊𝒊𝜸𝜸 × 𝑾𝑾′ .
𝟑𝟑 𝟐𝟐
--------------------------------------- (INTERMEDIATE SHEAR) -----------------------------------------
𝑳𝑳𝑳𝑳 − 𝑮𝑮𝑮𝑮
�� � × (𝒆𝒆 − 𝟎𝟎. 𝟓𝟓𝟓𝟓) + 𝑮𝑮𝑮𝑮�
𝟎𝟎. 𝟕𝟕𝟕𝟕 − 𝟎𝟎. 𝟓𝟓𝟓𝟓
Where, LS: LOCAL SHEAR GS: GENERAL SHEAR e: void ratio
-------------------------Vesic'sBearing Capacity Factors (Table of IS: 6403-1981) ----------------------

For (GENERAL SHEAR)(𝐞𝐞 < 0.55) For (LOCAL SHEAR) (𝐞𝐞 > 0.75)
Formula Factors Formula Factors
𝑁𝑁𝑐𝑐 = (𝑁𝑁𝑞𝑞 − 1) cot ϕ 𝑁𝑁𝑐𝑐 𝑁𝑁 ′ 𝑐𝑐 = (𝑁𝑁 ′ 𝑞𝑞 − 1) cot ϕ′ 𝑁𝑁 ′ 𝑐𝑐

𝑁𝑁𝑞𝑞 = tan2 (45 + ϕ)�𝑒𝑒 𝜋𝜋 tan ϕ � 𝑁𝑁𝑞𝑞 𝑁𝑁 ′ 𝑞𝑞 = tan2 (45 + ϕ′ )�𝑒𝑒 𝜋𝜋 tan ϕ � 𝑁𝑁 ′ 𝑞𝑞

𝑁𝑁𝛾𝛾 = 2�𝑁𝑁𝑞𝑞 − 1� tan ϕ 𝑁𝑁𝛾𝛾 𝑁𝑁 ′ 𝛾𝛾 = 2�𝑁𝑁 ′ 𝑞𝑞 − 1� tan ϕ′ 𝑁𝑁 ′ 𝑦𝑦

*Where, 𝜙𝜙 ′ = 𝑡𝑡𝑡𝑡𝑡𝑡−1 (0.67 𝑡𝑡𝑡𝑡𝑡𝑡 𝜙𝜙)

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 7


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

-----------------------------------Hansen’s Shape Factors (IS 6403 table 2) ---------------------------------

Shape (Sc) (Sq) (Sy)

Strip 1.00 1.00 1.00


Circle 1.30 1.20 0.60
Square 1.30 1.20 0.80
𝐵𝐵 𝐵𝐵 𝐵𝐵
Rectangle 1 + 0.2 1 + 0.2 1 − 0.4
𝐿𝐿 𝐿𝐿 𝐿𝐿

* B: width of footing (m) L: length of footing (m)

-----------------------------------Hansen’sDepth Factors (IS 6403 cl: 5.1.2.2) -----------------------------


Formula Conditions Factors Value
𝐷𝐷𝐹𝐹
1 + 0.2( ) × 𝐾𝐾𝑃𝑃 For all ϕ values 𝑑𝑑𝑐𝑐 𝒅𝒅𝒄𝒄
𝐵𝐵
1 Φ<10° 𝑑𝑑𝑞𝑞 =𝑑𝑑𝛾𝛾 𝒅𝒅𝒒𝒒

𝐷𝐷𝐹𝐹
1 + 0.1( ) × 𝐾𝐾𝑃𝑃 Φ>10° 𝑑𝑑𝑞𝑞 =𝑑𝑑𝛾𝛾 𝒅𝒅𝜸𝜸
𝐵𝐵

*Where,𝑲𝑲𝒑𝒑 = 𝑡𝑡𝑡𝑡𝑡𝑡 45 + ,√𝑵𝑵∅ = 𝑲𝑲𝒑𝒑
2

---------------------------------Hansen’s Inclination Factors (IS 6403 cl: 5.1.2.3) -------------------------


