You are on page 1of 65

PROJECT

SUB SOIL INVESTIGATION FOR PROPOSED


CONSTRUCTION OF EIGHT LANE
ASL 103 B
EXPRESSWAY STARTING BEFORE KMP
EXPRESSWAY AND ENDS AT CH 7+000
NEAR KHANPUR GHATI (KM 18+500 TO
KM 47+000) SECTION OF DELHI VADODRA
GREEN FIELD ALIGNMENT (NH 148N) ON
EPC MODE UNDER BHARATMALA
2019
PARIYOJNA IN THE STATE OF
HARYANA(PACKAGE II)
________________________________
CH-21+900

GEOTECH INVESTIGATION REPORT

ISO/IEC: 17025-2005
NABL accredited lab

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant (Civil Engineering Projects)
"QUALITY
Registered Office: E-11, First Floor, Lekhraj Market-I,
Indira Nagar, Lucknow- 226016 CONSCIOUSNESS IS
Main Laboratory: 636/110, Budh Vihar, Takrohi, OUR CORE CONCEPT"
Indira Nagar, Lucknow-227105
Phone: 0522-2341943, 0522-4001043
Mobile: 9415025566, 9415501637, 38
E-mail: arunsoillab.asl@gmail.com
info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

ACKNOWLEDGEMENT

Project: - EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND


ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION
OF DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II)
CHAINGE-21+900

Client: - APCO INFRATECH PRIVATE LIMITED

Subject: - Site Investigation Report at CH – 21+900

Dear Sir,

With reference to your Work Order No WO/APCO/TE/2018-19/037 dated 22/03/2019.


Arun Soil Lab Pvt. Ltd. (ASL) is pleased to submit the site investigation report carried
out for the proposed site. The investigation ended up with conclusions and
recommendations relevant to the findings. Those, in addition to the laboratory test results,
engineering recommendations are also here with attached.

We look forward for further co-operation and would like to take this opportunity to highly
considerate confidence in our laboratory. For any clarification concerning the report,
please contact us at your convenience.

ARUN SOIL LAB Pvt. Ltd.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

CONTENTS

1. INTRODUCTION 1
2. REFERENCES 1
3. FIELD INVESTIGATION 2
4. LABORATORY TESTS 3
5. INTERPRETATION OF LAB TEST RESULTS
a. GENERAL NATURE OF SOIL STRATA 4
b. S.P.T. VALUES 4
c. WATER TABLE 4
6. RECOMMENDATIONS 5-12

ANNEXURES

7. BEARING CAPACITY CALCULATIONS Annexure I


8. SITE PLAN Annexure II
9. RESULTS SHEETS Annexure III
10. BORE-LOG CHARTS Annexure IV
11. TRIAXIAL SHEAR/DIRECT SHEAR GRAPHS Annexure V
12. e-Log P Curves Annexure VI

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

SUB-SOIL INVESTIGATION REPORT FOR PROPOSED CONSTRUCTION OF _


EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS
AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II)
CHAINGE-21+900

INTRODUCTION
The work of sub-soil exploration was awarded to us by APCO INFRATECH PRIVATE
LIMITED vide their Order No. WO/APCO/TE/2018-19/037 dated 22/03/2019. The object
of the investigation was to study the geo-technical properties of soil both in field and
laboratory and determine safe allowable pressure for the foundation soil.

REFERENCES
1. IS: 1892-1974 for field work including existent ground water table.
2. IS: 2132-1986 for sampling in Undisturbed and Disturbed form.
3. IS: 2131-1981 for Standard Penetration Test.
4. IS: 2720 for all laboratory tests on soil samples collected.
5. IS: 6403-1981 for determination of Bearing Capacity.
6. IS: 8009(Part I)-1976 for calculation of settlement of foundations.
7. IS: 1904-1986 for permissible maximum settlement, differential settlement and
angular distortion.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 1 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

FIELD INVESTIGATION
The field investigation work at this site was carried out from 22/04/2019 to 30/04/2019
The following investigation work was carried out 4 boreholes of diameter 150 mm were
made within the proposed layout of the structure. The borehole was progressed using
manually operated augers and further advanced by use of manually operated shell casing
to the desired depth. All boreholes are up to the depth of 20 meter. The locations of
boreholes have been reported in “BOREHOLE LOCATION PLAN”.

Standard Penetration Test (SPT) was conducted in the boreholes at every 1.50 m
interval and change of strata as per specifications. Standard split spoon sampler attached
to lower end of drill rods was driven in the boreholes by means of standard hammer of
63.50 kg falling freely from a height of 75 cm. The sampler was driven 45 cm as per
specifications and number of blows required for each 15 cm penetration was recorded.
The number of blows for the first 15 cm penetration was not taken into account as it is
considered seating drive. The number of blows for next 30 cm penetration was
designated as SPT ‘N’ value. Wherever the total penetration was less than 45 cm, the
number of blows & the depth penetrated is incorporated in respective bore logs.
Disturbed Soil samples obtained from standard split spoon sampler were collected in
polythene bags of suitable size. These samples were properly sealed, labeled, recorded
and carefully transported to laboratory for testing.

Undisturbed Soil Samples (UDS) were collected from the boreholes at every 1.50 m
interval & change of strata as per sampling specifications, in thin walled sampling tubes of
100 mm dia. and 450 mm length. These sampling tubes after retrieval from the boreholes
were properly waxed and sealed at both ends. These were carefully labeled and
transported to the laboratory for testing. UDS wherever slipped during lifting, were duly
marked in the bore logs as well in the soil profile.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 2 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

LABORATORY TESTS:
The following laboratory tests were conducted to determine the engineering
characteristics of sub-soils:

Natural moisture contents were determined by oven drying method as per IS 2720
(Part II)-1973. The results have been reported in result sheet attached.

Dry and Bulk density of soil strata were obtained using Shelby tubes in accordance with
IS 2720 (Part XXIX)-1975. The results have been reported in result sheet attached.

Particle size analysis test by hydrometer method were performed in accordance with
IS 2720 (Part IV) - 1965 on the part of soil samples obtained after the sieve analysis. The
results have been reported in result sheet attached.

