PROJECT

SUB SOIL INVESTIGATION FOR PROPOSED


CONSTRUCTION OF EIGHT LANE
ASL 103 Y
EXPRESSWAY STARTING BEFORE KMP
EXPRESSWAY AND ENDS AT CH 7+000
NEAR KHANPUR GHATI (KM 18+500 TO
KM 47+000) SECTION OF DELHI VADODRA
GREEN FIELD ALIGNMENT (NH 148N) ON
EPC MODE UNDER BHARATMALA
2019
PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II)
________________________________
CH-19+803/A

GEOTECH INVESTIGATION REPORT

ISO/IEC: 17025-2005
NABL accredited lab

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant (Civil Engineering Projects)

Registered Office: E-11, First Floor, Lekhraj Market-I,


Indira Nagar, Lucknow- 226016
Main Laboratory: 636/110, Budh Vihar, Takrohi, "QUALITY
Indira Nagar, Lucknow-227105 CONSCIOUSNESS IS
Phone: 0522-2341943, 0522-4001043
Mobile: 9415025566, 9415501637, 38 OUR CORE CONCEPT"
E-mail: arunsoillab.asl@gmail.com
info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

ACKNOWLEDGEMENT

Project: - SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT


LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000
NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA
GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA
PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A

Client: - M/S APCO INFRATECH PRIVATE LIMITED

Subject: - Site Investigation Report at CH – 19+803/A

Dear Sir,

With reference to your Work Order No. WO/APCO/TE/2018-19/037 dated 22/03/2019. Arun Soil
Lab Pvt. Ltd. (ASL) is pleased to submit the site investigation report carried out for the proposed
site.

The investigation ended up with conclusions and recommendations relevant to the findings. Those,
in addition to the laboratory test results, engineering recommendations are also here with attached.

We look forward for further co-operation and would like to take this opportunity to highly
considerate confidence in our laboratory. For any clarification concerning the report, please
contact us at your convenience.

ARUN SOIL LAB Pvt. Ltd.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

CONTENTS

1. INTRODUCTION 1
2. REFERENCES 1
3. FIELD INVESTIGATION 2
4. LABORATORY TESTS 3
5. INTERPRETATION OF LAB TEST RESULTS
a. GENERAL NATURE OF SOIL STRATA 4
b. S.P.T. VALUES 4
c. WATER TABLE 4
6. RECOMMENDATIONS 5-12

ANNEXURES

7. BEARING CAPACITY CALCULATIONS Annexure I


8. SITE PLAN Annexure II
9. RESULTS SHEETS Annexure III
10. BORE-LOG CHARTS Annexure IV
11. TRIAXIAL SHEAR/DIRECT SHEAR GRAPHS Annexure V
12. e-Log P Curves Annexure VI
13. PARTICLE SIZE ANALYSIS CURVES Annexure VII

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

SUB-SOIL INVESTIGATION REPORT FOR PROPOSED CONSTRUCTION OF


EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS
AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II)
CHAINAGE -19+803/A
INTRODUCTION
The work of sub-soil exploration was awarded to us by M/S APCO INFRATECH
PRIVATE LIMITED vide their Order No. WO/APCO/TE/2018-19/037 dated 22/03/2019
The object of the investigation was to study the geo-technical properties of soil both in
field and laboratory and determine safe allowable pressure for the foundation soil.
REFERENCES
1. IS: 1892-1974 for field work including existent ground water table.
2. IS: 2132-1986 for sampling in Undisturbed and Disturbed form.
3. IS: 2131-1981 for Standard Penetration Test.
4. IS: 2720 for all laboratory tests on soil samples collected.
5. IS: 6403-1981 for determination of Bearing Capacity.
6. IS: 8009(Part I)-1976 for calculation of settlement of foundations.
7. IS: 1904-1986 for permissible maximum settlement, differential settlement and
angular distortion.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 1 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

FIELD INVESTIGATION
The field investigation work at this site was carried out from 22/04/2019 April to
30/04/2019. The following investigation work was carried out 10 boreholes of diameter
150 mm were made within the proposed layout of the structure. The borehole was
progressed using manually operated augers and further advanced by use of manually
operated shell casing to the desired depth. The depth of bore hole varies from35 to45
meter. The locations of boreholes have been reported in “BOREHOLE LOCATION
PLAN”.

Standard Penetration Test (SPT) was conducted in the boreholes at every 1.50 m
interval and change of strata as per specifications. Standard split spoon sampler attached
to lower end of drill rods was driven in the boreholes by means of standard hammer of
63.50 kg falling freely from a height of 75 cm. The sampler was driven 45 cm as per
specifications and number of blows required for each 15 cm penetration was recorded.
The number of blows for the first 15 cm penetration was not taken into account as it is
considered seating drive. The number of blows for next 30 cm penetration was
designated as SPT „N‟ value. Wherever the total penetration was less than 45 cm, the
number of blows & the depth penetrated is incorporated in respective bore logs.
Disturbed Soil samples obtained from standard split spoon sampler were collected in
polythene bags of suitable size. These samples were properly sealed, labeled, recorded
and carefully transported to laboratory for testing.

Undisturbed Soil Samples (UDS) were collected from the boreholes at every 1.50 m
interval & change of strata as per sampling specifications, in thin walled sampling tubes of
100 mm dia. and 450 mm length. These sampling tubes after retrieval from the boreholes
were properly waxed and sealed at both ends. These were carefully labeled and
transported to the laboratory for testing. UDS wherever slipped during lifting, were duly
marked in the bore logs as well in the soil profile.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 2 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

LABORATORY TESTS:
The following laboratory tests were conducted to determine the engineering
characteristics of sub-soils:

Natural moisture contents were determined by oven drying method as per IS 2720
(Part II)-1973. The results have been reported in result sheet attached.

Dry and Bulk density of soil strata were obtained using Shelby tubes in accordance with
IS 2720 (Part XXIX)-1975. The results have been reported in result sheet attached.

Particle size analysis test by hydrometer method were performed in accordance with
IS 2720 (Part IV) - 1965 on the part of soil samples obtained after the sieve analysis. The
results have been reported in result sheet attached.

Atterberg Limits’ tests were performed in accordance with IS 2720 (Part V) - 1985 and
results have been reported in result sheet attached.

Specific gravity tests were performed in accordance with IS 2720 (Part III Section1) -
1980 and the results have been reported in result sheet attached.

Triaxial Compression Test under Unconsolidated Un-drained (UU) condition as per IS:
2720 (Part-XI)-2011 were performed on the undisturbed soil samples obtained during the
field investigation. The results have been reported in result sheet attached.

Direct shear tests were performed as per IS 2720 (Part XIII)-2015, on the undisturbed
soil samples obtained during the field investigation. The results and the density of
samples have been reported in result sheet attached.

Consolidation tests were performed as per IS 2720 (Part XV)-1986, on the


undisturbed soil samples obtained during the field investigation. The result in the form of
compression index (Cc) is reported in result sheet attached.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 3 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

INTERPRETATION OF THE LAB TEST RESULTS


GENERAL NATURE OF SOIL STRATA
The results of lab tests and bore hole log charts of bore holes 1 to 10 indicate that the
strata at the site is found to comprise of both cohesive as well as non-cohesive soil.
The cohesive type soil comprises of either silty clay soil of low and medium plasticity
and compressibility or clayey silt soil of low plasticity and compressibility belonging to
„CL‟, „CI‟ and „CL-ML‟, „ML‟ group of IS classification and having 82 to 97 percent
material finer than 75 micron.
However, the non-cohesive type soil is found to comprise of either sandy silt „ML‟ type
soil or silty sand „SM‟ type soil or poorly graded sand-silt mixture belonging and „SP‟
group of IS classification and having 22 to 88 percent fines.
The results of classification tests indicate that the natural soil stratum present at the Site
is found to comprise of both fine-grained soils (clayey soil) and coarse-grained soils
(sandy soil).
S.P.T. VALUES
The S.P.T. values obtained in the respective clayey layer region present as per bore-log
charts enclosed are found to range from 5 to 69 indicating „very soft‟ to „hard‟
consistency.
However, the S.P.T. values obtained in the respective sandy layer region present as per
bore-log charts enclosed are found to range from 7 to 74 indicating „loose‟ to „Very
Dense‟ relative density.
The results of S.P.T. values indicate that the stratum at the Site is „soft‟ to „very well
dense‟ compacted.
WATER TABLE
Water Table at the Site was observed at a depth from 1 metre to 3.5 metre below ground
level on the day of soil investigation during the last week of April 2019. However, the
existing water table may rise to ground level in the post-monsoon period in general.
Therefore, a water table at ground level that is a submerged condition has been adopted
for calculation purposes.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 4 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

RECOMMENDATIONS FOR PROPOSED CONSTRUCTION OF EIGHT LANE


EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000
NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II)
CHAINAGE 19+803/A

 PILE FOUNDATION
Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.50 3.40 0.56 - - - -


2.00 10.83 2.97 - - - -
3.50 19.26 6.48 - - - -
5.00 38.70 11.39 - - - -
6.50 42.46 17.71 - - - -
8.00 53.43 24.41 - - - -
9.50 65.27 31.80 - - - -
3 1000 11.00 2 77.67 39.64 - - - -
12.50 93.49 48.02 - - - -
14.00 107.11 56.83 - - - -
15.50 169.70 71.92 12.57 32.37 7.07 8.19
17.00 196.66 88.30 14.32 36.88 6.77 7.84
18.50 225.14 105.98 15.09 38.86 6.65 7.70
20.00 253.87 124.90 15.99 41.18 6.53 7.56
21.50 209.55 139.58 8.93 18.64 7.92 9.84
23.00 226.28 155.04 8.93 18.64 7.92 9.84
24.50 243.97 171.29 8.93 18.64 7.92 9.84
26.00 265.18 190.40 8.93 18.64 7.92 9.84
27.50 287.39 210.42 8.93 18.64 7.92 9.84

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 5 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

29.00 324.52 241.96 6.74 15.51 7.70 9.46


30.50 376.92 286.22 5.15 12.86 7.52 9.14
32.00 446.07 344.44 3.98 10.66 7.37 8.86
33.50 545.85 428.09 3.12 8.85 7.25 8.61
35.00 668.17 530.62 2.48 7.37 7.15 8.41
36.50 814.90 653.48 1.99 6.16 7.07 8.23

Pile
Length Pile Cut- Safe Pile Safe Pile
Pile Load Capacity of Pile
re Hole Below off Capacity Capacity Depth of fixity
Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.20 3.97 0.30 - - - -


1.70 13.95 3.30 - - - -
3.20 25.22 7.63 - - - -
4.70 51.48 13.61 - - - -
6.20 55.80 21.49 - - - -
7.70 70.03 29.81 - - - -
9.20 85.30 38.97 - - - -
3 1200 10.70 2.3 101.23 48.66 - - - -
12.20 121.94 58.99 - - - -
13.70 139.35 69.85 - - - -
15.20 224.87 88.04 - - - -
16.70 259.09 107.79 23.00 59.25 7.83 9.07
18.20 295.12 129.10 24.24 62.43 7.70 8.91
19.70 331.06 151.89 25.68 66.16 7.55 8.74
21.20 270.83 169.73 12.86 26.84 9.51 11.81

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 6 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

22.70 297.80 188.50 12.86 26.84 9.51 11.81


24.20 318.86 208.22 12.86 26.84 9.51 11.81
25.70 344.16 231.35 12.86 26.84 9.51 11.81
27.20 370.62 255.58 12.86 26.84 9.51 11.81
28.70 398.43 280.92 12.86 26.84 9.51 11.81
30.20 445.17 320.74 10.16 23.04 9.28 11.43
31.70 511.08 376.52 8.10 19.72 9.09 11.09
33.20 610.21 459.80 6.51 16.86 8.93 10.79
34.70 735.28 564.89 5.28 14.43 8.79 10.53
36.20 888.57 693.49 4.32 12.36 8.68 10.29

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.50 3.14 0.56 - - - -


2.00 12.34 4.60 - - - -
3.50 19.55 8.18 - - - -
5.00 28.66 12.89 - - - -
6.50 39.25 18.73 - - - -
4 1000 8.00 2 55.60 25.98 - - - -
9.50 67.90 33.73 - - - -
11.00 80.85 42.00 - - - -
12.50 97.37 57.99 - - - -
14.00 121.30 75.60 - - - -
15.50 147.25 94.84 - - - -
17.00 171.65 110.28 - - - -

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 7 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

18.50 194.18 126.73 7.96 16.60 8.23 10.23


20.00 217.91 144.16 7.96 16.60 8.23 10.23
21.50 238.19 162.58 7.96 16.60 8.23 10.23
23.00 259.69 182.00 7.96 16.60 8.23 10.23
24.50 282.42 202.44 7.96 16.60 8.23 10.23
26.00 305.16 221.84 8.93 18.64 7.92 9.84
27.50 338.48 253.71 5.87 12.25 9.11 11.32
29.00 376.79 287.16 5.87 12.25 9.11 11.32
30.50 560.22 339.21 4.59 10.44 8.89 10.94
32.00 649.12 414.89 3.63 8.88 8.70 10.60
33.50 768.76 516.11 2.89 7.54 8.54 10.31
35.00 921.69 644.90 2.33 6.41 8.41 10.05
36.50 1013.73 820.95 1.89 5.46 8.29 9.82

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.20 3.67 0.30 - - - -


1.70 15.97 5.28 - - - -
3.20 25.51 9.72 - - - -
4.70 37.46 15.50 - - - -
6.20 51.20 22.66 - - - -
4 1200 7.70 2.3 72.72 31.63 - - - -
9.20 88.52 41.21 - - - -
10.70 105.13 51.40 - - - -
12.20 124.85 70.67 - - - -

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 8 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

13.70 154.32 91.89 - - - -


15.20 186.25 115.05 - - - -
16.70 216.82 133.77 - - - -
18.20 244.75 153.69 - - - -
19.70 274.12 174.80 - - - -
21.20 304.83 197.10 - - - -
22.70 337.13 220.58 11.46 23.91 9.88 12.27
24.20 364.21 245.30 11.46 23.91 9.88 12.27
25.70 391.60 268.79 12.86 26.84 9.51 11.81
27.20 430.83 307.12 8.45 17.64 10.94 13.58
28.70 476.47 347.36 8.45 17.64 10.94 13.58
30.20 752.05 409.73 6.88 15.45 10.71 13.20
31.70 857.93 500.27 5.64 13.50 10.51 12.85
33.20 1000.52 621.28 4.66 11.78 10.34 12.54
34.70 1182.93 775.20 3.87 10.29 10.19 12.26
36.20 1238.06 985.53 2.77 7.59 10.86 12.99

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.50 5.40 0.57 - - - -


2.00 18.33 6.27 - - - -
3.50 26.28 12.53 - - - -
5.00 38.15 20.17 - - - -
6.50 55.18 26.53 - - - -
8.00 66.66 33.36 - - - -
5 1000 9.50 2 78.30 40.57 - - - -
11.00 90.39 48.15 - - - -

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 9 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

12.50 102.94 56.11 - - - -


14.00 116.57 66.02 - - - -
15.50 132.19 76.51 - - - -
17.00 207.32 93.50 16.27 41.91 6.49 7.51
18.50 236.78 111.82 17.01 43.81 6.39 7.40
20.00 268.12 131.49 17.80 45.84 6.30 7.29
21.50 291.59 152.53 18.67 48.09 6.20 7.18
23.00 316.67 174.94 19.11 49.21 6.15 7.12
24.50 343.49 198.75 19.58 50.44 6.10 7.06
26.00 371.92 223.96 20.08 51.73 6.05 7.00
27.50 402.09 250.58 20.64 53.15 5.99 6.94
29.00 455.15 296.31 13.18 38.72 5.96 6.71
30.50 562.29 365.47 8.85 28.82 5.95 6.51
32.00 671.95 458.37 6.18 21.81 5.96 6.34
33.50 812.47 576.98 4.47 16.78 5.98 6.19
35.00 986.19 723.26 3.33 13.10 6.01 6.07
36.50 1234.06 905.51 2.54 10.36 6.05 5.97

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.20 6.21 0.30 - - - -


1.70 23.96 7.31 - - - -
3.20 33.88 14.92 - - - -
4.70 48.89 24.18 - - - -

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 10 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

6.20 71.57 31.93 - - - -


5 1200 7.70 2.3 86.35 40.43 - - - -
9.20 101.39 49.37 - - - -
10.70 116.97 58.76 - - - -
12.20 133.10 68.61 - - - -
13.70 150.22 80.76 - - - -
15.20 170.00 93.61 - - - -
16.70 273.06 114.09 26.14 67.33 7.51 8.69
18.20 310.31 136.17 27.32 70.38 7.40 8.56
19.70 349.92 159.86 28.59 73.64 7.28 8.44
21.20 391.58 185.20 30.00 77.26 7.17 8.30
22.70 435.16 212.19 30.69 79.06 7.11 8.24
24.20 467.06 240.85 31.46 81.03 7.06 8.17
25.70 500.86 271.19 32.26 83.10 7.00 8.10
27.20 536.75 303.23 33.15 85.39 6.93 8.03
28.70 599.88 358.02 22.48 64.99 6.89 7.79
30.20 738.96 440.72 15.83 50.26 6.87 7.58
31.70 869.55 551.72 11.49 39.32 6.87 7.40
33.20 1036.93 693.39 8.57 31.16 6.89 7.24
34.70 1243.94 868.07 6.54 24.98 6.91 7.10
36.20 1553.12 1085.68 5.10 20.24 6.94 6.97

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 11 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.50 4.43 0.56 - - - -


2.00 9.45 2.94 - - - -
3.50 16.85 6.40 - - - -
5.00 28.99 13.67 - - - -
6.50 43.07 21.49 - - - -
6 1000 8.00 2 56.07 30.14 - - - -
9.50 71.92 37.52 - - - -
11.00 84.30 45.33 - - - -
12.50 97.15 53.59 - - - -
14.00 111.23 62.81 - - - -
15.50 125.89 72.54 - - - -
17.00 141.22 82.77 9.87 20.60 7.66 9.52
18.50 246.49 101.44 9.87 20.60 7.66 9.52
20.00 190.93 124.58 - - - -
21.50 218.70 149.24 4.73 9.87 9.79 12.16
23.00 248.26 175.40 4.73 9.87 9.79 12.16
24.50 342.39 199.04 14.40 37.09 6.76 7.82
26.00 370.57 224.06 16.45 42.37 6.46 7.48
27.50 400.52 250.47 18.08 46.56 6.26 7.25
29.00 453.13 295.83 11.81 34.53 6.22 7.01
30.50 559.29 364.41 8.07 26.09 6.19 6.80
32.00 668.08 456.54 5.73 20.05 6.19 6.61
33.50 807.55 574.25 4.20 15.63 6.19 6.44
35.00 979.91 719.46 3.16 12.34 6.21 6.29
36.50 1187.88 894.18 2.43 9.85 6.23 6.17

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 12 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.20 5.11 0.30 - - - -


1.70 12.26 3.29 - - - -
3.20 22.09 7.57 - - - -
4.70 37.62 16.40 - - - -
6.20 55.70 26.00 - - - -
6 1200 7.70 2.3 72.17 36.58 - - - -
9.20 93.16 45.72 - - - -
10.70 109.07 55.39 - - - -
12.20 125.54 65.58 - - - -
13.70 143.49 76.92 - - - -
15.20 162.13 88.87 - - - -
16.70 181.59 101.42 - - - -
18.20 327.40 123.92 - - - -
19.70 241.72 151.78 - - - -
21.20 281.22 181.45 - - - -
22.70 322.79 212.92 - - - -
24.20 466.15 241.39 23.13 59.59 7.82 9.05
25.70 499.63 271.52 26.43 68.07 7.48 8.66
27.20 535.29 303.32 29.04 74.80 7.25 8.39
28.70 597.91 357.68 20.10 57.86 7.19 8.14
30.20 735.89 439.70 14.39 45.37 7.16 7.91
31.70 865.48 549.82 10.60 36.02 7.14 7.71
33.20 1031.68 690.44 8.01 28.91 7.13 7.52
34.70 1237.06 863.89 6.18 23.43 7.14 7.36
36.20 1485.07 1072.57 4.86 19.17 7.15 7.21

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 13 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.50 3.53 0.56 - - - -


2.00 13.03 3.04 - - - -
3.50 22.58 6.66 - - - -
5.00 30.68 13.36 - - - -
6.50 49.88 19.49 - - - -
7 1000 8.00 2 54.06 28.64 - - - -
9.50 68.91 38.74 - - - -
11.00 84.62 49.80 - - - -
12.50 101.46 61.77 - - - -
14.00 160.14 74.77 - - - -
15.50 184.23 89.02 - - - -
17.00 209.95 104.53 11.80 30.40 7.22 8.36
18.50 181.71 120.77 12.71 32.73 7.04 8.16
20.00 205.15 138.03 13.45 34.65 6.91 8.00
21.50 266.83 156.97 13.91 35.82 6.84 7.92
23.00 335.19 178.60 14.32 36.88 6.77 7.84
24.50 361.02 201.61 14.77 38.05 6.70 7.76
26.00 388.48 226.00 15.19 39.12 6.64 7.69
27.50 417.58 251.77 15.60 40.19 6.58 7.62
29.00 468.86 296.01 10.46 30.42 6.52 7.36
30.50 544.52 360.57 7.29 23.38 6.48 7.13
32.00 679.55 450.51 5.25 18.22 6.46 6.92
33.50 815.71 565.57 3.90 14.38 6.45 6.73
35.00 984.26 707.62 2.96 11.47 6.45 6.57
36.50 1187.72 878.61 2.30 9.24 6.46 6.43

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 14 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.20 4.13 0.30 - - - -


1.70 16.79 3.36 - - - -
3.20 29.60 7.80 - - - -
4.70 39.85 16.06 - - - -
6.20 65.63 23.50 - - - -
7 1200 7.70 2.3 69.49 34.65 - - - -
9.20 88.16 46.94 - - - -
10.70 107.79 60.36 - - - -
12.20 128.79 74.90 - - - -
13.70 209.10 90.57 - - - -
15.20 239.79 107.75 - - - -
16.70 272.46 126.45 - - - -
18.20 227.86 146.09 20.42 52.59 8.15 9.44
19.70 256.82 166.96 21.61 55.67 8.00 9.26
21.20 350.99 189.77 22.34 57.55 7.91 9.16
22.70 463.14 215.80 23.00 59.25 7.83 9.07
24.20 493.81 243.47 23.73 61.13 7.75 8.98
25.70 526.40 272.81 24.40 62.84 7.68 8.89
27.20 560.97 303.80 25.06 64.56 7.61 8.81
28.70 621.92 356.77 17.75 50.88 7.54 8.54
30.20 711.88 433.92 12.95 40.53 7.49 8.29
31.70 885.52 541.28 9.68 32.61 7.45 8.07
33.20 1047.52 678.60 7.40 26.48 7.43 7.86
34.70 1248.14 848.09 5.77 21.68 7.42 7.68
36.20 1490.51 1052.11 4.57 17.89 7.42 7.52

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 15 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.50 3.57 0.56 - - - -


2.00 9.65 2.98 - - - -
3.50 19.53 8.42 - - - -
5.00 37.60 13.43 - - - -
6.50 50.83 19.67 - - - -
8 1000 8.00 2 55.06 28.93 - - - -
9.50 70.71 39.53 - - - -
11.00 88.17 51.63 - - - -
12.50 106.72 64.86 - - - -
14.00 126.86 79.20 - - - -
15.50 215.54 94.63 - - - -
17.00 244.67 111.42 11.48 29.58 7.29 8.44
18.50 275.63 129.56 12.55 32.33 7.07 8.19
20.00 308.01 149.07 13.40 34.52 6.92 8.01
21.50 331.27 169.93 13.91 35.82 6.84 7.92
23.00 356.13 192.16 14.36 36.98 6.76 7.83
24.50 382.63 215.76 14.84 38.23 6.69 7.75
26.00 385.01 239.89 15.28 39.37 6.62 7.67
27.50 413.79 265.36 15.72 40.49 6.56 7.60
29.00 464.40 309.04 10.52 30.61 6.50 7.34
30.50 539.02 372.73 7.33 23.51 6.46 7.11
32.00 639.80 458.23 5.28 18.31 6.44 6.90
33.50 637.98 500.05 3.91 14.44 6.43 6.72
35.00 698.58 550.75 2.97 11.51 6.44 6.56
36.50 770.70 611.05 2.30 9.27 6.45 6.42

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 16 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free Fixed Free Fixed


Head Head Head Head

0.20 4.18 0.30 - - - -


1.70 12.37 3.30 - - - -
3.20 25.22 9.90 - - - -
4.70 49.41 16.00 - - - -
6.20 66.77 23.58 - - - -
8 1200 7.70 2.3 70.66 34.85 - - - -
9.20 90.35 47.73 - - - -
10.70 112.19 62.38 - - - -
12.20 135.26 78.39 - - - -
13.70 160.30 95.74 - - - -
15.20 282.74 114.32 - - - -
16.70 319.92 134.53 - - - -
18.20 359.36 156.37 20.17 51.94 8.18 9.48
19.70 400.45 179.84 21.53 55.46 8.01 9.27
21.20 443.81 204.94 22.34 57.55 7.91 9.16
22.70 489.06 231.68 23.06 59.41 7.83 9.06
24.20 520.51 260.06 23.84 61.42 7.74 8.96
25.70 512.28 289.09 24.55 63.24 7.66 8.88
27.20 546.49 319.73 25.25 65.04 7.59 8.79
28.70 606.64 372.03 17.86 51.21 7.52 8.52
30.20 695.37 448.15 13.02 40.76 7.47 8.27
31.70 815.28 550.25 9.73 32.78 7.44 8.05
33.20 786.80 600.44 7.43 26.60 7.42 7.85
34.70 859.38 661.21 5.79 21.77 7.41 7.66
36.20 945.72 733.45 4.59 17.95 7.41 7.50

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 17 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL103Y/2019

However, the Final Ultimate Bearing Capacity of the Pile must be adopted only after
performing Pile Load Test on Test Pile constructed at the Site as per IS: 2911(Part-4)-
1985 and actual design load requirements of the Proposed Structure.
NOTE: -
The above recommendations are based on the field investigation data results and the
laboratory tests results of the samples collected from the test locations and our
experience in this regards. If the actual sub-soil conditions during excavation for the
foundations differ from that has been reported, a reference should be made to us for
suggestions.
Further, the recommendations are based on the assumptions as mentioned in the Report
and the designer of the Structure should take into consideration all the factors required as
per codes. The recommendations should be taken as guidelines for the designer.

