ASL-173E
CH-87+430(INTERCHANGE)
GEOTECHNICAL REPORT
ISO/IEC 17025 Accredited Testing Laboratory by NABL
PROJECT
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION
OF FOUR-LANE GREENFIELD AMRITSAR CONNECTIVITY FOR
CONNECTION OF AMRITSAR WITH DELHI-AMRITSAR-KATRA
EXPRESSWAY FROM JUNCTION WITH NH-3 AND TARAN
BYPASS NEAR MANNAWALA VILLAGE CH 70+950 TO
JUNCTION WITH NH-354 AJANALA ROAD NEAR HARSHA CHINA
VILLAGE CH 99+020 (KM 70+950 TO KM 99+020 OF AMRITSAR
CONNECTIVITY) ON EPC MODE UNDER BHARATMALA
PARIYOJNA IN THE STATE OF PUNJAB
arunsoillab.asl@gmail.com
9415025566, 9415501637
info@arunsoillab.com
ACKNOWLEDGEMENT
Dear Sir,
With reference to your Order DPS/ASR-KE/WO/2023/35 dated 10th May 2023,
Arun Soil Lab Pvt. Ltd. (ASL) is pleased to submit the report carried out for the
proposed site.
We look forward for further co-operation if any, whenever required. For any further
clarification concerning the report, please contact us at your convenience.
CONTENTS
1. INTRODUCTION 1
SUMMARY OF FIELD WORK 1
2. REFERENCES 2
3. METHODOLOGY OF FIELD INVESTIGATION 3
STANDARD PENETRATION TEST (SPT) 3
UNDISTURBED SOIL SAMPLES (UDS) 4
4. LABORATORY TESTS 5
CLASSIFICATION AND ABBREVIATIONS 6
5. INTERPRETATION OF LAB TEST RESULTS
a. GENERAL NATURE OF SOIL STRATA 7
b. SPT VALUES 7
c. WATER TABLE 7
d. HARMFUL SALTS TEST REPORT 8
6. RECOMMENDATIONS 9-10
7. SITE PLAN/GOOGLE EARTH IMAGE 11
8. SITE PHOTOGRAPHS 12
9. BEARING CAPACITY CALCULATIONS 13-16
10. RESULTS SHEETS 17-18
11. BORE-LOG CHARTS 19
12. TRIAXIAL SHEAR/DIRECT SHEAR GRAPHS 20-23
13. CONSOLIDATION TEST GRAPHS 24
INTRODUCTION
The work of sub-soil exploration was awarded to us by M/s D.P.S. Contractors Pvt. Ltd. The
object of the investigation was to study the geo-technical properties of soil both in field and
laboratory and determine safe allowable pressure for the foundation soil.
Depth Field
Bore Easting Northing Field Investigation
Investigation
Hole (m) Completion Date
Start Date
1 35.00 489836.521 3507820.977 21/05/2023 22/05/2023
REFERENCES
Laboratory Test IS Code Referred
Bulk Density By calculations
Natural Moisture Content IS : 2720 (Part-2)-1973, RA-2010
Specific Gravity IS : 2720 (Part-3)-1980, RA-2007
Grain Size Analysis IS : 2720 (Part-4)-1985, RA-2010
Liquid Limit and Plastic Limit IS : 2720 (Part-5)-1985, RA-2010
Shrinkage Limit IS : 2720 (Part 6) -1972, RA-2007
Free Swell Index IS : 2720 (Part-40) -1977, RA-2007
Unconsolidated Undrained Triaxial Shear Test IS : 2720 (Part-11)-1993, RA-2007
Consolidation Test IS : 2720 (Part-15)-1986, RA-2007
pH value IS : 3025 (Part-11)-1983, RA-2006
Chemical Analysis
of Water* Sulphates IS : 3025 (Part-24)-1986, RA-2009
Chlorides IS : 3025 (Part-32)-1988, RA-2009
pH value IS : 2720 (Part 26)-1987, RA-2007
Chemical Analysis
of Soil* Sulphates IS : 2720 (Part-27)-1977, RA-2010
Chlorides IS : 3025 (Part-32)-1988, RA-2009
Undisturbed Soil Samples (UDS) were collected from the boreholes at every 1.50
m interval & change of strata as per sampling specifications, in thin-walled sampling
tubes of 100 mm dia. and 450 mm length. These sampling tubes after retrieval from
the boreholes were properly waxed and sealed at both ends. These were carefully
labeled and transported to the laboratory for testing. UDS wherever slipped during
lifting, were duly marked in the bore logs as well in the soil profile.