Formula Conditions Factors Value
𝛼𝛼 2
(1 − ) For all ϕ values 𝑖𝑖𝑐𝑐 = 𝑖𝑖𝑞𝑞 𝒊𝒊𝒄𝒄 1.00
90°
𝛼𝛼
(1 − )2 Φ>10° 𝑖𝑖𝛾𝛾 𝒊𝒊𝒒𝒒 1.00
𝛷𝛷

0 Φ=10° 𝑖𝑖𝛾𝛾 𝒊𝒊𝜸𝜸 1.00

*where, α-Inclination of the load to the vertical in degrees,

Φ- Angle of shearing resistance

NOTE: We take inclination factor 1 for 𝛼𝛼 = 0 when foundation is at normal base and not inclined.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 8


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

BEARING CAPACITY BASED ON SETTLEMENT CRITERIA AS PER


IS: 8009 (PART I) – 1976 & IS: 1904 – 1986

PRIMARY CONSOLIDATION SETTLEMENT:

It is defined as the process in which the soil volume decreases. It is also defined as
the decrease in water content of saturated soil that happens without the replacement
of water by air. Primary consolidation treats the consolidation to take place only in
one dimension

SECONDARY COMPRESSION SETTLEMENT/CREEP:

It occurs under constant effective stress due to continuous rearrangement of clay


particles into a more stable configuration. Predominates in highly plastic clays and
organic clays after primary consolidation the soil structure continues to adjust to the
load for some additional time. This settlement is termed secondary consolidation

****************************FOR CLAY ********************************

Depth of pressure bulb (effective zone)


(1.5 × 𝐵𝐵)below𝐷𝐷𝑓𝑓
Where, 𝐷𝐷𝑓𝑓 = depth of footing and 𝐵𝐵= breadth of footing; both in m

---------------------------------------- Consolidation Settlement ---------------------------------------

𝐶𝐶𝑐𝑐 𝐻𝐻𝑖𝑖 𝑃𝑃𝑜𝑜 + ∆𝑃𝑃


𝑆𝑆 = � log � �
1 + 𝑒𝑒𝑜𝑜 𝑃𝑃𝑜𝑜

-----------------------------------------Initial Effective Pressure-----------------------------------------

𝑥𝑥
𝑃𝑃𝑜𝑜 = × 𝛾𝛾
2
Where,
𝑥𝑥 = thickness of Layer and 𝛾𝛾= density (with water table correction)

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 9


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

-------------------------------------------Incremental Stress-----------------------------------------------

𝐵𝐵 × 𝐿𝐿
Δ𝑃𝑃 = 𝑃𝑃 ×
(𝐿𝐿 + 𝑍𝑍)(𝐵𝐵 + 𝑍𝑍)

Where,
𝒛𝒛
Z = as the effect of stress is acting on the center of the layer
𝟐𝟐
𝒛𝒛
= Mid-point of the thickness of layer
𝟐𝟐

P= Applied Pressure at foundation base.

********************************FOR SAND************************************

Depth of pressure bulb (effective zone)


(1.5 × 𝐵𝐵) Below 𝐷𝐷𝑓𝑓
Where, 𝐷𝐷𝑓𝑓 = depth of footing (m)
𝐵𝐵= breadth of footing(m)

Immediate settlement takes place as the load is applied or within a time period of about 7
days.

-----------------------------------------Immediate Settlement--------------------------------------------

∆𝑃𝑃 × 𝑋𝑋�
𝑆𝑆𝑠𝑠 =
𝑊𝑊 ′

------------------------------------------------Incremental Stress---------------------------------------------

𝐵𝐵 × 𝐿𝐿
Δ𝑃𝑃 = 𝑃𝑃 ×
(𝐿𝐿 + 𝑍𝑍)(𝐵𝐵 + 𝑍𝑍)

Where,
𝒛𝒛
Z = as the effect of stress is acting on the center of the layer
𝟐𝟐
𝒛𝒛
=Mid-point of the thickness of layer
𝟐𝟐

P= Applied Pressure at foundation base.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 10


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

--------------------------------------Settlement for Unit Pressure--------------------------------------

𝟎𝟎. 𝟕𝟕𝟕𝟕𝟕𝟕 2 × 𝐵𝐵 2
𝑋𝑋� = � �×� �
𝑵𝑵′′ − 𝟑𝟑 𝐵𝐵 + 0.3

Where, N’’ = Corrected SPT (should be rounded off to lowest side)