Er. Anurag Kapoor


Er. Danish B.Tech. (Civil)
M.Tech. (Geotech) PGDM (Finance), LM - IGS & IRC
ASSISTANT ENGINEER DIRECTOR TECHNICAL
ARUN SOIL LAB Pvt. Ltd. ARUN SOIL LAB Pvt. Ltd.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 18 of 18 arunsoillab.asl@gmail.com; info@arunsoillab.com
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.080
BORE HOLE 03 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 S 0.50 190.080 189.580 0.50 0.00 27 1.78 7.65 3.82 3.82 9 12.73 14.47 81.71 1.50 1.91 0.37 1.57 1.00 1.66 4.95 1.66 83.37 3.40 0.56
2 S 2.00 189.580 188.080 1.50 0.00 28 1.80 7.85 11.77 15.59 9 15.20 16.72 237.61 1.50 9.71 0.38 4.71 1.00 26.34 19.79 28.01 265.62 10.83 2.97
3 S 3.50 188.080 186.580 1.50 0.00 28 1.83 8.14 12.21 27.80 9 15.20 16.72 385.27 1.50 21.70 0.38 4.71 1.00 58.87 34.64 86.88 472.15 19.26 6.48
4 S 5.00 186.580 185.080 1.50 0.00 30 1.86 8.43 12.65 40.45 9 21.65 22.40 762.12 1.50 34.13 0.41 4.71 1.00 99.92 49.48 186.81 948.92 38.70 11.39
5 C 6.50 185.080 183.580 1.50 0.40 6 2.00 9.81 14.71 55.16 9 10.00 0.57 712.75 1.50 47.81 0.11 4.71 0.57 141.39 64.32 328.20 1040.94 42.46 17.71
6 C 8.00 183.580 182.080 1.50 0.40 6 2.01 9.91 14.86 70.02 9 10.00 0.57 829.46 1.50 62.59 0.11 4.71 0.57 152.37 79.17 480.57 1310.03 53.43 24.41
7 C 9.50 182.080 180.580 1.50 0.40 7 2.01 9.91 14.86 84.88 9 10.00 0.71 946.68 1.50 77.45 0.12 4.71 0.57 173.09 94.01 653.66 1600.34 65.27 31.80
8 C 11.00 180.580 179.080 1.50 0.40 7 2.02 10.00 15.00 99.88 9 10.00 0.71 1064.55 1.50 92.38 0.12 4.71 0.57 186.05 108.86 839.71 1904.26 77.67 39.64
9 C 12.50 179.080 177.580 1.50 0.50 7 2.01 9.91 14.86 114.74 9 10.00 0.71 1250.54 1.50 107.31 0.12 4.71 0.47 201.88 123.70 1041.59 2292.13 93.49 48.02
10 C 14.00 177.580 176.080 1.50 0.50 7 2.03 10.10 15.15 129.89 9 10.00 0.71 1369.60 1.50 122.32 0.12 4.71 0.47 214.90 138.54 1256.50 2626.09 107.11 56.83
11 S 15.50 176.080 174.580 1.50 0.00 30 1.88 8.63 12.95 142.84 9 21.65 22.40 2504.90 1.50 136.37 0.41 4.71 1.00 399.27 153.39 1655.76 4160.67 169.70 71.92
12 S 17.00 174.580 173.080 1.50 0.00 30 1.89 8.73 13.09 155.93 9 21.65 22.40 2728.40 1.50 149.39 0.41 4.71 1.00 437.39 168.23 2093.15 4821.55 196.66 88.30
13 S 18.50 173.080 171.580 1.50 0.00 30 1.89 8.73 13.09 169.02 9 21.65 22.40 2951.04 1.50 162.48 0.41 4.71 1.00 475.72 183.08 2568.87 5519.90 225.14 105.98
14 S 20.00 171.580 170.080 1.50 0.00 30 1.80 7.85 11.77 180.79 9 21.65 22.40 3143.39 1.50 174.91 0.41 4.71 1.00 512.11 197.92 3080.98 6224.37 253.87 124.90
15 C 21.50 170.080 168.580 1.50 0.35 12 2.04 10.20 15.30 180.79 9 10.00 1.69 1669.33 1.50 188.44 0.21 4.71 0.64 387.32 212.76 3468.30 5137.62 209.55 139.58
16 C 23.00 168.580 167.080 1.50 0.35 12 2.04 10.20 15.30 180.79 9 10.00 1.69 1669.33 1.50 203.74 0.21 4.71 0.64 410.30 227.61 3878.60 5547.93 226.28 155.04
17 C 24.50 167.080 165.580 1.50 0.35 12 2.06 10.40 15.59 180.79 9 10.00 1.69 1669.46 1.50 219.19 0.21 4.71 0.64 433.51 242.45 4312.11 5981.57 243.97 171.29
18 C 26.00 165.580 164.080 1.50 0.35 14 2.04 10.20 15.30 180.79 9 10.00 2.29 1671.72 1.50 234.63 0.25 4.71 0.64 517.70 257.30 4829.81 6501.53 265.18 190.40
19 C 27.50 164.080 162.580 1.50 0.35 14 2.04 10.20 15.30 180.79 9 10.00 2.29 1671.72 1.50 249.93 0.25 4.71 0.64 544.67 272.14 5374.48 7046.20 287.39 210.42
20 C 29.00 162.580 161.080 1.50 0.35 14 2.04 10.20 15.30 180.79 10 10.00 2.29 1698.68 2.50 265.23 0.25 4.71 0.64 883.26 286.98 6257.73 7956.41 324.52 241.96
21 C 30.50 161.080 159.580 1.50 0.35 14 2.04 10.20 15.30 180.79 11 10.00 2.29 1725.64 3.50 280.53 0.25 4.71 0.64 1257.80 301.83 7515.53 9241.16 376.92 286.22
22 C 32.00 159.580 158.080 1.50 0.35 14 2.04 10.20 15.30 180.79 12 10.00 2.29 1752.60 4.50 295.83 0.25 4.71 0.64 1668.29 316.67 9183.81 10936.41 446.07 344.44
23 C 33.50 158.080 156.580 1.50 0.35 16 2.04 10.20 15.30 180.79 13 10.00 3.06 1782.65 5.50 311.13 0.29 4.71 0.64 2416.45 331.52 11600.27 13382.92 545.85 428.09
24 C 35.00 156.580 155.080 1.50 0.35 16 2.05 10.30 15.45 180.79 14 10.00 3.06 1809.73 6.50 326.50 0.29 4.71 0.64 2971.89 346.36 14572.15 16381.88 668.17 530.62
25 C 36.50 155.080 153.580 1.50 0.35 16 2.06 10.40 15.59 180.79 15 10.00 3.06 1836.80 7.50 342.02 0.29 4.71 0.64 3570.35 361.20 18142.51 19979.31 814.90 653.48
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.080
BORE HOLE 03 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 S S 0.50 190.080 189.580 0.50 0.00 6.00 ‐ 0.60 29580.40 0.05 ‐ 4.75 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 S S 2.00 189.580 188.080 1.50 0.00 6.50 ‐ 0.70 29580.40 0.05 ‐ 4.61 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 S S 3.50 188.080 186.580 1.50 0.00 7.67 ‐ 0.93 29580.40 0.05 ‐ 4.35 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 S S 5.00 186.580 185.080 1.50 0.00 9.75 ‐ 1.35 29580.40 0.05 ‐ 4.04 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 C C 6.50 185.080 183.580 1.50 0.40 9.75 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 C C 8.00 183.580 182.080 1.50 0.40 9.75 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 C C 9.50 182.080 180.580 1.50 0.40 9.75 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 C C 11.00 180.580 179.080 1.50 0.40 9.75 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 C C 12.50 179.080 177.580 1.50 0.50 9.75 17.65 ‐ 29580.40 0.05 4.50 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 C C 14.00 177.580 176.080 1.50 0.50 9.75 17.65 ‐ 29580.40 0.05 4.50 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 S S 15.50 176.080 174.580 1.50 0.00 14.40 ‐ 2.03 29580.40 0.05 ‐ 3.72 Long 0.00 7.07 8.19 123.24 12.57 317.44 32.37
12 S S 17.00 174.580 173.080 1.50 0.00 17.83 ‐ 2.53 29580.40 0.05 ‐ 3.56 Long 0.00 6.77 7.84 140.43 14.32 361.72 36.88
13 S S 18.50 173.080 171.580 1.50 0.00 19.43 ‐ 2.76 29580.40 0.05 ‐ 3.50 Long 0.00 6.65 7.70 147.95 15.09 381.09 38.86
14 S S 20.00 171.580 170.080 1.50 0.00 21.38 ‐ 3.04 29580.40 0.05 ‐ 3.43 Long 0.00 6.53 7.56 156.80 15.99 403.88 41.18
15 C C 21.50 170.080 168.580 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 0.00 7.92 9.84 87.58 8.93 182.78 18.64
16 C C 23.00 168.580 167.080 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 0.00 7.92 9.84 87.58 8.93 182.78 18.64
17 C C 24.50 167.080 165.580 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 0.00 7.92 9.84 87.58 8.93 182.78 18.64
18 C C 26.00 165.580 164.080 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 0.00 7.92 9.84 87.58 8.93 182.78 18.64
19 C C 27.50 164.080 162.580 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 0.00 7.92 9.84 87.58 8.93 182.78 18.64
20 C C 29.00 162.580 161.080 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 1.00 7.70 9.46 66.10 6.74 152.12 15.51
21 C C 30.50 161.080 159.580 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 2.00 7.52 9.14 50.48 5.15 126.16 12.86
22 C C 32.00 159.580 158.080 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 3.00 7.37 8.86 39.06 3.98 104.57 10.66
23 C C 33.50 158.080 156.580 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 4.00 7.25 8.61 30.61 3.12 86.80 8.85
24 C C 35.00 156.580 155.080 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 5.00 7.15 8.41 24.30 2.48 72.27 7.37
25 C C 36.50 155.080 153.580 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 6.00 7.07 8.23 19.52 1.99 60.42 6.16
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.080
BORE HOLE 03 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 S 0.20 189.780 189.580 0.20 0.00 27 1.78 7.65 1.53 1.53 9 12.73 14.47 97.14 1.50 0.76 0.37 0.75 1.00 0.32 2.85 0.32 97.46 3.97 0.30
2 S 1.70 189.580 188.080 1.50 0.00 28 1.80 7.85 11.77 13.30 9 15.20 16.72 317.56 1.50 7.41 0.38 5.65 1.00 24.14 24.23 24.46 342.02 13.95 3.30
3 S 3.20 188.080 186.580 1.50 0.00 28 1.83 8.14 12.21 25.51 9 15.20 16.72 530.74 1.50 19.40 0.38 5.65 1.00 63.18 45.60 87.64 618.38 25.22 7.63
4 S 4.70 186.580 185.080 1.50 0.00 30 1.86 8.43 12.65 38.16 9 21.65 22.40 1062.62 1.50 31.83 0.41 5.65 1.00 111.85 66.98 199.48 1262.11 51.48 13.61
5 C 6.20 185.080 183.580 1.50 0.40 6 2.00 9.81 14.71 52.87 9 10.00 0.57 1001.03 1.50 45.51 0.11 5.65 0.57 167.62 88.35 367.11 1368.14 55.80 21.49
6 C 7.70 183.580 182.080 1.50 0.40 6 2.01 9.91 14.86 67.73 9 10.00 0.57 1169.11 1.50 60.30 0.11 5.65 0.57 180.80 109.73 547.91 1717.01 70.03 29.81
7 C 9.20 182.080 180.580 1.50 0.40 7 2.01 9.91 14.86 82.58 9 10.00 0.71 1338.06 1.50 75.16 0.12 5.65 0.57 205.32 131.10 753.23 2091.28 85.30 38.97
8 C 10.70 180.580 179.080 1.50 0.40 7 2.02 10.00 15.00 97.59 9 10.00 0.71 1507.80 1.50 90.09 0.12 5.65 0.57 220.87 152.48 974.10 2481.90 101.23 48.66
9 C 12.20 179.080 177.580 1.50 0.50 7 2.01 9.91 14.86 112.45 9 10.00 0.71 1775.61 1.50 105.02 0.12 5.65 0.47 239.87 173.85 1213.96 2989.58 121.94 58.99
10 C 13.70 177.580 176.080 1.50 0.50 7 2.03 10.10 15.15 127.60 9 10.00 0.71 1947.07 1.50 120.02 0.12 5.65 0.47 255.50 195.23 1469.46 3416.53 139.35 69.85
11 S 15.20 176.080 174.580 1.50 0.00 30 1.88 8.63 12.95 140.54 9 21.65 22.40 3572.73 1.50 134.07 0.41 5.65 1.00 471.06 216.60 1940.52 5513.25 224.87 88.04
12 S 16.70 174.580 173.080 1.50 0.00 30 1.89 8.73 13.09 153.64 9 21.65 22.40 3894.82 1.50 147.09 0.41 5.65 1.00 516.80 237.98 2457.32 6352.14 259.09 107.79
13 S 18.20 173.080 171.580 1.50 0.00 30 1.89 8.73 13.09 166.73 9 21.65 22.40 4215.41 1.50 160.18 0.41 5.65 1.00 562.80 259.35 3020.12 7235.53 295.12 129.10
14 S 19.70 171.580 170.080 1.50 0.00 30 1.80 7.85 11.77 178.50 9 21.65 22.40 4490.17 1.50 172.61 0.41 5.65 1.00 606.47 280.73 3626.59 8116.76 331.06 151.89
15 C 21.20 170.080 168.580 1.50 0.35 12 2.04 10.20 15.30 193.80 9 10.00 1.69 2552.85 1.50 186.15 0.21 5.65 0.64 460.64 302.11 4087.23 6640.09 270.83 169.73
16 C 22.70 168.580 167.080 1.50 0.35 12 2.04 10.20 15.30 209.10 9 10.00 1.69 2725.88 1.50 201.45 0.21 5.65 0.64 488.22 323.48 4575.46 7301.34 297.80 188.50
17 C 24.20 167.080 165.580 1.50 0.35 12 2.06 10.40 15.59 209.10 9 10.00 1.69 2726.11 1.50 216.89 0.21 5.65 0.64 516.07 344.86 5091.53 7817.64 318.86 208.22
18 C 25.70 165.580 164.080 1.50 0.35 14 2.04 10.20 15.30 209.10 9 10.00 2.29 2730.02 1.50 232.34 0.25 5.65 0.64 616.39 366.23 5707.92 8437.94 344.16 231.35
19 C 27.20 164.080 162.580 1.50 0.35 14 2.04 10.20 15.30 209.10 9 10.00 2.29 2730.02 1.50 247.64 0.25 5.65 0.64 648.75 387.61 6356.66 9086.68 370.62 255.58
20 C 28.70 162.580 161.080 1.50 0.35 14 2.06 10.40 15.59 209.10 9 10.00 2.29 2730.32 1.50 263.08 0.25 5.65 0.64 681.41 408.98 7038.08 9768.40 398.43 280.92
21 C 30.20 161.080 159.580 1.50 0.35 14 2.06 10.40 15.59 209.10 10 10.00 2.29 2769.14 2.50 278.68 0.25 5.65 0.64 1107.30 430.36 8145.38 10914.52 445.17 320.74
22 C 31.70 159.580 158.080 1.50 0.35 14 2.06 10.40 15.59 209.10 11 10.00 2.29 2807.96 3.50 294.27 0.25 5.65 0.64 1577.16 451.73 9722.53 12530.49 511.08 376.52
23 C 33.20 158.080 156.580 1.50 0.35 16 2.06 10.40 15.59 209.10 12 10.00 3.06 2852.23 4.50 309.86 0.29 5.65 0.64 2386.02 473.11 12108.55 14960.78 610.21 459.80
24 C 34.70 156.580 155.080 1.50 0.35 16 2.06 10.40 15.59 209.10 13 10.00 3.06 2891.05 5.50 325.46 0.29 5.65 0.64 3027.53 494.48 15136.08 18027.13 735.28 564.89
25 C 36.20 155.080 153.580 1.50 0.35 16 2.06 10.40 15.59 209.10 14 10.00 3.06 2929.87 6.50 341.05 0.29 5.65 0.64 3719.60 515.86 18855.68 21785.56 888.57 693.49
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.080
BORE HOLE 03 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 S S 0.20 189.780 189.580 0.20 0.00 6.00 ‐ 0.60 29580.40 0.10 ‐ 5.50 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 S S 1.70 189.580 188.080 1.50 0.00 6.50 ‐ 0.70 29580.40 0.10 ‐ 5.33 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 S S 3.20 188.080 186.580 1.50 0.00 7.67 ‐ 0.93 29580.40 0.10 ‐ 5.03 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 S S 4.70 186.580 185.080 1.50 0.00 9.75 ‐ 1.35 29580.40 0.10 ‐ 4.67 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 C C 6.20 185.080 183.580 1.50 0.40 9.75 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 C C 7.70 183.580 182.080 1.50 0.40 9.75 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 C C 9.20 182.080 180.580 1.50 0.40 9.75 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 C C 10.70 180.580 179.080 1.50 0.40 9.75 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 C C 12.20 179.080 177.580 1.50 0.50 9.75 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 C C 13.70 177.580 176.080 1.50 0.50 9.75 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 S S 15.20 176.080 174.580 1.50 0.00 14.40 ‐ 2.03 29580.40 0.10 ‐ 4.31 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 S S 16.70 174.580 173.080 1.50 0.00 17.83 ‐ 2.53 29580.40 0.10 ‐ 4.12 Long 0.00 7.83 9.07 225.59 23.00 581.09 59.25
13 S S 18.20 173.080 171.580 1.50 0.00 19.43 ‐ 2.76 29580.40 0.10 ‐ 4.05 Long 0.00 7.70 8.91 237.68 24.24 612.21 62.43
14 S S 19.70 171.580 170.080 1.50 0.00 21.38 ‐ 3.04 29580.40 0.10 ‐ 3.97 Long 0.00 7.55 8.74 251.89 25.68 648.82 66.16
15 C C 21.20 170.080 168.580 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 0.00 9.51 11.81 126.12 12.86 263.21 26.84
16 C C 22.70 168.580 167.080 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 0.00 9.51 11.81 126.12 12.86 263.21 26.84
17 C C 24.20 167.080 165.580 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 0.00 9.51 11.81 126.12 12.86 263.21 26.84
18 C C 25.70 165.580 164.080 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 0.00 9.51 11.81 126.12 12.86 263.21 26.84
19 C C 27.20 164.080 162.580 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 0.00 9.51 11.81 126.12 12.86 263.21 26.84
20 C C 28.70 162.580 161.080 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 0.00 9.51 11.81 126.12 12.86 263.21 26.84
21 C C 30.20 161.080 159.580 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 1.00 9.28 11.43 99.67 10.16 225.93 23.04
22 C C 31.70 159.580 158.080 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 2.00 9.09 11.09 79.42 8.10 193.40 19.72
23 C C 33.20 158.080 156.580 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 3.00 8.93 10.79 63.84 6.51 165.38 16.86
24 C C 34.70 156.580 155.080 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 4.00 8.79 10.53 51.78 5.28 141.48 14.43
25 C C 36.20 155.080 153.580 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 5.00 8.68 10.29 42.38 4.32 121.20 12.36
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.960
BORE HOLE 04 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 S 0.50 189.960 189.460 0.50 0.00 27 1.72 7.06 3.53 3.53 9 12.73 14.47 75.42 1.50 1.77 0.37 1.57 1.00 1.53 4.95 1.53 76.96 3.14 0.56
2 C 2.00 189.460 187.960 1.50 0.10 21 1.93 9.12 13.68 17.21 9 10.00 6.20 226.69 1.50 10.37 0.38 4.71 1.00 74.35 19.79 75.89 302.58 12.34 4.60
3 S 3.50 187.960 186.460 1.50 0.00 27 1.84 8.24 12.36 29.57 9 12.73 14.47 342.47 1.50 23.39 0.37 4.71 1.00 60.99 34.64 136.88 479.35 19.55 8.18
4 S 5.00 186.460 184.960 1.50 0.00 27 1.87 8.53 12.80 42.37 9 12.73 14.47 472.11 1.50 35.97 0.37 4.71 1.00 93.79 49.48 230.68 702.79 28.66 12.89
5 S 6.50 184.960 183.460 1.50 0.00 27 1.89 8.73 13.09 55.46 9 12.73 14.47 604.14 1.50 48.91 0.37 4.71 1.00 127.55 64.32 358.23 962.37 39.25 18.73
6 C 8.00 183.460 181.960 1.50 0.40 8 2.04 10.20 15.30 70.76 9 10.00 0.86 836.46 1.50 63.11 0.14 4.71 0.57 168.56 79.17 526.79 1363.25 55.60 25.98
7 C 9.50 181.960 180.460 1.50 0.40 8 2.02 10.00 15.00 85.76 9 10.00 0.86 954.24 1.50 78.26 0.14 4.71 0.57 183.62 94.01 710.41 1664.64 67.90 33.73
8 C 11.00 180.460 178.960 1.50 0.40 8 2.03 10.10 15.15 100.91 9 10.00 0.86 1073.27 1.50 93.34 0.14 4.71 0.57 198.59 108.86 909.00 1982.27 80.85 42.00
9 C 12.50 178.960 177.460 1.50 0.15 25 1.99 9.71 14.56 115.48 9 10.00 10.88 1052.41 1.50 108.20 0.47 4.71 1.00 425.95 123.70 1334.95 2387.36 97.37 57.99
10 C 14.00 177.460 175.960 1.50 0.15 25 1.98 9.61 14.42 129.89 9 10.00 10.88 1165.21 1.50 122.69 0.47 4.71 1.00 473.71 138.54 1808.66 2973.87 121.30 75.60
11 C 15.50 175.960 174.460 1.50 0.15 25 1.99 9.71 14.56 144.46 9 10.00 10.88 1280.01 1.50 137.18 0.47 4.71 1.00 521.47 153.39 2330.13 3610.14 147.25 94.84
12 C 17.00 174.460 172.960 1.50 0.30 16 1.99 9.71 14.56 159.02 9 10.00 3.06 1468.57 1.50 151.74 0.29 4.71 0.74 409.83 168.23 2739.96 4208.54 171.65 110.28
13 C 18.50 172.960 171.460 1.50 0.30 16 1.98 9.61 14.42 173.44 9 10.00 3.06 1581.68 1.50 166.23 0.29 4.71 0.74 439.20 183.08 3179.17 4760.85 194.18 126.73
14 C 20.00 171.460 169.960 1.50 0.30 16 1.98 9.61 14.42 187.85 9 10.00 3.06 1694.91 1.50 180.64 0.29 4.71 0.74 468.42 197.92 3647.59 5342.50 217.91 144.16
15 C 21.50 169.960 168.460 1.50 0.30 16 1.97 9.51 14.27 187.85 9 10.00 3.06 1694.79 1.50 194.99 0.29 4.71 0.74 497.50 212.76 4145.09 5839.88 238.19 162.58
16 C 23.00 168.460 166.960 1.50 0.30 16 1.99 9.71 14.56 187.85 9 10.00 3.06 1695.02 1.50 209.40 0.29 4.71 0.74 526.72 227.61 4671.80 6366.83 259.69 182.00
17 C 24.50 166.960 165.460 1.50 0.30 16 2.03 10.10 15.15 187.85 9 10.00 3.06 1695.50 1.50 224.26 0.29 4.71 0.74 556.83 242.45 5228.63 6924.13 282.42 202.44
18 C 26.00 165.460 163.960 1.50 0.35 14 2.03 10.10 15.15 187.85 9 10.00 2.29 1727.09 1.50 239.41 0.25 4.71 0.64 526.13 257.30 5754.76 7481.85 305.16 221.84
19 C 27.50 163.960 162.460 1.50 0.20 24 2.01 9.91 14.86 187.85 9 10.00 9.44 1650.76 1.50 254.42 0.45 4.71 1.00 893.12 272.14 6647.88 8298.64 338.48 253.71
20 C 29.00 162.460 160.960 1.50 0.20 24 2.00 9.81 14.71 187.85 9 10.00 9.44 1650.40 1.50 269.20 0.45 4.71 1.00 939.64 286.98 7587.52 9237.92 376.79 287.16
21 S 30.50 160.960 159.460 1.50 0.00 32 1.94 9.22 13.83 187.85 10 30.85 30.21 4660.69 2.50 283.47 0.45 4.71 1.00 1486.87 301.83 9074.40 13735.08 560.22 339.21
22 S 32.00 159.460 157.960 1.50 0.00 32 1.92 9.02 13.53 187.85 11 30.85 30.21 4658.36 3.50 297.15 0.45 4.71 1.00 2182.08 316.67 11256.48 15914.84 649.12 414.89
23 S 33.50 157.960 156.460 1.50 0.00 32 1.92 9.02 13.53 187.85 12 30.85 30.21 4658.36 4.50 310.69 0.45 4.71 1.00 2933.31 331.52 14189.79 18848.15 768.76 516.11
24 S 35.00 156.460 154.960 1.50 0.00 32 1.96 9.41 14.12 187.85 13 30.85 30.21 4663.01 5.50 324.51 0.45 4.71 1.00 3744.72 346.36 17934.51 22597.53 921.69 644.90
25 C 36.50 154.960 153.460 1.50 0.15 26 2.02 10.00 15.00 187.85 14 10.67 12.54 1784.68 6.50 339.08 0.49 4.71 1.00 5134.97 361.20 23069.48 24854.16 1013.73 820.95
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.960
BORE HOLE 04 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 S S 0.50 189.960 189.460 0.50 0.00 6.00 ‐ 0.60 29580.40 0.05 ‐ 4.75 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 C S 2.00 189.460 187.960 1.50 0.10 7.00 ‐ 0.80 29580.40 0.05 ‐ 4.49 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 S S 3.50 187.960 186.460 1.50 0.00 9.00 ‐ 1.20 29580.40 0.05 ‐ 4.14 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 S S 5.00 186.460 184.960 1.50 0.00 12.00 ‐ 1.69 29580.40 0.05 ‐ 3.86 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 S S 6.50 184.960 183.460 1.50 0.00 21.00 ‐ 2.98 29580.40 0.05 ‐ 3.45 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 C C 8.00 183.460 181.960 1.50 0.40 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 C C 9.50 181.960 180.460 1.50 0.40 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 C C 11.00 180.460 178.960 1.50 0.40 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 C C 12.50 178.960 177.460 1.50 0.15 5.30 ‐ 29580.40 0.05 6.08 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 C C 14.00 177.460 175.960 1.50 0.15 5.30 ‐ 29580.40 0.05 6.08 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 C C 15.50 175.960 174.460 1.50 0.15 5.30 ‐ 29580.40 0.05 6.08 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 C C 17.00 174.460 172.960 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
13 C C 18.50 172.960 171.460 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Long 0.00 8.23 10.23 78.02 7.96 162.83 16.60
14 C C 20.00 171.460 169.960 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Long 0.00 8.23 10.23 78.02 7.96 162.83 16.60
15 C C 21.50 169.960 168.460 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Long 0.00 8.23 10.23 78.02 7.96 162.83 16.60
16 C C 23.00 168.460 166.960 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Long 0.00 8.23 10.23 78.02 7.96 162.83 16.60
17 C C 24.50 166.960 165.460 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Long 0.00 8.23 10.23 78.02 7.96 162.83 16.60
18 C C 26.00 165.460 163.960 1.50 0.35 12.36 ‐ 29580.40 0.05 4.92 ‐ Long 0.00 7.92 9.84 87.58 8.93 182.78 18.64
19 C C 27.50 163.960 162.460 1.50 0.20 7.06 ‐ 29580.40 0.05 5.66 ‐ Long 0.00 9.11 11.32 57.56 5.87 120.13 12.25
20 C C 29.00 162.460 160.960 1.50 0.20 7.06 ‐ 29580.40 0.05 5.66 ‐ Long 0.00 9.11 11.32 57.56 5.87 120.13 12.25
21 S C 30.50 160.960 159.460 1.50 0.20 7.06 ‐ 29580.40 0.05 5.66 ‐ Long 1.00 8.89 10.94 45.04 4.59 102.43 10.44
22 S C 32.00 159.460 157.960 1.50 0.20 7.06 ‐ 29580.40 0.05 5.66 ‐ Long 2.00 8.70 10.60 35.56 3.63 87.08 8.88
23 S C 33.50 157.960 156.460 1.50 0.20 7.06 ‐ 29580.40 0.05 5.66 ‐ Long 3.00 8.54 10.31 28.34 2.89 73.96 7.54
24 S C 35.00 156.460 154.960 1.50 0.20 7.06 ‐ 29580.40 0.05 5.66 ‐ Long 4.00 8.41 10.05 22.81 2.33 62.86 6.41
25 C C 36.50 154.960 153.460 1.50 0.20 7.06 ‐ 29580.40 0.05 5.66 ‐ Long 5.00 8.29 9.82 18.54 1.89 53.51 5.46
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.960
BORE HOLE 04 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 S 0.20 189.660 189.460 0.20 0.00 27 1.72 7.06 1.41 1.41 9 12.73 14.47 89.67 1.50 0.71 0.37 0.75 1.00 0.29 2.85 0.29 89.96 3.67 0.30
2 C 1.70 189.460 187.960 1.50 0.10 21 1.93 9.12 13.68 15.09 9 10.00 6.20 308.87 1.50 8.25 0.38 5.65 1.00 82.33 24.23 82.62 391.49 15.97 5.28
3 S 3.20 187.960 186.460 1.50 0.00 27 1.84 8.24 12.36 27.45 9 12.73 14.47 476.13 1.50 21.27 0.37 5.65 1.00 66.56 45.60 149.19 625.32 25.51 9.72
4 S 4.70 186.460 184.960 1.50 0.00 27 1.87 8.53 12.80 40.25 9 12.73 14.47 663.30 1.50 33.85 0.37 5.65 1.00 105.92 66.98 255.11 918.41 37.46 15.50
5 S 6.20 184.960 183.460 1.50 0.00 27 1.89 8.73 13.09 53.34 9 12.73 14.47 853.74 1.50 46.79 0.37 5.65 1.00 146.43 88.35 401.54 1255.28 51.20 22.66
6 C 7.70 183.460 181.960 1.50 0.40 8 2.04 10.20 15.30 68.64 9 10.00 0.86 1181.53 1.50 60.99 0.14 5.65 0.57 199.75 109.73 601.29 1782.82 72.72 31.63
7 C 9.20 181.960 180.460 1.50 0.40 8 2.02 10.00 15.00 83.64 9 10.00 0.86 1351.12 1.50 76.14 0.14 5.65 0.57 217.81 131.10 819.11 2170.22 88.52 41.21
8 C 10.70 180.460 178.960 1.50 0.40 8 2.03 10.10 15.15 98.80 9 10.00 0.86 1522.54 1.50 91.22 0.14 5.65 0.57 235.79 152.48 1054.89 2577.43 105.13 51.40
9 C 12.20 178.960 177.460 1.50 0.15 25 1.99 9.71 14.56 113.36 9 10.00 10.88 1503.45 1.50 106.08 0.47 5.65 1.00 502.76 173.85 1557.66 3061.11 124.85 70.67
10 C 13.70 177.460 175.960 1.50 0.15 25 1.98 9.61 14.42 127.78 9 10.00 10.88 1665.77 1.50 120.57 0.47 5.65 1.00 560.07 195.23 2117.73 3783.50 154.32 91.89
11 C 15.20 175.960 174.460 1.50 0.15 25 1.99 9.71 14.56 142.34 9 10.00 10.88 1831.21 1.50 135.06 0.47 5.65 1.00 617.39 216.60 2735.11 4566.32 186.25 115.05
12 C 16.70 174.460 172.960 1.50 0.30 16 1.99 9.71 14.56 156.90 9 10.00 3.06 2094.15 1.50 149.62 0.29 5.65 0.74 486.65 237.98 3221.76 5315.91 216.82 133.77
13 C 18.20 172.960 171.460 1.50 0.30 16 1.98 9.61 14.42 171.32 9 10.00 3.06 2256.99 1.50 164.11 0.29 5.65 0.74 521.89 259.35 3743.66 6000.65 244.75 153.69
14 C 19.70 171.460 169.960 1.50 0.30 16 1.98 9.61 14.42 185.73 9 10.00 3.06 2420.03 1.50 178.53 0.29 5.65 0.74 556.96 280.73 4300.61 6720.65 274.12 174.80
15 C 21.20 169.960 168.460 1.50 0.30 16 1.97 9.51 14.27 200.00 9 10.00 3.06 2581.21 1.50 192.87 0.29 5.65 0.74 591.84 302.11 4892.45 7473.67 304.83 197.10
16 C 22.70 168.460 166.960 1.50 0.30 16 1.99 9.71 14.56 214.57 9 10.00 3.06 2746.33 1.50 207.29 0.29 5.65 0.74 626.91 323.48 5519.36 8265.69 337.13 220.58
17 C 24.20 166.960 165.460 1.50 0.30 16 2.03 10.10 15.15 214.57 9 10.00 3.06 2747.14 1.50 222.14 0.29 5.65 0.74 663.04 344.86 6182.40 8929.55 364.21 245.30
18 C 25.70 165.460 163.960 1.50 0.35 14 2.03 10.10 15.15 214.57 9 10.00 2.29 2791.75 1.50 237.30 0.25 5.65 0.64 626.87 366.23 6809.28 9601.03 391.60 268.79
19 C 27.20 163.960 162.460 1.50 0.20 24 2.01 9.91 14.86 214.57 9 10.00 9.44 2689.81 1.50 252.30 0.45 5.65 1.00 1063.74 387.61 7873.02 10562.83 430.83 307.12
20 C 28.70 162.460 160.960 1.50 0.20 24 2.00 9.81 14.71 214.57 9 10.00 9.44 2689.18 1.50 267.08 0.45 5.65 1.00 1119.57 408.98 8992.59 11681.77 476.47 347.36
21 C 30.20 160.960 159.460 1.50 0.00 32 1.94 9.22 13.83 214.57 10 30.85 30.21 7674.91 2.50 281.35 0.45 5.65 1.00 1770.91 430.36 10763.51 18438.41 752.05 409.73
22 C 31.70 159.460 157.960 1.50 0.00 32 1.92 9.02 13.53 214.57 11 30.85 30.21 7670.88 3.50 295.03 0.45 5.65 1.00 2599.83 451.73 13363.34 21034.22 857.93 500.27
23 C 33.20 157.960 156.460 1.50 0.00 32 1.92 9.02 13.53 214.57 12 30.85 30.21 7670.88 4.50 308.57 0.45 5.65 1.00 3495.97 473.11 16859.31 24530.19 1000.52 621.28
24 C 34.70 156.460 154.960 1.50 0.00 32 1.96 9.41 14.12 214.57 13 30.85 30.21 7678.93 5.50 322.40 0.45 5.65 1.00 4464.34 494.48 21323.65 29002.57 1182.93 775.20
25 C 36.20 154.960 153.460 1.50 0.15 26 2.02 10.00 15.00 214.57 14 10.67 12.54 2906.38 6.50 336.96 0.49 5.65 1.00 6123.98 515.86 27447.63 30354.01 1238.06 985.53
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.960