LABORATORY TESTS:
The following laboratory tests were conducted to determine the engineering characteristics of sub-
soils:
Natural moisture contents were determined by oven drying method as per IS 2720 (Part II)-1973.
The results have been reported in result sheet attached.
Dry and Bulk density of soil strata were obtained using Shelby tubes in accordance with IS 2720
(Part XXIX)-1975. The results have been reported in result sheet attached.
Particle size analysis test by hydrometer method were performed in accordance with IS 2720
(Part IV) - 1965 on the part of soil samples obtained after the sieve analysis. The results have been
reported in result sheet attached.
Atterberg Limits’ tests were performed in accordance with IS 2720 (Part V) - 1985 and results
have been reported in result sheet attached.
Specific gravity tests were performed in accordance with IS 2720 (Part III Section1) -1980 and
the results have been reported in result sheet attached.
Triaxial Compression Test under Unconsolidated Un-drained (UU) condition as per IS: 2720
(Part-XI)-2011 were performed on the undisturbed soil samples obtained during the field
investigation. The results have been reported in result sheet attached.
Direct shear tests were performed as per IS 2720 (Part XIII)-2015, on the undisturbed soil
samples obtained during the field investigation. The results and the density of samples have been
reported in result sheet attached.
Consolidation tests were performed as per IS 2720 (Part XV)-1986, on the undisturbed soil
samples obtained during the field investigation. The result in the form of compression index (Cc)
is reported in result sheet attached.
CLASSIFICATION OF SOIL
S.P.T. VALUES
The S.P.T. values obtained in the respective clayey layer region present as per bore-log charts
enclosed are found to range from 10 to 33 indicating ‘Stiff’ to ‘Hard’ consistency.
However, the S.P.T. values obtained in the respective sandy layer region present as per bore-log
charts enclosed are found to range from 15 to 89 indicating ‘Medium Dense’ to ‘Very Dense’
relative density.
The results of S.P.T. values indicate that the stratum at the Site is ‘Well’ to ‘Very Well’
compacted.
WATER TABLE
Water Table at the Site was observed at a depth from 21.00 metre below ground level on the day of
soil investigation during the Fourth week of May 2023. However, the existing water table may rise
in the post-monsoon period in general. Therefore, a water table at a depth of 0.00 metre below
ground level has been adopted for calculation purposes.
TABLE NO. 1
BORE DEPTH
CARBONATES BICARBONATES CHLORIDES SULPHATES
HOLE IN pH
% % % %
NO. METRES
However, the Final Ultimate Bearing Capacity of the pile must be adopted only after performing
Pile Load Test on Test Pile constructed at the site as per IS: 2911 (Part- IV)-1985 and actual
design load requirements of the proposed structure.