Atterberg Limits’ tests were performed in accordance with IS 2720 (Part V) - 1985 and
results have been reported in result sheet attached.

Specific gravity tests were performed in accordance with IS 2720 (Part III Section1) -
1980 and the results have been reported in result sheet attached.

Triaxial Compression Test under Unconsolidated Un-drained (UU) condition as per IS:
2720 (Part-XI)-2011 were performed on the undisturbed soil samples obtained during the
field investigation. The results have been reported in result sheet attached.

Direct shear tests were performed as per IS 2720 (Part XIII)-2015, on the undisturbed
soil samples obtained during the field investigation. The results and the density of
samples have been reported in result sheet attached.

Consolidation tests were performed as per IS 2720 (Part XV)-1986, on the


undisturbed soil samples obtained during the field investigation. The result in the form of
compression index (Cc) is reported in result sheet attached.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 3 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

INTERPRETATION OF THE LAB TEST RESULTS


GENERAL NATURE OF SOIL STRATA

The results of lab tests and bore hole log charts of bore holes 1,2,3and 4 indicate that
the strata at the site is found to comprise of both cohesive as well as non-cohesive soil.
The cohesive type soil comprises of either silty clay soil of low and medium plasticity
and compressibility or clayey silt soil of low plasticity and compressibility belonging to
‘CL’, ‘CI’ and ‘ML’ group of IS classification and having 82 to 99 percent material finer
than 75 micron.
However, the non-cohesive type soil is found to comprise of either sandy silt ‘ML’ type
soil or silty sand ‘SM’ type soil IS classification and having 14 to 84 percent fines.
The results of classification tests indicate that the natural soil stratum present at the Site
is found to comprise of both fine-grained soils (clayey soil) and coarse-grained soils
(sandy soil).

S.P.T. VALUES
The S.P.T. values obtained in the respective clayey layer region present as per bore-log
charts enclosed are found to range from 5 to 27 indicating ‘loose’ to ‘very stiff’
consistency.
However, the S.P.T. values obtained in the respective sandy layer region present as per
bore-log charts enclosed are found to range from 18 to 32 indicating ‘Medium’ to
‘Dense’ relative density.
The results of S.P.T. values indicate that the stratum at the Site is ‘loose’ to ‘well’
compacted.
WATER TABLE
Water Table at the Site was observed at a depth from 1.5 metre to 1.7 metre below
ground level on the day of soil investigation during the last week of April 2016. However,
the existing water table may rise upto the ground level in the post-monsoon period in
general. .

Therefore, a water table at ground level that is a submerged condition has been adopted
for calculation purposes.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 4 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

RECOMMENDATIONS FOR PROPOSED CONSTRUCTION OF EIGHT LANE


EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000
NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER
BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II)
CHAINAGE-21+900

 RAFT FOUNDATION

Depth of  Size of Footing  Net Safe  Safe 


Borehole  Type of  Shape of  Settlement 
Foundation  Bearing  Allowable 
No.  Structure  Footing  Produced 
below GL  Length  Width  Capacity  Pressure 

      (m)     (m)  (m)  Tonne/sqm  (mm)  Tonne/sqm


3  SVUP  1.00  RECTANGULAR 21.25  11.20  15.95  114.45  9.78 
      2.00  RECTANGULAR 21.25  11.20  18.81  137.07  9.45 

 Pile foundation

DIA=1000 MM
Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)


Free  Fixed  Free  Fixed 
                  Head  Head  Head  Head 
                             
0.50 4.29 0.57 1.91 5.65 11.25 12.65
2.00 11.44 3.03 3.80 11.66 8.53 9.51
3.50 29.32 8.80 6.01 15.16 7.04 8.54
5.00 39.75 14.96 6.01 15.16 7.04 8.54
6.50 50.98 21.73 6.01 15.16 7.04 8.54
8.00 92.55 30.34 7.06 22.58 6.57 7.23
1 1000 9.50 2 113.55 40.29 7.21 23.10 6.51 7.16
11.00 88.34 50.14 4.68 11.62 7.83 9.52

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 5 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

12.50 104.22 60.75 4.68 11.62 7.83 9.52


14.00 124.25 70.19 6.41 16.23 6.85 8.31
15.50 139.40 80.17 6.41 16.23 6.85 8.31
17.00 155.33 90.67 6.41 16.23 6.85 8.31
18.00 166.25 97.98 6.41 16.23 6.85 8.31

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free  Fixed  Free  Fixed 


                  Head  Head  Head  Head 
                             
0.50 3.17 0.56 3.30 10.05 9.04 10.09
2.00 8.74 2.98 3.80 11.66 8.53 9.51
3.50 22.06 9.19 4.62 14.34 7.87 8.74
5.00 39.50 14.31 5.63 17.74 7.24 8.01
6.50 48.89 20.78 6.03 19.07 7.03 7.77
8.00 61.95 28.37 6.90 22.04 6.63 7.31
9.50 77.07 37.17 7.36 23.62 6.45 7.09
11.00 83.66 48.04 4.17 10.30 8.21 9.99
2 1000 12.50 2 100.45 59.81 4.17 10.30 8.21 9.99
14.00 120.81 68.59 6.41 16.23 6.85 8.31
15.50 134.92 77.82 6.41 16.23 6.85 8.31
17.00 149.62 87.49 6.41 16.23 6.85 8.31
18.00 159.75 94.20 6.41 16.23 6.85 8.31

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 6 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free  Fixed  Free  Fixed 


                  Head  Head  Head  Head 
                             
0.50 3.71 0.57 3.30 10.05 9.04 10.09
2.00 13.79 4.29 3.80 11.66 8.53 9.51
3.50 21.77 7.39 4.62 14.34 7.87 8.74
5.00 21.91 11.07 5.63 17.74 7.24 8.01
6.50 32.15 15.98 6.03 19.07 7.03 7.77
8.00 47.90 22.43 6.90 22.04 6.63 7.31
9.50 79.28 30.59 7.36 23.62 6.45 7.09
3 1000 11.00 2 97.87 40.06 6.22 19.71 6.94 7.66
12.50 117.91 50.82 6.74 21.48 6.70 7.39
14.00 155.60 63.27 7.51 24.12 6.40 7.03
15.50 181.55 77.07 7.78 25.09 6.29 6.91
17.00 209.22 92.27 8.05 26.02 6.20 6.81
18.00 228.56 103.17 8.43 27.34 6.08 6.66