BORE HOLE 04 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 S S 0.20 189.660 189.460 0.20 0.00 6.00 ‐ 0.60 29580.40 0.10 ‐ 5.50 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 C S 1.70 189.460 187.960 1.50 0.10 7.00 ‐ 0.80 29580.40 0.10 ‐ 5.19 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 S S 3.20 187.960 186.460 1.50 0.00 9.00 ‐ 1.20 29580.40 0.10 ‐ 4.79 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 S S 4.70 186.460 184.960 1.50 0.00 12.00 ‐ 1.69 29580.40 0.10 ‐ 4.47 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 S S 6.20 184.960 183.460 1.50 0.00 21.00 ‐ 2.98 29580.40 0.10 ‐ 3.99 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 C C 7.70 183.460 181.960 1.50 0.40 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 C C 9.20 181.960 180.460 1.50 0.40 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 C C 10.70 180.460 178.960 1.50 0.40 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 C C 12.20 178.960 177.460 1.50 0.15 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 C C 13.70 177.460 175.960 1.50 0.15 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 C C 15.20 175.960 174.460 1.50 0.15 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 C C 16.70 174.460 172.960 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
13 C C 18.20 172.960 171.460 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
14 C C 19.70 171.460 169.960 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
15 C C 21.20 169.960 168.460 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
16 C C 22.70 168.460 166.960 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Long 0.00 9.88 12.27 112.35 11.46 234.47 23.91
17 C C 24.20 166.960 165.460 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Long 0.00 9.88 12.27 112.35 11.46 234.47 23.91
18 C C 25.70 165.460 163.960 1.50 0.35 12.36 ‐ 29580.40 0.10 5.91 ‐ Long 0.00 9.51 11.81 126.12 12.86 263.21 26.84
19 C C 27.20 163.960 162.460 1.50 0.20 7.06 ‐ 29580.40 0.10 6.80 ‐ Long 0.00 10.94 13.58 82.89 8.45 172.99 17.64
20 C C 28.70 162.460 160.960 1.50 0.20 7.06 ‐ 29580.40 0.10 6.80 ‐ Long 0.00 10.94 13.58 82.89 8.45 172.99 17.64
21 C C 30.20 160.960 159.460 1.50 0.20 7.06 ‐ 29580.40 0.10 6.80 ‐ Long 1.00 10.71 13.20 67.52 6.88 151.51 15.45
22 C C 31.70 159.460 157.960 1.50 0.20 7.06 ‐ 29580.40 0.10 6.80 ‐ Long 2.00 10.51 12.85 55.34 5.64 132.40 13.50
23 C C 33.20 157.960 156.460 1.50 0.20 7.06 ‐ 29580.40 0.10 6.80 ‐ Long 3.00 10.34 12.54 45.66 4.66 115.57 11.78
24 C C 34.70 156.460 154.960 1.50 0.20 7.06 ‐ 29580.40 0.10 6.80 ‐ Long 4.00 10.19 12.26 37.92 3.87 100.87 10.29
25 C C 36.20 154.960 153.460 1.50 0.15 5.30 ‐ 29580.40 0.10 7.30 ‐ Long 5.00 10.86 12.99 27.17 2.77 74.41 7.59
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 194.387
BORE HOLE 05 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 SM 0.50 192.387 191.887 0.50 0.00 30 1.77 7.55 3.78 3.78 9 21.65 22.40 130.64 1.50 1.89 0.41 1.57 1.00 1.84 4.95 1.84 132.48 5.40 0.57
2 CL 2.00 191.887 190.387 1.50 0.25 17 1.94 9.22 13.83 17.60 9 10.00 3.53 324.34 1.50 10.69 0.31 4.71 0.87 123.17 19.79 125.01 449.35 18.33 6.27
3 ML 3.50 190.387 188.887 1.50 0.15 22 1.96 9.41 14.12 31.73 9 10.00 7.13 379.51 1.50 24.66 0.40 4.71 1.00 139.76 34.64 264.77 644.28 26.28 12.53
4 ML 5.00 188.887 187.387 1.50 0.15 22 1.96 9.41 14.12 45.85 9 10.00 7.13 490.42 1.50 38.79 0.40 4.71 1.00 180.09 49.48 444.86 935.28 38.15 20.17
5 ML 6.50 187.387 185.887 1.50 0.00 28 1.91 8.92 13.39 59.23 9 15.20 16.72 765.57 1.50 52.54 0.38 4.71 1.00 142.56 64.32 587.42 1353.00 55.18 26.53
6 CL 8.00 185.887 184.387 1.50 0.45 6 1.96 9.41 14.12 73.36 9 10.00 0.57 890.20 1.50 66.30 0.11 4.71 0.52 156.63 79.17 744.06 1634.25 66.66 33.36
7 CI 9.50 184.387 182.887 1.50 0.45 6 2.02 10.00 15.00 88.36 9 10.00 0.57 1008.18 1.50 80.86 0.11 4.71 0.52 167.45 94.01 911.51 1919.68 78.30 40.57
8 CI 11.00 182.887 181.387 1.50 0.45 6 2.02 10.00 15.00 103.37 9 10.00 0.57 1126.02 1.50 95.86 0.11 4.71 0.52 178.60 108.86 1090.10 2216.13 90.39 48.15
9 CI 12.50 181.387 179.887 1.50 0.45 6 2.02 10.00 15.00 118.37 9 10.00 0.57 1243.87 1.50 110.87 0.11 4.71 0.52 189.75 123.70 1279.85 2523.72 102.94 56.11
10 CI 14.00 179.887 178.387 1.50 0.40 9 2.04 10.20 15.30 133.67 9 10.00 1.03 1331.25 1.50 126.02 0.16 4.71 0.57 246.96 138.54 1526.81 2858.06 116.57 66.02
11 CI 15.50 178.387 176.887 1.50 0.40 9 2.03 10.10 15.15 148.82 9 10.00 1.03 1450.22 1.50 141.25 0.16 4.71 0.57 264.00 153.39 1790.81 3241.02 132.19 76.51
12 ML 17.00 176.887 175.387 1.50 0.00 30 1.91 8.92 13.39 162.21 9 21.65 22.40 2836.86 1.50 155.51 0.41 4.71 1.00 455.33 168.23 2246.14 5083.00 207.32 93.50
13 ML 18.50 175.387 173.887 1.50 0.00 30 1.91 8.92 13.39 175.59 9 21.65 22.40 3064.50 1.50 168.90 0.41 4.71 1.00 494.53 183.08 2740.67 5805.16 236.78 111.82
14 ML 20.00 173.887 172.387 1.50 0.00 30 1.93 9.12 13.68 189.28 9 21.65 22.40 3298.87 1.50 182.43 0.41 4.71 1.00 534.15 197.92 3274.82 6573.68 268.12 131.49
15 ML 21.50 172.387 170.887 1.50 0.00 30 1.94 9.22 13.83 189.28 9 21.65 22.40 3299.73 1.50 196.19 0.41 4.71 1.00 574.42 212.76 3849.24 7148.97 291.59 152.53
16 ML 23.00 170.887 169.387 1.50 0.00 30 1.94 9.22 13.83 189.28 9 21.65 22.40 3299.73 1.50 210.02 0.41 4.71 1.00 614.91 227.61 4464.15 7763.88 316.67 174.94
17 ML 24.50 169.387 167.887 1.50 0.00 30 1.96 9.41 14.12 189.28 9 21.65 22.40 3301.45 1.50 223.99 0.41 4.71 1.00 655.83 242.45 5119.97 8421.43 343.49 198.75
18 ML 26.00 167.887 166.387 1.50 0.00 30 1.96 9.41 14.12 189.28 9 21.65 22.40 3301.45 1.50 238.11 0.41 4.71 1.00 697.17 257.30 5817.15 9118.60 371.92 223.96
19 ML 27.50 166.387 164.887 1.50 0.00 30 1.97 9.51 14.27 189.28 9 21.65 22.40 3302.32 1.50 252.31 0.41 4.71 1.00 738.74 272.14 6555.89 9858.20 402.09 250.58
20 ML 29.00 164.887 163.387 1.50 0.00 30 1.97 9.51 14.27 189.28 10 21.65 22.40 3302.32 2.50 266.58 0.41 4.71 1.00 1300.86 286.98 7856.75 11159.07 455.15 296.31
21 ML 30.50 163.387 161.887 1.50 0.00 31 1.97 9.51 14.27 189.28 11 25.84 25.99 3938.96 3.50 280.85 0.43 4.71 1.00 1990.12 301.83 9846.87 13785.83 562.29 365.47
22 ML 32.00 161.887 160.387 1.50 0.00 31 1.97 9.51 14.27 189.28 12 25.84 25.99 3938.96 4.50 295.12 0.43 4.71 1.00 2688.73 316.67 12535.59 16474.55 671.95 458.37
23 ML 33.50 160.387 158.887 1.50 0.00 31 1.97 9.51 14.27 189.28 13 25.84 25.99 3938.96 5.50 309.39 0.43 4.71 1.00 3445.11 331.52 15980.71 19919.67 812.47 576.98
24 ML 35.00 158.887 157.387 1.50 0.00 31 1.97 9.51 14.27 189.28 14 25.84 25.99 3938.96 6.50 323.66 0.43 4.71 1.00 4259.28 346.36 20239.99 24178.95 986.19 723.26
25 ML 36.50 157.387 155.887 1.50 0.00 32 1.97 9.51 14.27 189.28 15 30.85 30.21 4698.63 7.50 337.92 0.45 4.71 1.00 5317.48 361.20 25557.46 30256.09 1234.06 905.51
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 194.387
BORE HOLE 05 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 SM S 0.50 192.387 191.887 0.50 0.00 14.00 ‐ 1.98 29580.40 0.05 ‐ 3.74 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 CL C 2.00 191.887 190.387 1.50 0.25 14.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 ML C 3.50 190.387 188.887 1.50 0.15 14.00 5.30 ‐ 29580.40 0.05 6.08 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 ML C 5.00 188.887 187.387 1.50 0.15 14.00 5.30 ‐ 29580.40 0.05 6.08 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 ML C 6.50 187.387 185.887 1.50 0.15 14.00 5.30 ‐ 29580.40 0.05 6.08 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 CL C 8.00 185.887 184.387 1.50 0.45 14.00 15.89 ‐ 29580.40 0.05 4.62 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 CI C 9.50 184.387 182.887 1.50 0.45 14.00 15.89 ‐ 29580.40 0.05 4.62 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 CI C 11.00 182.887 181.387 1.50 0.45 14.00 15.89 ‐ 29580.40 0.05 4.62 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 CI C 12.50 181.387 179.887 1.50 0.45 14.00 15.89 ‐ 29580.40 0.05 4.62 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 CI C 14.00 179.887 178.387 1.50 0.40 14.00 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 CI C 15.50 178.387 176.887 1.50 0.40 14.00 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 ML S 17.00 176.887 175.387 1.50 0.00 22.00 ‐ 3.13 29580.40 0.05 ‐ 3.41 Long 0.00 6.49 7.51 159.57 16.27 411.02 41.91
13 ML S 18.50 175.387 173.887 1.50 0.00 23.67 ‐ 3.37 29580.40 0.05 ‐ 3.36 Long 0.00 6.39 7.40 166.81 17.01 429.66 43.81
14 ML S 20.00 173.887 172.387 1.50 0.00 25.50 ‐ 3.63 29580.40 0.05 ‐ 3.31 Long 0.00 6.30 7.29 174.53 17.80 449.56 45.84
15 ML S 21.50 172.387 170.887 1.50 0.00 27.60 ‐ 3.93 29580.40 0.05 ‐ 3.26 Long 0.00 6.20 7.18 183.11 18.67 471.66 48.09
16 ML S 23.00 170.887 169.387 1.50 0.00 28.67 ‐ 4.09 29580.40 0.05 ‐ 3.24 Long 0.00 6.15 7.12 187.37 19.11 482.62 49.21
17 ML S 24.50 169.387 167.887 1.50 0.00 29.86 ‐ 4.26 29580.40 0.05 ‐ 3.21 Long 0.00 6.10 7.06 192.04 19.58 494.67 50.44
18 ML S 26.00 167.887 166.387 1.50 0.00 31.13 ‐ 4.44 29580.40 0.05 ‐ 3.18 Long 0.00 6.05 7.00 196.94 20.08 507.28 51.73
19 ML S 27.50 166.387 164.887 1.50 0.00 32.56 ‐ 4.65 29580.40 0.05 ‐ 3.15 Long 0.00 5.99 6.94 202.37 20.64 521.27 53.15
20 ML S 29.00 164.887 163.387 1.50 0.00 33.56 ‐ 4.79 29580.40 0.05 ‐ 3.14 Long 1.00 5.96 6.71 129.25 13.18 379.70 38.72
21 ML S 30.50 163.387 161.887 1.50 0.00 34.56 ‐ 4.94 29580.40 0.05 ‐ 3.12 Long 2.00 5.95 6.51 86.82 8.85 282.67 28.82
22 ML S 32.00 161.887 160.387 1.50 0.00 35.56 ‐ 5.05 29580.40 0.05 ‐ 3.10 Long 3.00 5.96 6.34 60.63 6.18 213.85 21.81
23 ML S 33.50 160.387 158.887 1.50 0.00 36.56 ‐ 5.16 29580.40 0.05 ‐ 3.09 Long 4.00 5.98 6.19 43.84 4.47 164.52 16.78
24 ML S 35.00 158.887 157.387 1.50 0.00 37.56 ‐ 5.27 29580.40 0.05 ‐ 3.08 Long 5.00 6.01 6.07 32.64 3.33 128.46 13.10
25 ML S 36.50 157.387 155.887 1.50 0.00 38.56 ‐ 5.38 29580.40 0.05 ‐ 3.06 Long 6.00 6.05 5.97 24.91 2.54 101.63 10.36
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 194.387
BORE HOLE 05 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 SM 0.20 192.087 191.887 0.20 0.00 30 1.77 7.55 1.51 1.51 9 21.65 22.40 151.78 1.50 0.76 0.41 0.75 1.00 0.35 2.85 0.35 152.13 6.21 0.30
2 CL 1.70 191.887 190.387 1.50 0.25 17 1.94 9.22 13.83 15.34 9 10.00 3.53 445.11 1.50 8.42 0.31 5.65 0.87 141.92 24.23 142.28 587.38 23.96 7.31
3 ML 3.20 190.387 188.887 1.50 0.15 22 1.96 9.41 14.12 29.46 9 10.00 7.13 528.46 1.50 22.40 0.40 5.65 1.00 159.95 45.60 302.23 830.69 33.88 14.92
4 ML 4.70 188.887 187.387 1.50 0.15 22 1.96 9.41 14.12 43.58 9 10.00 7.13 688.18 1.50 36.52 0.40 5.65 1.00 208.35 66.98 510.57 1198.75 48.89 24.18
5 ML 6.20 187.387 185.887 1.50 0.00 28 1.91 8.92 13.39 56.97 9 15.20 16.72 1080.36 1.50 50.28 0.38 5.65 1.00 163.70 88.35 674.27 1754.63 71.57 31.93
6 CL 7.70 185.887 184.387 1.50 0.45 6 1.96 9.41 14.12 71.09 9 10.00 0.57 1256.87 1.50 64.03 0.11 5.65 0.52 185.94 109.73 860.21 2117.08 86.35 40.43
7 CI 9.20 184.387 182.887 1.50 0.45 6 2.02 10.00 15.00 86.10 9 10.00 0.57 1426.80 1.50 78.59 0.11 5.65 0.52 198.92 131.10 1059.13 2485.93 101.39 49.37
8 CI 10.70 182.887 181.387 1.50 0.45 6 2.02 10.00 15.00 101.10 9 10.00 0.57 1596.50 1.50 93.60 0.11 5.65 0.52 212.30 152.48 1271.43 2867.93 116.97 58.76
9 CI 12.20 181.387 179.887 1.50 0.45 6 2.02 10.00 15.00 116.11 9 10.00 0.57 1766.20 1.50 108.60 0.11 5.65 0.52 225.67 173.85 1497.10 3263.30 133.10 68.61
10 CI 13.70 179.887 178.387 1.50 0.40 9 2.04 10.20 15.30 131.40 9 10.00 1.03 1892.57 1.50 123.75 0.16 5.65 0.57 293.30 195.23 1790.41 3682.98 150.22 80.76
11 CI 15.20 178.387 176.887 1.50 0.40 9 2.03 10.10 15.15 146.56 9 10.00 1.03 2063.87 1.50 138.98 0.16 5.65 0.57 313.76 216.60 2104.17 4168.03 170.00 93.61
12 ML 16.70 176.887 175.387 1.50 0.00 30 1.91 8.92 13.39 159.94 9 21.65 22.40 4052.22 1.50 153.25 0.41 5.65 1.00 538.44 237.98 2642.61 6694.82 273.06 114.09
13 ML 18.20 175.387 173.887 1.50 0.00 30 1.91 8.92 13.39 173.33 9 21.65 22.40 4380.01 1.50 166.64 0.41 5.65 1.00 585.47 259.35 3228.08 7608.09 310.31 136.17
14 ML 19.70 173.887 172.387 1.50 0.00 30 1.93 9.12 13.68 187.01 9 21.65 22.40 4718.00 1.50 180.17 0.41 5.65 1.00 633.02 280.73 3861.10 8579.10 349.92 159.86
15 ML 21.20 172.387 170.887 1.50 0.00 30 1.94 9.22 13.83 200.84 9 21.65 22.40 5058.10 1.50 193.92 0.41 5.65 1.00 681.35 302.11 4542.45 9600.54 391.58 185.20
16 ML 22.70 170.887 169.387 1.50 0.00 30 1.94 9.22 13.83 214.67 9 21.65 22.40 5396.70 1.50 207.75 0.41 5.65 1.00 729.93 323.48 5272.38 10669.08 435.16 212.19
17 ML 24.20 169.387 167.887 1.50 0.00 30 1.96 9.41 14.12 214.67 9 21.65 22.40 5399.69 1.50 221.73 0.41 5.65 1.00 779.03 344.86 6051.41 11451.10 467.06 240.85
18 ML 25.70 167.887 166.387 1.50 0.00 30 1.96 9.41 14.12 214.67 9 21.65 22.40 5399.69 1.50 235.85 0.41 5.65 1.00 828.65 366.23 6880.06 12279.75 500.86 271.19
19 ML 27.20 166.387 164.887 1.50 0.00 30 1.97 9.51 14.27 214.67 9 21.65 22.40 5401.18 1.50 250.04 0.41 5.65 1.00 878.53 387.61 7758.59 13159.76 536.75 303.23
20 ML 28.70 164.887 163.387 1.50 0.00 30 1.97 9.51 14.27 214.67 10 21.65 22.40 5401.18 2.50 264.31 0.41 5.65 1.00 1547.77 408.98 9306.35 14707.53 599.88 358.02
21 ML 30.20 163.387 161.887 1.50 0.00 31 1.97 9.51 14.27 214.67 11 25.84 25.99 6442.20 3.50 278.58 0.43 5.65 1.00 2368.88 430.36 11675.23 18117.43 738.96 440.72
22 ML 31.70 161.887 160.387 1.50 0.00 31 1.97 9.51 14.27 214.67 12 25.84 25.99 6442.20 4.50 292.85 0.43 5.65 1.00 3201.70 451.73 14876.94 21319.13 869.55 551.72
23 ML 33.20 160.387 158.887 1.50 0.00 31 1.97 9.51 14.27 214.67 13 25.84 25.99 6442.20 5.50 307.12 0.43 5.65 1.00 4103.86 473.11 18980.80 25423.00 1036.93 693.39
24 ML 34.70 158.887 157.387 1.50 0.00 31 1.97 9.51 14.27 214.67 14 25.84 25.99 6442.20 6.50 321.39 0.43 5.65 1.00 5075.36 494.48 24056.16 30498.36 1243.94 868.07
25 ML 36.20 157.387 155.887 1.50 0.00 32 1.97 9.51 14.27 214.67 15 30.85 30.21 7684.36 7.50 335.66 0.45 5.65 1.00 6338.19 515.86 30394.35 38078.71 1553.12 1085.68
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 194.387
BORE HOLE 05 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 SM S 0.20 192.087 191.887 0.20 0.00 14.00 ‐ 1.98 29580.40 0.10 ‐ 4.33 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 CL C 1.70 191.887 190.387 1.50 0.25 14.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 ML C 3.20 190.387 188.887 1.50 0.15 14.00 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 ML C 4.70 188.887 187.387 1.50 0.15 14.00 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 ML C 6.20 187.387 185.887 1.50 0.15 14.00 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 CL C 7.70 185.887 184.387 1.50 0.45 14.00 15.89 ‐ 29580.40 0.10 5.55 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 CI C 9.20 184.387 182.887 1.50 0.45 14.00 15.89 ‐ 29580.40 0.10 5.55 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 CI C 10.70 182.887 181.387 1.50 0.45 14.00 15.89 ‐ 29580.40 0.10 5.55 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 CI C 12.20 181.387 179.887 1.50 0.45 14.00 15.89 ‐ 29580.40 0.10 5.55 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 CI C 13.70 179.887 178.387 1.50 0.40 14.00 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 CI C 15.20 178.387 176.887 1.50 0.40 14.00 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 ML S 16.70 176.887 175.387 1.50 0.00 22.00 ‐ 3.13 29580.40 0.10 ‐ 3.95 Long 0.00 7.51 8.69 256.34 26.14 660.29 67.33
13 ML S 18.20 175.387 173.887 1.50 0.00 23.67 ‐ 3.37 29580.40 0.10 ‐ 3.89 Long 0.00 7.40 8.56 267.97 27.32 690.24 70.38
14 ML S 19.70 173.887 172.387 1.50 0.00 25.50 ‐ 3.63 29580.40 0.10 ‐ 3.83 Long 0.00 7.28 8.44 280.38 28.59 722.21 73.64
15 ML S 21.20 172.387 170.887 1.50 0.00 27.60 ‐ 3.93 29580.40 0.10 ‐ 3.77 Long 0.00 7.17 8.30 294.16 30.00 757.71 77.26
16 ML S 22.70 170.887 169.387 1.50 0.00 28.67 ‐ 4.09 29580.40 0.10 ‐ 3.74 Long 0.00 7.11 8.24 301.00 30.69 775.32 79.06
17 ML S 24.20 169.387 167.887 1.50 0.00 29.86 ‐ 4.26 29580.40 0.10 ‐ 3.71 Long 0.00 7.06 8.17 308.51 31.46 794.67 81.03
18 ML S 25.70 167.887 166.387 1.50 0.00 31.13 ‐ 4.44 29580.40 0.10 ‐ 3.68 Long 0.00 7.00 8.10 316.38 32.26 814.93 83.10
19 ML S 27.20 166.387 164.887 1.50 0.00 32.56 ‐ 4.65 29580.40 0.10 ‐ 3.65 Long 0.00 6.93 8.03 325.10 33.15 837.40 85.39
20 ML S 28.70 164.887 163.387 1.50 0.00 33.56 ‐ 4.79 29580.40 0.10 ‐ 3.63 Long 1.00 6.89 7.79 220.42 22.48 637.34 64.99
21 ML S 30.20 163.387 161.887 1.50 0.00 34.56 ‐ 4.94 29580.40 0.10 ‐ 3.61 Long 2.00 6.87 7.58 155.27 15.83 492.94 50.26
22 ML S 31.70 161.887 160.387 1.50 0.00 35.56 ‐ 5.05 29580.40 0.10 ‐ 3.59 Long 3.00 6.87 7.40 112.64 11.49 385.62 39.32
23 ML S 33.20 160.387 158.887 1.50 0.00 36.56 ‐ 5.16 29580.40 0.10 ‐ 3.57 Long 4.00 6.89 7.24 84.00 8.57 305.58 31.16
24 ML S 34.70 158.887 157.387 1.50 0.00 37.56 ‐ 5.27 29580.40 0.10 ‐ 3.56 Long 5.00 6.91 7.10 64.16 6.54 245.02 24.98
25 ML S 36.20 157.387 155.887 1.50 0.00 38.56 ‐ 5.38 29580.40 0.10 ‐ 3.55 Long 6.00 6.94 6.97 50.03 5.10 198.54 20.24
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 194.450
BORE HOLE 06 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 S 0.50 192.450 191.950 0.50 0.00 29 1.74 7.26 3.63 3.63 9 18.14 19.34 106.81 1.50 1.81 0.40 1.57 1.00 1.71 4.95 1.71 108.51 4.43 0.56
2 S 2.00 191.950 190.450 1.50 0.00 27 1.83 8.14 12.21 15.84 9 12.73 14.47 204.62 1.50 9.73 0.37 4.71 1.00 25.38 19.79 27.09 231.71 9.45 2.94
3 S 3.50 190.450 188.950 1.50 0.00 27 1.84 8.24 12.36 28.20 9 12.73 14.47 328.74 1.50 22.02 0.37 4.71 1.00 57.41 34.64 84.50 413.24 16.85 6.40
4 C 5.00 188.950 187.450 1.50 0.15 22 1.92 9.02 13.53 41.73 9 10.00 7.13 456.97 1.50 34.96 0.40 4.71 1.00 169.17 49.48 253.67 710.65 28.99 13.67
5 C 6.50 187.450 185.950 1.50 0.25 14 1.93 9.12 13.68 55.41 9 10.00 2.29 616.68 1.50 48.57 0.25 4.71 0.87 185.66 64.32 439.33 1056.01 43.07 21.49
6 C 8.00 185.950 184.450 1.50 0.25 14 1.94 9.22 13.83 69.24 9 10.00 2.29 725.37 1.50 62.32 0.25 4.71 0.87 209.90 79.17 649.24 1374.61 56.07 30.14
7 C 9.50 184.450 182.950 1.50 0.40 7 2.02 10.00 15.00 84.24 9 10.00 0.71 941.70 1.50 76.74 0.12 4.71 0.57 172.47 94.01 821.71 1763.41 71.92 37.52
8 C 11.00 182.950 181.450 1.50 0.40 7 2.02 10.00 15.00 99.25 9 10.00 0.71 1059.55 1.50 91.74 0.12 4.71 0.57 185.50 108.86 1007.21 2066.75 84.30 45.33
9 C 12.50 181.450 179.950 1.50 0.40 7 2.01 9.91 14.86 114.10 9 10.00 0.71 1176.21 1.50 106.68 0.12 4.71 0.57 198.46 123.70 1205.66 2381.87 97.15 53.59
10 C 14.00 179.950 178.450 1.50 0.40 8 2.02 10.00 15.00 129.11 9 10.00 0.86 1294.68 1.50 121.61 0.14 4.71 0.57 226.68 138.54 1432.34 2727.02 111.23 62.81
11 C 15.50 178.450 176.950 1.50 0.40 8 2.02 10.00 15.00 144.11 9 10.00 0.86 1412.53 1.50 136.61 0.14 4.71 0.57 241.58 153.39 1673.92 3086.45 125.89 72.54
12 C 17.00 176.950 175.450 1.50 0.40 8 2.03 10.12 15.18 159.30 9 10.00 0.86 1531.80 1.50 151.70 0.14 4.71 0.57 256.58 168.23 1930.50 3462.30 141.22 82.77
13 S 18.50 175.450 173.950 1.50 0.00 31 1.94 9.22 13.83 173.12 9 25.84 25.99 3608.11 1.50 166.21 0.43 4.71 1.00 504.76 183.08 2435.26 6043.37 246.49 101.44
14 C 20.00 173.950 172.450 1.50 0.15 24 1.96 9.41 14.12 187.25 9 10.00 9.44 1609.51 1.50 180.18 0.45 4.71 1.00 636.39 197.92 3071.65 4681.16 190.93 124.58
15 C 21.50 172.450 170.950 1.50 0.15 24 1.96 9.41 14.12 187.25 9 10.00 9.44 1609.51 1.50 194.31 0.45 4.71 1.00 680.83 212.76 3752.48 5361.99 218.70 149.24
16 C 23.00 170.950 169.450 1.50 0.15 24 1.95 9.32 13.97 187.25 9 10.00 9.44 1609.15 1.50 208.35 0.45 4.71 1.00 725.04 227.61 4477.52 6086.66 248.26 175.40
17 S 24.50 169.450 167.950 1.50 0.00 30 1.95 9.32 13.97 187.25 9 21.65 22.40 3266.07 1.50 222.33 0.41 4.71 1.00 650.96 242.45 5128.48 8394.55 342.39 199.04
18 S 26.00 167.950 166.450 1.50 0.00 30 1.94 9.22 13.83 187.25 9 21.65 22.40 3265.21 1.50 236.23 0.41 4.71 1.00 691.66 257.30 5820.14 9085.35 370.57 224.06
19 S 27.50 166.450 164.950 1.50 0.00 30 1.96 9.41 14.12 187.25 9 21.65 22.40 3266.93 1.50 250.21 0.41 4.71 1.00 732.58 272.14 6552.72 9819.65 400.52 250.47
20 S 29.00 164.950 163.450 1.50 0.00 30 1.96 9.41 14.12 187.25 10 21.65 22.40 3266.93 2.50 264.33 0.41 4.71 1.00 1289.88 286.98 7842.60 11109.53 453.13 295.83
21 S 30.50 163.450 161.950 1.50 0.00 31 1.96 9.41 14.12 187.25 11 25.84 25.99 3896.75 3.50 278.45 0.43 4.71 1.00 1973.13 301.83 9815.72 13712.48 559.29 364.41
22 S 32.00 161.950 160.450 1.50 0.00 31 1.97 9.51 14.27 187.25 12 25.84 25.99 3897.76 4.50 292.65 0.43 4.71 1.00 2666.21 316.67 12481.93 16379.69 668.08 456.54
23 S 33.50 160.450 158.950 1.50 0.00 31 1.98 9.61 14.42 187.25 13 25.84 25.99 3898.76 5.50 306.99 0.43 4.71 1.00 3418.41 331.52 15900.35 19799.10 807.55 574.25
24 S 35.00 158.950 157.450 1.50 0.00 31 1.96 9.41 14.12 187.25 14 25.84 25.99 3896.75 6.50 321.26 0.43 4.71 1.00 4227.72 346.36 20128.07 24024.83 979.91 719.46
25 S 36.50 157.450 155.950 1.50 0.00 31 1.99 9.71 14.56 187.25 15 25.84 25.99 3899.76 7.50 335.60 0.43 4.71 1.00 5095.93 361.20 25224.00 29123.76 1187.88 894.18
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 194.450
BORE HOLE 06 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 S S 0.50 192.450 191.950 0.50 0.00 10.00 ‐ 1.40 29580.40 0.05 ‐ 4.01 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 S S 2.00 191.950 190.450 1.50 0.00 9.00 ‐ 1.20 29580.40 0.05 ‐ 4.14 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 S S 3.50 190.450 188.950 1.50 0.00 10.00 ‐ 1.40 29580.40 0.05 ‐ 4.01 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 C C 5.00 188.950 187.450 1.50 0.15 10.00 5.30 ‐ 29580.40 0.05 6.08 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 C C 6.50 187.450 185.950 1.50 0.25 10.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 C C 8.00 185.950 184.450 1.50 0.25 10.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 C C 9.50 184.450 182.950 1.50 0.40 10.00 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 C C 11.00 182.950 181.450 1.50 0.40 10.00 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 C C 12.50 181.450 179.950 1.50 0.40 10.00 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 C C 14.00 179.950 178.450 1.50 0.40 10.00 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 C C 15.50 178.450 176.950 1.50 0.40 10.00 14.12 ‐ 29580.40 0.05 4.76 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 C C 17.00 176.950 175.450 1.50 0.40 10.00 14.12 ‐ 29580.40 0.05 4.76 ‐ Long 0.00 7.66 9.52 96.81 9.87 202.04 20.60
13 S C 18.50 175.450 173.950 1.50 0.40 10.00 14.12 ‐ 29580.40 0.05 4.76 ‐ Long 0.00 7.66 9.52 96.81 9.87 202.04 20.60
14 C C 20.00 173.950 172.450 1.50 0.15 10.00 5.30 ‐ 29580.40 0.05 6.08 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
15 C C 21.50 172.450 170.950 1.50 0.15 10.00 5.30 ‐ 29580.40 0.05 6.08 ‐ Long 0.00 9.79 12.16 46.39 4.73 96.82 9.87
16 C C 23.00 170.950 169.450 1.50 0.15 10.00 5.30 ‐ 29580.40 0.05 6.08 ‐ Long 0.00 9.79 12.16 46.39 4.73 96.82 9.87
17 S S 24.50 169.450 167.950 1.50 0.00 18.00 ‐ 2.55 29580.40 0.05 ‐ 3.56 Long 0.00 6.76 7.82 141.23 14.40 363.77 37.09
18 S S 26.00 167.950 166.450 1.50 0.00 22.40 ‐ 3.19 29580.40 0.05 ‐ 3.40 Long 0.00 6.46 7.48 161.33 16.45 415.54 42.37
19 S S 27.50 166.450 164.950 1.50 0.00 26.17 ‐ 3.73 29580.40 0.05 ‐ 3.30 Long 0.00 6.26 7.25 177.29 18.08 456.66 46.56
20 S S 29.00 164.950 163.450 1.50 0.00 27.17 ‐ 3.87 29580.40 0.05 ‐ 3.27 Long 1.00 6.22 7.01 115.83 11.81 338.64 34.53
21 S S 30.50 163.450 161.950 1.50 0.00 28.17 ‐ 4.02 29580.40 0.05 ‐ 3.25 Long 2.00 6.19 6.80 79.18 8.07 255.90 26.09
22 S S 32.00 161.950 160.450 1.50 0.00 29.17 ‐ 4.16 29580.40 0.05 ‐ 3.23 Long 3.00 6.19 6.61 56.19 5.73 196.59 20.05
23 S S 33.50 160.450 158.950 1.50 0.00 30.17 ‐ 4.30 29580.40 0.05 ‐ 3.20 Long 4.00 6.19 6.44 41.15 4.20 153.23 15.63
24 S S 35.00 158.950 157.450 1.50 0.00 31.17 ‐ 4.45 29580.40 0.05 ‐ 3.18 Long 5.00 6.21 6.29 30.95 3.16 120.98 12.34
25 S S 36.50 157.450 155.950 1.50 0.00 32.17 ‐ 4.59 29580.40 0.05 ‐ 3.16 Long 6.00 6.23 6.17 23.82 2.43 96.62 9.85
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 194.450
BORE HOLE 06 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 S 0.20 192.150 191.950 0.20 0.00 29 1.74 7.26 1.45 1.45 9 18.14 19.34 125.01 1.50 0.73 0.40 0.75 1.00 0.33 2.85 0.33 125.34 5.11 0.30
2 S 1.70 191.950 190.450 1.50 0.00 27 1.83 8.14 12.21 13.66 9 12.73 14.47 276.63 1.50 7.56 0.37 5.65 1.00 23.65 24.23 23.97 300.60 12.26 3.29
3 S 3.20 190.450 188.950 1.50 0.00 27 1.84 8.24 12.36 26.02 9 12.73 14.47 455.52 1.50 19.84 0.37 5.65 1.00 62.08 45.60 86.06 541.57 22.09 7.57
4 C 4.70 188.950 187.450 1.50 0.15 22 1.92 9.02 13.53 39.55 9 10.00 7.13 640.69 1.50 32.78 0.40 5.65 1.00 195.54 66.98 281.60 922.29 37.62 16.40
5 C 6.20 187.450 185.950 1.50 0.25 14 1.93 9.12 13.68 53.23 9 10.00 2.29 865.75 1.50 46.39 0.25 5.65 0.87 218.19 88.35 499.79 1365.54 55.70 26.00
6 C 7.70 185.950 184.450 1.50 0.25 14 1.94 9.22 13.83 67.06 9 10.00 2.29 1022.30 1.50 60.15 0.25 5.65 0.87 247.28 109.73 747.07 1769.36 72.17 36.58
7 C 9.20 184.450 182.950 1.50 0.40 7 2.02 10.00 15.00 82.06 9 10.00 0.71 1332.22 1.50 74.56 0.12 5.65 0.57 204.70 131.10 951.77 2283.99 93.16 45.72
8 C 10.70 182.950 181.450 1.50 0.40 7 2.02 10.00 15.00 97.07 9 10.00 0.71 1501.92 1.50 89.57 0.12 5.65 0.57 220.33 152.48 1172.10 2674.02 109.07 55.39
9 C 12.20 181.450 179.950 1.50 0.40 7 2.01 9.91 14.86 111.93 9 10.00 0.71 1669.91 1.50 104.50 0.12 5.65 0.57 235.88 173.85 1407.98 3077.89 125.54 65.58
10 C 13.70 179.950 178.450 1.50 0.40 8 2.02 10.00 15.00 126.93 9 10.00 0.86 1840.69 1.50 119.43 0.14 5.65 0.57 269.42 195.23 1677.39 3518.09 143.49 76.92
11 C 15.20 178.450 176.950 1.50 0.40 8 2.02 10.00 15.00 141.94 9 10.00 0.86 2010.39 1.50 134.43 0.14 5.65 0.57 287.30 216.60 1964.70 3975.09 162.13 88.87
12 C 16.70 176.950 175.450 1.50 0.40 8 2.03 10.12 15.18 157.12 9 10.00 0.86 2182.16 1.50 149.53 0.14 5.65 0.57 305.30 237.98 2270.00 4452.15 181.59 101.42
13 S 18.20 175.450 173.950 1.50 0.00 31 1.94 9.22 13.83 170.95 9 25.84 25.99 5159.14 1.50 164.03 0.43 5.65 1.00 597.78 259.35 2867.78 8026.91 327.40 123.92
14 C 19.70 173.950 172.450 1.50 0.15 24 1.96 9.41 14.12 185.07 9 10.00 9.44 2303.12 1.50 178.01 0.45 5.65 1.00 755.44 280.73 3623.22 5926.34 241.72 151.78
15 C 21.20 172.450 170.950 1.50 0.15 24 1.96 9.41 14.12 199.19 9 10.00 9.44 2462.84 1.50 192.13 0.45 5.65 1.00 808.77 302.11 4431.99 6894.83 281.22 181.45
16 C 22.70 170.950 169.450 1.50 0.15 24 1.95 9.32 13.97 213.16 9 10.00 9.44 2620.27 1.50 206.18 0.45 5.65 1.00 861.83 323.48 5293.82 7914.08 322.79 212.92