B = breadth of footing (m)

-----------------------------------------Water Table Correction (W’) -----------------------------------------

CASE -1
𝐿𝐿𝐸𝐸 ≤ 𝑊𝑊𝑡𝑡 Then W’= 1

CASE-2
𝐿𝐿𝑆𝑆 ≥ 𝑊𝑊𝑡𝑡 Then W’= 0.5

CASE-3
Interpolation for water table correction if 𝐿𝐿𝐸𝐸 > 𝑊𝑊𝑡𝑡 > 𝐿𝐿𝑆𝑆
𝑊𝑊𝑡𝑡 − 𝐿𝐿𝑆𝑆
𝑊𝑊 ′ = 0.5 + � � × 0.5
𝐿𝐿𝐸𝐸 − 𝐿𝐿𝑆𝑆
Where,𝐿𝐿𝑆𝑆 = 𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿𝐿 𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠𝑠 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑ℎ
𝐿𝐿𝐸𝐸 = 𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙𝑙 𝑒𝑒𝑒𝑒𝑒𝑒 𝑑𝑑𝑑𝑑𝑑𝑑𝑑𝑑ℎ

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 11


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

-------------------------------------------------Special Case--------------------------------------------------

Settlement coefficient: is applied when clay layer is resting on cohesion less soil layer or rock
and settlement value is high.

𝑺𝑺 = 𝝀𝝀 𝑺𝑺𝒐𝒐𝒐𝒐𝒐𝒐
𝐻𝐻𝑡𝑡
𝝀𝝀 = factor related to pore pressure parameter and the ratio and read form figure given
𝐵𝐵
below. In absence of data regarding the pore pressure parameter the values can be taken
from the table given below:

Type of clay 𝝀𝝀
Very sensitive clay 1.0 to 1.2
Normally consolidated clay 0.7 to1.0
Over consolidated 0.5 to 0.7
Highly Over consolidated 0.2 to 0.5

*Reference IS: 8009 (Part I) - 1976

-----------------------------------------------Total settlement (𝑺𝑺𝒕𝒕 )-------------------------------------

𝑺𝑺𝒕𝒕 = (𝑺𝑺 + 𝑺𝑺𝒔𝒔 ) × 𝒅𝒅𝒅𝒅𝒅𝒅𝒅𝒅𝒅𝒅 𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇 × 𝒓𝒓𝒓𝒓𝒓𝒓𝒓𝒓𝒓𝒓𝒓𝒓𝒓𝒓𝒓𝒓 𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇𝒇

𝑺𝑺𝒕𝒕 = (Consolidation Settlement + Immediate Settlement) X Depth factor X Rigidity factor


Where: Rigidity factor = 0.8 is taken from IS: 8009 (Part-I)-1976
And Value of Depth correction factor is taken from the graph given in IS: 8009 (Part-I)-1976

Note: Permissible settlement is governed from Table 1 of IS: 1904 - 1986

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 12


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

RECOMMENDATIONS DESIGN, SUPPLY, ERECTION, TESTING AND


COMMISSIONING FOR 25KV OHE FOR INCREASING SPEED POTENTIAL TO
160KMPH ON GHAZIABAD (EXCL)-DEEN DAYAL UPADHAYA NAGAR(EXCL)
UP & DN MAIN LINE OF PRAYAGRAJ DIVISION (TOTAL 757 RKM/1655 TKM)
(CH-1398/36-1398/40, LOCATION- DANKAUR TSS)

BOREHOLE Depth of Net Safe


NO Size of Footing Settlement
Foundation Shape of Footing Bearing
Produced
below GL Length Width Capacity
(m) (m) (m) Tonne/sqm (mm)

1.20 1.50 1.50 12.02 7.18


1.20 2.00 2.00 12.69 10.05
9 1.50 ISOLATED SQUARE 1.50 1.50 14.45 9.83
1.50 FOOTING 2.00 2.00 14.60 12.86
1.80 1.50 1.50 16.59 12.95
1.80 2.00 2.00 16.58 16.34