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free  Fixed  Free  Fixed 


                  Head  Head  Head  Head 
                             
0.50 3.66 0.57 3.30 10.05 9.04 10.09
2.00 10.16 3.02 3.80 11.66 8.53 9.51
3.50 19.49 5.73 4.62 14.34 7.87 8.74
5.00 27.33 8.98 3.30 10.05 9.04 10.09

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 7 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

6.50 36.57 14.02 5.63 17.74 7.24 8.01


8.00 46.44 20.47 6.01 15.16 7.04 8.54
9.50 57.77 27.31 7.36 23.62 6.45 7.09
4 1000 11.00 2 94.25 36.82 6.22 19.71 6.94 7.66
12.50 81.47 46.58 4.68 11.62 7.83 9.52
14.00 96.30 57.00 4.68 11.62 7.83 9.52
15.50 111.93 68.08 4.68 11.62 7.83 9.52
17.00 131.63 77.23 6.41 16.23 6.85 8.31
18.00 141.37 83.59 6.41 16.23 6.85 8.31

DIA=1200 MM
Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free  Fixed  Free  Fixed 


                  Head  Head  Head  Head 
                             
0.20 4.98 0.30 3.08 9.09 13.02 14.64
1.70 14.68 3.35 6.13 18.78 9.87 11.00
3.20 39.10 10.56 8.85 22.20 8.47 10.28
4.70 52.68 18.24 8.85 22.20 8.47 10.28
6.20 67.25 26.64 8.85 22.20 8.47 10.28
1 1200 7.70 2.3 123.88 37.03 11.39 36.39 7.60 8.37
9.20 151.34 49.02 11.64 37.24 7.53 8.29
10.70 113.29 61.06 6.88 16.99 9.41 11.45
12.20 133.37 74.00 6.88 16.99 9.41 11.45
13.70 159.77 85.60 9.45 23.78 8.24 10.00
15.20 179.03 97.83 9.45 23.78 8.24 10.00
16.70 199.26 110.70 9.45 23.78 8.24 10.00
17.70 213.08 119.64 9.45 23.78 8.24 10.00

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 8 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free  Fixed  Free  Fixed 


                  Head  Head  Head  Head 
                             
0.20 3.73 0.30 5.32 16.19 10.46 11.68
1.70 11.20 3.31 6.13 18.78 9.87 11.00
3.20 28.56 10.84 7.44 23.10 9.11 10.12
4.70 51.82 17.06 9.09 28.58 8.37 9.27
6.20 64.02 25.11 9.73 30.74 8.13 8.99
2 1200 7.70 2.3 80.79 34.30 11.13 35.52 7.68 8.46
9.20 100.13 44.94 11.88 38.07 7.46 8.21
10.70 106.74 58.16 6.13 15.05 9.87 12.02
12.20 127.72 72.45 6.13 15.05 9.87 12.02
13.70 154.76 83.26 9.45 23.78 8.24 10.00
15.20 172.75 94.61 9.45 23.78 8.24 10.00
16.70 191.46 106.50 9.45 23.78 8.24 10.00
17.70 204.34 114.72 9.45 23.78 8.24 10.00

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free  Fixed  Free  Fixed 


                  Head  Head  Head  Head 
                             
0.20 4.33 0.30 5.32 16.19 10.46 11.68
1.70 22.58 6.90 6.13 18.78 9.87 11.00
3.20 41.34 14.07 7.44 23.10 9.11 10.12
4.70 44.39 20.08 9.09 28.58 8.37 9.27

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 9 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

3 1200 6.20 2.3 59.70 27.56 9.73 30.74 8.13 8.99


7.70 79.30 36.01 11.13 35.52 7.68 8.46
9.20 131.30 47.54 11.88 38.07 7.46 8.21
10.70 157.43 60.65 10.03 31.76 8.03 8.87
12.20 185.27 75.30 10.87 34.62 7.76 8.55
13.70 240.48 92.03 12.11 38.88 7.40 8.14
15.20 276.06 110.39 12.56 40.45 7.28 8.00
16.70 313.68 130.41 12.99 41.94 7.17 7.88
17.70 339.83 144.69 13.61 44.08 7.03 7.71

Pile
Length Pile Cut- Safe Pile Safe Pile
Bore Pile Load Capacity of Pile
Below off Capacity Capacity Depth of fixity
Hole Diametre (Lateral)
Cut-off Length (compression) (Uplift)
Level

(mm) (m) (m) (Tonnes) (Tonnes) (Tonnes) (m)

Free  Fixed  Free  Fixed 


                  Head  Head  Head  Head 
                             
0.20 4.28 0.30 5.32 16.19 10.46 11.68
1.70 13.08 3.35 6.13 18.78 9.87 11.00
3.20 25.52 6.79 7.44 23.10 9.11 10.12
4.70 36.48 11.03 5.32 16.19 10.46 11.68
6.20 48.21 17.16 9.09 28.58 8.37 9.27
7.70 61.13 25.18 8.85 22.20 8.47 10.28
4 1200 9.20 2.3 75.83 33.67 11.88 38.07 7.46 8.21
10.70 125.22 45.16 10.03 31.76 8.03 8.87
12.20 104.77 57.09 6.88 16.99 9.41 11.45
13.70 123.38 69.80 6.88 16.99 9.41 11.45
15.20 142.95 83.31 6.88 16.99 9.41 11.45
16.70 168.98 94.56 9.45 23.78 8.24 10.00
17.70 181.40 102.37 9.45 23.78 8.24 10.00

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 10 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ISO/IEC: 17025-2005 accredited lab Geotech Investigation Report No. ASL 103B/2019

NOTE: -
The above recommendations are based on the field investigation data results and the
laboratory tests results of the samples collected from the test locations and our
experience in this regards. If the actual sub-soil conditions during excavation for the
foundations differ from that has been reported, a reference should be made to us for
suggestions.
Further, the recommendations are based on the assumptions as mentioned in the Report
and the designer of the Structure should take into consideration all the factors required as
per codes. The recommendations should be taken as guidelines for the designer.