17 S 24.20 169.450 167.950 1.50 0.00 30 1.95 9.32 13.97 213.16 9 21.65 22.40 5361.45 1.50 220.15 0.41 5.65 1.00 773.50 344.86 6067.32 11428.77 466.15 241.39
18 S 25.70 167.950 166.450 1.50 0.00 30 1.94 9.22 13.83 213.16 9 21.65 22.40 5359.96 1.50 234.05 0.41 5.65 1.00 822.34 366.23 6889.66 12249.63 499.63 271.52
19 S 27.20 166.450 164.950 1.50 0.00 30 1.96 9.41 14.12 213.16 9 21.65 22.40 5362.94 1.50 248.03 0.41 5.65 1.00 871.45 387.61 7761.11 13124.05 535.29 303.32
20 S 28.70 164.950 163.450 1.50 0.00 30 1.96 9.41 14.12 213.16 10 21.65 22.40 5362.94 2.50 262.15 0.41 5.65 1.00 1535.10 408.98 9296.21 14659.16 597.91 357.68
21 S 30.20 163.450 161.950 1.50 0.00 31 1.96 9.41 14.12 213.16 11 25.84 25.99 6396.61 3.50 276.27 0.43 5.65 1.00 2349.24 430.36 11645.45 18042.06 735.89 439.70
22 S 31.70 161.950 160.450 1.50 0.00 31 1.97 9.51 14.27 213.16 12 25.84 25.99 6398.34 4.50 290.47 0.43 5.65 1.00 3175.65 451.73 14821.10 21219.44 865.48 549.82
23 S 33.20 160.450 158.950 1.50 0.00 31 1.98 9.61 14.42 213.16 13 25.84 25.99 6400.07 5.50 304.81 0.43 5.65 1.00 4073.00 473.11 18894.11 25294.18 1031.68 690.44
24 S 34.70 158.950 157.450 1.50 0.00 31 1.96 9.41 14.12 213.16 14 25.84 25.99 6396.61 6.50 319.08 0.43 5.65 1.00 5038.89 494.48 23932.99 30329.60 1237.06 863.89
25 S 36.20 157.450 155.950 1.50 0.00 31 1.99 9.71 14.56 213.16 15 25.84 25.99 6401.80 7.50 333.42 0.43 5.65 1.00 6075.45 515.86 30008.44 36410.24 1485.07 1072.57
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 194.450
BORE HOLE 06 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 S S 0.20 192.150 191.950 0.20 0.00 10.00 ‐ 1.40 29580.40 0.10 ‐ 4.64 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 S S 1.70 191.950 190.450 1.50 0.00 9.00 ‐ 1.20 29580.40 0.10 ‐ 4.79 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 S S 3.20 190.450 188.950 1.50 0.00 10.00 ‐ 1.40 29580.40 0.10 ‐ 4.64 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 C C 4.70 188.950 187.450 1.50 0.15 10.00 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 C C 6.20 187.450 185.950 1.50 0.25 10.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 C C 7.70 185.950 184.450 1.50 0.25 10.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 C C 9.20 184.450 182.950 1.50 0.40 10.00 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 C C 10.70 182.950 181.450 1.50 0.40 10.00 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 C C 12.20 181.450 179.950 1.50 0.40 10.00 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 C C 13.70 179.950 178.450 1.50 0.40 10.00 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 C C 15.20 178.450 176.950 1.50 0.40 10.00 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 C C 16.70 176.950 175.450 1.50 0.40 10.00 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
13 S C 18.20 175.450 173.950 1.50 0.40 10.00 14.12 ‐ 29580.40 0.10 5.71 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
14 C C 19.70 173.950 172.450 1.50 0.15 10.00 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
15 C C 21.20 172.450 170.950 1.50 0.15 10.00 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
16 C C 22.70 170.950 169.450 1.50 0.15 10.00 5.30 ‐ 29580.40 0.10 7.30 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
17 S S 24.20 169.450 167.950 1.50 0.00 18.00 ‐ 2.55 29580.40 0.10 ‐ 4.11 Long 0.00 7.82 9.05 226.88 23.13 584.39 59.59
18 S S 25.70 167.950 166.450 1.50 0.00 22.40 ‐ 3.19 29580.40 0.10 ‐ 3.94 Long 0.00 7.48 8.66 259.16 26.43 667.56 68.07
19 S S 27.20 166.450 164.950 1.50 0.00 26.17 ‐ 3.73 29580.40 0.10 ‐ 3.81 Long 0.00 7.25 8.39 284.80 29.04 733.60 74.80
20 S S 28.70 164.950 163.450 1.50 0.00 27.17 ‐ 3.87 29580.40 0.10 ‐ 3.79 Long 1.00 7.19 8.14 197.10 20.10 567.44 57.86
21 S S 30.20 163.450 161.950 1.50 0.00 28.17 ‐ 4.02 29580.40 0.10 ‐ 3.76 Long 2.00 7.16 7.91 141.11 14.39 444.98 45.37
22 S S 31.70 161.950 160.450 1.50 0.00 29.17 ‐ 4.16 29580.40 0.10 ‐ 3.73 Long 3.00 7.14 7.71 103.98 10.60 353.24 36.02
23 S S 33.20 160.450 158.950 1.50 0.00 30.17 ‐ 4.30 29580.40 0.10 ‐ 3.71 Long 4.00 7.13 7.52 78.54 8.01 283.50 28.91
24 S S 34.70 158.950 157.450 1.50 0.00 31.17 ‐ 4.45 29580.40 0.10 ‐ 3.68 Long 5.00 7.14 7.36 60.61 6.18 229.80 23.43
25 S S 36.20 157.450 155.950 1.50 0.00 32.17 ‐ 4.59 29580.40 0.10 ‐ 3.66 Long 6.00 7.15 7.21 47.66 4.86 187.95 19.17
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.231
BORE HOLE 07 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.50 190.231 189.731 0.50 0.00 27 1.81 7.94 3.97 3.97 9 12.73 14.47 84.85 1.50 1.99 0.37 1.57 1.00 1.73 4.95 1.73 86.58 3.53 0.56
2 SM 2.00 189.731 188.231 1.50 0.00 29 1.82 8.04 12.06 16.03 9 18.14 19.34 289.50 1.50 10.00 0.40 4.71 1.00 28.21 19.79 29.94 319.44 13.03 3.04
3 SM 3.50 188.231 186.731 1.50 0.00 29 1.82 8.04 12.06 28.10 9 18.14 19.34 461.35 1.50 22.07 0.40 4.71 1.00 62.23 34.64 92.16 553.52 22.58 6.66
4 CL 5.00 186.731 185.231 1.50 0.25 12 1.93 9.12 13.68 41.78 9 10.00 1.69 507.48 1.50 34.94 0.21 4.71 0.87 152.56 49.48 244.72 752.20 30.68 13.36
5 SM 6.50 185.231 183.731 1.50 0.00 29 1.87 8.53 12.80 54.58 9 18.14 19.34 842.31 1.50 48.18 0.40 4.71 1.00 135.86 64.32 380.58 1222.89 49.88 19.49
6 CL 8.00 183.731 182.231 1.50 0.25 16 1.93 9.12 13.68 68.26 9 10.00 3.06 720.35 1.50 61.42 0.29 4.71 0.87 224.55 79.17 605.13 1325.48 54.06 28.64
7 CL 9.50 182.231 180.731 1.50 0.25 16 1.96 9.41 14.12 82.38 9 10.00 3.06 831.62 1.50 75.32 0.29 4.71 0.87 252.72 94.01 857.86 1689.47 68.91 38.74
8 CL 11.00 180.731 179.231 1.50 0.25 16 1.91 8.92 13.39 95.77 9 10.00 3.06 936.17 1.50 89.07 0.29 4.71 0.87 280.60 108.86 1138.46 2074.63 84.62 49.80
9 CL 12.50 179.231 177.731 1.50 0.25 16 1.91 8.92 13.39 109.15 9 10.00 3.06 1041.30 1.50 102.46 0.29 4.71 0.87 307.74 123.70 1446.20 2487.50 101.46 61.77
10 SM 14.00 177.731 176.231 1.50 0.00 30 1.85 8.34 12.50 121.66 9 21.65 22.40 2142.10 1.50 115.40 0.41 4.71 1.00 337.89 138.54 1784.09 3926.18 160.14 74.77
11 SM 15.50 176.231 174.731 1.50 0.00 30 1.86 8.43 12.65 134.31 9 21.65 22.40 2358.09 1.50 127.98 0.41 4.71 1.00 374.72 153.39 2158.80 4516.89 184.23 89.02
12 SM 17.00 174.731 173.231 1.50 0.00 30 1.87 8.53 12.80 147.11 9 21.65 22.40 2576.59 1.50 140.71 0.41 4.71 1.00 411.97 168.23 2570.78 5147.36 209.95 104.53
13 CL 18.50 173.231 171.731 1.50 0.25 17 1.95 9.32 13.97 161.08 9 10.00 3.53 1451.34 1.50 154.09 0.31 4.71 0.87 433.07 183.08 3003.85 4455.18 181.71 120.77
14 CL 20.00 171.731 170.231 1.50 0.25 17 1.96 9.41 14.12 175.20 9 10.00 3.53 1562.39 1.50 168.14 0.31 4.71 0.87 463.43 197.92 3467.28 5029.67 205.15 138.03
15 ML 21.50 170.231 168.731 1.50 0.00 29 1.89 8.73 13.09 175.20 9 18.14 19.34 2562.29 1.50 181.75 0.40 4.71 1.00 512.54 212.76 3979.82 6542.12 266.83 156.97
16 SM 23.00 168.731 167.231 1.50 0.00 31 1.90 8.83 13.24 175.20 9 25.84 25.99 3646.30 1.50 194.91 0.43 4.71 1.00 591.94 227.61 4571.76 8218.06 335.19 178.60
17 SM 24.50 167.231 165.731 1.50 0.00 31 1.91 8.92 13.39 175.20 9 25.84 25.99 3647.30 1.50 208.23 0.43 4.71 1.00 632.37 242.45 5204.12 8851.43 361.02 201.61
18 SM 26.00 165.731 164.231 1.50 0.00 31 1.91 8.92 13.39 175.20 9 25.84 25.99 3647.30 1.50 221.61 0.43 4.71 1.00 673.02 257.30 5877.14 9524.45 388.48 226.00
19 SM 27.50 164.231 162.731 1.50 0.00 31 1.91 8.92 13.39 175.20 9 25.84 25.99 3647.30 1.50 235.00 0.43 4.71 1.00 713.67 272.14 6590.82 10238.12 417.58 251.77
20 SM 29.00 162.731 161.231 1.50 0.00 31 1.91 8.92 13.39 175.20 10 25.84 25.99 3647.30 2.50 248.39 0.43 4.71 1.00 1257.21 286.98 7848.03 11495.33 468.86 296.01
21 SM 30.50 161.231 159.731 1.50 0.00 31 1.91 8.92 13.39 175.20 11 25.84 25.99 3647.30 3.50 261.77 0.43 4.71 1.00 1854.95 301.83 9702.98 13350.28 544.52 360.57
22 SM 32.00 159.731 158.231 1.50 0.00 32 1.96 9.41 14.12 175.20 12 30.85 30.21 4356.50 4.50 275.53 0.45 4.71 1.00 2601.37 316.67 12304.35 16660.85 679.55 450.51
23 SM 33.50 158.231 156.731 1.50 0.00 32 1.94 9.22 13.83 175.20 13 30.85 30.21 4354.18 5.50 289.50 0.45 4.71 1.00 3340.72 331.52 15645.07 19999.24 815.71 565.57
24 SM 35.00 156.731 155.231 1.50 0.00 32 1.92 9.02 13.53 175.20 14 30.85 30.21 4351.85 6.50 303.18 0.45 4.71 1.00 4134.69 346.36 19779.76 24131.61 984.26 707.62
25 SM 36.50 155.231 153.731 1.50 0.00 32 1.94 9.22 13.83 175.20 15 30.85 30.21 4354.18 7.50 316.86 0.45 4.71 1.00 4986.07 361.20 24765.83 29120.01 1187.72 878.61
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.231
BORE HOLE 07 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.50 190.231 189.731 0.50 0.00 5.00 ‐ 0.40 29580.40 0.05 ‐ 5.15 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 SM S 2.00 189.731 188.231 1.50 0.00 6.00 ‐ 0.60 29580.40 0.05 ‐ 4.75 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 SM S 3.50 188.231 186.731 1.50 0.00 6.33 ‐ 0.67 29580.40 0.05 ‐ 4.65 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 CL S 5.00 186.731 185.231 1.50 0.25 7.00 ‐ 0.80 29580.40 0.05 ‐ 4.49 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 SM S 6.50 185.231 183.731 1.50 0.00 8.00 ‐ 1.00 29580.40 0.05 ‐ 4.29 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 CL C 8.00 183.731 182.231 1.50 0.25 8.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 CL C 9.50 182.231 180.731 1.50 0.25 8.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 CL C 11.00 180.731 179.231 1.50 0.25 8.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 CL C 12.50 179.231 177.731 1.50 0.25 8.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 SM S 14.00 177.731 176.231 1.50 0.00 9.50 ‐ 1.30 29580.40 0.05 ‐ 4.07 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 SM S 15.50 176.231 174.731 1.50 0.00 11.57 ‐ 1.63 29580.40 0.05 ‐ 3.89 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 SM S 17.00 174.731 173.231 1.50 0.00 13.00 ‐ 1.83 29580.40 0.05 ‐ 3.80 Long 0.00 7.22 8.36 115.76 11.80 298.17 30.40
13 CL S 18.50 173.231 171.731 1.50 0.25 14.67 ‐ 2.07 29580.40 0.05 ‐ 3.71 Long 0.00 7.04 8.16 124.63 12.71 321.02 32.73
14 CL S 20.00 171.731 170.231 1.50 0.25 16.10 ‐ 2.28 29580.40 0.05 ‐ 3.64 Long 0.00 6.91 8.00 131.94 13.45 339.84 34.65
15 ML S 21.50 170.231 168.731 1.50 0.00 17.00 ‐ 2.41 29580.40 0.05 ‐ 3.60 Long 0.00 6.84 7.92 136.39 13.91 351.31 35.82
16 SM S 23.00 168.731 167.231 1.50 0.00 17.83 ‐ 2.53 29580.40 0.05 ‐ 3.56 Long 0.00 6.77 7.84 140.43 14.32 361.72 36.88
17 SM S 24.50 167.231 165.731 1.50 0.00 18.77 ‐ 2.66 29580.40 0.05 ‐ 3.53 Long 0.00 6.70 7.76 144.87 14.77 373.17 38.05
18 SM S 26.00 165.731 164.231 1.50 0.00 19.64 ‐ 2.79 29580.40 0.05 ‐ 3.49 Long 0.00 6.64 7.69 148.94 15.19 383.65 39.12
19 SM S 27.50 164.231 162.731 1.50 0.00 20.53 ‐ 2.92 29580.40 0.05 ‐ 3.46 Long 0.00 6.58 7.62 153.01 15.60 394.14 40.19
20 SM S 29.00 162.731 161.231 1.50 0.00 21.53 ‐ 3.06 29580.40 0.05 ‐ 3.43 Long 1.00 6.52 7.36 102.56 10.46 298.30 30.42
21 SM S 30.50 161.231 159.731 1.50 0.00 22.53 ‐ 3.20 29580.40 0.05 ‐ 3.40 Long 2.00 6.48 7.13 71.50 7.29 229.29 23.38
22 SM S 32.00 159.731 158.231 1.50 0.00 23.53 ‐ 3.35 29580.40 0.05 ‐ 3.37 Long 3.00 6.46 6.92 51.53 5.25 178.70 18.22
23 SM S 33.50 158.231 156.731 1.50 0.00 24.53 ‐ 3.49 29580.40 0.05 ‐ 3.34 Long 4.00 6.45 6.73 38.20 3.90 140.99 14.38
24 SM S 35.00 156.731 155.231 1.50 0.00 25.53 ‐ 3.64 29580.40 0.05 ‐ 3.31 Long 5.00 6.45 6.57 29.02 2.96 112.49 11.47
25 SM S 36.50 155.231 153.731 1.50 0.00 26.53 ‐ 3.78 29580.40 0.05 ‐ 3.29 Long 6.00 6.46 6.43 22.51 2.30 90.65 9.24
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.231
BORE HOLE 07 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.20 189.931 189.731 0.20 0.00 27 1.81 7.94 1.59 1.59 9 12.73 14.47 100.87 1.50 0.79 0.37 0.75 1.00 0.33 2.85 0.33 101.21 4.13 0.30
2 SM 1.70 189.731 188.231 1.50 0.00 29 1.82 8.04 12.06 13.65 9 18.14 19.34 385.58 1.50 7.62 0.40 5.65 1.00 25.79 24.23 26.12 411.70 16.79 3.36
3 SM 3.20 188.231 186.731 1.50 0.00 29 1.82 8.04 12.06 25.71 9 18.14 19.34 633.05 1.50 19.68 0.40 5.65 1.00 66.61 45.60 92.73 725.77 29.60 7.80
4 CL 4.70 186.731 185.231 1.50 0.25 12 1.93 9.12 13.68 39.39 9 10.00 1.69 705.56 1.50 32.55 0.21 5.65 0.87 178.77 66.98 271.50 977.05 39.85 16.06
5 SM 6.20 185.231 183.731 1.50 0.00 29 1.87 8.53 12.80 52.19 9 18.14 19.34 1182.69 1.50 45.79 0.40 5.65 1.00 154.97 88.35 426.47 1609.16 65.63 23.50
6 CL 7.70 183.731 182.231 1.50 0.25 16 1.93 9.12 13.68 65.87 9 10.00 3.06 1013.51 1.50 59.03 0.29 5.65 0.87 263.66 109.73 690.13 1703.64 69.49 34.65
7 CL 9.20 182.231 180.731 1.50 0.25 16 1.96 9.41 14.12 80.00 9 10.00 3.06 1173.83 1.50 72.93 0.29 5.65 0.87 297.47 131.10 987.60 2161.44 88.16 46.94
8 CL 10.70 180.731 179.231 1.50 0.25 16 1.91 8.92 13.39 93.38 9 10.00 3.06 1324.22 1.50 86.69 0.29 5.65 0.87 330.93 152.48 1318.53 2642.75 107.79 60.36
9 CL 12.20 179.231 177.731 1.50 0.25 16 1.91 8.92 13.39 106.77 9 10.00 3.06 1475.61 1.50 100.08 0.29 5.65 0.87 363.49 173.85 1682.02 3157.63 128.79 74.90
10 SM 13.70 177.731 176.231 1.50 0.00 30 1.85 8.34 12.50 119.27 9 21.65 22.40 3047.38 1.50 113.02 0.41 5.65 1.00 397.10 195.23 2079.11 5126.50 209.10 90.57
11 SM 15.20 176.231 174.731 1.50 0.00 30 1.86 8.43 12.65 131.92 9 21.65 22.40 3358.66 1.50 125.60 0.41 5.65 1.00 441.29 216.60 2520.40 5879.07 239.79 107.75
12 SM 16.70 174.731 173.231 1.50 0.00 30 1.87 8.53 12.80 144.72 9 21.65 22.40 3673.54 1.50 138.32 0.41 5.65 1.00 486.00 237.98 3006.40 6679.94 272.46 126.45
13 CL 18.20 173.231 171.731 1.50 0.25 17 1.95 9.32 13.97 158.70 9 10.00 3.53 2066.69 1.50 151.71 0.31 5.65 0.87 513.51 259.35 3519.90 5586.59 227.86 146.09
14 CL 19.70 171.731 170.231 1.50 0.25 17 1.96 9.41 14.12 172.82 9 10.00 3.53 2226.64 1.50 165.76 0.31 5.65 0.87 549.94 280.73 4069.84 6296.48 256.82 166.96
15 ML 21.20 170.231 168.731 1.50 0.00 29 1.89 8.73 13.09 185.91 9 18.14 19.34 3928.49 1.50 179.37 0.40 5.65 1.00 606.99 302.11 4676.83 8605.32 350.99 189.77
16 SM 22.70 168.731 167.231 1.50 0.00 31 1.90 8.83 13.24 199.15 9 25.84 25.99 5976.61 1.50 192.53 0.43 5.65 1.00 701.64 323.48 5378.47 11355.08 463.14 215.80
17 SM 24.20 167.231 165.731 1.50 0.00 31 1.91 8.92 13.39 199.15 9 25.84 25.99 5978.34 1.50 205.84 0.43 5.65 1.00 750.15 344.86 6128.62 12106.96 493.81 243.47
18 SM 25.70 165.731 164.231 1.50 0.00 31 1.91 8.92 13.39 199.15 9 25.84 25.99 5978.34 1.50 219.23 0.43 5.65 1.00 798.94 366.23 6927.56 12905.90 526.40 272.81
19 SM 27.20 164.231 162.731 1.50 0.00 31 1.91 8.92 13.39 199.15 9 25.84 25.99 5978.34 1.50 232.62 0.43 5.65 1.00 847.72 387.61 7775.28 13753.62 560.97 303.80
20 SM 28.70 162.731 161.231 1.50 0.00 31 1.91 8.92 13.39 199.15 10 25.84 25.99 5978.34 2.50 246.00 0.43 5.65 1.00 1494.18 408.98 9269.46 15247.80 621.92 356.77
21 SM 30.20 161.231 159.731 1.50 0.00 31 1.91 8.92 13.39 199.15 11 25.84 25.99 5978.34 3.50 259.39 0.43 5.65 1.00 2205.68 430.36 11475.14 17453.48 711.88 433.92
22 SM 31.70 159.731 158.231 1.50 0.00 32 1.96 9.41 14.12 199.15 12 30.85 30.21 7141.07 4.50 273.14 0.45 5.65 1.00 3094.64 451.73 14569.78 21710.85 885.52 541.28
23 SM 33.20 158.231 156.731 1.50 0.00 32 1.94 9.22 13.83 199.15 13 30.85 30.21 7137.05 5.50 287.12 0.45 5.65 1.00 3975.86 473.11 18545.64 25682.69 1047.52 678.60
24 SM 34.70 156.731 155.231 1.50 0.00 32 1.92 9.02 13.53 199.15 14 30.85 30.21 7133.02 6.50 300.80 0.45 5.65 1.00 4922.63 494.48 23468.27 30601.30 1248.14 848.09
25 SM 36.20 155.231 153.731 1.50 0.00 32 1.94 9.22 13.83 199.15 15 30.85 30.21 7137.05 7.50 314.48 0.45 5.65 1.00 5938.29 515.86 29406.56 36543.61 1490.51 1052.11
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.231
BORE HOLE 07 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.20 189.931 189.731 0.20 0.00 5.00 ‐ 0.40 29580.40 0.10 ‐ 5.96 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 SM S 1.70 189.731 188.231 1.50 0.00 6.00 ‐ 0.60 29580.40 0.10 ‐ 5.50 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 SM S 3.20 188.231 186.731 1.50 0.00 6.33 ‐ 0.67 29580.40 0.10 ‐ 5.38 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 CL S 4.70 186.731 185.231 1.50 0.25 7.00 ‐ 0.80 29580.40 0.10 ‐ 5.19 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 SM S 6.20 185.231 183.731 1.50 0.00 8.00 ‐ 1.00 29580.40 0.10 ‐ 4.96 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 CL C 7.70 183.731 182.231 1.50 0.25 8.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 CL C 9.20 182.231 180.731 1.50 0.25 8.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 CL C 10.70 180.731 179.231 1.50 0.25 8.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 CL C 12.20 179.231 177.731 1.50 0.25 8.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 SM S 13.70 177.731 176.231 1.50 0.00 9.50 ‐ 1.30 29580.40 0.10 ‐ 4.71 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 SM S 15.20 176.231 174.731 1.50 0.00 11.57 ‐ 1.63 29580.40 0.10 ‐ 4.50 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 SM S 16.70 174.731 173.231 1.50 0.00 13.00 ‐ 1.83 29580.40 0.10 ‐ 4.40 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
13 CL S 18.20 173.231 171.731 1.50 0.25 14.67 ‐ 2.07 29580.40 0.10 ‐ 4.29 Long 0.00 8.15 9.44 200.21 20.42 515.71 52.59
14 CL S 19.70 171.731 170.231 1.50 0.25 16.10 ‐ 2.28 29580.40 0.10 ‐ 4.21 Long 0.00 8.00 9.26 211.95 21.61 545.95 55.67
15 ML S 21.20 170.231 168.731 1.50 0.00 17.00 ‐ 2.41 29580.40 0.10 ‐ 4.16 Long 0.00 7.91 9.16 219.11 22.34 564.38 57.55
16 SM S 22.70 168.731 167.231 1.50 0.00 17.83 ‐ 2.53 29580.40 0.10 ‐ 4.12 Long 0.00 7.83 9.07 225.59 23.00 581.09 59.25
17 SM S 24.20 167.231 165.731 1.50 0.00 18.77 ‐ 2.66 29580.40 0.10 ‐ 4.08 Long 0.00 7.75 8.98 232.73 23.73 599.48 61.13
18 SM S 25.70 165.731 164.231 1.50 0.00 19.64 ‐ 2.79 29580.40 0.10 ‐ 4.04 Long 0.00 7.68 8.89 239.27 24.40 616.32 62.84
19 SM S 27.20 164.231 162.731 1.50 0.00 20.53 ‐ 2.92 29580.40 0.10 ‐ 4.01 Long 0.00 7.61 8.81 245.81 25.06 633.17 64.56
20 SM S 28.70 162.731 161.231 1.50 0.00 21.53 ‐ 3.06 29580.40 0.10 ‐ 3.97 Long 1.00 7.54 8.54 174.11 17.75 498.95 50.88
21 SM S 30.20 161.231 159.731 1.50 0.00 22.53 ‐ 3.20 29580.40 0.10 ‐ 3.93 Long 2.00 7.49 8.29 126.97 12.95 397.49 40.53
22 SM S 31.70 159.731 158.231 1.50 0.00 23.53 ‐ 3.35 29580.40 0.10 ‐ 3.90 Long 3.00 7.45 8.07 94.95 9.68 319.83 32.61
23 SM S 33.20 158.231 156.731 1.50 0.00 24.53 ‐ 3.49 29580.40 0.10 ‐ 3.86 Long 4.00 7.43 7.86 72.58 7.40 259.70 26.48
24 SM S 34.70 156.731 155.231 1.50 0.00 25.53 ‐ 3.64 29580.40 0.10 ‐ 3.83 Long 5.00 7.42 7.68 56.57 5.77 212.64 21.68
25 SM S 36.20 155.231 153.731 1.50 0.00 26.53 ‐ 3.78 29580.40 0.10 ‐ 3.80 Long 6.00 7.42 7.52 44.85 4.57 175.45 17.89
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.144
BORE HOLE 08 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 S 0.50 190.144 189.644 0.50 0.00 27 1.82 8.04 4.02 4.02 9 12.73 14.47 85.90 1.50 2.01 0.37 1.57 1.00 1.75 4.95 1.75 87.65 3.57 0.56
2 S 2.00 189.644 188.144 1.50 0.00 27 1.83 8.14 12.21 16.23 9 12.73 14.47 208.55 1.50 10.13 0.37 4.71 1.00 26.41 19.79 28.15 236.70 9.65 2.98
3 C 3.50 188.144 186.644 1.50 0.10 23 1.94 9.22 13.83 30.06 9 10.00 8.20 335.09 1.50 23.14 0.42 4.71 1.00 115.66 34.64 143.81 478.90 19.53 8.42
4 S 5.00 186.644 185.144 1.50 0.00 29 1.87 8.53 12.80 42.86 9 18.14 19.34 675.35 1.50 36.46 0.40 4.71 1.00 102.81 49.48 246.62 921.97 37.60 13.43
5 S 6.50 185.144 183.644 1.50 0.00 29 1.88 8.63 12.95 55.80 9 18.14 19.34 860.52 1.50 49.33 0.40 4.71 1.00 139.11 64.32 385.74 1246.25 50.83 19.67
6 C 8.00 183.644 182.144 1.50 0.25 16 1.98 9.61 14.42 70.22 9 10.00 3.06 736.34 1.50 63.01 0.29 4.71 0.87 227.78 79.17 613.51 1349.86 55.06 28.93
7 C 9.50 182.144 180.644 1.50 0.25 17 1.99 9.71 14.56 84.78 9 10.00 3.53 852.63 1.50 77.50 0.31 4.71 0.87 267.55 94.01 881.06 1733.70 70.71 39.53
8 C 11.00 180.644 179.144 1.50 0.25 18 1.99 9.71 14.56 99.34 9 10.00 4.07 969.06 1.50 92.06 0.32 4.71 0.87 311.51 108.86 1192.57 2161.63 88.17 51.63
9 C 12.50 179.144 177.644 1.50 0.25 18 1.96 9.41 14.12 113.47 9 10.00 4.07 1079.51 1.50 106.41 0.32 4.71 0.87 344.45 123.70 1537.02 2616.53 106.72 64.86
10 C 14.00 177.644 176.144 1.50 0.25 18 2.00 9.81 14.71 128.18 9 10.00 4.07 1195.67 1.50 120.82 0.32 4.71 0.87 377.56 138.54 1914.58 3110.25 126.86 79.20
11 S 15.50 176.144 174.644 1.50 0.00 31 1.90 8.83 13.24 141.42 9 25.84 25.99 2960.54 1.50 134.80 0.43 4.71 1.00 409.37 153.39 2323.95 5284.49 215.54 94.63
12 S 17.00 174.644 173.144 1.50 0.00 31 1.89 8.73 13.09 154.51 9 25.84 25.99 3225.28 1.50 147.96 0.43 4.71 1.00 449.35 168.23 2773.30 5998.58 244.67 111.42
13 S 18.50 173.144 171.644 1.50 0.00 31 1.90 8.83 13.24 167.75 9 25.84 25.99 3495.02 1.50 161.13 0.43 4.71 1.00 489.33 183.08 3262.63 6757.65 275.63 129.56
14 S 20.00 171.644 170.144 1.50 0.00 31 1.89 8.73 13.09 180.84 9 25.84 25.99 3759.76 1.50 174.29 0.43 4.71 1.00 529.32 197.92 3791.95 7551.71 308.01 149.07
15 S 21.50 170.144 168.644 1.50 0.00 31 1.90 8.83 13.24 180.84 9 25.84 25.99 3760.76 1.50 187.46 0.43 4.71 1.00 569.30 212.76 4361.25 8122.01 331.27 169.93
16 S 23.00 168.644 167.144 1.50 0.00 31 1.90 8.83 13.24 180.84 9 25.84 25.99 3760.76 1.50 200.70 0.43 4.71 1.00 609.51 227.61 4970.75 8731.51 356.13 192.16
17 S 24.50 167.144 165.644 1.50 0.00 31 1.90 8.83 13.24 180.84 9 25.84 25.99 3760.76 1.50 213.94 0.43 4.71 1.00 649.71 242.45 5620.47 9381.23 382.63 215.76
18 S 26.00 165.644 164.144 1.50 0.00 30 1.91 8.92 13.39 180.84 9 21.65 22.40 3153.72 1.50 227.25 0.41 4.71 1.00 665.37 257.30 6285.84 9439.56 385.01 239.89
19 S 27.50 164.144 162.644 1.50 0.00 30 1.92 9.02 13.53 180.84 9 21.65 22.40 3154.58 1.50 240.71 0.41 4.71 1.00 704.78 272.14 6990.62 10145.21 413.79 265.36
20 S 29.00 162.644 161.144 1.50 0.00 30 1.92 9.02 13.53 180.84 10 21.65 22.40 3154.58 2.50 254.25 0.41 4.71 1.00 1240.68 286.98 8231.31 11385.89 464.40 309.04
21 S 30.50 161.144 159.644 1.50 0.00 30 1.92 9.02 13.53 180.84 11 21.65 22.40 3154.58 3.50 267.78 0.41 4.71 1.00 1829.41 301.83 10060.72 13215.30 539.02 372.73
22 S 32.00 159.644 158.144 1.50 0.00 30 1.92 9.02 13.53 180.84 12 21.65 22.40 3154.58 4.50 281.31 0.41 4.71 1.00 2470.98 316.67 12531.70 15686.28 639.80 458.23
23 C 33.50 158.144 156.644 1.50 0.50 8 2.03 10.10 15.15 180.84 13 10.00 0.86 1924.39 5.50 295.66 0.14 4.71 0.47 1185.69 331.52 13717.39 15641.78 637.98 500.05
24 C 35.00 156.644 155.144 1.50 0.50 8 2.04 10.20 15.30 180.84 14 10.00 0.86 1962.93 6.50 310.88 0.14 4.71 0.47 1447.04 346.36 15164.43 17127.36 698.58 550.75
25 C 36.50 155.144 153.644 1.50 0.50 8 2.06 10.40 15.59 180.84 15 10.00 0.86 2001.51 7.50 326.33 0.14 4.71 0.47 1729.65 361.20 16894.08 18895.59 770.70 611.05
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.144
BORE HOLE 08 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 S S 0.50 190.144 189.644 0.50 0.00 5.00 ‐ 0.40 29580.40 0.05 ‐ 5.15 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 S S 2.00 189.644 188.144 1.50 0.00 6.00 ‐ 0.60 29580.40 0.05 ‐ 4.75 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 C S 3.50 188.144 186.644 1.50 0.10 6.33 ‐ 0.67 29580.40 0.05 ‐ 4.65 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 S S 5.00 186.644 185.144 1.50 0.00 7.00 ‐ 0.80 29580.40 0.05 ‐ 4.49 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 S S 6.50 185.144 183.644 1.50 0.00 8.00 ‐ 1.00 29580.40 0.05 ‐ 4.29 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 C C 8.00 183.644 182.144 1.50 0.25 8.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 C C 9.50 182.144 180.644 1.50 0.25 8.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 C C 11.00 180.644 179.144 1.50 0.25 8.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 C C 12.50 179.144 177.644 1.50 0.25 8.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 C C 14.00 177.644 176.144 1.50 0.25 8.00 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 S S 15.50 176.144 174.644 1.50 0.00 10.67 ‐ 1.50 29580.40 0.05 ‐ 3.96 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 S S 17.00 174.644 173.144 1.50 0.00 12.43 ‐ 1.75 29580.40 0.05 ‐ 3.84 Long 0.00 7.29 8.44 112.61 11.48 290.06 29.58
13 S S 18.50 173.144 171.644 1.50 0.00 14.38 ‐ 2.03 29580.40 0.05 ‐ 3.72 Long 0.00 7.07 8.19 123.11 12.55 317.10 32.33
14 S S 20.00 171.644 170.144 1.50 0.00 16.00 ‐ 2.26 29580.40 0.05 ‐ 3.64 Long 0.00 6.92 8.01 131.44 13.40 338.55 34.52
15 S S 21.50 170.144 168.644 1.50 0.00 17.00 ‐ 2.41 29580.40 0.05 ‐ 3.60 Long 0.00 6.84 7.92 136.39 13.91 351.31 35.82
16 S S 23.00 168.644 167.144 1.50 0.00 17.91 ‐ 2.54 29580.40 0.05 ‐ 3.56 Long 0.00 6.76 7.83 140.79 14.36 362.65 36.98
17 S S 24.50 167.144 165.644 1.50 0.00 18.92 ‐ 2.68 29580.40 0.05 ‐ 3.52 Long 0.00 6.69 7.75 145.56 14.84 374.95 38.23
18 S S 26.00 165.644 164.144 1.50 0.00 19.85 ‐ 2.82 29580.40 0.05 ‐ 3.49 Long 0.00 6.62 7.67 149.88 15.28 386.06 39.37
19 S S 27.50 164.144 162.644 1.50 0.00 20.79 ‐ 2.95 29580.40 0.05 ‐ 3.45 Long 0.00 6.56 7.60 154.16 15.72 397.08 40.49
20 S S 29.00 162.644 161.144 1.50 0.00 21.79 ‐ 3.10 29580.40 0.05 ‐ 3.42 Long 1.00 6.50 7.34 103.19 10.52 300.21 30.61
21 S S 30.50 161.144 159.644 1.50 0.00 22.79 ‐ 3.24 29580.40 0.05 ‐ 3.39 Long 2.00 6.46 7.11 71.87 7.33 230.56 23.51
22 S S 32.00 159.644 158.144 1.50 0.00 23.79 ‐ 3.39 29580.40 0.05 ‐ 3.36 Long 3.00 6.44 6.90 51.75 5.28 179.55 18.31
23 C S 33.50 158.144 156.644 1.50 0.50 24.79 ‐ 3.53 29580.40 0.05 ‐ 3.33 Long 4.00 6.43 6.72 38.34 3.91 141.58 14.44
24 C S 35.00 156.644 155.144 1.50 0.50 25.79 ‐ 3.67 29580.40 0.05 ‐ 3.31 Long 5.00 6.44 6.56 29.11 2.97 112.90 11.51
25 C S 36.50 155.144 153.644 1.50 0.50 26.79 ‐ 3.82 29580.40 0.05 ‐ 3.28 Long 6.00 6.45 6.42 22.57 2.30 90.94 9.27
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 Conservative side FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.144
BORE HOLE 08 Critical Depth (Pd Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate pile  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  capacity (Uplift)
off Level Friction Pressure Pressure Friction pile (compression)
Capacity capacity