NOTE: -
The above recommendations are based on the field investigation data results and the laboratory
tests results of the samples collected from the test locations and our experience in this regard. If the
actual sub-soil conditions during excavation for the foundations differ from that has been reported,
Further, the recommendations are based on the assumptions as mentioned in the Report and the
designer of the Structure should take into consideration all the factors required as per codes. The
SITE PHOTOGRAPHS
SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES [AS PER IRC:78-2014 AND IS :2911(Part 1)]
ESTIMATION OF VERTICAL COMPRESSIVE AND UPLIFT LOAD CARRYING CAPACITY OF BORED CAST IN-SITU CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF FOUR-LANE GREENFIELD AMRITSAR CONNECTIVITY FOR CONNECTION OF AMRITSAR WITH DELHI-AMRITSAR-KATRA EXPRESSWAY
NAME OF THE PROJECT FROM JUNCTION WITH NH-3 AND TARAN BYPASS NEAR MANNAWALA VILLAGE CH 70+950 TO JUNCTION WITH NH-354 AJANALA ROAD NEAR HARSHA CHINA VILLAGE CH 99+020 (KM 70+950 TO KM
99+020 PF AMRITSAR CONNECTIVITY) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF PUNJAB
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 (Conservative side) FOS In Compression 2.50
Pile Cut off Length Below G.L(m)
BORE HOLE Average Void Factor (%) FOS In Uplift
2.00 10.00 2.50
Parameters of Pile Reduced Level of Borehole (m) 100.000 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
BH-1 Settlement (Assumed) 10.00 mm (1% of pile diameter) (Assumed)
Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Cumulative
Total Difference in
Pile Length Angle of Effective Effective Skin Self
Type of Soil RL of Layer RL of Layer Thickness of Submerged Ultimate End Factors for Skin Friction Weight of Ultimate shaft Total Ultimate pile Safe Pile Capacity Safe Pile Capacity
Layer no Below Cut- Cohesion Internal Bulk Density Overburden Overburden Bearing Capacity Factor friction in Weight of
Layer Top Bottom Layer Bulk Density Bearing Displaced Soil and resistance capacity (compression) (Uplift)
off Level Friction Pressure Pressure at pile layer pile
tip Capacity RCC
1 CLAY 0.50 98.000 97.500 0.50 0.20 18 1.87 8.53 4.27 4.27 9 7.48 4.07 180.06 1.50 2.13 0.32 1.57 0.7 23.62 4.95 1.60 23.62 203.68 8.14 1.16
2 SAND 8.00 97.500 90.000 7.50 0.00 27 1.76 7.45 55.90 60.17 9 12.73 14.47 643.97 1.50 32.22 0.37 23.56 0.0 420.05 79.17 31.92 443.68 1087.64 41.11 20.34
3 SAND 9.50 90.000 88.500 1.50 0.00 29 1.91 8.92 13.39 73.55 9 18.14 19.34 1115.64 1.50 66.86 0.40 4.71 0.0 188.55 94.01 36.25 632.23 1747.86 67.59 27.10
4 CLAY 12.50 88.500 85.500 3.00 0.30 17 2.06 10.40 31.19 104.74 9 7.12 3.53 812.17 1.50 89.15 0.31 9.42 0.7 583.22 123.70 41.45 1215.45 2027.62 78.47 46.40
5 CLAY 14.00 85.500 84.000 1.50 0.35 16 2.07 10.49 15.74 120.48 9 6.76 3.06 899.67 1.50 112.61 0.29 4.71 0.7 343.70 138.54 43.93 1559.15 2458.81 95.81 57.51