Er. Anurag Kapoor


Er. Danish M.Tech. (Geotech)
M.Tech. (Geotech) PGDM (Finance), LM - IGS & IRC
ASSISTANT ENGINEER DIRECTOR TECHNICAL
ARUN SOIL LAB Pvt. Ltd. ARUN SOIL LAB Pvt. Ltd.

ARUN SOIL LAB PVT. LTD.


Geotech & Material Consultants for Civil Engineering Projects
E-11, First Floor, Lekhraj Market-I, Indira Nagar, Lucknow- 226016
Phone: 2341943; Telefax: 4001043; Mobile: 9415025566, 9415501637, 38
Page 11 of 11 arunsoillab.asl@gmail.com; info@arunsoillab.com
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED BEARING CAPACITY CALCULATION

BEARING CAPACITY CALCULATION SHEET AS PER IS: 6403-1981

NAME OF PROJECT

Water table below borehole


Depth of borehole 20.00 metre level (m)
1.30 Factor of safety 2.50
BOREHOLE 03
Water table used for calculation Assumed post monsoon rise
(m)
0.35 (m)
0.95

Ultimate Net Bearing 
Input Parameters Shearing Resistance Parameters
Capacity
Net Safe 
Density Density Density Density
Angle of
Bearing 
S.  Type of  Above Including Below Including Void Effective Inclination General Local Capacity
Depth Length Width Diameter Cohesion Shearing Bearing Capacity Factors Shape Factors Depth Factors Intermediate
No. foundation Foundation water Foundation water
Resistance Ratio Surcharge Factors shear shear
Level effect Level effect

Bulk Bulk c Ø Ø' e q Nc Nq Nγ Nc' Nq' Nγ' Sc Sq Sγ Dc Dq Dγ Dc' Dq' Dγ' Ic Iq Iγ

(m) (m) (m) (m) (gms/cc) (kN/m3) (gms/cc) (kN/m3) Kg/cm2 ° ° kN/m2 kN/m2 kN/m2 kN/m2 kN/m2

1 RECTANGULAR 1.00 21.25 11.20 ‐ 1.85 11.77 1.85 11.77 0.00 27 18.85 0.693 11.77 23.94 13.20 14.47 13.80 5.71 4.58 1.11 1.11 0.79 1.03 1.01 1.01 1.02 1.01 1.01 1.00 1.00 1.00 749.56 248.09 391.01 156.40

2 RECTANGULAR 2.00 21.25 11.20 ‐ 1.85 10.05 1.85 10.05 0.00 27 18.85 0.693 20.10 23.94 13.20 14.47 13.80 5.71 4.58 1.11 1.11 0.79 1.06 1.03 1.03 1.05 1.02 1.02 1.00 1.00 1.00 876.01 295.66 461.06 184.42
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED SETTLEMENT CALCULATION

SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 1

Depth 1.00 metre Settlement effective zone depth 1.50 X Width Depth factor 0.95


Length 21.25 metre Water Table depth for calculation 0.35 (m) bgl Rigidity factor 0.80 BOREHOLE 3
Width 11.20 metre Applied Pressure at foundation base 156.40 kN/m2 Type of foundation RECTANGULAR

Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 1.00 1.00 1.85 ‐ ‐ ‐ Depth of foundation

2 2 SAND 1.00 2.50 1.50 1.85 ‐ ‐ 11.00 29.79 141.59 0.366 0.500 ‐ 103.680
114.45
3 3 CLAY 2.50 4.00 1.50 1.90 0.635 0.089 ‐ 42.66 117.77 ‐ ‐ 46.918 ‐

4 4 SAND 4.00 17.80 13.80 1.90 ‐ NIL


ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED SETTLEMENT CALCULATION

SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 1

Depth 1.00 metre Settlement effective zone depth 1.50 X Width Depth factor 0.95


Length 21.25 metre Water Table depth for calculation 0.35 (m) bgl Rigidity factor 0.80 BOREHOLE 3
Width 11.20 metre Applied Pressure at foundation base 95.93 kN/m2 Type of foundation RECTANGULAR

FINAL TRIAL
Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 1.00 1.00 1.85 ‐ ‐ ‐ Depth of foundation

2 2 SAND 1.00 2.50 1.50 1.85 ‐ ‐ 11.00 29.79 86.84 0.366 0.50 ‐ 63.59
75.00
3 3 CLAY 2.50 4.00 1.50 1.90 0.635 0.089 ‐ 42.66 72.23 ‐ ‐ 35.09 ‐

4 4 SAND 4.00 17.80 13.80 1.90 ‐ NIL


ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED SETTLEMENT CALCULATION

SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 2

Depth 2.00 metre Settlement effective zone depth 1.50 X Width Depth factor 0.95


Length 21.25 metre Water Table depth for calculation 1.30 (m) bgl Rigidity factor 0.80 BOREHOLE 3
Width 11.20 metre Applied Pressure at foundation base 184.42 kN/m2 Type of foundation RECTANGULAR

Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 2.00 2.00 1.85 ‐ ‐ ‐ Depth of foundation

2 2 SAND 2.00 2.50 0.50 1.85 ‐ ‐ 11.00 42.29 178.30 0.366 0.500 ‐ 130.559
137.07
3 3 CLAY 2.50 4.00 1.50 1.90 0.635 0.089 ‐ 51.00 156.69 ‐ ‐ 49.797 ‐

4 4 SAND 4.00 18.80 14.80 1.90 ‐ NIL


ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED SETTLEMENT CALCULATION

SETTLEMENT CALCULATION AS PER IS 8009 (PART 1) : 1976
CALCULATION SHEET 2

Depth 2.00 metre Settlement effective zone depth 1.50 X Width Depth factor 0.95


Length 21.25 metre Water Table depth for calculation 1.30 (m) bgl Rigidity factor 0.80 BOREHOLE 3
Width 11.20 metre Applied Pressure at foundation base 92.64 kN/m2 Type of foundation RECTANGULAR