C Ø Pd Ru K Pdi tan δ Asi α  Rf  Qu= Ru+ Rf Qu S

(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 S 0.20 189.844 189.644 0.20 0.00 27 1.82 8.04 1.61 1.61 9 12.73 14.47 102.12 1.50 0.80 0.37 0.75 1.00 0.34 2.85 0.34 102.45 4.18 0.30
2 S 1.70 189.644 188.144 1.50 0.00 27 1.83 8.14 12.21 13.82 9 12.73 14.47 278.89 1.50 7.71 0.37 5.65 1.00 24.14 24.23 24.47 303.36 12.37 3.30
3 C 3.20 188.144 186.644 1.50 0.10 23 1.94 9.22 13.83 27.65 9 10.00 8.20 463.80 1.50 20.73 0.42 5.65 1.00 130.10 45.60 154.58 618.37 25.22 9.90
4 S 4.70 186.644 185.144 1.50 0.00 29 1.87 8.53 12.80 40.44 9 18.14 19.34 941.67 1.50 34.05 0.40 5.65 1.00 115.21 66.98 269.79 1211.46 49.41 16.00
5 S 6.20 185.144 183.644 1.50 0.00 29 1.88 8.63 12.95 53.39 9 18.14 19.34 1208.53 1.50 46.92 0.40 5.65 1.00 158.77 88.35 428.56 1637.08 66.77 23.58
6 C 7.70 183.644 182.144 1.50 0.25 16 1.98 9.61 14.42 67.81 9 10.00 3.06 1036.38 1.50 60.60 0.29 5.65 0.87 267.47 109.73 696.02 1732.40 70.66 34.85
7 C 9.20 182.144 180.644 1.50 0.25 17 1.99 9.71 14.56 82.37 9 10.00 3.53 1204.38 1.50 75.09 0.31 5.65 0.87 314.80 131.10 1010.83 2215.21 90.35 47.73
8 C 10.70 180.644 179.144 1.50 0.25 18 1.99 9.71 14.56 96.93 9 10.00 4.07 1372.63 1.50 89.65 0.32 5.65 0.87 367.16 152.48 1377.99 2750.61 112.19 62.38
9 C 12.20 179.144 177.644 1.50 0.25 18 1.96 9.41 14.12 111.05 9 10.00 4.07 1531.53 1.50 103.99 0.32 5.65 0.87 406.69 173.85 1784.68 3316.21 135.26 78.39
10 C 13.70 177.644 176.144 1.50 0.25 18 2.00 9.81 14.71 125.76 9 10.00 4.07 1698.99 1.50 118.41 0.32 5.65 0.87 446.42 195.23 2231.10 3930.09 160.30 95.74
11 S 15.20 176.144 174.644 1.50 0.00 31 1.90 8.83 13.24 139.00 9 25.84 25.99 4218.61 1.50 132.38 0.43 5.65 1.00 482.45 216.60 2713.55 6932.16 282.74 114.32
12 S 16.70 174.644 173.144 1.50 0.00 31 1.89 8.73 13.09 152.10 9 25.84 25.99 4599.55 1.50 145.55 0.43 5.65 1.00 530.43 237.98 3243.97 7843.53 319.92 134.53
13 S 18.20 173.144 171.644 1.50 0.00 31 1.90 8.83 13.24 165.34 9 25.84 25.99 4988.26 1.50 158.72 0.43 5.65 1.00 578.41 259.35 3822.38 8810.64 359.36 156.37
14 S 19.70 171.644 170.144 1.50 0.00 31 1.89 8.73 13.09 178.43 9 25.84 25.99 5369.20 1.50 171.88 0.43 5.65 1.00 626.39 280.73 4448.77 9817.97 400.45 179.84
15 S 21.20 170.144 168.644 1.50 0.00 31 1.90 8.83 13.24 191.67 9 25.84 25.99 5757.90 1.50 185.05 0.43 5.65 1.00 674.37 302.11 5123.14 10881.04 443.81 204.94
16 S 22.70 168.644 167.144 1.50 0.00 31 1.90 8.83 13.24 204.91 9 25.84 25.99 6144.87 1.50 198.29 0.43 5.65 1.00 722.62 323.48 5845.75 11990.63 489.06 231.68
17 S 24.20 167.144 165.644 1.50 0.00 31 1.90 8.83 13.24 204.91 9 25.84 25.99 6144.87 1.50 211.53 0.43 5.65 1.00 770.87 344.86 6616.62 12761.49 520.51 260.06
18 S 25.70 165.644 164.144 1.50 0.00 30 1.91 8.92 13.39 204.91 9 21.65 22.40 5153.29 1.50 224.84 0.41 5.65 1.00 789.97 366.23 7406.59 12559.88 512.28 289.09
19 S 27.20 164.144 162.644 1.50 0.00 30 1.92 9.02 13.53 204.91 9 21.65 22.40 5154.78 1.50 238.30 0.41 5.65 1.00 837.26 387.61 8243.86 13398.63 546.49 319.73
20 S 28.70 162.644 161.144 1.50 0.00 30 1.92 9.02 13.53 204.91 10 21.65 22.40 5154.78 2.50 251.83 0.41 5.65 1.00 1474.69 408.98 9718.55 14873.32 606.64 372.03
21 S 30.20 161.144 159.644 1.50 0.00 30 1.92 9.02 13.53 204.91 11 21.65 22.40 5154.78 3.50 265.37 0.41 5.65 1.00 2175.52 430.36 11894.06 17048.84 695.37 448.15
22 S 31.70 159.644 158.144 1.50 0.00 30 1.92 9.02 13.53 204.91 12 21.65 22.40 5154.78 4.50 278.90 0.41 5.65 1.00 2939.75 451.73 14833.81 19988.59 815.28 550.25
23 C 33.20 158.144 156.644 1.50 0.50 8 2.03 10.10 15.15 204.91 13 10.00 0.86 3044.28 5.50 293.24 0.14 5.65 0.47 1412.28 473.11 16246.09 19290.38 786.80 600.44
24 C 34.70 156.644 155.144 1.50 0.50 8 2.04 10.20 15.30 204.91 14 10.00 0.86 3099.80 6.50 308.47 0.14 5.65 0.47 1723.99 494.48 17970.08 21069.88 859.38 661.21
25 C 36.20 155.144 153.644 1.50 0.50 8 2.06 10.40 15.59 204.91 15 10.00 0.86 3155.37 7.50 323.92 0.14 5.65 0.47 2061.21 515.86 20031.28 23186.65 945.72 733.45
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR
NAME OF THE PROJECT KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN
THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.144
BORE HOLE 08 Critical Depth (Pdi Level) 20.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 S S 0.20 189.844 189.644 0.20 0.00 5.00 ‐ 0.40 29580.40 0.10 ‐ 5.96 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
2 S S 1.70 189.644 188.144 1.50 0.00 6.00 ‐ 0.60 29580.40 0.10 ‐ 5.50 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
3 C S 3.20 188.144 186.644 1.50 0.10 6.33 ‐ 0.67 29580.40 0.10 ‐ 5.38 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
4 S S 4.70 186.644 185.144 1.50 0.00 7.00 ‐ 0.80 29580.40 0.10 ‐ 5.19 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
5 S S 6.20 185.144 183.644 1.50 0.00 8.00 ‐ 1.00 29580.40 0.10 ‐ 4.96 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
6 C C 7.70 183.644 182.144 1.50 0.25 8.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
7 C C 9.20 182.144 180.644 1.50 0.25 8.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
8 C C 10.70 180.644 179.144 1.50 0.25 8.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
9 C C 12.20 179.144 177.644 1.50 0.25 8.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
10 C C 13.70 177.644 176.144 1.50 0.25 8.00 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
11 S S 15.20 176.144 174.644 1.50 0.00 10.67 ‐ 1.50 29580.40 0.10 ‐ 4.58 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
12 S S 16.70 174.644 173.144 1.50 0.00 12.43 ‐ 1.75 29580.40 0.10 ‐ 4.44 Short/Intermediate 0.00 ‐ ‐ ‐ ‐ ‐ ‐
13 S S 18.20 173.144 171.644 1.50 0.00 14.38 ‐ 2.03 29580.40 0.10 ‐ 4.31 Long 0.00 8.18 9.48 197.77 20.17 509.41 51.94
14 S S 19.70 171.644 170.144 1.50 0.00 16.00 ‐ 2.26 29580.40 0.10 ‐ 4.21 Long 0.00 8.01 9.27 211.15 21.53 543.88 55.46
15 S S 21.20 170.144 168.644 1.50 0.00 17.00 ‐ 2.41 29580.40 0.10 ‐ 4.16 Long 0.00 7.91 9.16 219.11 22.34 564.38 57.55
16 S S 22.70 168.644 167.144 1.50 0.00 17.91 ‐ 2.54 29580.40 0.10 ‐ 4.12 Long 0.00 7.83 9.06 226.18 23.06 582.59 59.41
17 S S 24.20 167.144 165.644 1.50 0.00 18.92 ‐ 2.68 29580.40 0.10 ‐ 4.07 Long 0.00 7.74 8.96 233.84 23.84 602.34 61.42
18 S S 25.70 165.644 164.144 1.50 0.00 19.85 ‐ 2.82 29580.40 0.10 ‐ 4.03 Long 0.00 7.66 8.88 240.77 24.55 620.19 63.24
19 S S 27.20 164.144 162.644 1.50 0.00 20.79 ‐ 2.95 29580.40 0.10 ‐ 4.00 Long 0.00 7.59 8.79 247.64 25.25 637.89 65.04
20 S S 28.70 162.644 161.144 1.50 0.00 21.79 ‐ 3.10 29580.40 0.10 ‐ 3.96 Long 1.00 7.52 8.52 175.20 17.86 502.19 51.21
21 S S 30.20 161.144 159.644 1.50 0.00 22.79 ‐ 3.24 29580.40 0.10 ‐ 3.92 Long 2.00 7.47 8.27 127.64 13.02 399.75 40.76
22 S S 31.70 159.644 158.144 1.50 0.00 23.79 ‐ 3.39 29580.40 0.10 ‐ 3.89 Long 3.00 7.44 8.05 95.38 9.73 321.43 32.78
23 C S 33.20 158.144 156.644 1.50 0.50 24.79 ‐ 3.53 29580.40 0.10 ‐ 3.86 Long 4.00 7.42 7.85 72.87 7.43 260.84 26.60
24 C S 34.70 156.644 155.144 1.50 0.50 25.79 ‐ 3.67 29580.40 0.10 ‐ 3.83 Long 5.00 7.41 7.66 56.76 5.79 213.46 21.77
25 C S 36.20 155.144 153.644 1.50 0.50 26.79 ‐ 3.82 29580.40 0.10 ‐ 3.80 Long 6.00 7.41 7.50 44.98 4.59 176.05 17.95
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR 
Project Name ‐ 
GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE 
Existing Ground Water Level ‐  1.50 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV
Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 3
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ CRR FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 190.080 187.080 3.00 1.45 6 56 1.78 17.46 25.31 25.80 0.99 0.099 1.51 0.75 1.05 0.75 1.2 6.42 0.133 1.32 0.175 1.775 NL
2 187.080 185.580 1.50 2.95 7 42 1.80 17.65 51.79 37.57 0.98 0.137 1.40 0.75 1.05 0.75 1.2 6.93 0.139 1.23 0.171 1.246 NL
3 185.580 184.080 1.50 4.45 10 44 1.83 17.95 78.71 49.78 0.97 0.155 1.30 0.75 1.05 0.85 1.2 10.41 0.185 1.19 0.220 1.414 NL
4 184.080 182.580 1.50 5.95 16 41 1.86 18.24 106.18 62.54 0.96 0.165 1.21 0.75 1.05 0.85 1.2 15.49 0.270 1.15 0.311 1.883 NL
5 182.580 181.080 1.50 7.45 9 96 2.00 19.61 135.60 77.25 0.94 0.168 1.12 0.75 1.05 0.95 1.2 9.01 0.166 1.06 0.176 1.048 NL
6 181.080 179.580 1.50 8.95 12 95 2.01 19.71 165.17 92.11 0.92 0.168 1.04 0.75 1.05 0.95 1.2 11.17 0.196 1.02 0.200 1.193 NL
7 179.580 178.080 1.50 10.45 17 95 2.01 19.71 194.74 106.96 0.90 0.165 0.97 0.75 1.05 1.00 1.2 15.57 0.271 0.98 0.266 1.609 NL
8 178.080 176.580 1.50 11.95 23 96 2.02 19.81 224.45 121.97 0.86 0.160 0.91 0.75 1.05 1.00 1.2 19.76 0.390 0.93 0.364 2.277 NL
9 176.580 175.080 1.50 13.45 23 97 2.01 19.71 254.02 136.83 0.81 0.153 0.86 0.75 1.05 1.00 1.2 18.62 0.347 0.90 0.312 2.042 NL
10 175.080 173.580 1.50 14.95 28 96 2.03 19.91 283.88 151.98 0.76 0.144 0.81 0.75 1.05 1.00 1.2 21.40 0.365 0.86 0.313 2.170 NL
11 173.580 172.080 1.50 16.45 33 52 1.88 18.44 311.54 164.92 0.71 0.137 0.77 0.75 1.05 1.00 1.2 24.08 0.650 0.82 0.534 3.909 NL
12 172.080 170.580 1.50 17.95 35 53 1.89 18.54 339.34 178.02 0.67 0.129 0.74 0.75 1.05 1.00 1.2 24.42 0.320 0.80 0.255 1.970 NL
13 170.580 169.080 1.50 19.45 29 52 1.88 18.44 367.00 190.96 0.63 0.123 0.71 0.75 1.05 1.00 1.2 19.39 0.374 0.80 0.300 2.441 NL
14 169.080 167.580 1.50 20.95 39 93 2.04 20.01 397.01 206.26 0.60 0.117 0.67 0.75 1.05 1.00 1.2 24.85 0.360 0.75 0.269 2.303 NL
15 167.580 166.080 1.50 22.45 42 87 2.04 20.01 427.02 221.56 0.57 0.112 0.64 0.75 1.05 1.00 1.2 25.56 0.321 0.72 0.232 2.068 NL
16 166.080 164.580 1.50 23.95 46 86 2.06 20.20 457.32 237.15 0.55 0.108 0.62 0.75 1.05 1.00 1.2 26.78 0.321 0.69 0.223 2.061 NL
17 164.580 163.080 1.50 25.45 42 87 2.04 20.01 494.91 260.03 0.54 0.104 0.58 0.75 1.05 1.00 1.2 22.98 0.326 0.69 0.226 2.186 NL
18 163.080 161.580 1.50 26.95 46 86 2.06 20.20 526.24 276.65 0.52 0.101 0.55 0.75 1.05 1.00 1.2 24.11 0.250 0.67 0.168 1.660 NL
19 161.580 160.080 1.50 28.45 42 87 2.04 20.01 556.69 292.39 0.51 0.099 0.53 0.75 1.05 1.00 1.2 21.17 0.385 0.68 0.261 2.644 NL
20 160.080 158.580 1.50 29.95 43 88 2.04 20.01 589.64 310.63 0.50 0.097 0.51 0.75 1.05 1.00 1.2 20.76 0.360 0.67 0.240 2.486 NL
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR 
Project Name ‐ 
GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE 
Existing Ground Water Level ‐  2.00 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV
Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 4
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ CRR FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 191.960 188.960 3.00 1.45 6 87 1.72 16.87 24.46 29.85 0.99 0.082 1.47 0.75 1.05 0.75 1.2 6.24 0.131 1.28 0.167 2.026 NL
2 188.960 187.460 1.50 2.95 7 88 1.93 18.93 52.85 43.53 0.98 0.121 1.35 0.75 1.05 0.75 1.2 6.67 0.136 1.19 0.161 1.338 NL
3 187.460 185.960 1.50 4.45 9 80 1.84 18.04 79.92 55.89 0.97 0.141 1.25 0.75 1.05 0.85 1.2 9.04 0.166 1.14 0.190 1.353 NL
4 185.960 184.460 1.50 5.95 12 81 1.87 18.34 104.70 65.97 0.96 0.154 1.18 0.75 1.05 0.85 1.2 11.40 0.200 1.11 0.222 1.441 NL
5 184.460 182.960 1.50 7.45 21 79 1.89 18.54 132.51 79.06 0.94 0.160 1.11 0.75 1.05 0.95 1.2 20.84 0.210 1.09 0.228 1.424 NL
6 182.960 181.460 1.50 8.95 20 95 2.04 20.01 162.52 94.36 0.92 0.161 1.03 0.75 1.05 0.95 1.2 18.43 0.341 1.02 0.347 2.154 NL
7 181.460 179.960 1.50 10.45 18 96 2.02 19.81 192.23 109.36 0.90 0.160 0.96 0.75 1.05 1.00 1.2 16.32 0.287 0.97 0.279 1.749 NL
8 179.960 178.460 1.50 11.95 16 95 2.03 19.91 222.09 124.51 0.86 0.155 0.90 0.75 1.05 1.00 1.2 13.60 0.235 0.94 0.221 1.424 NL
9 178.460 176.960 1.50 13.45 22 87 1.99 19.52 251.37 139.08 0.81 0.149 0.85 0.75 1.05 1.00 1.2 17.65 0.319 0.90 0.287 1.926 NL
10 176.960 175.460 1.50 14.95 22 92 1.98 19.42 280.49 153.49 0.76 0.141 0.80 0.75 1.05 1.00 1.2 16.72 0.365 0.87 0.319 2.258 NL
11 175.460 173.960 1.50 16.45 27 93 1.99 19.52 309.77 168.06 0.71 0.133 0.76 0.75 1.05 1.00 1.2 19.49 0.650 0.84 0.544 4.080 NL
12 173.960 172.460 1.50 17.95 29 88 1.99 19.52 339.04 182.62 0.67 0.126 0.73 0.75 1.05 1.00 1.2 19.92 0.320 0.81 0.259 2.062 NL
13 172.460 170.960 1.50 19.45 29 87 1.98 19.42 368.17 197.04 0.63 0.119 0.69 0.75 1.05 1.00 1.2 19.02 0.360 0.79 0.286 2.397 NL
14 170.960 169.460 1.50 20.95 29 89 1.98 19.42 397.30 211.45 0.60 0.114 0.66 0.75 1.05 1.00 1.2 18.19 0.360 0.78 0.281 2.465 NL
15 169.460 167.960 1.50 22.45 29 93 1.97 19.32 426.28 225.72 0.57 0.110 0.64 0.75 1.05 1.00 1.2 17.44 0.321 0.77 0.247 2.249 NL
16 167.960 166.460 1.50 23.95 34 92 1.99 19.52 455.55 240.29 0.55 0.106 0.61 0.75 1.05 1.00 1.2 19.62 0.321 0.74 0.237 2.230 NL
17 166.460 164.960 1.50 25.45 36 91 2.03 19.91 491.58 261.61 0.54 0.102 0.58 0.75 1.05 1.00 1.2 19.61 0.326 0.72 0.234 2.287 NL
18 164.960 163.460 1.50 26.95 26 90 2.03 19.91 528.87 284.19 0.52 0.099 0.54 0.75 1.05 1.00 1.2 13.37 0.250 0.75 0.187 1.894 NL
19 163.460 161.960 1.50 28.45 39 85 2.01 19.71 557.42 298.02 0.51 0.097 0.53 0.75 1.05 1.00 1.2 19.40 0.385 0.69 0.265 2.729 NL
20 161.960 160.460 1.50 29.95 40 87 2.00 19.61 588.01 313.91 0.50 0.095 0.51 0.75 1.05 1.00 1.2 19.17 0.360 0.68 0.244 2.560 NL
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR 
Project Name ‐ 
GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE 
Existing Ground Water Level ‐  3.50 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV
Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 5
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ CRR FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 194.387 191.387 3.00 1.45 14 43 1.94 19.03 27.59 47.69 0.99 0.062 1.31 0.75 1.05 0.75 1.2 13.02 0.225 1.22 0.276 4.468 NL
2 191.387 189.887 1.50 2.95 17 88 1.96 19.22 56.42 61.81 0.98 0.096 1.21 0.75 1.05 0.75 1.2 14.58 0.252 1.15 0.290 3.014 NL
3 189.887 188.387 1.50 4.45 14 87 1.96 19.22 85.25 75.94 0.97 0.117 1.12 0.75 1.05 0.85 1.2 12.63 0.219 1.08 0.236 2.010 NL
4 188.387 186.887 1.50 5.95 15 88 1.91 18.73 112.33 88.31 0.96 0.131 1.06 0.75 1.05 0.85 1.2 12.73 0.220 1.03 0.228 1.736 NL
5 186.887 185.387 1.50 7.45 16 72 1.96 19.22 141.17 102.43 0.94 0.140 0.99 0.75 1.05 0.95 1.2 14.21 0.245 0.99 0.244 1.741 NL
6 185.387 183.887 1.50 8.95 15 88 2.02 19.81 170.88 117.43 0.92 0.145 0.93 0.75 1.05 0.95 1.2 12.48 0.216 0.96 0.207 1.432 NL
7 183.887 182.387 1.50 10.45 14 99 2.02 19.81 200.60 132.44 0.90 0.146 0.87 0.75 1.05 1.00 1.2 11.53 0.202 0.93 0.187 1.284 NL
8 182.387 180.887 1.50 11.95 16 98 2.02 19.81 230.31 147.44 0.86 0.144 0.82 0.75 1.05 1.00 1.2 12.44 0.216 0.90 0.194 1.347 NL
9 180.887 179.387 1.50 13.45 15 99 2.04 20.01 260.32 162.74 0.81 0.140 0.78 0.75 1.05 1.00 1.2 11.03 0.194 0.88 0.172 1.227 NL
10 179.387 177.887 1.50 14.95 19 98 2.03 19.91 290.18 177.89 0.76 0.134 0.74 0.75 1.05 1.00 1.2 13.26 0.229 0.85 0.195 1.459 NL
11 177.887 176.387 1.50 16.45 24 99 1.91 18.73 318.28 191.28 0.71 0.128 0.71 0.75 1.05 1.00 1.2 16.03 0.281 0.82 0.230 1.803 NL
12 176.387 174.887 1.50 17.95 30 52 1.91 18.73 346.38 204.67 0.67 0.122 0.68 0.75 1.05 1.00 1.2 19.21 0.367 0.78 0.288 2.363 NL
13 174.887 173.387 1.50 19.45 27 52 1.93 18.93 374.77 218.35 0.63 0.116 0.65 0.75 1.05 1.00 1.2 16.59 0.293 0.78 0.230 1.973 NL
14 173.387 171.887 1.50 20.95 31 72 1.93 18.93 403.16 232.03 0.60 0.112 0.62 0.75 1.05 1.00 1.2 18.31 0.337 0.76 0.255 2.279 NL
15 171.887 170.387 1.50 22.45 36 73 1.94 19.03 431.70 245.86 0.57 0.108 0.60 0.75 1.05 1.00 1.2 20.46 0.435 0.73 0.316 2.918 NL
16 170.387 168.887 1.50 23.95 34 73 1.96 19.22 460.53 259.98 0.55 0.106 0.58 0.75 1.05 1.00 1.2 18.60 0.346 0.73 0.252 2.385 NL
17 168.887 167.387 1.50 25.45 37 74 1.97 19.32 491.55 276.28 0.54 0.103 0.56 0.75 1.05 1.00 1.2 19.41 0.375 0.71 0.265 2.575 NL
18 167.387 165.887 1.50 26.95 40 75 1.97 19.32 524.03 294.05 0.52 0.100 0.53 0.75 1.05 1.00 1.2 20.08 0.408 0.69 0.279 2.784 NL
19 165.887 164.387 1.50 28.45 44 72 1.91 18.73 551.39 306.70 0.51 0.099 0.52 0.75 1.05 1.00 1.2 21.44 0.385 0.66 0.256 2.584 NL
20 164.387 162.887 1.50 29.95 38 80 1.91 18.73 580.22 320.83 0.50 0.098 0.50 0.75 1.05 1.00 1.2 17.92 0.326 0.68 0.223 2.282 NL
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR 
Project Name ‐ 
GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE 
Existing Ground Water Level ‐  3.50 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV
Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 6
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ CRR FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 194.450 191.450 3.00 1.45 10 43 1.74 17.06 24.74 44.85 0.99 0.059 1.33 0.75 1.05 0.75 1.2 9.46 0.172 1.21 0.208 3.529 NL
2 191.450 189.950 1.50 2.95 8 76 1.83 17.95 51.66 57.06 0.98 0.095 1.24 0.75 1.05 0.75 1.2 7.05 0.141 1.12 0.158 1.656 NL
3 189.950 188.450 1.50 4.45 12 28 1.84 18.04 78.73 69.41 0.97 0.118 1.16 0.75 1.05 0.85 1.2 11.20 0.185 1.10 0.203 1.712 NL
4 188.450 186.950 1.50 5.95 14 87 1.92 18.83 106.74 82.71 0.96 0.133 1.09 0.75 1.05 0.85 1.2 12.20 0.212 1.05 0.223 1.675 NL
5 186.950 185.450 1.50 7.45 10 93 1.93 18.93 135.13 96.39 0.94 0.142 1.02 0.75 1.05 0.95 1.2 9.13 0.167 1.01 0.169 1.185 NL
6 185.450 183.950 1.50 8.95 13 93 1.94 19.03 163.67 110.22 0.92 0.148 0.96 0.75 1.05 0.95 1.2 11.15 0.196 0.98 0.191 1.295 NL
7 183.950 182.450 1.50 10.45 15 95 2.02 19.81 193.38 125.23 0.90 0.149 0.90 0.75 1.05 1.00 1.2 12.72 0.220 0.94 0.207 1.391 NL
8 182.450 180.950 1.50 11.95 15 96 2.02 19.81 223.10 140.23 0.86 0.147 0.85 0.75 1.05 1.00 1.2 11.98 0.208 0.91 0.191 1.298 NL
9 180.950 179.450 1.50 13.45 13 97 2.01 19.71 252.67 155.09 0.81 0.142 0.80 0.75 1.05 1.00 1.2 9.82 0.177 0.90 0.159 1.118 NL
10 179.450 177.950 1.50 14.95 18 96 2.02 19.81 282.38 170.09 0.76 0.136 0.76 0.75 1.05 1.00 1.2 12.90 0.223 0.87 0.193 1.417 NL
11 177.950 176.450 1.50 16.45 12 97 2.02 19.81 312.10 185.10 0.71 0.129 0.72 0.75 1.05 1.00 1.2 8.18 0.155 0.87 0.135 1.044 NL
12 176.450 174.950 1.50 17.95 14 97 2.03 19.91 341.96 200.25 0.67 0.123 0.69 0.75 1.05 1.00 1.2 9.09 0.167 0.85 0.142 1.156 NL
13 174.950 173.450 1.50 19.45 47 42 1.94 19.03 370.50 214.08 0.63 0.117 0.66 0.75 1.05 1.00 1.2 29.25 0.165 0.71 0.117 0.999 L
14 173.450 171.950 1.50 20.95 32 87 1.96 19.22 399.33 228.20 0.60 0.113 0.63 0.75 1.05 1.00 1.2 19.11 0.363 0.76 0.275 2.434 NL
15 171.950 170.450 1.50 22.45 35 87 1.96 19.22 428.16 242.32 0.57 0.109 0.61 0.75 1.05 1.00 1.2 20.08 0.407 0.73 0.299 2.740 NL
16 170.450 168.950 1.50 23.95 34 87 1.95 19.12 456.85 256.30 0.55 0.106 0.58 0.75 1.05 1.00 1.2 18.78 0.352 0.73 0.257 2.418 NL
17 168.950 167.450 1.50 25.45 42 82 1.95 19.12 489.94 274.68 0.54 0.103 0.56 0.75 1.05 1.00 1.2 22.12 0.365 0.69 0.251 2.432 NL
18 167.450 165.950 1.50 26.95 40 80 1.94 19.03 519.21 289.24 0.52 0.101 0.54 0.75 1.05 1.00 1.2 20.32 0.423 0.69 0.291 2.880 NL
19 165.950 164.450 1.50 28.45 45 82 1.95 19.12 554.92 310.23 0.51 0.099 0.51 0.75 1.05 1.00 1.2 21.75 0.385 0.66 0.254 2.577 NL
20 164.450 162.950 1.50 29.95 41 79 1.95 19.12 583.75 324.36 0.50 0.097 0.50 0.75 1.05 1.00 1.2 19.18 0.366 0.67 0.245 2.524 NL
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR 
Project Name ‐ 
GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE 
Existing Ground Water Level ‐  1.20 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV
Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 7
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ CRR FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 192.231 189.231 3.00 1.45 7 62 1.81 17.75 25.74 23.29 0.99 0.118 1.54 0.75 1.05 0.75 1.2 7.62 0.148 1.37 0.202 1.717 NL
2 189.231 187.731 1.50 2.95 9 44 1.82 17.85 52.51 35.35 0.98 0.157 1.42 0.75 1.05 0.75 1.2 9.03 0.166 1.27 0.211 1.348 NL
3 187.731 186.231 1.50 4.45 10 42 1.82 17.85 79.28 47.41 0.97 0.174 1.31 0.75 1.05 0.85 1.2 10.56 0.187 1.20 0.225 1.291 NL
4 186.231 184.731 1.50 5.95 7 95 1.93 18.93 109.09 62.50 0.96 0.180 1.21 0.75 1.05 0.85 1.2 6.78 0.137 1.10 0.151 0.840 L
5 184.731 183.231 1.50 7.45 11 32 1.87 18.34 136.60 75.30 0.94 0.184 1.13 0.75 1.05 0.95 1.2 11.12 0.195 1.07 0.210 1.140 NL
6 183.231 181.731 1.50 8.95 9 96 1.93 18.93 164.99 88.98 0.92 0.184 1.05 0.75 1.05 0.95 1.2 8.51 0.159 1.03 0.163 0.886 L
7 181.731 180.231 1.50 10.45 14 96 1.96 19.22 193.82 103.11 0.90 0.181 0.99 0.75 1.05 1.00 1.2 13.05 0.225 0.99 0.224 1.234 NL
8 180.231 178.731 1.50 11.95 9 92 1.91 18.73 221.92 116.49 0.86 0.176 0.93 0.75 1.05 1.00 1.2 7.91 0.151 0.97 0.146 0.833 L
9 178.731 177.231 1.50 13.45 10 93 1.91 18.73 250.01 129.88 0.81 0.168 0.88 0.75 1.05 1.00 1.2 8.32 0.157 0.94 0.148 0.878 L
10 177.231 175.731 1.50 14.95 11 28 1.85 18.14 277.23 142.38 0.76 0.160 0.84 0.75 1.05 1.00 1.2 8.72 0.152 0.92 0.140 0.877 L
11 175.731 174.231 1.50 16.45 12 27 1.86 18.24 304.59 155.03 0.71 0.151 0.80 0.75 1.05 1.00 1.2 9.07 0.156 0.90 0.141 0.937 L
12 174.231 172.731 1.50 17.95 16 28 1.87 18.34 332.10 167.83 0.67 0.142 0.76 0.75 1.05 1.00 1.2 11.56 0.190 0.87 0.166 1.166 NL
13 172.731 171.231 1.50 19.45 14 88 1.95 19.12 360.78 181.81 0.63 0.135 0.73 0.75 1.05 1.00 1.2 9.64 0.165 0.87 0.143 1.063 NL
14 171.231 169.731 1.50 20.95 17 87 1.96 19.22 389.62 195.93 0.60 0.128 0.70 0.75 1.05 1.00 1.2 11.19 0.196 0.84 0.166 1.291 NL
15 169.731 168.231 1.50 22.45 24 52 1.89 18.54 417.42 209.02 0.57 0.123 0.67 0.75 1.05 1.00 1.2 15.16 0.263 0.80 0.212 1.716 NL
16 168.231 166.731 1.50 23.95 26 32 1.90 18.63 445.37 222.26 0.55 0.119 0.64 0.75 1.05 1.00 1.2 15.79 0.276 0.78 0.216 1.814 NL
17 166.731 165.231 1.50 25.45 32 30 1.91 18.73 472.76 234.94 0.54 0.116 0.62 0.75 1.05 1.00 1.2 18.74 0.365 0.75 0.274 2.357 NL
18 165.231 163.731 1.50 26.95 37 39 1.91 18.73 504.36 251.83 0.52 0.113 0.59 0.75 1.05 1.00 1.2 20.69 0.365 0.72 0.263 2.328 NL
19 163.731 162.231 1.50 28.45 37 44 1.91 18.73 536.27 269.03 0.51 0.110 0.57 0.75 1.05 1.00 1.2 19.77 0.385 0.71 0.273 2.488 NL
20 162.231 160.731 1.50 29.95 39 97 1.99 19.52 560.27 278.32 0.50 0.109 0.55 0.75 1.05 1.00 1.2 20.36 0.426 0.70 0.297 2.731 NL
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR 
Project Name ‐ 
GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE 
Existing Ground Water Level ‐  1.50 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV
Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 8
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ CRR FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 192.144 189.144 3.00 1.45 5 55 1.82 17.85 25.88 26.37 0.99 0.105 1.50 0.75 1.05 0.75 1.2 5.33 0.120 1.29 0.155 1.479 NL
2 189.144 187.644 1.50 2.95 7 53 1.83 17.95 52.80 38.58 0.98 0.144 1.39 0.75 1.05 0.75 1.2 6.88 0.139 1.22 0.169 1.170 NL
3 187.644 186.144 1.50 4.45 9 87 1.94 19.03 81.34 52.41 0.97 0.162 1.28 0.75 1.05 0.85 1.2 9.22 0.169 1.16 0.196 1.211 NL
4 186.144 184.644 1.50 5.95 12 42 1.87 18.34 107.65 64.01 0.96 0.173 1.20 0.75 1.05 0.85 1.2 11.52 0.201 1.12 0.226 1.303 NL
5 184.644 183.144 1.50 7.45 14 45 1.88 18.44 135.30 76.95 0.94 0.179 1.12 0.75 1.05 0.95 1.2 14.04 0.242 1.08 0.261 1.463 NL
6 183.144 181.644 1.50 8.95 15 95 1.98 19.42 164.43 91.37 0.92 0.179 1.04 0.75 1.05 0.95 1.2 14.02 0.242 1.03 0.248 1.388 NL
7 181.644 180.144 1.50 10.45 19 96 1.99 19.52 193.70 105.93 0.90 0.176 0.97 0.75 1.05 1.00 1.2 17.48 0.315 0.98 0.309 1.752 NL
8 180.144 178.644 1.50 11.95 17 95 1.99 19.52 222.98 120.49 0.86 0.171 0.91 0.75 1.05 1.00 1.2 14.70 0.254 0.95 0.241 1.410 NL
9 178.644 177.144 1.50 13.45 20 96 1.96 19.22 251.81 134.62 0.81 0.164 0.86 0.75 1.05 1.00 1.2 16.33 0.287 0.91 0.262 1.603 NL
10 177.144 175.644 1.50 14.95 22 95 2.00 19.61 281.23 149.33 0.76 0.155 0.82 0.75 1.05 1.00 1.2 16.98 0.302 0.88 0.266 1.722 NL
11 175.644 174.144 1.50 16.45 24 44 1.90 18.63 309.18 162.57 0.71 0.146 0.78 0.75 1.05 1.00 1.2 17.66 0.319 0.85 0.273 1.867 NL
12 174.144 172.644 1.50 17.95 23 45 1.89 18.54 336.98 175.66 0.67 0.138 0.74 0.75 1.05 1.00 1.2 16.17 0.284 0.84 0.239 1.730 NL
13 172.644 171.144 1.50 19.45 28 46 1.90 18.63 364.93 188.90 0.63 0.131 0.71 0.75 1.05 1.00 1.2 18.85 0.165 0.81 0.133 1.016 NL
14 171.144 169.644 1.50 20.95 29 44 1.89 18.54 392.74 201.99 0.60 0.125 0.68 0.75 1.05 1.00 1.2 18.72 0.350 0.79 0.277 2.207 NL
15 169.644 168.144 1.50 22.45 26 46 1.90 18.63 420.69 215.23 0.57 0.121 0.66 0.75 1.05 1.00 1.2 16.12 0.283 0.79 0.224 1.852 NL
16 168.144 166.644 1.50 23.95 27 43 1.90 18.63 448.64 228.47 0.55 0.117 0.63 0.75 1.05 1.00 1.2 16.11 0.283 0.78 0.219 1.874 NL
17 166.644 165.144 1.50 25.45 30 82 1.91 18.73 478.05 243.17 0.54 0.114 0.61 0.75 1.05 1.00 1.2 17.17 0.365 0.75 0.275 2.421 NL
18 165.144 163.644 1.50 26.95 31 85 1.92 18.83 513.75 264.16 0.52 0.110 0.57 0.75 1.05 1.00 1.2 16.78 0.365 0.74 0.269 2.455 NL
19 163.644 162.144 1.50 28.45 33 86 1.92 18.83 541.69 277.40 0.51 0.108 0.55 0.75 1.05 1.00 1.2 17.26 0.385 0.72 0.278 2.583 NL
20 162.144 160.644 1.50 29.95 36 83 1.92 18.83 570.09 291.08 0.50 0.106 0.54 0.75 1.05 1.00 1.2 18.21 0.334 0.70 0.235 2.222 NL
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 1 Easting 711251.86 Depth of Water Level (m bgl) 1.00
Total depth of Coordinate Northing 3116734.80 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
35.00
Bore Hole (m) Elevation 191.280 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27