6 SAND 17.00 84.000 81.000 3.00 0.00 30 1.95 9.32 27.95 148.43 9 21.65 22.40 2606.00 1.50 134.45 0.41 9.42 0.0 787.34 168.23 51.67 2346.48 4952.49 196.73 82.52
7 SAND 24.50 81.000 73.500 7.50 0.00 33 1.97 9.51 71.35 148.43 9 36.82 35.19 4423.91 1.50 184.10 0.46 23.56 0.0 2999.63 242.45 69.86 5346.11 9770.02 391.37 173.94
8 SAND 26.00 73.500 72.000 1.50 0.00 34 1.99 9.71 14.56 148.43 9 43.95 41.06 5280.18 1.50 227.06 0.48 4.71 0.0 765.53 257.30 73.27 6111.64 11391.82 457.17 196.86
9 SAND 27.00 72.000 71.000 1.00 0.00 34 1.99 9.71 9.71 148.43 9 43.95 41.06 5280.18 1.50 239.19 0.48 3.14 0.0 537.63 267.19 75.53 6649.28 11929.45 478.87 212.90
10 SAND 28.00 71.000 70.000 1.00 0.00 34 1.99 9.71 9.71 148.43 9 43.95 41.06 5280.18 1.50 248.90 0.48 3.14 0.0 559.45 277.09 77.80 7208.73 12488.91 501.45 229.55
* Safe pile capacity in uplift = 70% of skin friction capacity + Self weight of pile
Page 13 of 24
ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION
SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES [AS PER IRC:78-2014 AND IS :2911(Part 1)]
ESTIMATION OF VERTICAL COMPRESSIVE AND UPLIFT LOAD CARRYING CAPACITY OF BORED CAST IN-SITU CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF FOUR-LANE GREENFIELD AMRITSAR CONNECTIVITY FOR CONNECTION OF AMRITSAR WITH DELHI-AMRITSAR-KATRA EXPRESSWAY
NAME OF THE PROJECT FROM JUNCTION WITH NH-3 AND TARAN BYPASS NEAR MANNAWALA VILLAGE CH 70+950 TO JUNCTION WITH NH-354 AJANALA ROAD NEAR HARSHA CHINA VILLAGE CH 99+020 (KM 70+950 TO KM
99+020 PF AMRITSAR CONNECTIVITY) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF PUNJAB
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 (Conservative side) FOS In Compression 2.50
Pile Cut off Length Below G.L(m)
BORE HOLE Average Void Factor (%) FOS In Uplift
2.30 10.00 2.50
Parameters of Pile Reduced Level of Borehole (m) 100.000 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
BH-1 Settlement (Assumed) 12.00 mm (1% of pile diameter) (Assumed)
Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Cumulative
Total Difference in
Pile Length Angle of Effective Effective Skin Self
Type of Soil RL of Layer RL of Layer Thickness of Submerged Ultimate End Factors for Skin Friction Weight of Ultimate shaft Total Ultimate pile Safe Pile Capacity Safe Pile Capacity
Layer no Below Cut- Cohesion Internal Bulk Density Overburden Overburden Bearing Capacity Factor friction in Weight of
Layer Top Bottom Layer Bulk Density Bearing Displaced Soil and resistance capacity (compression) (Uplift)
off Level Friction Pressure Pressure at pile layer pile
tip Capacity RCC
1 CLAY 0.20 97.700 97.500 0.20 0.20 18 1.87 8.53 1.71 1.71 9 7.48 4.07 241.55 1.50 0.85 0.32 0.75 0.7 10.87 2.85 0.92 10.87 252.42 10.20 0.59
2 SAND 7.70 97.500 90.000 7.50 0.00 27 1.76 7.45 55.90 57.61 9 12.73 14.47 902.65 1.50 29.66 0.37 28.27 0.0 464.02 109.73 44.58 474.89 1377.54 51.64 24.27