FINAL TRIAL
Settlement  Water 
Type of  Layer Start  Layer End  Layer  Compression  Corrected  Effective  Increment  Consolidation  Immediate  Total 
S. No. Layer No. Density Void Raito for Unit  Correction 
Layer depth depth Thickness Index SPT stress stress settlement settlement settlement
Pressure factor

CLAY e Cc N'' Pₒ ΔP W'

SAND (m) (m) (m) (gms/cc) kN/m2 kN/m2 (mm) (mm) (mm) (mm)

1 1 SAND 0.00 2.00 2.00 1.85 ‐ ‐ ‐ Depth of foundation

2 2 SAND 2.00 2.50 0.50 1.85 ‐ ‐ 11.00 42.29 89.56 0.366 0.500 ‐ 65.583
75.00
3 3 CLAY 2.50 4.00 1.50 1.90 0.635 0.089 ‐ 51.00 78.71 ‐ ‐ 33.103 ‐

4 4 SAND 4.00 18.80 14.80 1.90 ‐ NIL


ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
NAME OF THE PROJECT DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-
21+900
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.048
BORE HOLE 01 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  pile capacity (Uplift)
off Level Friction Pressure Friction pile (compression)
Capacity capacity
C Ø que k pdi tan δ asi α qus Qu QuS
(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.50 190.048 189.548 0.50 0.00 28 1.84 8.24 4.12 9 15.20 16.72 103.24 1.50 2.06 0.38 1.57 1.00 1.86 4.95 1.86 105.10 4.29 0.57
2 ML 2.00 189.548 188.048 1.50 0.00 28 1.84 8.24 12.36 9 15.20 16.72 250.72 1.50 10.30 0.38 4.71 1.00 27.94 19.79 29.80 280.53 11.44 3.03
3 CI 3.50 188.048 186.548 1.50 0.45 6 2.04 10.20 15.30 9 10.00 0.57 563.79 1.50 24.13 0.11 4.71 0.52 125.30 34.64 155.10 718.90 29.32 8.80
4 CI 5.00 186.548 185.048 1.50 0.45 6 2.03 10.10 15.15 9 10.00 0.57 682.77 1.50 39.35 0.11 4.71 0.52 136.61 49.48 291.72 974.49 39.75 14.96
5 CI 6.50 185.048 183.548 1.50 0.45 7 2.04 10.20 15.30 9 10.00 0.71 803.50 1.50 54.58 0.12 4.71 0.52 154.74 64.32 446.46 1249.96 50.98 21.73
6 SM 8.00 183.548 182.048 1.50 0.00 31 1.88 8.63 12.95 9 25.84 25.99 1613.89 1.50 68.70 0.43 4.71 1.00 208.63 79.17 655.09 2268.98 92.55 30.34
7 SM 9.50 182.048 180.548 1.50 0.00 31 1.89 8.73 13.09 9 25.84 25.99 1880.64 1.50 81.72 0.43 4.71 1.00 248.17 94.01 903.26 2783.89 113.55 40.29
8 CL 11.00 180.548 179.048 1.50 0.30 12 1.95 9.32 13.97 9 10.00 1.69 1017.12 1.50 95.25 0.21 4.71 0.74 245.39 108.86 1148.65 2165.77 88.34 50.14
9 CL 12.50 179.048 177.548 1.50 0.30 12 2.05 10.30 15.45 9 10.00 1.69 1139.08 1.50 109.96 0.21 4.71 0.74 267.49 123.70 1416.14 2555.22 104.22 60.75
10 CI 14.00 177.548 176.048 1.50 0.50 8 2.06 10.40 15.59 9 10.00 0.86 1396.87 1.50 125.48 0.14 4.71 0.47 233.40 138.54 1649.54 3046.41 124.25 70.19
11 CI 15.50 176.048 174.548 1.50 0.50 8 2.06 10.40 15.59 9 10.00 0.86 1519.34 1.50 141.07 0.14 4.71 0.47 248.89 153.39 1898.43 3417.77 139.40 80.17
12 CI 17.00 174.548 173.048 1.50 0.50 8 2.09 10.69 16.03 9 10.00 0.86 1645.37 1.50 156.89 0.14 4.71 0.47 264.60 168.23 2163.03 3808.40 155.33 90.67
13 CI 18.00 173.048 172.048 1.00 0.50 8 2.07 10.49 10.49 9 10.00 0.86 1727.72 1.50 170.15 0.14 3.14 0.47 185.18 178.13 2348.21 4075.93 166.25 97.98
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
NAME OF THE PROJECT
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.048
BORE HOLE 01 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.50 190.048 189.548 0.50 0.00 4.00 ‐ 0.20 29580.40 0.05 ‐ 5.92 Short/Intermediate 2.00 11.25 12.65 18.73 1.91 55.39 5.65
2 ML S 2.00 189.548 188.048 1.50 0.00 7.00 ‐ 0.80 29580.40 0.05 ‐ 4.49 Short/Intermediate 2.00 8.53 9.51 37.26 3.80 114.36 11.66
3 CI C 3.50 188.048 186.548 1.50 0.45 15.89 ‐ 29580.40 0.05 4.62 ‐ Short/Intermediate 2.00 7.04 8.54 58.92 6.01 148.66 15.16
4 CI C 5.00 186.548 185.048 1.50 0.45 15.89 ‐ 29580.40 0.05 4.62 ‐ Short/Intermediate 2.00 7.04 8.54 58.92 6.01 148.66 15.16
5 CI C 6.50 185.048 183.548 1.50 0.45 15.89 ‐ 29580.40 0.05 4.62 ‐ Short/Intermediate 2.00 7.04 8.54 58.92 6.01 148.66 15.16
6 SM S 8.00 183.548 182.048 1.50 0.00 21.00 ‐ 2.98 29580.40 0.05 ‐ 3.45 Short/Intermediate 2.00 6.57 7.23 69.21 7.06 221.42 22.58
7 SM S 9.50 182.048 180.548 1.50 0.00 22.00 ‐ 3.13 29580.40 0.05 ‐ 3.41 Short/Intermediate 2.00 6.51 7.16 70.72 7.21 226.59 23.10
8 CL C 11.00 180.548 179.048 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Short/Intermediate 2.00 7.83 9.52 45.88 4.68 113.99 11.62
9 CL C 12.50 179.048 177.548 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Short/Intermediate 2.00 7.83 9.52 45.88 4.68 113.99 11.62