0.00 - 0.50 191.280 - 190.780 DS - - - 100 100 100 52 - NON-PLASTIC ML - - - - - - - - 0.018 0.80 7.48 0 48 49 3
0.014 0.48 7.56
1.00 - 1.45 190.280 - 189.830 UD - - - 100 100 100 56 - NON-PLASTIC ML 1.81 20.80 1.50 2.52 0.680 0 27° - 0.016 0.66 7.98 0 44 53 3
1.45 - 1.90 189.830 - 189.380 SPT 7 11.32 11.32 - -

2.50 - 2.95 188.780 - 188.330 UD - - - 100 100 100 55 - NON-PLASTIC ML 1.88 22.60 1.53 - - - - - - - - 0 45 52 3
2.95 - 3.40 188.330 - 187.880 SPT 9 12.69 12.69 - -

4.00 - 4.45 187.280 - 186.830 UD - - - 100 100 100 53 - NON-PLASTIC ML 1.89 22.90 1.54 - - - - - - - - 0 47 50 3
4.45 - 4.90 186.830 - 186.380 SPT 8 10.25 10.25 - -
CLAY STARTS FROM 5.5 METER DEPTH
5.50 - 5.95 185.780 - 185.330 UD - - - 100 100 97 92 - 27 22 5 ML 1.93 21.20 1.59 2.59 0.629 0.10 19° 0.120 - - - 0 8 77 15
5.95 - 6.40 185.330 - 184.880 SPT 5 5.93 5.93 - -

7.00 - 7.45 184.280 - 183.830 UD - - - 100 100 97- 92


27 22 5 ML 1.93 20.80 1.60 - - - - - - - - 0 8 77 15
7.45 - 7.90 183.830 - 183.380 SPT 6 6.66 6.66 - -
SAND STARTS FROM 5.5 METER DEPTH
8.50 - 8.95 182.780 - 182.330 UD - - - 100 100 100 32 - NON-PLASTIC SM 1.84 23.60 1.49 2.54 0.705 0 29° - - - - 0 68 31 1
8.95 - 9.40 182.330 - 181.880 SPT 9 9.50 9.50 - -

10.00 - 10.45 181.280 - 180.830 UD - - - 100 100 100 31 - NON-PLASTIC SM 1.87 22.20 1.53 - - - - - - - - 0 69 30 1
10.45 - 10.90 180.830 - 180.380 SPT 14 14.09 14.09 - -

11.50 - 11.95 179.780 - 179.330 UD - - - 97 92 90 88 - 28 22 6 CL-ML 1.97 21.30 1.62 2.62 0.617 0.15 22° 0.117 - - - 3 9 72 16
11.95 - 12.40 179.330 - 178.880 SPT 12 11.51 11.51 - -

13.00 - 13.45 178.280 - 177.830 UD - - - 100 100 97 92 - 33 22 11 CL 1.98 20.80 1.64 2.65 0.616 0.25 16° 0.113 - - - 0 8 73 19
13.45 - 13.90 177.830 - 177.380 SPT 14 12.84 12.84 - -

14.50 - 14.95 176.780 - 176.330 UD - - - 100 100 98 93 - 33 22 11 CL 1.99 20.50 1.65 - - - - - - - - 0 7 74 19


14.95 - 15.40 176.330 - 175.880 SPT 16 14.08 14.08 - -

16.00 - 16.45 175.280 - 174.830 UD - - - 100 100 100 22 - NON-PLASTIC SM 1.90 22.30 1.55 2.56 0.652 0 30° - - - - 0 78 21 1
16.45 - 16.90 174.830 - 174.380 SPT 20 16.98 15.99 - -

17.50 - 17.95 173.780 - 173.330 UD - - - 100 100 100 24 - NON-PLASTIC SM S L I P P E D - - - - 0 76 23 1


17.95 - 18.40 173.330 - 172.880 SPT 23 18.87 16.94 - -

19.00 - 19.45 172.280 - 171.830 UD - - - 96 92 90 88 - 30 20 10 CL 1.94 19.20 1.63 2.65 0.626 0.25 15° 0.117 - - - 4 8 70 18
19.45 - 19.90 171.830 - 171.380 SPT 12 9.52 9.52 - -

20.50 - 20.95 170.780 - 170.330 UD - - - 97 92 90 22 - NON-PLASTIC SM 1.90 21.50 1.56 - - - - - - - - 3 75 21 1


20.95 - 21.40 170.330 - 169.880 SPT 26 20.01 17.51 - -

22.00 - 22.45 169.280 - 168.830 UD - - - 100 100 100 24 - NON-PLASTIC SM 1.90 20.30 1.58 2.6 0.646 0 31° - - - - 0 76 23 1
22.45 - 22.90 168.830 - 168.380 SPT 30 22.41 18.71 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR
NAME OF THE PROJECT GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 1 Easting 711251.86 Depth of Water Level (m bgl) 1.00
Total depth of Coordinate Northing 3116734.80 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
35.00
Bore Hole (m) Elevation 191.280 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27
23.50 - 23.95 167.780 - 167.330 UD - - - 100 100 100 25 - NON-PLASTIC SM 1.90 20.20 1.58 - - - - - - - - 0 75 24 1
23.95 - 24.40 167.330 - 166.880 SPT 32 23.23 19.12 - -

25.00 - 25.45 166.280 - 165.830 UD - - - 100 100 100 24 - NON-PLASTIC SM S L I P P E D - - - - 0 76 23 1


25.45 - 25.90 165.830 - 165.380 SPT 37 26.12 20.56 - -

26.50 - 26.95 164.780 - 164.330 UD - - - 100 100 88 82 - 28 22 6 CL-ML 1.99 20.70 1.65 2.66 0.612 0.20 22° 0.090 - - - 0 18 65 17
26.95 - 27.40 164.330 - 163.880 SPT 22 15.08 15.04 - -

28.00 - 28.45 163.280 - 162.830 UD - - - 95 91 87 82 - 28 22 6 CL-ML 2.00 19.50 1.67 - - - - - - - - 5 13 65 17


28.45 - 28.90 162.830 - 162.380 SPT 27 17.97 16.49 - -

29.50 - 29.95 161.780 - 161.330 UD - - - 100 100 97 42 - NON-PLASTIC SM 1.89 21.30 1.56 2.59 0.660 0 31° - - - - 0 58 40 2
29.95 - 30.40 161.330 - 160.880 SPT 42 27.27 21.14 - -

31.00 - 31.45 160.280 - 159.830 UD - - - 100 100 98 44 - NON-PLASTIC SM 1.92 20.10 1.60 - - - - - - - - 0 56 42 2
31.45 - 31.90 159.830 - 159.380 SPT 51 32.29 23.65 - -

32.50 - 32.95 158.780 - 158.330 UD - - - 100 100 97 42 - NON-PLASTIC SM S L I P P E D - - - - 0 58 40 2


32.95 - 33.40 158.330 - 157.880 SPT 58 35.83 25.42 - -

34.00 - 34.45 157.280 - 156.830 UD - - - 100 100 97 40 - NON-PLASTIC SM 1.95 19.50 1.63 - - - - - - - - 0 60 38 2
34.45 - 34.90 156.830 - 156.380 SPT 67 40.37 27.69 - -

34.90 - 35.00 156.380 - 156.280 DS - - - 100 100 97 42 - NON-PLASTIC SM - - - - - - - - - - - 0 58 40 2


ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 2 Easting 711302.93 Depth of Water Level (m bgl) 1.50
Total depth of Coordinate Northing 3116666.58 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
35.00
Bore Hole (m) Elevation 192.175 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27

0.00 - 0.50 192.175 - 191.675 DS - - - 100 100 97 72 - NON-PLASTIC ML - - - - - - - - 0.008 0.83 7.45 0 28 68 4
0.016 0.48 7.25
1.00 - 1.45 191.175 - 190.725 UD - - - 96 92 90 87 - 26 22 4 ML 1.91 18.7 1.61 2.62 0.627 0.10 19° 0.120 0.014 0.66 7.38 4 9 71 16
1.45 - 1.90 190.725 - 190.275 SPT 6 9.47 9.47 - -

2.50 - 2.95 189.675 - 189.225 UD - - - 96 90 87 82 - 26 22 4 ML 1.86 22.6 1.52 - - - - - - - - 4 14 67 15


2.95 - 3.40 189.225 - 188.775 SPT 8 11.14 11.14 - -

4.00 - 4.45 188.175 - 187.725 UD - - - 100 100 97 62 - NON-PLASTIC ML 1.85 23.2 1.50 2.52 0.680 0 27° - - - - 0 38 58 4
4.45 - 4.90 187.725 - 187.275 SPT 10 12.76 12.76 - -

5.50 - 5.95 186.675 - 186.225 UD - - - 100 100 100 93 - 28 22 6 CL-ML 1.97 20.8 1.63 2.64 0.620 0.15 22° 0.117 - - - 0 7 76 17
5.95 - 6.40 186.225 - 185.775 SPT 12 14.13 14.13 - -

7.00 - 7.45 185.175 - 184.725 UD - - - 100 100 97 95 - 30 20 10 CL 1.95 19.2 1.64 - - - - - - - - 0 5 75 20


7.45 - 7.90 184.725 - 184.275 SPT 13 14.33 14.33 - -

8.50 - 8.95 183.675 - 183.225 UD - - - 100 100 100 96 - 33 22 11 CL 1.98 20.7 1.64 2.65 0.616 0.25 15° 0.120 - - - 0 4 74 22
8.95 - 9.40 183.225 - 182.775 SPT 13 13.52 13.52 - -

10.00 - 10.45 182.175 - 181.725 UD - - - 94 88 82 76 - NON-PLASTIC ML 1.90 21.8 1.56 2.54 0.628 0 27° - - - - 6 18 71 5
10.45 - 10.90 181.725 - 181.275 SPT 15 14.88 14.88 - -

11.50 - 11.95 180.675 - 180.225 UD - - - 94 88 83 76 - 30 20 10 CL 1.96 18.9 1.65 2.65 0.606 0.25 18° 0.110 - - - 6 18 71 5
11.95 - 12.40 180.225 - 179.775 SPT 18 17.04 16.02 - -

13.00 - 13.45 179.175 - 178.725 UD - - - 96 88 83 78 - 30 20 10 CL 1.98 19.0 1.66 - - - - - - - - 4 18 73 5


13.45 - 13.90 178.725 - 178.275 SPT 20 18.13 16.57 - -

14.50 - 14.95 177.675 - 177.225 UD - - - 97 92 90 42 - NON-PLASTIC SM 1.90 22.0 1.56 2.57 0.647 0 31° - - - - 3 55 40 2
14.95 - 15.40 177.225 - 176.775 SPT 21 18.34 16.67 - -

16.00 - 16.45 176.175 - 175.725 UD - - - 98 93 90 43 - NON-PLASTIC SM 1.90 21.3 1.57 - - - - - - - - 2 55 41 2


16.45 - 16.90 175.725 - 175.275 SPT 24 20.23 17.62 - -

17.50 - 17.95 174.675 - 174.225 UD - - - 96 90 87 82 - 32 20 12 CL 1.96 18.0 1.66 2.67 0.608 0.30 14° 0.083 - - - 4 14 64 18
17.95 - 18.40 174.225 - 173.775 SPT 27 21.96 18.48 - -

19.00 - 19.45 173.175 - 172.725 UD - - - 100 100 97 62 - NON-PLASTIC ML 1.89 19.8 1.58 2.6 0.646 0 30° - - - - 0 38 58 4
19.45 - 19.90 172.725 - 172.275 SPT 31 24.43 19.72 - -

20.50 - 20.95 171.675 - 171.225 UD - - - 84 76 72 62 - 27 22 5 ML 1.98 20.2 1.65 - - - - - - - - 16 22 49 13


20.95 - 21.40 171.225 - 170.775 SPT 33 25.15 20.08 - -

22.00 - 22.45 170.175 - 169.725 UD - - - 96 90 87 82 - 27 22 5 ML 1.99 19.7 1.66 - - - - - - - - 4 14 66 16


22.45 - 22.90 169.725 - 169.275 SPT 33 24.36 19.68 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 2 Easting 711302.93 Depth of Water Level (m bgl) 1.50
Total depth of Coordinate Northing 3116666.58 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
35.00
Bore Hole (m) Elevation 192.175 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27
23.50 - 23.95 168.675 - 168.225 UD - - - 97 92 90 88 - 30 20 10 CL 2.00 18.6 1.69 - - - - - - - - 3 9 70 18
23.95 - 24.40 168.225 - 167.775 SPT 32 22.89 18.95 - -

25.00 - 25.45 167.175 - 166.725 UD - - - 97 93 90 87 - 30 20 10 CL 13.74 17.3 11.71 2.69 0.070 0.30 19° 0.070 - - - 3 10 69 18
25.45 - 25.90 166.725 - 166.275 SPT 37 18.87 16.94 - -

26.50 - 26.95 165.675 - 165.225 UD - - - 97 92 90 88 - 30 20 10 CL 2.02 17.0 1.73 - - - - - - - - 3 9 70 18


26.95 - 27.40 165.225 - 164.775 SPT 39 19.43 17.22 - -

28.00 - 28.45 164.175 - 163.725 UD - - - 97 92 90 87 - 32 20 10 CL 2.02 18.2 1.71 - - - - - - - - 3 10 68 19


28.45 - 28.90 163.725 - 163.275 SPT 37 18.01 16.51 - -

29.50 - 29.95 162.675 - 162.225 UD - - - 100 100 100 52 - NON-PLASTIC ML 1.91 20.7 1.58 2.63 0.665 0 30° - - - - 0 48 49 3
29.95 - 30.40 162.225 - 161.775 SPT 42 20.04 17.52 - -

31.00 - 31.45 161.175 - 160.725 UD - - - 100 100 100 53 - NON-PLASTIC ML 1.91 20.2 1.59 - - - - - - - - 0 47 50 3
31.45 - 31.90 160.725 - 160.275 SPT 44 20.57 17.79 - -

32.50 - 32.95 159.675 - 159.225 UD - - - 100 100 100 54 - NON-PLASTIC ML S L I P P E D - - - - 0 46 51 3


32.95 - 33.40 159.225 - 158.775 SPT 46 20.80 17.90 - -

34.00 - 34.45 158.175 - 157.725 UD - - - 96 92 90 87 - 26 22 4 ML 1.99 18.9 1.67 - - - - - - - - 4 9 73 14


34.45 - 34.90 157.725 - 157.275 SPT 52 23.02 19.01 - -

34.90 - 35.00 157.275 - 157.175 DS - - - 96 92 90 87 - 26 22 4 ML - - - - - - - - - - - 4 9 73 14


ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 3 Easting 711305.76 Depth of Water Level (m bgl) 1.50
Total depth of Coordinate Northing 3116616.44 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 192.080 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27

0.00 - 0.50 192.080 - 191.580 DS - - - 97 92 90 52 - NON-PLASTIC ML - - - - - - - - 0.012 0.90 7.61 - - - 3


0.018 0.97 7.15
1.00 - 1.45 191.080 - 190.630 UD - - - 100 100 100 56 - NON-PLASTIC ML 1.78 20.5 1.48 2.52 0.703 0 27° - 0.014 0.91 7.58 0 44 52 4
1.45 - 1.90 190.630 - 190.180 SPT 6 9.77 9.77 - -

2.50 - 2.95 189.580 - 189.130 UD - - - 97 92 90 42 - NON-PLASTIC SM 1.80 23.0 1.46 2.54 0.740 0 28° - - - - 3 55 40 2
2.95 - 3.40 189.130 - 188.680 SPT 7 10.02 10.02 - -

4.00 - 4.45 188.080 - 187.630 UD - - - 97 93 90 44 - NON-PLASTIC SM 1.83 22.3 1.50 - - - - - - - - 3 53 42 2


4.45 - 4.90 187.630 - 187.180 SPT 10 13.03 13.03 - -

5.50 - 5.95 186.580 - 186.130 UD - - - 98 92 90 41 - NON-PLASTIC SM 1.86 20.9 1.54 2.54 0.649 0 30° - - - - 2 57 39 2
5.95 - 6.40 186.130 - 185.680 SPT 16 19.33 17.17 - -

7.00 - 7.45 185.080 - 184.630 UD - - - 100 100 100 96 - 36 22 14 CI 2.00 21.5 1.65 2.65 0.606 0.40 6° 0.123 - - - 0 4 72 24
7.45 - 7.90 184.630 - 184.180 SPT 9 10.11 10.11 - -

8.50 - 8.95 183.580 - 183.130 UD - - - 100 100 100 95 - 36 22 14 CI 2.01 20.8 1.66 - - - - - - - - 0 5 71 24
8.95 - 9.40 183.130 - 182.680 SPT 12 12.66 12.66 - -

10.00 - 10.45 182.080 - 181.630 UD - - - 100 100 100 95 - 36 22 14 CI 2.01 20.4 1.67 2.65 0.587 0.40 7° 0.117 - - - 0 5 71 24
10.45 - 10.90 181.630 - 181.180 SPT 17 16.98 15.99 - -

11.50 - 11.95 180.580 - 180.130 UD - - - 100 100 100 96 - 37 22 15 CI 2.02 19.8 1.69 - - - - - - - - 0 4 72 24
11.95 - 12.40 180.130 - 179.680 SPT 23 21.84 18.42 - -

13.00 - 13.45 179.080 - 178.630 UD - - - 100 100 100 97 - 36 22 14 CI 2.01 19.2 1.69 2.67 0.580 0.50 7° 0.100 - - - 0 3 72 25
13.45 - 13.90 178.630 - 178.180 SPT 23 20.87 17.94 - -