## The soil strata is found to be normal silty sand soil which is recommendable for
construction purpose.

## Borehole no-9 is governing borehole for safe bearing capacity.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 13


ALTRUIST
GEOTECHNICAL
SERVICES

GEOTECH AND DESIGN LGF-06 Omaxe Avenue, Phone: 9140708822


Omaxe City, Bijnor Road 9140240977
CONSULTANTS, Lucknow E-mail:altruistgeo@gmail.com
CONTRACTORS U.P. 226025 Web- www.altruistgeo.com

NOTE: - The above recommendations are based on the field investigation data
results and the laboratory tests results of the samples collected from the test
locations and our experience in this regards. If the actual sub-soil conditions during
excavation for the foundations differ from that has been reported, a reference should
be made to us for suggestions. Further, the recommendations are based on the
assumptions as mentioned in the Report and the designer of the Structure should
take into consideration all the factors required as per codes. The recommendations
should be taken as guidelines for the designer.

PREPARED BY: CHECKED BY:


Er. NITESH CHAYRASIYA Er. Pratosh Chaurasia
B.Tech. (Civil) B.Tech. (Civil), MIGS
ALTRUIST GEOTECHNICAL DIRECTOR/TECHNICAL MANAGER
SERVICES Pvt. Ltd. ALTRUIST GEOTECHNICAL
SERVICES Pvt. Ltd.

ALTRUIST GEOTECHNICAL SERVICES AGS-SSI/20-21 Page 14


BEARING CAPACITY CALCULATION SHEET AS PER IS: 6403-1981
Water table below borehole level
Depth of borehole 3.00 metre - Factor of safety 3.00
(m)
BOREHOLE 9
Water table used for calculation Assumed post monsoon rise
(m)
3.00 (m)
-

Ultimate Net Bearing 
Input Parameters Shearing Resistance Parameters
Capacity
Net Safe 
Density Density Density Density Bearing 
Angle of
S.  Type of  Above Including Below Including Void Effective Inclination General Local Capacity
Depth Length Width Cohesion Shearing Bearing Capacity Factors Shape Factors Depth Factors Intermediate
No. foundation Foundation water Foundation water Ratio Surcharge Factors shear shear
Resistance
Level effect Level effect

Bulk Bulk c Ø Ø' e q Nc Nq Nγ Nc' Nq' Nγ' Sc Sq Sγ Dc Dq Dγ Dc' Dq' Dγ' Ic Iq Iγ

(m) (m) (m) (gms/cc) (kN/m3) (gms/cc) (kN/m3) Kg/cm2 ° ° kN/m2 kN/m2 kN/m2 kN/m2 kN/m2

1 SQUARE 1.20 1.50 1.50 1.74 17.06 1.74 17.06 0.00 28 19.61 0.668 20.48 25.80 14.72 16.72 14.47 6.16 5.10 1.30 1.20 0.80 1.27 1.13 1.13 1.23 1.11 1.11 1.00 1.00 1.00 575.96 199.18 353.66 117.89

2 SQUARE 1.20 2.00 2.00 1.74 17.06 1.74 17.06 0.00 28 19.61 0.668 20.48 25.80 14.72 16.72 14.47 6.16 5.10 1.30 1.20 0.80 1.20 1.10 1.10 1.17 1.09 1.09 1.00 1.00 1.00 609.24 209.21 373.22 124.41

3 SQUARE 1.50 1.50 1.50 1.74 17.06 1.74 17.06 0.00 28 19.61 0.668 25.60 25.80 14.72 16.72 14.47 6.16 5.10 1.30 1.20 0.80 1.33 1.17 1.17 1.28 1.14 1.14 1.00 1.00 1.00 691.19 240.42 425.23 141.74

4 SQUARE 1.50 2.00 2.00 1.74 17.06 1.74 17.06 0.00 28 19.61 0.668 25.60 25.80 14.72 16.72 14.47 6.16 5.10 1.30 1.20 0.80 1.25 1.12 1.12 1.21 1.11 1.11 1.00 1.00 1.00 698.62 242.58 429.56 143.19