10 CI C 14.00 177.548 176.048 1.50 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Short/Intermediate 2.00 6.85 8.31 62.82 6.41 159.18 16.23
11 CI C 15.50 176.048 174.548 1.50 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Short/Intermediate 2.00 6.85 8.31 62.82 6.41 159.18 16.23
12 CI C 17.00 174.548 173.048 1.50 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Long 2.00 6.85 8.31 62.82 6.41 159.18 16.23
13 CI C 18.00 173.048 172.048 1.00 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Long 2.00 6.85 8.31 62.82 6.41 159.18 16.23
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
NAME OF THE PROJECT DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-
21+900
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.048
BORE HOLE 01 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  pile capacity (Uplift)
off Level Friction Pressure Friction pile (compression)
Capacity capacity
C Ø que k pdi tan δ asi α qus Qu QuS
(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.20 189.748 189.548 0.20 0.00 28 1.84 8.24 1.65 9 15.20 16.72 121.77 1.50 0.82 0.38 0.75 1.00 0.36 2.85 0.36 122.12 4.98 0.30
2 ML 1.70 189.548 188.048 1.50 0.00 28 1.84 8.24 12.36 9 15.20 16.72 334.14 1.50 7.83 0.38 5.65 1.00 25.48 24.23 25.84 359.98 14.68 3.35
3 CI 3.20 188.048 186.548 1.50 0.45 6 2.04 10.20 15.30 9 10.00 0.57 784.57 1.50 21.65 0.11 5.65 0.52 148.16 45.60 174.00 958.57 39.10 10.56
4 CI 4.70 186.548 185.048 1.50 0.45 6 2.03 10.10 15.15 9 10.00 0.57 955.89 1.50 36.88 0.11 5.65 0.52 161.73 66.98 335.73 1291.62 52.68 18.24
5 CI 6.20 185.048 183.548 1.50 0.45 7 2.04 10.20 15.30 9 10.00 0.71 1129.90 1.50 52.10 0.12 5.65 0.52 183.12 88.35 518.85 1648.75 67.25 26.64
6 SM 7.70 183.548 182.048 1.50 0.00 31 1.88 8.63 12.95 9 25.84 25.99 2277.14 1.50 66.23 0.43 5.65 1.00 241.35 109.73 760.20 3037.33 123.88 37.03
7 SM 9.20 182.048 180.548 1.50 0.00 31 1.89 8.73 13.09 9 25.84 25.99 2661.54 1.50 79.25 0.43 5.65 1.00 288.79 131.10 1048.99 3710.53 151.34 49.02
8 CL 10.70 180.548 179.048 1.50 0.30 12 1.95 9.32 13.97 9 10.00 1.69 1438.48 1.50 92.78 0.21 5.65 0.74 290.01 152.48 1339.00 2777.48 113.29 61.06
9 CI 12.20 179.048 177.548 1.50 0.30 12 2.05 10.30 15.45 9 10.00 1.69 1614.30 1.50 107.49 0.21 5.65 0.74 316.53 173.85 1655.54 3269.83 133.37 74.00
10 CI 13.70 177.548 176.048 1.50 0.50 8 2.06 10.40 15.59 9 10.00 0.86 1984.56 1.50 123.01 0.14 5.65 0.47 277.13 195.23 1932.67 3917.22 159.77 85.60
11 CI 15.20 176.048 174.548 1.50 0.50 8 2.06 10.40 15.59 9 10.00 0.86 2160.91 1.50 138.60 0.14 5.65 0.47 295.72 216.60 2228.39 4389.30 179.03 97.83
12 CI 16.70 174.548 173.048 1.50 0.50 8 2.09 10.69 16.03 9 10.00 0.86 2342.43 1.50 154.42 0.14 5.65 0.47 314.57 237.98 2542.96 4885.39 199.26 110.70
13 CI 17.70 173.048 172.048 1.00 0.50 8 2.07 10.49 10.49 9 10.00 0.86 2460.99 1.50 167.68 0.14 3.77 0.47 220.26 252.23 2763.22 5224.21 213.08 119.64
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
NAME OF THE PROJECT
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.048
BORE HOLE 01 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.20 189.748 189.548 0.20 0.00 4.00 ‐ 0.20 29580.40 0.10 ‐ 6.85 Short/Intermediate 2.30 13.02 14.64 30.17 3.08 89.17 9.09
2 ML S 1.70 189.548 188.048 1.50 0.00 7.00 ‐ 0.80 29580.40 0.10 ‐ 5.19 Short/Intermediate 2.30 9.87 11.00 60.08 6.13 184.20 18.78
3 CI C 3.20 188.048 186.548 1.50 0.45 15.89 ‐ 29580.40 0.10 5.55 ‐ Short/Intermediate 2.30 8.47 10.28 86.84 8.85 217.67 22.20
4 CI C 4.70 186.548 185.048 1.50 0.45 15.89 ‐ 29580.40 0.10 5.55 ‐ Short/Intermediate 2.30 8.47 10.28 86.84 8.85 217.67 22.20
5 CI C 6.20 185.048 183.548 1.50 0.45 15.89 ‐ 29580.40 0.10 5.55 ‐ Short/Intermediate 2.30 8.47 10.28 86.84 8.85 217.67 22.20
6 SM S 7.70 183.548 182.048 1.50 0.00 21.00 ‐ 2.98 29580.40 0.10 ‐ 3.99 Short/Intermediate 2.30 7.60 8.37 111.68 11.39 356.89 36.39
7 SM S 9.20 182.048 180.548 1.50 0.00 22.00 ‐ 3.13 29580.40 0.10 ‐ 3.95 Short/Intermediate 2.30 7.53 8.29 114.10 11.64 365.23 37.24
8 CL C 10.70 180.548 179.048 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Short/Intermediate 2.30 9.41 11.45 67.48 6.88 166.64 16.99
9 CI C 12.20 179.048 177.548 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Short/Intermediate 2.30 9.41 11.45 67.48 6.88 166.64 16.99