14.50 - 14.95 177.580 - 177.130 UD - - - 100 100 100 96 - 36 22 14 CI 2.03 18.5 1.71 - - - - - - - - 0 4 72 24
14.95 - 15.40 177.130 - 176.680 SPT 28 24.35 19.68 - -
SAND STARTS FROM 15.40 METER DEPTH
16.00 - 16.45 176.080 - 175.630 UD - - - 100 100 97 52 - NON-PLASTIC ML 1.88 20.7 1.56 2.58 0.654 0 30° - - - - 0 48 49 3
16.45 - 16.90 175.630 - 175.180 SPT 33 27.73 21.37 - -

17.50 - 17.95 174.580 - 174.130 UD - - - 100 100 96 - 53


NON-PLASTIC ML 1.89 19.9 1.58 - - - - - - - - 0 47 50 3
17.95 - 18.40 174.130 - 173.680 SPT 35 28.46 21.73 - -
CLAY STARTS FROM 18.40 METER DEPTH
19.00 - 19.45 173.080 - 172.630 UD - - - 100 100 97 52 - NON-PLASTIC ML S L I P P E D - - - - 0 48 49 3
19.45 - 19.90 172.630 - 172.180 SPT 29 22.82 18.91 - -

20.50 - 20.95 171.580 - 171.130 UD - - - 100 100 98 53 - NON-PLASTIC ML 1.88 19.2 1.58 - - - - - - - - 0 47 50 3
20.95 - 21.40 171.130 - 170.680 SPT 35 26.73 20.87 - -

22.00 - 22.45 170.080 - 169.630 UD - - - 100 100 100 93 - 29 21 8 CL 2.04 18.6 1.72 2.67 0.552 0.35 12° 0.080 - - - 0 7 76 17
22.45 - 22.90 169.630 - 169.180 SPT 39 28.79 21.90 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 3 Easting 711305.76 Depth of Water Level (m bgl) 1.50
Total depth of Coordinate Northing 3116616.44 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 192.080 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27
23.50 - 23.95 168.580 - 168.130 UD - - - 96 92 90 87 - 29 21 8 CL 2.04 18.0 1.73 - - - - - - - - 4 9 71 16
23.95 - 24.40 168.130 - 167.680 SPT 42 30.00 22.50 - -

25.00 - 25.45 167.080 - 166.630 UD - - - 96 92 90 86 - 30 20 10 CL 2.06 17.5 1.75 - - - - - - - - 4 10 68 18


25.45 - 25.90 166.630 - 166.180 SPT 46 31.82 23.41 - -

26.50 - 26.95 165.580 - 165.130 UD - - - 96 93 90 87 - 30 20 10 CL 2.04 17.0 1.74 2.69 0.546 0.35 14° 0.070 - - - 4 9 69 18
26.95 - 27.40 165.130 - 164.680 SPT 42 28.19 21.60 - -

28.00 - 28.45 164.080 - 163.630 UD - - - 95 92 90 88 - 30 20 10 CL 2.04 17.3 1.74 - - - - - - - - 5 7 69 19


28.45 - 28.90 163.630 - 163.180 SPT 43 28.02 21.51 - -

29.50 - 29.95 162.580 - 162.130 UD - - - 96 91 90 87 - 30 20 10 CL 2.06 16.8 1.76 - - - - - - - - 4 9 69 18


29.95 - 30.40 162.130 - 161.680 SPT 48 30.38 22.69 - -

31.00 - 31.45 161.080 - 160.630 UD - - - 96 92 90 88 - 30 20 10 CL 2.04 18.6 1.72 - - - - - - - - 4 8 69 19


31.45 - 31.90 160.630 - 160.180 SPT 39 24.00 19.50 - -

32.50 - 32.95 159.580 - 159.130 UD - - - 96 91 90 87 - 32 20 12 CL 2.04 17.9 1.73 - - - - - - - - 4 9 68 19


32.95 - 33.40 159.130 - 158.680 SPT 42 25.15 20.08 - -

34.00 - 34.45 158.080 - 157.630 UD - - - 96 92 90 88 - 32 20 12 CL 2.04 16.8 1.75 2.7 0.543 0.35 16° 0.065 - - - 4 8 69 19
34.45 - 34.90 157.630 - 157.180 SPT 50 29.15 22.08 - -

35.50 - 35.95 156.580 - 156.130 UD - - - 96 92 91 87 - 32 20 12 CL 2.05 16.2 1.76 - - - - - - - - 4 9 68 19


35.95 - 36.40 156.130 - 155.680 SPT 55 31.24 23.12 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 4 Easting 711264.95 Depth of Water Level (m bgl) 2.00
Total depth of Coordinate Northing 3116617.96 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 191.960 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27

0.00 - 0.50 191.960 - 191.460 DS - - - 97 92 90 52 - NON-PLASTIC ML - - - - - - - - 0.010 0.73 7.35 - - - 3


0.006 0.72 7.45
1.00 - 1.45 190.960 - 190.510 UD - - - 97 92 90 55 - NON-PLASTIC ML 1.72 17.2 1.47 2.52 0.714 0 27° - 0.018 0.56 7.34 3 42 51 4
1.45 - 1.90 190.510 - 190.060 SPT 6 8.19 8.19 100 100 97 87 NON-PLASTIC ML -

2.50 - 2.95 189.460 - 189.010 UD - - - 96 92 90 88 - 26 22 4 ML 1.93 20.9 1.60 2.62 0.638 0.10 21° 0.117 - - - 4 8 72 16
2.95 - 3.40 189.010 - 188.560 SPT 7 9.91 9.91 - -

4.00 - 4.45 187.960 - 187.510 UD - - - 96 92 90 80 - NON-PLASTIC ML 1.84 22.6 1.50 2.54 0.693 0 27° - - - - 4 16 74 6
4.45 - 4.90 187.510 - 187.060 SPT 9 11.63 11.63 - -

5.50 - 5.95 186.460 - 186.010 UD - - - 97 93 90 81 - NON-PLASTIC ML 1.87 21.3 1.54 - - - - - - - - 3 16 75 6


5.95 - 6.40 186.010 - 185.560 SPT 12 14.39 14.39 - -

7.00 - 7.45 184.960 - 184.510 UD - - - 97 92 90 79 - NON-PLASTIC ML 1.89 20.5 1.57 - - - - - - - - 3 18 74 5


7.45 - 7.90 184.510 - 184.060 SPT 21 23.62 19.31 - -

8.50 - 8.95 183.460 - 183.010 UD - - - 100 100 97 95 - 36 22 14 CI 2.04 20.8 1.69 2.67 0.580 0.40 8° 0.110 - - - 0 5 70 25
8.95 - 9.40 183.010 - 182.560 SPT 20 21.09 18.05 - -

10.00 - 10.45 181.960 - 181.510 UD - - - 100 100 96 96 - 36 22 14 CI 2.02 21.2 1.67 - - - - - - - - 0 4 71 25


10.45 - 10.90 181.510 - 181.060 SPT 18 17.95 16.48 - -

11.50 - 11.95 180.460 - 180.010 UD - - - 100 100 97 - 95


36 22 14 CI 2.03 21.4 1.67 - - - - - - - - 0 5 70 25
11.95 - 12.40 180.010 - 179.560 SPT 16 15.18 15.09 - -
SAND STARTS FROM 12.00 METER DEPTH
13.00 - 13.45 178.960 - 178.510 UD - - - 96 92 90 87 - 28 22 6 CL-ML 1.99 20.6 1.65 2.65 0.606 0.15 25° 0.100 - - - 4 9 70 17
13.45 - 13.90 178.510 - 178.060 SPT 22 19.96 17.48 - -

14.50 - 14.95 177.460 - 177.010 UD - - - 100 100 97 92 - 30 22 8 CL 1.98 19.2 1.66 - - - - - - - - 0 8 73 19


14.95 - 15.40 177.010 - 176.560 SPT 22 19.17 17.09 - -

16.00 - 16.45 175.960 - 175.510 UD - - - 100 100 97 93 - 30 22 8 CL 1.99 18.9 1.67 - - - - - - - - 0 7 74 19


16.45 - 16.90 175.510 - 175.060 SPT 27 22.64 18.82 - -

17.50 - 17.95 174.460 - 174.010 UD - - - 97 92 90 88 - 29 21 8 CL 1.99 18.2 1.68 2.67 0.589 0.30 16° 0.090 - - - 3 9 70 18
17.95 - 18.40 174.010 - 173.560 SPT 29 23.45 19.23 - -

19.00 - 19.45 172.960 - 172.510 UD - - - 96 93 91 87 - 29 21 8 CL 1.98 20.0 1.65 - - - - - - - - 4 9 69 18


19.45 - 19.90 172.510 - 172.060 SPT 29 22.66 18.83 - -

20.50 - 20.95 171.460 - 171.010 UD - - - 97 94 92 89 - 30 20 10 CL 1.98 18.7 1.67 - - - - - - - - 3 8 70 19


20.95 - 21.40 171.010 - 170.560 SPT 29 21.92 18.46 - -

22.00 - 22.45 169.960 - 169.510 UD - - - 100 100 97 93 - 30 20 10 CL 1.97 18.2 1.67 - . - - - - - - 0 7 74 19


22.45 - 22.90 169.510 - 169.060 SPT 29 21.25 18.13 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 4 Easting 711264.95 Depth of Water Level (m bgl) 2.00
Total depth of Coordinate Northing 3116617.96 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 191.960 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27
23.50 - 23.95 168.460 - 168.010 UD - - - 100 99 95 92 - 30 20 10 CL 1.99 17.8 1.69 - - - - - - - - 0 8 73 19
23.95 - 24.40 168.010 - 167.560 SPT 34 24.16 19.58 - -

25.00 - 25.45 166.960 - 166.510 UD - - - 100 100 95 91 - 33 22 11 CL 2.03 18.6 1.71 - - - - - - - - 0 9 71 20


25.45 - 25.90 166.510 - 166.060 SPT 36 24.80 19.90 - -

26.50 - 26.95 165.460 - 165.010 UD - - - 100 99 96 90 - 33 22 11 CL 2.03 19.5 1.70 2.69 0.582 0.35 14° 0.065 - - - 0 10 70 20
26.95 - 27.40 165.010 - 164.560 SPT 26 17.39 16.20 - -

28.00 - 28.45 163.960 - 163.510 UD - - - 100 100 100 85 - 28 22 6 CL-ML 2.01 20.9 1.66 2.65 0.596 0.20 24° 0.060 - - - 0 15 69 16
28.45 - 28.90 163.510 - 163.060 SPT 39 25.35 20.18 - -

29.50 - 29.95 162.460 - 162.010 UD - - - 100 100 100 87 - 28 22 6 CL-ML 2.00 19.2 1.68 - - - - - - - - 0 13 71 16
29.95 - 30.40 162.010 - 161.560 SPT 44 27.83 21.42 - -

31.00 - 31.45 160.960 - 160.510 UD - - - 100 100 100 80 - NON-PLASTIC ML 1.94 21.3 1.60 - - - - - - - - 0 20 74 6
31.45 - 31.90 160.510 - 160.060 SPT 47 28.98 21.99 - -

32.50 - 32.95 159.460 - 159.010 UD - - - 100 100 97 45 - NON-PLASTIC SM 1.92 22.5 1.57 2.59 0.650 0 32° - - - - 0 55 43 2
32.95 - 33.40 159.010 - 158.560 SPT 51 30.70 22.85 - -

34.00 - 34.45 157.960 - 157.510 UD - - - 100 100 98 48 - NON-PLASTIC SM S L I P P E D - - - - 0 52 46 2


34.45 - 34.90 157.510 - 157.060 SPT 49 28.78 21.89 - -

35.50 - 35.95 156.460 - 156.010 UD - - - 100 100 97 42 - NON-PLASTIC SM 1.90 21.6 1.56 - - - - - - - - 0 58 40 2
35.95 - 36.40 156.010 - 155.560 SPT 46 26.41 20.71 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 5 Easting 711305.31 Depth of Water Level (m bgl) 3.50
Total depth of Coordinate Northing 3116571.43 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 194.387 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27

0.00 - 0.50 194.387 - 193.887 DS - - - 100 100 97 42 - NON-PLASTIC SM - - - - - - - - 0.014 0.62 7.62 0 - - 2
0.012 0.52 7.54
1.00 - 1.45 193.387 - 192.937 UD - - - 100 100 97 43 - NON-PLASTIC SM 1.77 16.2 1.52 2.54 0.671 0 30° - 0.010 0.64 7.49 0 57 41 2
1.45 - 1.90 192.937 - 192.487 SPT 14 19.00 19.00 - -

2.50 - 2.95 191.887 - 191.437 UD - - - 96 92 90 88 - 30 20 10 CL 1.94 17.5 1.65 2.65 0.606 0.25 17° 0.110 - - - 4 8 69 19
2.95 - 3.40 191.437 - 190.987 SPT 17 19.49 19.49 - -

4.00 - 4.45 190.387 - 189.937 UD - - - 100 100 97 87 - 27 22 5 ML 1.96 20.9 1.62 2.64 0.630 0.15 22° 0.100 - - - 0 13 71 16
4.45 - 4.90 189.937 - 189.487 SPT 14 17.79 16.40 - -

5.50 - 5.95 188.887 - 188.437 UD - - - 100 100 97 88 - 27 22 5 ML 1.96 20.5 1.63 - - - - - - - - 0 12 71 17


5.95 - 6.40 188.437 - 187.987 SPT 15 17.61 16.31 - -

7.00 - 7.45 187.387 - 186.937 UD - - - 100 100 100 72 - NON-PLASTIC ML 1.91 22.6 1.56 2.58 0.654 0 28° - - - - 0 28 67 5
7.45 - 7.90 186.937 - 186.487 SPT 16 17.65 16.33 - -

8.50 - 8.95 185.887 - 185.437 UD - - - 96 92 90 88 - 33 21 12 CL 1.96 19.8 1.64 - - - - - - - - 4 8 68 20


8.95 - 9.40 185.437 - 184.987 SPT 15 15.62 15.31 - -

10.00 - 10.45 184.387 - 183.937 UD - - - 100 100 100 99 - 38 23 15 CI 2.02 21.6 1.66 2.65 0.596 0.45 6° 0.113 - - - 0 1 79 20
10.45 - 10.90 183.937 - 183.487 SPT 14 13.82 13.82 - -

11.50 - 11.95 182.887 - 182.437 UD - - - 100 100 100 98 - 38 23 15 CI 2.02 20.9 1.67 - - - - - - - - 0 2 72 26
11.95 - 12.40 182.437 - 181.987 SPT 16 15.04 15.02 - -

13.00 - 13.45 181.387 - 180.937 UD - - - 100 100 100 99 - 37 22 15 CI 2.02 21.2 1.67 - - - - - - - - 0 1 73 26
13.45 - 13.90 180.937 - 180.487 SPT 15 13.48 13.48 - -

14.50 - 14.95 179.887 - 179.437 UD - - - 100 100 100 98 - 37 22 15 CI 2.04 20.7 1.69 2.67 0.580 0.40 9° 0.110 - - - 0 2 72 26
14.95 - 15.40 179.437 - 178.987 SPT 19 16.36 15.68 - -

16.00 - 16.45 178.387 - 177.937 UD - - - 100 100 100 99 - 37 22 15 CI 2.03 18.9 1.71 - - - - - - - - 0 1 73 26
16.45 - 16.90 177.937 - 177.487 SPT 24 19.86 17.43 - -

17.50 - 17.95 176.887 - 176.437 UD - - - 100 100 100 52 - NON-PLASTIC ML 1.91 21.2 1.58 2.6 0.646 0 30° - - - - 0 48 48 4
17.95 - 18.40 176.437 - 175.987 SPT 30 24.02 19.51 - -

19.00 - 19.45 175.387 - 174.937 UD - - - 100 100 97 52 - NON-PLASTIC ML S L I P P E D - - - - 0 48 48 4


19.45 - 19.90 174.937 - 174.487 SPT 27 20.91 17.96 - -

20.50 - 20.95 173.887 - 173.437 UD - - - 96 92 90 72 - NON-PLASTIC ML 1.93 20.5 1.60 - - - - - - - - 4 24 67 5


20.95 - 21.40 173.437 - 172.987 SPT 31 23.29 19.15 - -

22.00 - 22.45 172.387 - 171.937 UD - - - 96 92 70 73 - NON-PLASTIC ML 1.94 19.7 1.62 - - - - - - - - 4 23 68 5


22.45 - 22.90 171.937 - 171.487 SPT 36 26.25 20.63 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 5 Easting 711305.31 Depth of Water Level (m bgl) 3.50
Total depth of Coordinate Northing 3116571.43 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 194.387 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27
23.50 - 23.95 170.887 - 170.437 UD - - - 96 92 70 73 - NON-PLASTIC ML 1.94 21.5 1.60 - - - - - - - - 4 23 68 5
23.95 - 24.40 170.437 - 169.987 SPT 34 24.08 19.54 - -

25.00 - 25.45 169.387 - 168.937 UD - - - 96 93 91 74 - NON-PLASTIC ML 1.96 20.3 1.63 - - - - - - - - 4 22 69 5


25.45 - 25.90 168.937 - 168.487 SPT 37 25.46 20.23 - -

26.50 - 26.95 167.887 - 167.437 UD - - - 96 92 90 75 - NON-PLASTIC ML 1.96 19.6 1.64 2.62 0.598 0 30° - - - - 4 21 69 6
26.95 - 27.40 167.437 - 166.987 SPT 40 26.77 20.89 - -

28.00 - 28.45 166.387 - 165.937 UD - - - 96 93 90 72 - NON-PLASTIC ML 1.97 18.9 1.66 - - - - - - - - 4 24 67 5


28.45 - 28.90 165.937 - 165.487 SPT 44 28.65 21.83 - -

29.50 - 29.95 164.887 - 164.437 UD - - - 94 92 90 80 - NON-PLASTIC ML S L I P P E D - - - - 6 14 74 6


29.95 - 30.40 164.437 - 163.987 SPT 38 24.10 19.55 - -

31.00 - 31.45 163.387 - 162.937 UD - - - 97 93 91 44 - NON-PLASTIC SM 1.91 20.80 1.58 2.6 0.646 0 31° - - - - 3 53 42 2
31.45 - 31.90 162.937 - 162.487 SPT 40 24.76 19.88 - -

32.50 - 32.95 161.887 - 161.437 UD - - - 97 92 91 43 - NON-PLASTIC SM 1.91 21.90 1.57 - - - - - - - - 3 54 41 2


32.95 - 33.40 161.437 - 160.987 SPT 36 21.76 18.38 - -

34.00 - 34.45 160.387 - 159.937 UD - - - 98 92 90 44 - NON-PLASTIC SM 1.91 21.20 1.58 - - - - - - - - 2 54 42 2


34.45 - 34.90 159.937 - 159.487 SPT 41 24.21 19.61 - -

35.50 - 35.95 158.887 - 158.437 UD - - - 97 93 91 43 - NON-PLASTIC SM 1.92 20.50 1.59 - - - - - - - - 3 54 41 2


35.95 - 36.40 158.437 - 157.987 SPT 43 24.81 19.91 - -

37.00 - 37.45 157.387 - 156.937 UD - - - 97 92 90 42 - NON-PLASTIC SM 1.93 19.80 1.61 2.62 0.627 0 32° - - - - 3 55 40 2
37.45 - 37.90 156.937 - 156.487 SPT 48 27.06 21.03 - -

38.50 - 38.95 155.887 - 155.437 UD - - - 97 93 91 44 - NON-PLASTIC SM S L I P P E D - - - - 3 53 42 2


38.95 - 39.40 155.437 - 154.987 SPT 50 27.54 21.27 - -

40.00 - 40.45 154.387 - 153.937 UD - - - 97 93 92 45 - NON-PLASTIC SM 1.95 18.90 1.64 - - - - - - - - 3 52 43 2


40.45 - 40.90 153.937 - 153.487 SPT 58 31.22 23.11 - -

41.50 - 41.95 152.887 - 152.437 UD - - - 96 92 90 43 - NON-PLASTIC SM S L I P P E D - - - - 4 53 41 2


41.95 - 42.40 152.437 - 151.987 SPT 57 29.99 22.50 - -

43.00 - 43.45 151.387 - 150.937 UD - - - 96 93 91 44 - NON-PLASTIC SM 1.95 18.20 1.65 - - - - - - - - 4 52 42 2


43.45 - 43.90 150.937 - 150.487 SPT 62 31.90 23.45 - -

44.50 - 44.95 149.887 - 149.437 UD - - - 96 93 91 42 - NON-PLASTIC SM 1.95 18.80 1.64 - - - - - - - - 4 54 40 2


44.95 - 45.45 149.437 - 148.937 SPT 52 26.16 20.58
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000
NAME OF THE PROJECT NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA
PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A

Client Name M/S APCO INFRATECH PRIVATE LIMITED


Bore Hole No. 6 Easting 711264.59 Depth of Water Level (m bgl) 3.50
Total depth of Coordinate Northing 3116572.94 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 194.450 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
overburden
Silt Factor
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

corrected due to
corrected due to
Angle of

Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27

0.00 - 0.50 194.450 - 193.950 DS - - - 94 92 90 42 - NON-PLASTIC SM - - - - - - - - 0.016 0.64 7.54 - - - 2


0.016 0.98 7.41
1.00 - 1.45 193.450 - 193.000 UD - - - 95 92 90 43 - NON-PLASTIC SM 1.74 15.8 1.50 2.52 0.680 0 29° - 0.012 0.81 7.52 5 52 41 2
1.45 - 1.90 193.000 - 192.550 SPT 10 13.63 13.63 - -

2.50 - 2.95 191.950 - 191.500 UD - - - 100 100 97 76 - NON-PLASTIC ML 1.83 18.6 1.54 2.5 0.623 0 27° - - - - 0 24 70 6
2.95 - 3.40 191.500 - 191.050 SPT 8 9.28 9.28 - -

4.00 - 4.45 190.450 - 190.000 UD - - - 100 100 100 28 - NON-PLASTIC SM 1.84 20.8 1.52 - - - - - - - - 0 72 27 1
4.45 - 4.90 190.000 - 189.550 SPT 12 15.66 15.33 - -

5.50 - 5.95 188.950 - 188.500 UD - - - 97 92 90 87 - 28 22 6 CL-ML 1.92 21.7 1.58 2.6 0.646 0.15 22° 0.120 - - - 3 10 70 17
5.95 - 6.40 188.500 - 188.050 SPT 14 16.85 15.93 - -

7.00 - 7.45 187.450 - 187.000 UD - - - 100 100 100 93 - 29 21 8 CL 1.93 20.5 1.60 2.62 0.638 0.25 14° 0.123 - - - 0 7 74 19
7.45 - 7.90 187.000 - 186.550 SPT 10 11.25 11.25 - -

8.50 - 8.95 185.950 - 185.500 UD - - - 100 100 100 93 - 29 21 8 CL 1.94 19.9 1.62 - - - - - - - - 0 7 74 19
8.95 - 9.40 185.500 - 185.050 SPT 13 13.79 13.79 - -

10.00 - 10.45 184.450 - 184.000 UD - - - 100 100 97 95 - 36 22 14 CI 2.02 21.2 1.67 2.65 0.587 0.40 7° 0.117 - - - 0 5 71 24
10.45 - 10.90 184.000 - 183.550 SPT 15 15.04 15.02 - -

11.50 - 11.95 182.950 - 182.500 UD - - - 100 100 97 96 - 36 22 14 CI 2.02 20.7 1.67 - - - - - - - - 0 4 72 24


11.95 - 12.40 182.500 - 182.050 SPT 15 14.31 14.31 - -

13.00 - 13.45 181.450 - 181.000 UD - - - 100 100 98 97 - 36 22 14 CI 2.01 20.9 1.66 - - - - - - - - 0 3 72 25


13.45 - 13.90 181.000 - 180.550 SPT 13 11.85 11.85 - -

14.50 - 14.95 179.950 - 179.500 UD - - - 100 100 97 96 - 36 22 14 CI 2.02 20.2 1.68 2.67 0.589 0.40 8° 0.110 - - - 0 4 71 25
14.95 - 15.40 179.500 - 179.050 SPT 18 15.72 15.36 - -

16.00 - 16.45 178.450 - 178.000 UD - - - 100 100 98 97 - 37 22 15 CI S L I P P E D - - - - 0 3 71 26


16.45 - 16.90 178.000 - 177.550 SPT 12 10.11 10.11 - -

17.50 - 17.95 176.950 - 176.500 UD - - - 100 100 98 97 - 36 22 14 CI 2.03 21.3 1.67 - - - - - - - - 0 3 72 25


17.95 - 18.40 176.500 - 176.050 SPT 14 11.35 11.35 - -

19.00 - 19.45 175.450 - 175.000 UD - - - 100 100 97 42 - NON-PLASTIC SM 1.94 22.3 1.59 2.6 0.635 0 31° - - - - 0 58 40 2
19.45 - 19.90 175.000 - 174.550 SPT 47 36.85 25.93 - -

20.50 - 20.95 173.950 - 173.500 UD - - - 96 92 90 87 - 26 22 4 ML 1.96 20.0 1.63 2.64 0.620 0.15 24° 0.060 - - - 4 9 71 16
20.95 - 21.40 173.500 - 173.050 SPT 32 24.30 19.65 - -

22.00 - 22.45 172.450 - 172.000 UD - - - 96 92 90 87 - 26 22 4 ML 1.96 19.5 1.64 - - - - - - - - 4 9 71 16


22.45 - 22.90 172.000 - 171.550 SPT 35 25.76 20.38 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000
NAME OF THE PROJECT NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA
PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A

Client Name M/S APCO INFRATECH PRIVATE LIMITED


Bore Hole No. 6 Easting 711264.59 Depth of Water Level (m bgl) 3.50
Total depth of Coordinate Northing 3116572.94 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 194.450 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
overburden
Silt Factor
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

corrected due to
corrected due to
Angle of

Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27
23.50 - 23.95 170.950 - 170.500 UD - - - 96 92 90 87 - 26 22 4 ML 1.95 18.9 1.64 - - - - - - - - 4 9 71 16
23.95 - 24.40 170.500 - 170.050 SPT 34 24.29 19.65 - -

25.00 - 25.45 169.450 - 169.000 UD - - - 100 100 100 82 - NON-PLASTIC ML 1.95 20.5 1.62 2.62 0.617 0 30° - - - - 0 18 76 6
25.45 - 25.90 169.000 - 168.550 SPT 42 29.16 22.08 - -

26.50 - 26.95 167.950 - 167.500 UD - - - 100 100 100 80 - NON-PLASTIC ML 1.94 21.2 1.60 - - - - - - - - 0 20 74 6
26.95 - 27.40 167.500 - 167.050 SPT 40 27.02 21.01 - -

28.00 - 28.45 166.450 - 166.000 UD - - - 100 100 99 82 - NON-PLASTIC ML 1.95 19.8 1.63 - - - - - - - - 0 18 76 6
28.45 - 28.90 166.000 - 165.550 SPT 45 29.59 22.30 - -

29.50 - 29.95 164.950 - 164.500 UD - - - 100 100 100 79 - NON-PLASTIC ML S L I P P E D - - - - 0 21 73 6


29.95 - 30.40 164.500 - 164.050 SPT 41 26.26 20.63 - -

31.00 - 31.45 163.450 - 163.000 UD - - - 100 100 98 80 - NON-PLASTIC ML 1.97 19.1 1.65 2.64 0.600 0 31° - - - - 0 20 74 6
31.45 - 31.90 163.000 - 162.550 SPT 46 28.70 21.85 - -

32.50 - 32.95 161.950 - 161.500 UD - - - 100 100 100 81 - NON-PLASTIC ML 1.98 18.3 1.67 - - - - - - - - 0 19 75 6
32.95 - 33.40 161.500 - 161.050 SPT 56 34.05 24.53 - -

34.00 - 34.45 160.450 - 160.000 UD - - - 100 100 100 80 - NON-PLASTIC ML 1.97 18.9 1.66 - - - - - - - - 0 20 74 6
34.45 - 34.90 160.000 - 159.550 SPT 48 28.46 21.73 - -

35.50 - 35.95 158.950 - 158.500 UD - - - 100 100 100 82 - NON-PLASTIC ML 1.98 17.9 1.68 - - - - - - - - 0 18 76 6
35.95 - 36.40 158.500 - 158.050 SPT 60 34.69 24.85 - -

37.00 - 37.45 157.450 - 157.000 UD - - - 100 100 100 83 - NON-PLASTIC ML 1.99 19.2 1.67 2.64 0.581 0 31° - - - - 0 17 77 6
37.45 - 37.90 157.000 - 156.550 SPT 58 32.71 23.86 - -

38.50 - 38.95 155.950 - 155.500 UD - - - 100 100 98 80 - NON-PLASTIC ML S L I P P E D - - - - 0 20 74 6


38.95 - 39.40 155.500 - 155.050 SPT 64 35.27 25.14 - -

40.00 - 40.45 154.450 - 154.000 UD - - - 100 100 100 82 - NON-PLASTIC ML 1.99 18.6 1.68 - - - - - - - - 0 18 76 6
40.45 - 40.90 154.000 - 153.550 SPT 62 33.35 24.18 - -

41.50 - 41.95 152.950 - 152.500 UD - - - 100 100 100 81 - NON-PLASTIC ML 2.00 17.8 1.70 - - - - - - - - 0 19 75 6
41.95 - 42.40 152.500 - 152.050 SPT 73 38.33 26.67 - -

43.00 - 43.45 151.450 - 151.000 UD - - - 100 100 100 80 - NON-PLASTIC ML 2.02 17.2 1.72 - - - - - - - - 0 20 74 6
43.45 - 43.90 151.000 - 150.550 SPT 74 37.94 26.47 - -

44.50 - 44.95 149.950 - 149.500 UD - - - 100 100 100 82 - NON-PLASTIC ML S L I P P E D - - - - 0 18 76 6


44.95 - 45.45 149.500 - 149.000 SPT 71 35.57 25.29
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 7 Easting 711302.06 Depth of Water Level (m bgl) 1.20
Total depth of Coordinate Northing 3116526.52 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 192.231 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.00 - 0.50 192.231 - 191.731 DS - - - 96 92 90 68 - NON-PLASTIC ML - - - - - - - - 0.010 0.80 7.69 4 28 64 4


0.020 0.85 7.45
1.00 - 1.45 191.231 - 190.781 UD - - - 100 100 97 62 - NON-PLASTIC ML 1.81 20.5 1.50 2.54 0.693 0 27° - 0.010 0.94 7.45 0 38 58 4
1.45 - 1.90 190.781 - 190.331 SPT 7 11.33 11.33 - -

2.50 - 2.95 189.731 - 189.281 UD - - - 100 100 100 44 - NON-PLASTIC SM 1.82 22.7 1.48 2.53 0.709 0 29° - - - - 0 56 40 4
2.95 - 3.40 189.281 - 188.831 SPT 9 12.80 12.80 - -

4.00 - 4.45 188.231 - 187.781 UD - - - 100 100 100 42 - NON-PLASTIC SM 1.82 22.3 1.49 - - - - - - - - 0 58 38 4
4.45 - 4.90 187.781 - 187.331 SPT 10 12.99 12.99 - -

5.50 - 5.95 186.731 - 186.281 UD - - - 100 100 97 95 - 33 22 11 CL 1.93 21.5 1.59 2.62 0.648 0.25 12° 0.123 - - - 0 5 73 22
5.95 - 6.40 186.281 - 185.831 SPT 7 8.38 8.38 - -

7.00 - 7.45 185.231 - 184.781 UD - - - 100 100 100 32 - NON-PLASTIC SM 1.87 21.9 1.53 2.54 0.660 0 29° - - - - 0 68 31 1
7.45 - 7.90 184.781 - 184.331 SPT 11 12.38 12.38 - -