5 SQUARE 1.80 1.50 1.50 1.74 17.06 1.74 17.06 0.00 28 19.61 0.668 30.72 25.80 14.72 16.72 14.47 6.16 5.10 1.30 1.20 0.80 1.40 1.20 1.20 1.34 1.17 1.17 1.00 1.00 1.00 791.49 277.34 488.14 162.71

6 SQUARE 1.80 2.00 2.00 1.74 17.06 1.74 17.06 0.00 28 19.61 0.668 30.72 25.80 14.72 16.72 14.47 6.16 5.10 1.30 1.20 0.80 1.30 1.15 1.15 1.26 1.13 1.13 1.00 1.00 1.00 791.35 277.07 487.93 162.64
ANNEXURE I
SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 1

Depth 1.20 metre Settlement effective zone depth 1.50 X Width Depth factor 1.00


Length 1.50 metre Water Table depth for calculation 3.00 (m) bgl Rigidity factor 0.80 BOREHOLE 9
Width 1.50 metre Applied Pressure at foundation base 117.89 kN/m2 Type of foundation SQUARE

Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 1.20 1.20 1.74 ‐ ‐ ‐ Depth of foundation


7.18
2 2 SAND 1.20 3.00 1.80 1.78 ‐ ‐ 14.00 36.19 46.05 0.195 1.000 ‐ 8.977

SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 2

Depth 1.20 metre Settlement effective zone depth 1.50 X Width Depth factor 1.00


Length 2.00 metre Water Table depth for calculation 3.00 (m) bgl Rigidity factor 0.80 BOREHOLE 9
Width 2.00 metre Applied Pressure at foundation base 124.41 kN/m2 Type of foundation SQUARE

Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 1.20 1.20 1.74 ‐ ‐ ‐ Depth of foundation


10.05
2 2 SAND 1.20 3.00 1.80 1.78 ‐ ‐ 14.00 36.19 59.17 0.212 1.000 ‐ 12.560

SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 3

Depth 1.50 metre Settlement effective zone depth 1.50 X Width Depth factor 1.00


Length 1.50 metre Water Table depth for calculation 3.00 (m) bgl Rigidity factor 0.80 BOREHOLE 9
Width 1.50 metre Applied Pressure at foundation base 141.74 kN/m2 Type of foundation SQUARE

Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 1.50 1.50 1.74 ‐ ‐ ‐ Depth of foundation


9.83
ANNEXURE I

2 2 SAND 1.50 3.00 1.50 1.78 ‐ ‐ 14.00 38.69 63.00 0.195 1.000 ‐ 12.281
SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 4

Depth 1.50 metre Settlement effective zone depth 1.50 X Width Depth factor 1.00


Length 2.00 metre Water Table depth for calculation 3.00 (m) bgl Rigidity factor 0.80 BOREHOLE 9
Width 2.00 metre Applied Pressure at foundation base 143.19 kN/m2 Type of foundation SQUARE

Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 1.50 1.50 1.74 ‐ ‐ ‐ Depth of foundation


12.86
2 2 SAND 1.50 3.00 1.50 1.78 ‐ ‐ 14.00 38.69 75.73 0.212 1.000 ‐ 16.076

SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 5

Depth 1.80 metre Settlement effective zone depth 1.50 X Width Depth factor 1.00


Length 1.50 metre Water Table depth for calculation 3.00 (m) bgl Rigidity factor 0.80 BOREHOLE 9
Width 1.50 metre Applied Pressure at foundation base 162.71 kN/m2 Type of foundation SQUARE

Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 1.80 1.80 1.74 ‐ ‐ ‐ Depth of foundation


12.95
2 2 SAND 1.80 3.00 1.20 1.78 ‐ ‐ 14.00 41.19 83.02 0.195 1.000 ‐ 16.184

SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 6

Depth 1.80 metre Settlement effective zone depth 1.50 X Width Depth factor 1.00


Length 2.00 metre Water Table depth for calculation 3.00 (m) bgl Rigidity factor 0.80 BOREHOLE 9
Width 2.00 metre Applied Pressure at foundation base 162.64 kN/m2 Type of foundation SQUARE

Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 1.80 1.80 1.74 ‐ ‐ ‐ Depth of foundation