10 CI C 13.70 177.548 176.048 1.50 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
11 CI C 15.20 176.048 174.548 1.50 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
12 CI C 16.70 174.548 173.048 1.50 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
13 CI C 17.70 173.048 172.048 1.00 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
NAME OF THE PROJECT DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-
21+900
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.823
BORE HOLE 02 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  pile capacity (Uplift)
off Level Friction Pressure Friction pile (compression)
Capacity capacity
C Ø que k pdi tan δ asi α qus Qu QuS
(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.50 189.823 189.323 0.50 0.00 26 1.85 8.34 4.17 9 10.67 12.54 75.96 1.50 2.08 0.35 1.57 1.00 1.74 4.95 1.74 77.70 3.17 0.56
2 ML 2.00 189.323 187.823 1.50 0.00 26 1.88 8.63 12.95 9 10.67 12.54 185.85 1.50 10.64 0.35 4.71 1.00 26.63 19.79 28.37 214.23 8.74 2.98
3 CL‐ML 3.50 187.823 186.323 1.50 0.15 22 1.95 9.32 13.97 9 10.00 7.13 374.23 1.50 24.10 0.40 4.71 1.00 138.15 34.64 166.52 540.75 22.06 9.19
4 SM 5.00 186.323 184.823 1.50 0.00 29 1.89 8.73 13.09 9 18.14 19.34 695.70 1.50 37.63 0.40 4.71 1.00 106.13 49.48 272.66 968.35 39.50 14.31
5 CI 6.50 184.823 183.323 1.50 0.45 6 2.03 10.10 15.15 9 10.00 0.57 780.21 1.50 51.76 0.11 4.71 0.52 145.83 64.32 418.49 1198.69 48.89 20.78
6 ML 8.00 183.323 181.823 1.50 0.00 28 1.89 8.73 13.09 9 15.20 16.72 921.72 1.50 65.88 0.38 4.71 1.00 178.75 79.17 597.24 1518.95 61.95 28.37
7 ML 9.50 181.823 180.323 1.50 0.00 28 1.89 8.73 13.09 9 15.20 16.72 1077.98 1.50 78.97 0.38 4.71 1.00 214.28 94.01 811.52 1889.49 77.07 37.17
8 CL 11.00 180.323 178.823 1.50 0.25 15 1.95 9.32 13.97 9 10.00 2.65 964.40 1.50 92.50 0.27 4.71 0.87 275.27 108.86 1086.79 2051.19 83.66 48.04
9 CL 12.50 178.823 177.323 1.50 0.25 15 1.95 9.32 13.97 9 10.00 2.65 1074.16 1.50 106.48 0.27 4.71 0.87 301.74 123.70 1388.52 2462.68 100.45 59.81
10 CI 14.00 177.323 175.823 1.50 0.50 7 2.03 10.10 15.15 9 10.00 0.71 1359.58 1.50 121.04 0.12 4.71 0.47 213.80 138.54 1602.32 2961.91 120.81 68.59
11 CI 15.50 175.823 174.323 1.50 0.50 7 2.03 10.10 15.15 9 10.00 0.71 1478.58 1.50 136.19 0.12 4.71 0.47 226.95 153.39 1829.27 3307.86 134.92 77.82
12 CI 17.00 174.323 172.823 1.50 0.50 7 2.04 10.20 15.30 9 10.00 0.71 1598.77 1.50 151.42 0.12 4.71 0.47 240.16 168.23 2069.43 3668.20 149.62 87.49
13 CI 18.00 172.823 171.823 1.00 0.50 7 2.05 10.30 10.30 9 10.00 0.71 1679.67 1.50 164.22 0.12 3.14 0.47 167.51 178.13 2236.95 3916.62 159.75 94.20
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
NAME OF THE PROJECT
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.823
BORE HOLE 02 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.50 189.823 189.323 0.50 0.00 6.00 ‐ 0.60 29580.40 0.05 ‐ 4.75 Short/Intermediate 2.00 9.04 10.09 32.40 3.30 98.61 10.05
2 ML S 2.00 189.323 187.823 1.50 0.00 7.00 ‐ 0.80 29580.40 0.05 ‐ 4.49 Short/Intermediate 2.00 8.53 9.51 37.26 3.80 114.36 11.66
3 CL‐ML S 3.50 187.823 186.323 1.50 0.15 9.00 ‐ 1.20 29580.40 0.05 ‐ 4.14 Short/Intermediate 2.00 7.87 8.74 45.27 4.62 140.61 14.34
4 SM S 5.00 186.323 184.823 1.50 0.00 13.00 ‐ 1.83 29580.40 0.05 ‐ 3.80 Short/Intermediate 2.00 7.24 8.01 55.26 5.63 173.94 17.74
5 CI S 6.50 184.823 183.323 1.50 0.45 15.00 ‐ 2.12 29580.40 0.05 ‐ 3.69 Short/Intermediate 2.00 7.03 7.77 59.14 6.03 187.05 19.07
6 ML S 8.00 183.323 181.823 1.50 0.00 20.00 ‐ 2.84 29580.40 0.05 ‐ 3.48 Short/Intermediate 2.00 6.63 7.31 67.67 6.90 216.11 22.04
7 ML S 9.50 181.823 180.323 1.50 0.00 23.00 ‐ 3.27 29580.40 0.05 ‐ 3.38 Short/Intermediate 2.00 6.45 7.09 72.18 7.36 231.63 23.62
8 CL C 11.00 180.323 178.823 1.50 0.25 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 2.00 8.21 9.99 40.93 4.17 101.04 10.30
9 CL C 12.50 178.823 177.323 1.50 0.25 8.83 ‐ 29580.40 0.05 5.36 ‐ Short/Intermediate 2.00 8.21 9.99 40.93 4.17 101.04 10.30
10 CI C 14.00 177.323 175.823 1.50 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Short/Intermediate 2.00 6.85 8.31 62.82 6.41 159.18 16.23
11 CI C 15.50 175.823 174.323 1.50 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Short/Intermediate 2.00 6.85 8.31 62.82 6.41 159.18 16.23
12 CI C 17.00 174.323 172.823 1.50 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Long 2.00 6.85 8.31 62.82 6.41 159.18 16.23