3 SAND 9.20 90.000 88.500 1.50 0.00 29 1.91 8.92 13.39 70.99 9 18.14 19.34 1573.52 1.50 64.30 0.40 5.65 0.0 217.60 131.10 50.81 692.48 2266.00 87.24 32.50
4 CLAY 12.20 88.500 85.500 3.00 0.30 17 2.06 10.40 31.19 102.18 9 7.12 3.53 1153.06 1.50 86.59 0.31 11.31 0.7 686.59 173.85 58.29 1379.07 2532.13 97.33 56.00
5 CLAY 13.70 85.500 84.000 1.50 0.35 16 2.07 10.49 15.74 117.92 9 6.76 3.06 1279.58 1.50 110.05 0.29 5.65 0.7 406.21 195.23 61.87 1785.29 3064.87 118.70 69.51
6 SAND 16.70 84.000 81.000 3.00 0.00 30 1.95 9.32 27.95 145.87 9 21.65 22.40 3713.57 1.50 131.89 0.41 11.31 0.0 926.82 237.98 73.01 2712.10 6425.67 254.64 99.74
7 SAND 24.20 81.000 73.500 7.50 0.00 33 1.97 9.51 71.35 145.87 9 36.82 35.19 6301.69 1.50 181.54 0.46 28.27 0.0 3549.51 344.86 99.20 6261.61 12563.31 502.31 209.81
8 SAND 26.00 73.500 71.700 1.80 0.00 34 1.99 9.71 17.48 145.87 9 43.95 41.06 7521.31 1.50 225.95 0.48 6.79 0.0 1097.01 370.51 105.09 7358.62 14879.93 596.19 243.09
9 SAND 27.00 71.700 70.700 1.00 0.00 34 1.99 9.71 9.71 145.87 9 43.95 41.06 7521.31 1.50 239.55 0.48 3.77 0.0 646.11 384.76 108.36 8004.73 15526.04 622.21 262.61
10 SAND 28.00 70.700 69.700 1.00 0.00 34 1.99 9.71 9.71 145.87 9 43.95 41.06 7521.31 1.50 249.25 0.48 3.77 0.0 672.30 399.01 111.63 8677.03 16198.34 649.30 282.86
* Safe pile capacity in uplift = 70% of skin friction capacity + Self weight of pile
Page 14 of 24
ARUN SOIL LAB PVT LTD
Lateral Load Capacity of Pile
[As per IS : 2911(Part 1/Sec 2)-2010, Second Revision and IRC : 78-2014]
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF FOUR-LANE GREENFIELD AMRITSAR CONNECTIVITY FOR CONNECTION OF
AMRITSAR WITH DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH NH-3 AND TARAN BYPASS NEAR MANNAWALA VILLAGE CH
Project Name
70+950 TO JUNCTION WITH NH-354 AJANALA ROAD NEAR HARSHA CHINA VILLAGE CH 99+020 (KM 70+950 TO KM 99+020 PF AMRITSAR
CONNECTIVITY) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF PUNJAB
PILE DETAILS :
Diameter of Pile, ( D ) = 1000 mm
Existing Ground Level = - m
Pile Cut-off Level = 2.75 m
Maximum Liquefiable Level / Loose or Soft soil = 0
Minimum Length of Pile to be long pile = 28.00 m
Grade of Concrete (M) = M35
4
Moment of Inertia of Pile, (I) = 0.0491 m
Modulus of Elasticity of Pile, (E) = 29580.40 Mpa
Pile Legth Above Scour /Liquefiable Level, (L1) = 0 m
SOIL PARAMETERS :
SOIL TYPE(CLAY/SILT/SAND) SAND
2
Cohesion of Soil, ( c ) = 0.00 kg/cm
2
Unconfined compressive strength of Soil, (su) = 0.00 kg/cm
Modulus of subgrade reaction for cohesive soil, k1 = -
Average "N" value = 20
OTHER PARAMETERS :
3
Modulus of Subgrade Reaction for granular soil, (חh) = 2.84 MN/m
3
Modulus of Subgrade Reaction for Cohesive Soil, (k1) = - MN/m
3
Modulus of horizontal subgrade reaction = - MN/m
K = [(k1*0.3/1.5*B)]
Stiffness Factor for P.C. Cohesive Soil, (R) = - m