16.34
ANNEXURE I

2 2 SAND 1.80 3.00 1.20 1.78 ‐ ‐ 14.00 41.19 96.24 0.212 1.000 ‐ 20.428
TEST RESULTS
Bore Hole No. 1398/36-1398/40 Latitude Depth of Water Level (m bgl) NILL
Coordinate Longitude Started on
7 3.00
Elevation 100.000 Completed on
% Material Passing Shear
Atterberg Limits
IS Sieve Characterisitics
Depth of Bore
Reduced Level (ASSUMED)
Index

Hole
LL PL PI

SPT Value
Void Ratio

4.750
2.000
0.425
0.075
Compression

due to dilatancy
Internal
Friction

Angle of

Specific Gravity
Cohesion

IS group symbol
due to overburden
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture

SPT Value corrected


SPT Value corrected
metre metre (mm) (mm) (mm) (mm) % % % N N' N" (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

0.00 - 0.50 100.000 - 99.500 DS 100 100 97 22 NON-PLASTIC SM

1.50 - 1.85 98.500 - 98.150 UDS 100 100 98 55 NON-PLASTIC ML - - - 1.75 14.90 1.52 2.50 0.641 0 27 -

1.85 - 2.30 98.150 - 97.700 SPT 100 100 96 38 NON-PLASTIC SM 13 16.85 16.85 1.77 - - - - - - -

2.30 - 3.00 97.700 - 97.000 DS 100 100 98 27 NON-PLASTIC SM - - - 1.78 - - - - - - -


ANNEXURE II
TEST RESULTS
Bore Hole No. 1398/36-1398/40 Latitude Depth of Water Level (m bgl) NILL
Coordinate Longitude Started on
8 3.00
Elevation 100.000 Completed on
% Material Passing Shear
Atterberg Limits
IS Sieve Characterisitics
Depth of Bore
Reduced Level (ASSUMED)
Index

Hole
LL PL PI

SPT Value
Void Ratio

4.750
2.000
0.425
0.075
Compression

due to dilatancy
Internal
Friction

Angle of

Specific Gravity
Cohesion

IS group symbol
due to overburden
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture

SPT Value corrected


SPT Value corrected
metre metre (mm) (mm) (mm) (mm) % % % N N' N" (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

0.00 - 0.50 100.000 - 99.500 DS 100 100 98 35 NON-PLASTIC SM

1.50 - 1.85 98.500 - 98.150 UDS 100 99 99 27 NON-PLASTIC SM - - - 1.77 15.30 1.54 2.54 0.655 0 28 -

1.85 - 2.30 98.150 - 97.700 SPT 100 98 97 33 NON-PLASTIC SM 14 18.10 18.10 1.79 - - - - - - -

2.30 - 3.00 97.700 - 97.000 DS 100 99 96 28 NON-PLASTIC SM - - - 1.80 - - - - - - -


ANNEXURE II
TEST RESULTS
Bore Hole No. 1398/36-1398/40 Latitude Depth of Water Level (m bgl) NILL
Coordinate Longitude Started on
9 3.00
Elevation 100.000 Completed on
% Material Passing Shear
Atterberg Limits
IS Sieve Characterisitics
Depth of Bore
Reduced Level (ASSUMED)
Index

Hole
LL PL PI

SPT Value
Void Ratio

4.750
2.000
0.425
0.075
Compression

due to dilatancy
Internal
Friction

Angle of

Specific Gravity
Cohesion

IS group symbol
due to overburden
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture

SPT Value corrected


SPT Value corrected
metre metre (mm) (mm) (mm) (mm) % % % N N' N" (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

0.00 - 0.50 100.000 - 99.500 DS 100 100 96 27 NON-PLASTIC SM

1.50 - 1.85 98.500 - 98.150 UDS 100 100 97 32 NON-PLASTIC SM - - - 1.74 15.20 1.51 2.52 0.668 0 28 -

1.85 - 2.30 98.150 - 97.700 SPT 100 100 99 22 NON-PLASTIC SM 11 14.28 14.28 1.78 - - - - - - -

2.30 - 3.00 97.700 - 97.000 DS 100 100 97 29 NON-PLASTIC SM - - - 1.81 - - - - - - -


ANNEXURE II
ANNEXURE III
ANNEXURE III
ANNEXURE III