8.50 - 8.95 183.731 - 183.281 UD - - - 100 100 100 96 - 33 22 11 CL 1.93 20.8 1.60 - - - - - - - - 0 4 75 21
8.95 - 9.40 183.281 - 182.831 SPT 9 9.56 9.56 - -

10.00 - 10.45 182.231 - 181.781 UD - - - 100 100 100 96 - 33 22 11 CL 1.96 20.2 1.63 2.64 0.620 0.25 16° 0.120 - - - 0 4 74 22
10.45 - 10.90 181.781 - 181.331 SPT 14 14.10 14.10 - -

11.50 - 11.95 180.731 - 180.281 UD - - - 100 100 97 92 - 30 20 10 CL 1.91 19.4 1.60 - - - - - - - - 0 8 71 21


11.95 - 12.40 180.281 - 179.831 SPT 9 8.66 8.66 - -

13.00 - 13.45 179.231 - 178.781 UD - - - 100 100 97 93 - 30 20 10 CL 1.91 18.9 1.61 - - - - - - - - 0 7 73 20


13.45 - 13.90 178.781 - 178.331 SPT 10 9.23 9.23 - -
SAND STARTS FROM 13.90 METER DEPTH
14.50 - 14.95 177.731 - 177.281 UD - - - 100 100 100 28 - NON-PLASTIC SM 1.85 23.0 1.50 2.54 0.693 0 30° - - - - 0 72 27 1
14.95 - 15.40 177.281 - 176.831 SPT 11 9.79 9.79 - -

16.00 - 16.45 176.231 - 175.781 UD - - - 100 100 100 27 - NON-PLASTIC SM 1.86 22.6 1.52 - - - - - - - - 0 73 26 1
16.45 - 16.90 175.781 - 175.331 SPT 12 10.32 10.32 - -

17.50 - 17.95 174.731 - 174.281 UD - - - 100 100 100 28 - NON-PLASTIC SM 1.87 21.3 1.54 - - - - - - - - 0 72 27 1
17.95 - 18.40 174.281 - 173.831 SPT 16 13.31 13.31 - -

19.00 - 19.45 173.231 - 172.781 UD - - - 96 92 90 88 - 30 20 10 CL 1.95 19.2 1.64 2.65 0.616 0.25 17° 0.113 - - - 4 8 70 18
19.45 - 19.90 172.781 - 172.331 SPT 14 11.24 11.24 - -

20.50 - 20.95 171.731 - 171.281 UD - - - 96 92 90 - 87


30 20 10 CL 1.96 18.5 1.65 - - - - - - - - 4 9 69 18
20.95 - 21.40 171.281 - 170.831 SPT 17 13.21 13.21 - -
SAND STARTS FROM 21.40 METER DEPTH
22.00 - 22.45 170.231 - 169.781 UD - - - 97 92 90 52 - NON-PLASTIC ML 1.89 20.9 1.56 2.59 0.660 0 29° - - - - 3 45 49 3
22.45 - 22.90 169.781 - 169.331 SPT 24 18.11 16.56 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 7 Easting 711302.06 Depth of Water Level (m bgl) 1.20
Total depth of Coordinate Northing 3116526.52 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 192.231 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
23.50 - 23.95 168.731 - 168.281 UD - - - 97 92 90 32 - NON-PLASTIC SM 1.90 21.5 1.56 - - - - - - - - 3 65 31 1
23.95 - 24.40 168.281 - 167.831 SPT 26 19.06 17.03 - -

25.00 - 25.45 167.231 - 166.781 UD - - - 97 93 90 30 - NON-PLASTIC SM 1.91 20.9 1.58 2.6 0.646 0 31° - - - - 3 67 29 1
25.45 - 25.90 166.781 - 166.331 SPT 32 22.80 18.90 - -

26.50 - 26.95 165.731 - 165.281 UD - - - 97 93 90 39 - NON-PLASTIC SM 1.91 20.3 1.59 - - - - - - - - 3 58 37 2


26.95 - 27.40 165.281 - 164.831 SPT 37 25.65 20.33 - -

28.00 - 28.45 164.231 - 163.781 UD - - - 97 93 90 44 - NON-PLASTIC SM 1.91 20.0 1.59 - - - - - - - - 3 53 42 2


28.45 - 28.90 163.781 - 163.331 SPT 37 24.98 19.99 - -

29.50 - 29.95 162.731 - 162.281 UD - - - 100 100 97 97 - 32 20 12 CL 1.99 18.3 1.68 2.69 0.601 0.30 17° 0.080 - - - 0 3 77 20
29.95 - 30.40 162.281 - 161.831 SPT 39 25.60 20.30 - -

31.00 - 31.45 161.231 - 160.781 UD - - - 96 92 90 88 - 32 20 12 CL 1.97 18.8 1.66 - - - - - - - - 4 8 68 20


31.45 - 31.90 160.781 - 160.331 SPT 33 21.09 18.05 - -

32.50 - 32.95 159.731 - 159.281 UD - - - 97 92 90 44 - NON-PLASTIC SM 1.96 20.9 1.62 2.60 0.605 0 32° - - - - 3 53 42 2
32.95 - 33.40 159.281 - 158.831 SPT 45 28.02 21.51 - -

34.00 - 34.45 158.231 - 157.781 UD - - - 97 93 90 45 - NON-PLASTIC SM 1.94 19.7 1.62 - - - - - - - - 3 52 43 2


34.45 - 34.90 157.781 - 157.331 SPT 45 27.33 21.17 - -

35.50 - 35.95 156.731 - 156.281 UD - - - 97 92 91 40 - NON-PLASTIC SM 1.93 20.5 1.60 - - - - - - - - 3 57 38 2


35.95 - 36.40 156.281 - 155.831 SPT 41 24.31 19.66 - -

37.00 - 37.45 155.231 - 154.781 UD - - - 97 92 90 43 - NON-PLASTIC SM 1.94 19.2 1.63 - - - - - - - - 3 54 41 2


37.45 - 37.90 154.781 - 154.331 SPT 45 26.05 20.53 - -

38.50 - 38.95 153.731 - 153.281 UD - - - 97 92 90 44 - NON-PLASTIC SM 1.96 21.0 1.62 - - - - - - - - 3 53 42 2


38.95 - 39.40 153.281 - 152.831 SPT 44 24.87 19.94 - -
CLAY STARTS FROM 39.40 METER DEPTH
40.00 - 40.45 152.231 - 151.781 UD - - - 97 92 90 88 - 36 22 14 CI 2.04 19.8 1.70 2.69 0.582 0.55 7° 0.070 - - - 3 9 66 22
40.45 - 40.90 151.781 - 151.331 SPT 36 19.84 17.42 - -
SILTY SAND STARTS FROM 40.90 METER DEPTH
41.50 - 41.95 150.731 - 150.281 UD - - - 97 92 90 44 - NON-PLASTIC SM 1.95 18.9 1.64 2.62 0.598 0 32° - - - - 3 53 42 2
41.95 - 42.40 150.281 - 149.831 SPT 48 25.85 20.43 - -

43.00 - 43.45 149.231 - 148.781 UD - - - 97 93 91 45 - NON-PLASTIC SM 1.95 19.2 1.64 - - - - - - - - 3 52 43 2


43.45 - 43.90 148.781 - 148.331 SPT 50 26.32 20.66 - -

44.50 - 44.95 147.731 - 147.281 UD - - - 97 92 90 43 - NON-PLASTIC SM 1.96 18.6 1.65 - - - - - - - - 3 54 41 2


44.95 - 45.45 147.281 - 146.781 SPT 59 30.34 22.67
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000
NAME OF THE PROJECT NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA
PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 8 Easting 711261.26 Depth of Water Level (m bgl) 1.50
Total depth of Coordinate Northing 3116528.03 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 192.144 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.00 - 0.50 192.144 - 191.644 DS - - - 100 100 97 52 - NON-PLASTIC ML - - - - - - - - 0.004 0.81 7.3 0 48 49 3
0.018 0.83 7.33
1.00 - 1.45 191.144 - 190.694 UD - - - 100 100 97 55 - NON-PLASTIC ML 1.82 24.0 1.47 - - - - - 0.012 0.83 7.36 0 45 52 3
1.45 - 1.90 190.694 - 190.244 SPT 5 8.06 8.06 - -

2.50 - 2.95 189.644 - 189.194 UD - - - 100 100 97 53 - NON-PLASTIC ML 1.83 22.8 1.49 2.52 0.691 0 27° - - - - 0 47 50 3
2.95 - 3.40 189.194 - 188.744 SPT 7 9.92 9.92 - -

4.00 - 4.45 188.144 - 187.694 UD - - - 100 100 97 - 87


26 22 4 ML 1.94 21.4 1.60 2.62 0.638 0.10 23° 0.113 - - - 0 13 73 14
4.45 - 4.90 187.694 - 187.244 SPT 9 11.51 11.51 - -
SAND STARTS FROM 4.90 METER DEPTH
5.50 - 5.95 186.644 - 186.194 UD - - - 100 100 100 42 - NON-PLASTIC SM 1.87 23.2 1.52 2.54 0.671 0 29° - - - - 0 58 40 2
5.95 - 6.40 186.194 - 185.744 SPT 12 14.27 14.27 - -

7.00 - 7.45 185.144 - 184.694 UD - - - 100 100 100 45 - NON-PLASTIC SM 1.88 22.7 1.53 - - - - - - - - 0 55 43 2
7.45 - 7.90 184.694 - 184.244 SPT 14 15.65 15.33 - -

8.50 - 8.95 183.644 - 183.194 UD - - - 100 100 97 95 - 33 22 11 CL 1.98 21.5 1.63 2.64 0.620 0.25 16° 0.120 - - - 0 5 76 19
8.95 - 9.40 183.194 - 182.744 SPT 15 15.79 15.40 - -

10.00 - 10.45 182.144 - 181.694 UD - - - 100 100 97 96 - 33 22 11 CL 1.99 20.8 1.65 - - - - - - - - 0 4 76 20


10.45 - 10.90 181.694 - 181.244 SPT 19 18.95 16.98 - -

11.50 - 11.95 180.644 - 180.194 UD - - - 100 100 98 95 - 33 22 11 CL 1.99 21.2 1.64 2.65 0.616 0.25 18° 0.110 - - - 0 5 73 22
11.95 - 12.40 180.194 - 179.744 SPT 17 16.16 15.58 - -

13.00 - 13.45 179.144 - 178.694 UD - - - 100 100 97 96 - 32 20 12 CL 1.96 18.9 1.65 - - - - - - - - 0 4 75 21


13.45 - 13.90 178.694 - 178.244 SPT 20 18.21 16.61 - -

14.50 - 14.95 177.644 - 177.194 UD - - - 100 100 97 95 - 33 22 11 CL 2.00 20.2 1.66 - - - - - - - - 0 5 73 22


14.95 - 15.40 177.194 - 176.744 SPT 22 19.21 17.11 - -

16.00 - 16.45 176.144 - 175.694 UD - - - 100 100 100 44 - NON-PLASTIC SM 1.90 22.6 1.55 2.56 0.652 0 31° - - - - 0 56 42 2
16.45 - 16.90 175.694 - 175.244 SPT 24 20.23 17.62 - -

17.50 - 17.95 174.644 - 174.194 UD - - - 100 100 100 45 - NON-PLASTIC SM 1.89 21.9 1.55 - - - - - - - - 0 55 43 2
17.95 - 18.40 174.194 - 173.744 SPT 23 18.76 16.88 - -

19.00 - 19.45 173.144 - 172.694 UD - - - 100 100 100 46 - NON-PLASTIC SM 1.90 20.8 1.57 - - - - - - - - 0 54 44 2
19.45 - 19.90 172.694 - 172.244 SPT 28 22.12 18.56 - -

20.50 - 20.95 171.644 - 171.194 UD - - - 100 100 100 44 - NON-PLASTIC SM 1.89 20.3 1.57 2.6 0.656 0 31° - - - - 0 56 42 2
20.95 - 21.40 171.194 - 170.744 SPT 29 22.23 18.62 - -

22.00 - 22.45 170.144 - 169.694 UD - - - 100 100 100 46 - NON-PLASTIC SM 1.90 21.5 1.56 - - - - - - - - 0 54 44 2
22.45 - 22.90 169.694 - 169.244 SPT 26 19.36 17.18 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000
NAME OF THE PROJECT NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA
PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 8 Easting 711261.26 Depth of Water Level (m bgl) 1.50
Total depth of Coordinate Northing 3116528.03 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
45.00
Bore Hole (m) Elevation 192.144 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
23.50 - 23.95 168.644 - 168.194 UD - - - 100 100 100 43 - NON-PLASTIC SM 1.90 22.0 1.56 - - - - - - - - 0 57 41 2
23.95 - 24.40 168.194 - 167.744 SPT 27 19.54 17.27 - -

25.00 - 25.45 167.144 - 166.694 UD - - - 100 100 97 82 - NON-PLASTIC ML 1.91 20.9 1.58 - - - - - - - - 0 18 77 5
25.45 - 25.90 166.694 - 166.244 SPT 30 21.11 18.06 - -

26.50 - 26.95 165.644 - 165.194 UD - - - 100 100 97 85 - NON-PLASTIC ML 1.92 21.3 1.58 2.62 0.658 0 30° - - - - 0 15 80 5
26.95 - 27.40 165.194 - 164.744 SPT 31 21.23 18.12 - -

28.00 - 28.45 164.144 - 163.694 UD - - - 100 100 97 86 - NON-PLASTIC ML S L I P P E D - - - - 0 14 81 5


28.45 - 28.90 163.694 - 163.244 SPT 33 22.01 18.51 - -

29.50 - 29.95 162.644 - 162.194 UD - - - 100 100 97 83 - NON-PLASTIC ML 1.92 19.9 1.60 - - - - - - - - 0 17 78 5
29.95 - 30.40 162.194 - 161.744 SPT 36 23.40 19.20 - -

31.00 - 31.45 161.144 - 160.694 UD - - - 100 100 97 82 - NON-PLASTIC ML 1.95 19.2 1.64 - - - - - - - - 0 18 77 5
31.45 - 31.90 160.694 - 160.244 SPT 41 25.96 20.48 - -

32.50 - 32.95 159.644 - 159.194 UD - - - 100 100 97 - 82


NON-PLASTIC ML S L I P P E D - - - - 0 18 77 5
32.95 - 33.40 159.194 - 158.744 SPT 41 25.33 20.17 - -
CLAY STARTS FROM 33.00 METER DEPTH
34.00 - 34.45 158.144 - 157.694 UD - - - 96 92 90 88 - 36 22 14 CI 2.03 20.8 1.68 2.67 0.589 0.50 8° 0.083 - - - 4 8 65 23
34.45 - 34.90 157.694 - 157.244 SPT 29 17.43 16.22 - -

35.50 - 35.95 156.644 - 156.194 UD - - - 96 92 90 88 - 37 22 15 CI 2.04 19.5 1.71 - - - - - - - - 4 8 64 24


35.95 - 36.40 156.194 - 155.744 SPT 33 19.31 17.16 - -

37.00 - 37.45 155.144 - 154.694 UD - - - 97 93 91 87 - 36 22 14 CI 2.06 18.9 1.73 - - - - - - - - 3 10 64 23


37.45 - 37.90 154.694 - 154.244 SPT 39 22.21 18.61 - -

38.50 - 38.95 153.644 - 153.194 UD - - - 96 93 90 88 - 36 22 14 CI 2.06 18.3 1.74 2.69 0.546 0.55 7° 0.070 - - - 4 8 65 23
38.95 - 39.40 153.194 - 152.744 SPT 45 24.96 19.98 - -

40.00 - 40.45 152.144 - 151.694 UD - - - 96 92 90 87 - 37 22 15 CI 1.89 7.2 1.76 - - - - - - - - 4 9 63 24


40.45 - 40.90 151.694 - 151.244 SPT 50 27.15 21.08 - -

41.50 - 41.95 150.644 - 150.194 UD - - - 97 93 91 88 - 38 23 15 CI 2.09 18.3 1.77 - - - - - - - - 3 9 64 24


41.95 - 42.40 150.194 - 149.744 SPT 56 29.61 22.31 - -

43.00 - 43.45 149.144 - 148.694 UD - - - 97 92 90 87 - 38 23 15 CI 2.09 18.0 1.77 - - - - - - - - 3 10 63 24


43.45 - 43.90 148.694 - 148.244 SPT 55 28.34 21.67 - -

44.50 - 44.95 147.644 - 147.194 UD - - - 97 93 91 88 - 38 23 15 CI 2.09 17.8 1.77 - - - - - - - - 3 9 64 24


44.95 - 45.45 147.194 - 146.694 SPT 56 28.11 21.56
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 9 Easting 711254.01 Depth of Water Level (m bgl) 1.20
Total depth of Coordinate Northing 3116478.27 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
35.00
Bore Hole (m) Elevation 192.190 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27

0.00 - 0.50 192.190 - 191.690 DS - - - 100 100 97 72 - NON-PLASTIC ML - - - - - - - - 0.008 0.91 7.68 0 28 68 4
0.016 0.95 7.52
1.00 - 1.45 191.190 - 190.740 UD - - - 100 100 97 74 - NON-PLASTIC ML 1.82 23.6 1.47 - - - - - 0.014 0.81 7.98 0 26 70 4
1.45 - 1.90 190.740 - 190.290 SPT 16 25.84 20.42 - -

2.50 - 2.95 189.690 - 189.240 UD - - - 100 100 97 72 - NON-PLASTIC ML 1.88 22.4 1.54 2.55 0.656 0 27° - - - - 0 28 68 4
2.95 - 3.40 189.240 - 188.790 SPT 18 25.32 20.16 - -

4.00 - 4.45 188.190 - 187.740 UD - - - 100 100 100 96 - 36 22 14 CI 1.99 21.6 1.64 2.65 0.616 0.40 4° 0.127 - - - 0 4 73 23
4.45 - 4.90 187.740 - 187.290 SPT 20 25.33 20.17 - -

5.50 - 5.95 186.690 - 186.240 UD - - - 100 100 100- 96


36 22 14 CI 1.99 20.9 1.65 - - - - - - - - 0 4 73 23
5.95 - 6.40 186.240 - 185.790 SPT 22 25.70 20.35 - -
SAND STARTS FROM 6.40 METER DEPTH
7.00 - 7.45 185.190 - 184.740 UD - - - 97 92 90 16 - NON-PLASTIC SM 1.84 22.5 1.50 2.54 0.693 0 29° - - - - 3 81 16 0
7.45 - 7.90 184.740 - 184.290 SPT 18 19.87 17.44 - -

8.50 - 8.95 183.690 - 183.240 UD - - - 97 92 90 17 - NON-PLASTIC SM 1.86 20.8 1.54 - - - - - - - - 3 80 17 0


8.95 - 9.40 183.240 - 182.790 SPT 21 22.02 18.51 - -
CLAY STARTS FROM 9.40 METER DEPTH
10.00 - 10.45 182.190 - 181.740 UD - - - 96 92 90 88 - 30 20 10 CL 1.94 19.2 1.63 2.64 0.620 0.25 15° 0.120 - - - 4 8 69 19
10.45 - 10.90 181.740 - 181.290 SPT 26 25.92 20.46 - -

11.50 - 11.95 180.690 - 180.240 UD - - - 97 93 91 - 87


30 20 10 CL 1.95 18.6 1.64 - - - - - - - - 3 10 68 19
11.95 - 12.40 180.240 - 179.790 SPT 5 4.76 4.76 - -
SAND STARTS FROM 12.40 METER DEPTH
13.00 - 13.45 179.190 - 178.740 UD - - - 97 92 90 32 - NON-PLASTIC SM 1.88 21.3 1.55 2.56 0.652 0 30° - - - - 3 65 31 1
13.45 - 13.90 178.740 - 178.290 SPT 11 10.06 10.06 - -

14.50 - 14.95 177.690 - 177.240 UD - - - 97 92 90 33 - NON-PLASTIC SM 1.89 20.9 1.56 - - - - - - - - 3 64 32 1


14.95 - 15.40 177.240 - 176.790 SPT 6 5.29 5.29 - -
CLAY STARTS FROM 15.40 METER DEPTH
16.00 - 16.45 176.190 - 175.740 UD - - - 96 92 90 88 - 33 22 11 CL 2.01 20.2 1.67 2.67 0.599 0.30 12° 0.090 - - - 4 8 68 20
16.45 - 16.90 175.740 - 175.290 SPT 8 6.77 6.77 - -

17.50 - 17.95 174.690 - 174.240 UD - - - 96 93 90 87 - 33 22 11 CL 2.00 21.0 1.65 - - - - - - - - 4 9 66 21


17.95 - 18.40 174.240 - 173.790 SPT 12 9.79 9.79 - -

19.00 - 19.45 173.190 - 172.740 UD - - - 97 92 91 88 - 33 22 11 CL 2.00 20.7 1.66 - - - - - - - - 3 9 67 21


19.45 - 19.90 172.740 - 172.290 SPT 16 12.60 12.60 - -
SAND STARTS FROM 19.90 METER DEPTH
20.50 - 20.95 171.690 - 171.240 UD - - - 100 100 97 44 - NON-PLASTIC SM 1.91 21.5 1.57 2.59 0.650 0 31° - - - - 0 56 42 2
20.95 - 21.40 171.240 - 170.790 SPT 13 9.93 9.93 - -

22.00 - 22.45 170.190 - 169.740 UD - - - 96 92 90 87 - 30 20 10 CL 1.97 18.2 1.67 2.66 0.593 0.30 14° 0.083 - - - 4 9 67 20
22.45 - 22.90 169.740 - 169.290 SPT 22 16.27 15.64 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 9 Easting 711254.01 Depth of Water Level (m bgl) 1.20
Total depth of Coordinate Northing 3116478.27 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
35.00
Bore Hole (m) Elevation 192.190 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27
23.50 - 23.95 168.690 - 168.240 UD - - - 97 92 90 88 - 30 20 10 CL 1.99 18.9 1.67 - - - - - - - - 3 9 68 20
23.95 - 24.40 168.240 - 167.790 SPT 20 14.34 14.34 - -

25.00 - 25.45 167.190 - 166.740 UD - - - 100 100 97 62 - NON-PLASTIC ML 1.92 21.6 1.58 - - - - - - - - 0 38 58 4
25.45 - 25.90 166.740 - 166.290 SPT 30 20.92 17.96 - -
CLAY STARTS FROM 15.40 METER DEPTH
26.50 - 26.95 165.690 - 165.240 UD - - - 100 100 97 92 - 28 22 6 CL-ML 2.01 20.5 1.67 2.65 0.587 0.20 24° 0.065 - - - 0 8 78 14
26.95 - 27.40 165.240 - 164.790 SPT 28 18.96 16.98 - -

28.00 - 28.45 164.190 - 163.740 UD - - - 100 100 97 93 - 28 22 6 CL-ML 2.01 20.9 1.66 - - - - - - - - 0 7 79 14
28.45 - 28.90 163.740 - 163.290 SPT 26 17.10 16.05 - -

29.50 - 29.95 162.690 - 162.240 UD - - - 100 100 97 92 - 28 22 6 CL-ML 2.01 19.4 1.68 - - - - - - - - 0 8 78 14
29.95 - 30.40 162.240 - 161.790 SPT 31 19.83 17.42 - -

31.00 - 31.45 161.190 - 160.740 UD - - - 100 100 98 93 - 28 22 6 CL-ML 2.00 19.0 1.68 - - - - - - - - 0 7 79 14
31.45 - 31.90 160.740 - 160.290 SPT 30 18.68 16.84 - -

32.50 - 32.95 159.690 - 159.240 UD - - - 100 100 97 92 - 28 22 6 CL-ML 2.00 18.6 1.69 - - - - - - - - 0 8 78 14
32.95 - 33.40 159.240 - 158.790 SPT 36 21.83 18.42 - -

34.00 - 34.45 158.190 - 157.740 UD - - - 100 100 97 52 - NON-PLASTIC ML 1.93 20.7 1.60 2.64 0.650 0 31° - - - - 0 48 49 3
34.45 - 34.90 157.740 - 157.290 SPT 40 23.68 19.34 - -

34.90 - 35.00 157.290 - 157.190 DS - - - 100 100 97 53 - NON-PLASTIC ML - - - - - - - - - - - 0 47 50 3

Sheet for Next Borehole and rename sheet no as BOREHOLE NO
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 10 Easting 711278.15 Depth of Water Level (m bgl) 1.50
Total depth of Coordinate Northing 3116402.81 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
35.00
Bore Hole (m) Elevation 192.170 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27

0.00 - 0.50 192.170 - 191.670 DS - - - 100 100 100 62 - NON-PLASTIC ML - - - - - - - - 0.006 0.67 7.54 0 38 58 4
0.012 0.9 7.48
1.00 - 1.45 191.170 - 190.720 UD - - - 100 100 98 78 - NON-PLASTIC ML 1.80 20.2 1.50 - - - - - 0.018 69 7.45 0 22 73 5
1.45 - 1.90 190.720 - 190.270 SPT 5 8.10 8.10 - -

2.50 - 2.95 189.670 - 189.220 UD - - - 96 92 90 88 - 26 22 4 ML 1.94 21.4 1.60 2.62 0.638 0.10 21° 0.117 - - - 4 8 74 14
2.95 - 3.40 189.220 - 188.770 SPT 6 8.39 8.39 - -

4.00 - 4.45 188.170 - 187.720 UD - - - 100 100 97 95 - 36 22 14 CI 2.01 20.9 1.66 2.65 0.596 0.40 6° 0.123 - - - 0 5 72 23
4.45 - 4.90 187.720 - 187.270 SPT 10 12.59 12.59 - -

5.50 - 5.95 186.670 - 186.220 UD - - - 100 100 97 96 - 36 22 14 CI 2.01 20.4 1.67 - - - - - - - - 0 4 72 24


5.95 - 6.40 186.220 - 185.770 SPT 13 15.10 15.05 - -

7.00 - 7.45 185.170 - 184.720 UD - - - 100 100 96 95 - 36 22 14 CI 2.02 20.1 1.68 2.67 0.589 0.40 7° 0.120 - - - 0 5 72 23
7.45 - 7.90 184.720 - 184.270 SPT 15 16.29 15.65 - -

8.50 - 8.95 183.670 - 183.220 UD - - - 100 100 97 - 96


37 22 15 CI 2.02 21.2 1.67 - - - - - - - - 0 4 72 24
8.95 - 9.40 183.220 - 182.770 SPT 14 14.33 14.33 - -
SAND STARTS FROM 9.40 METER DEPTH
10.00 - 10.45 182.170 - 181.720 UD - - - 100 100 100 28 - NON-PLASTIC SM 1.89 22.7 1.54 2.56 0.662 0 31° - - - - 0 72 27 1
10.45 - 10.90 181.720 - 181.270 SPT 16 15.65 15.33 - -

11.50 - 11.95 180.670 - 180.220 UD - - - 96 90 88 85 - 30 20 10 CL 1.94 18.9 1.63 - - - - - - - - 4 11 65 20


11.95 - 12.40 180.220 - 179.770 SPT 14 13.10 13.10 - -

13.00 - 13.45 179.170 - 178.720 UD - - - 96 90 88 86 - 30 20 10 CL 1.95 18.2 1.65 2.65 0.606 0.25 18° 0.113 - - - 4 10 66 20
13.45 - 13.90 178.720 - 178.270 SPT 17 15.26 15.13 - -

14.50 - 14.95 177.670 - 177.220 UD - - - 100 100 100 42 - NON-PLASTIC SM 1.88 20.8 1.56 - - - - - - - - 0 58 40 2
14.95 - 15.40 177.220 - 176.770 SPT 20 17.32 16.16 - -

16.00 - 16.45 176.170 - 175.720 UD - - - 100 100 100 44 - NON-PLASTIC SM 1.90 21.2 1.57 2.59 0.650 0 31° - - - - 0 56 42 2
16.45 - 16.90 175.720 - 175.270 SPT 23 19.23 17.12 - -

17.50 - 17.95 174.670 - 174.220 UD - - - 100 100 97 92 - 30 20 10 CL 1.96 18.0 1.66 - - - - - - - - 0 8 72 20


17.95 - 18.40 174.220 - 173.770 SPT 20 16.15 15.58 - -

19.00 - 19.45 173.170 - 172.720 UD - - - 100 100 97 93 - 30 20 10 CL 1.96 18.7 1.65 2.65 0.606 0.25 18° 0.100 - - - 0 7 73 20
19.45 - 19.90 172.720 - 172.270 SPT 18 14.05 14.05 - -

20.50 - 20.95 171.670 - 171.220 UD - - - 100 100 100 28 - NON-PLASTIC SM 1.89 21.9 1.55 - - - - - - - - 0 72 27 1
20.95 - 21.40 171.220 - 170.770 SPT 25 18.95 16.98 - -

22.00 - 22.45 170.170 - 169.720 UD - - - 96 92 90 87 - 28 22 6 CL-ML 1.99 20.7 1.65 2.65 0.606 0.20 23° 0.090 - - - 4 9 72 15
22.45 - 22.90 169.720 - 169.270 SPT 23 16.88 15.94 - -
ANNEXURE III
RESULT SHEET
SUB SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION OF EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH
NAME OF THE PROJECT 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA(PACKAGE II) AT CHAINAGE 19+803/A
Client Name M/S APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 10 Easting 711278.15 Depth of Water Level (m bgl) 1.50
Total depth of Coordinate Northing 3116402.81 Commenced on 24-Apr-2019 ARUN SOIL LAB PVT. LTD.
35.00
Bore Hole (m) Elevation 192.170 Completed on 2-May-2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 26 27 28 24 25 26 27
23.50 - 23.95 168.670 - 168.220 UD - - - 96 92 87 84 - 28 22 6 CL-ML 2.00 20.2 1.66 - - - - - - - - 4 12 70 14
23.95 - 24.40 168.220 - 167.770 SPT 26 18.50 16.75 - -

25.00 - 25.45 167.170 - 166.720 UD - - - 97 92 88 84 - 28 22 6 CL-ML 1.99 19.3 1.67 - - - - - - - - 3 13 70 14


25.45 - 25.90 166.720 - 166.270 SPT 28 19.34 17.17 - -
SAND STARTS FROM 25.90 METER DEPTH
26.50 - 26.95 165.670 - 165.220 UD - - - 97 92 90 62 - NON-PLASTIC ML 1.91 21.2 1.58 2.62 0.658 0 30° - - - - 3 35 58 4
26.95 - 27.40 165.220 - 164.770 SPT 32 21.53 18.27 - -

28.00 - 28.45 164.170 - 163.720 UD - - - 100 100 97 92 - 30 20 10 CL 1.98 17.9 1.68 - - - - - - - - 0 8 73 19


28.45 - 28.90 163.720 - 163.270 SPT 35 22.90 18.95 - -

29.50 - 29.95 162.670 - 162.220 UD - - - 100 100 97 93 - 30 20 10 CL 1.97 18.7 1.66 2.67 0.608 0.30 16° 0.080 - - - 0 7 74 19
29.95 - 30.40 162.220 - 161.770 SPT 26 16.56 15.78 - -

31.00 - 31.45 161.170 - 160.720 UD - - - 100 100 98 92 - 30 20 10 CL 1.98 17.2 1.69 - - - - - - - - 0 8 73 19


31.45 - 31.90 160.720 - 160.270 SPT 38 23.57 19.29 - -

32.50 - 32.95 159.670 - 159.220 UD - - - 100 100 97 93 - 30 20 10 CL 1.97 17.9 1.67 - - - - - - - - 0 7 73 20


32.95 - 33.40 159.220 - 158.770 SPT 30 18.14 16.57 - -

34.00 - 34.45 158.170 - 157.720 UD - - - 100 100 97 45 - NON-PLASTIC SM 1.94 19.6 1.62 - - - - - - - - 0 55 43 2
34.45 - 34.90 157.720 - 157.270 SPT 42 24.79 19.90 - -

34.90 - 35.00 157.270 - 157.170 DS - - - 100 100 98 44 - NON-PLASTIC SM - - - - - - - - - - - 0 56 42 2

Sheet for Next Borehole and rename sheet no as BOREHOLE NO
ANNEXURE III
ANNEXURE II
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 