Stiffness Factor for N.C.clay and NonCohesive Soil, (T) = 3.48 m
Embedded Pile Length (Le) = 28.00 m
Type of pile Behaviour Long
L1 / R or L1 / T = 0
Page 15 of 24
ARUN SOIL LAB PVT LTD
Lateral Load Capacity of Pile
[As per IS : 2911(Part 1/Sec 2)-2010, Second Revision and IRC : 78-2014]
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF FOUR-LANE GREENFIELD AMRITSAR CONNECTIVITY FOR CONNECTION OF
AMRITSAR WITH DELHI-AMRITSAR-KATRA EXPRESSWAY FROM JUNCTION WITH NH-3 AND TARAN BYPASS NEAR MANNAWALA VILLAGE CH
Project Name
70+950 TO JUNCTION WITH NH-354 AJANALA ROAD NEAR HARSHA CHINA VILLAGE CH 99+020 (KM 70+950 TO KM 99+020 PF AMRITSAR
CONNECTIVITY) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF PUNJAB
PILE DETAILS :
Diameter of Pile, ( D ) = 1200 mm
Existing Ground Level = - m
Pile Cut-off Level = 2.75 m
Maximum Liquefiable Level / Loose or Soft soil = 0
Minimum Length of Pile to be long pile = 28.00 m
Grade of Concrete (M) = M35
4
Moment of Inertia of Pile, (I) = 0.1018 m
Modulus of Elasticity of Pile, (E) = 29580.40 Mpa
Pile Legth Above Scour /Liquefiable Level, (L1) = 0 m
SOIL PARAMETERS :
SOIL TYPE(CLAY/SILT/SAND) SAND
2
Cohesion of Soil, ( c ) = 0.00 kg/cm
2
Unconfined compressive strength of Soil, (su) = 0.00 kg/cm
Modulus of subgrade reaction for cohesive soil, k1 = -
Average "N" value = 20
OTHER PARAMETERS :
3
Modulus of Subgrade Reaction for granular soil, (חh) = 2.84 MN/m
3
Modulus of Subgrade Reaction for Cohesive Soil, (k1) = - MN/m
3
Modulus of horizontal subgrade reaction = - MN/m
K = [(k1*0.3/1.5*B)]
Stiffness Factor for P.C. Cohesive Soil, (R) = - m
Stiffness Factor for N.C.clay and NonCohesive Soil, (T) = 4.03 m
Embedded Pile Length (Le) = 28.00 m
Type of pile Behaviour Long
L1 / R or L1 / T = 0
Page 16 of 24
RESULT SHEET
NAME OF THE PROJECT FOUR-LANE GREENFIELD AMRITSAR CONNECTIVITY FOR CONNECTION OF AMRITSAR WITH DELHI-AMRITSAR-KATRA EXPRESSWAY
Client Name M/s D.P.S. Contractors Pvt. Ltd.
Bore Hole No. 1 Easting 489836.52 Depth of Water Level (m bgl) 21.00
Total depth of
35.00
Coordinate Northing 3507820.98 Commenced on ARUN SOIL LAB PVT. LTD.
Bore Hole (m) Elevation 100.000 Completed on
% Material Passing
Original Moisture
Type of Sample
IS group symbol
Specific Gravity
Atterberg Limits
due to dilatancy
Compression
IS Sieve
Type of Test
Characterisitics
Void Ratio
Silt Factor
SPT Value
Depth of Bore Reduced Level
Index
Cohesion
Angle of
Friction
Internal
Hole (Assumed)
4.750
2.000
0.425
0.075
LL PL PI
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (e) (Kg/sqcm) (Ø) (Cc) CD/UU
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1.00 - 1.45 99.000 - 98.550 UD - - - 98 95 92 90 - 26 19 7 CL-ML 1.87 16.90 1.60 2.64 0.650 0.2 18 - UU
1.45 - 1.90 98.550 - 98.100 SPT 10 - - - -
2.50 - 2.95 97.500 - 97.050 UD - - - 100 100 100 26 - NON-PLASTIC SM 1.74 13.70 1.53 2.56 0.673 0 27 - CD
2.95 - 3.40 97.050 - 96.600 SPT 15 17.33 17.33 - -
5.50 - 5.95 94.500 - 94.050 UD - - - 100 100 99 18 - NON-PLASTIC SM 1.79 15.50 1.55 - - - - - CD
5.95 - 6.40 94.050 - 93.600 SPT 22 20.78 20.78 - -
10.00 - 10.45 90.000 - 89.550 UD - - - 100 100 100 14 - NON-PLASTIC SM 1.91 17.80 1.62 2.57 0.586 0 29 - CD
10.45 - 10.90 89.550 - 89.100 SPT 36 27.42 27.42 - -
-
11.50 - 11.95 88.500 - 88.050 UD - - - 90 87 85 82 - 34 25 9 ML 2.06 22.70 1.68 2.67 0.589 0.30 17 - UU
11.95 - 12.40 88.050 - 87.600 SPT 22 - - -
-
13.00 - 13.45 87.000 - 86.550 UD - - 92 89 86 85 - 34 25 9 ML - - - - - - - - UU
13.45 - 13.90 86.550 - 86.100 SPT 27 - - - -
14.50 - 14.95 85.500 - 85.050 UD - - - 93 90 88 86 - 34 25 9 ML 2.07 21.30 1.71 2.67 0.561 0.35 16 - UU
14.95 - 15.40 85.050 - 84.600 SPT 33 - - -
16.00 - 16.45 84.000 - 83.550 UD - - - 100 100 100 55 - NON-PLASTIC ML 1.95 18.60 1.64 2.59 0.579 0 30 - CD
16.45 - 16.90 83.550 - 83.100 SPT 38 22.79 22.79 - -
Page 17 of 24
RESULT SHEET
NAME OF THE PROJECT FOUR-LANE GREENFIELD AMRITSAR CONNECTIVITY FOR CONNECTION OF AMRITSAR WITH DELHI-AMRITSAR-KATRA EXPRESSWAY
Client Name M/s D.P.S. Contractors Pvt. Ltd.
Bore Hole No. 1 Easting 489836.52 Depth of Water Level (m bgl) 21.00
Total depth of
35.00
Coordinate Northing 3507820.98 Commenced on ARUN SOIL LAB PVT. LTD.
Bore Hole (m) Elevation 100.000 Completed on
% Material Passing
Original Moisture
Type of Sample
IS group symbol
Specific Gravity
Atterberg Limits
due to dilatancy
Compression
IS Sieve
Type of Test
Characterisitics
Void Ratio
Silt Factor
SPT Value
Depth of Bore Reduced Level
Index
Cohesion
Angle of
Friction
Internal
Hole (Assumed)
4.750
2.000
0.425
0.075
LL PL PI
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (e) (Kg/sqcm) (Ø) (Cc) CD/UU
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
19.00 - 19.45 81.000 - 80.550 UD - - - 100 100 100 26 - NON-PLASTIC SM 1.97 18.90 1.66 2.59 0.560 0 33 - CD
19.45 - 19.90 80.550 - 80.100 SPT 51 27.73 27.73 - -
22.00 - 22.45 78.000 - 77.550 UD - - - 100 100 98 11 - NON-PLASTIC SM-SP 1.96 19.70 1.64 2.6 0.585 0 33 - CD
22.45 - 22.90 77.550 - 77.100 SPT 52 38.53 26.77 - -
26.50 - 26.95 73.500 - 73.050 UD - - - 100 100 95 4 - NON-PLASTIC SP 1.99 17.60 1.69 2.61 0.544 0 34 - CD
26.95 - 27.40 73.050 - 72.600 SPT 75 50.91 32.96 - -
32.50 - 32.95 67.500 - 67.050 UD - - - 100 100 93 4 - NON-PLASTIC SP 1.99 16.50 1.71 2.61 0.526 0 34 - CD
32.95 - 33.40 67.050 - 66.600 SPT 85 51.90 33.45 - -
Page 18 of 24
Page 19 of 24
ISO/IEC: 17025-2017 accredited lab Triaxial / Direct Shear Graphs
Page 20 of 24
ISO/IEC: 17025-2017 accredited lab Triaxial / Direct Shear Graphs
Page 21 of 24
ISO/IEC: 17025-2017 accredited lab Triaxial / Direct Shear Graphs
Page 22 of 24
ISO/IEC: 17025-2017 accredited lab Triaxial / Direct Shear Graphs
Page 23 of 24
ISO/IEC: 17025-2017 accredited lab Consolidation Test Graphs
Page 24 of 24