13 CI C 18.00 172.823 171.823 1.00 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Long 2.00 6.85 8.31 62.82 6.41 159.18 16.23
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
NAME OF THE PROJECT DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-
21+900
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.823
BORE HOLE 02 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  pile capacity (Uplift)
off Level Friction Pressure Friction pile (compression)
Capacity capacity
C Ø que k pdi tan δ asi α qus Qu QuS
(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.20 189.523 189.323 0.20 0.00 26 1.85 8.34 1.67 9 10.67 12.54 91.04 1.50 0.83 0.35 0.75 1.00 0.33 2.85 0.33 91.37 3.73 0.30
2 ML 1.70 189.323 187.823 1.50 0.00 26 1.88 8.63 12.95 9 10.67 12.54 249.70 1.50 8.14 0.35 5.65 1.00 24.45 24.23 24.78 274.49 11.20 3.31
3 CL‐ML 3.20 187.823 186.323 1.50 0.15 22 1.95 9.32 13.97 9 10.00 7.13 518.11 1.50 21.60 0.40 5.65 1.00 157.21 45.60 181.99 700.11 28.56 10.84
4 SM 4.70 186.323 184.823 1.50 0.00 29 1.89 8.73 13.09 9 18.14 19.34 969.59 1.50 35.13 0.40 5.65 1.00 118.90 66.98 300.89 1270.48 51.82 17.06
5 CI 6.20 184.823 183.323 1.50 0.45 6 2.03 10.10 15.15 9 10.00 0.57 1095.87 1.50 49.26 0.11 5.65 0.52 172.77 88.35 473.65 1569.52 64.02 25.11
6 ML 7.70 183.323 181.823 1.50 0.00 28 1.89 8.73 13.09 9 15.20 16.72 1300.79 1.50 63.38 0.38 5.65 1.00 206.36 109.73 680.02 1980.81 80.79 34.30
7 ML 9.20 181.823 180.323 1.50 0.00 28 1.89 8.73 13.09 9 15.20 16.72 1525.81 1.50 76.47 0.38 5.65 1.00 248.99 131.10 929.01 2454.82 100.13 44.94
8 CL 10.70 180.323 178.823 1.50 0.25 15 1.95 9.32 13.97 9 10.00 2.65 1363.24 1.50 90.00 0.27 5.65 0.87 324.64 152.48 1253.65 2616.89 106.74 58.16
9 CL 12.20 178.823 177.323 1.50 0.25 15 1.95 9.32 13.97 9 10.00 2.65 1521.30 1.50 103.98 0.27 5.65 0.87 356.40 173.85 1610.05 3131.35 127.72 72.45
10 CI 13.70 177.323 175.823 1.50 0.50 7 2.03 10.10 15.15 9 10.00 0.71 1930.32 1.50 118.54 0.12 5.65 0.47 253.95 195.23 1864.00 3794.33 154.76 83.26
11 CI 15.20 175.823 174.323 1.50 0.50 7 2.03 10.10 15.15 9 10.00 0.71 2101.69 1.50 133.69 0.12 5.65 0.47 269.73 216.60 2133.74 4235.42 172.75 94.61
12 CI 16.70 174.323 172.823 1.50 0.50 7 2.04 10.20 15.30 9 10.00 0.71 2274.76 1.50 148.92 0.12 5.65 0.47 285.59 237.98 2419.33 4694.09 191.46 106.50
13 CI 17.70 172.823 171.823 1.00 0.50 7 2.05 10.30 10.30 9 10.00 0.71 2391.27 1.50 161.72 0.12 3.77 0.47 199.28 252.23 2618.61 5009.87 204.34 114.72
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
NAME OF THE PROJECT
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.823
BORE HOLE 02 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.20 189.523 189.323 0.20 0.00 6.00 ‐ 0.60 29580.40 0.10 ‐ 5.50 Short/Intermediate 2.30 10.46 11.68 52.22 5.32 158.81 16.19
2 ML S 1.70 189.323 187.823 1.50 0.00 7.00 ‐ 0.80 29580.40 0.10 ‐ 5.19 Short/Intermediate 2.30 9.87 11.00 60.08 6.13 184.20 18.78
3 CL‐ML S 3.20 187.823 186.323 1.50 0.15 9.00 ‐ 1.20 29580.40 0.10 ‐ 4.79 Short/Intermediate 2.30 9.11 10.12 73.00 7.44 226.53 23.10
4 SM S 4.70 186.323 184.823 1.50 0.00 13.00 ‐ 1.83 29580.40 0.10 ‐ 4.40 Short/Intermediate 2.30 8.37 9.27 89.13 9.09 280.28 28.58
5 CI S 6.20 184.823 183.323 1.50 0.45 15.00 ‐ 2.12 29580.40 0.10 ‐ 4.27 Short/Intermediate 2.30 8.13 8.99 95.41 9.73 301.44 30.74
6 ML S 7.70 183.323 181.823 1.50 0.00 20.00 ‐ 2.84 29580.40 0.10 ‐ 4.03 Short/Intermediate 2.30 7.68 8.46 109.18 11.13 348.32 35.52
7 ML S 9.20 181.823 180.323 1.50 0.00 23.00 ‐ 3.27 29580.40 0.10 ‐ 3.92 Short/Intermediate 2.30 7.46 8.21 116.47 11.88 373.37 38.07
8 CL C 10.70 180.323 178.823 1.50 0.25 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 2.30 9.87 12.02 60.16 6.13 147.60 15.05
9 CL C 12.20 178.823 177.323 1.50 0.25 8.83 ‐ 29580.40 0.10 6.43 ‐ Short/Intermediate 2.30 9.87 12.02 60.16 6.13 147.60 15.05
10 CI C 13.70 177.323 175.823 1.50 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
11 CI C 15.20 175.823 174.323 1.50 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
12 CI C 16.70 174.323 172.823 1.50 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
13 CI C 17.70 172.823 171.823 1.00 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
NAME OF THE PROJECT DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-
21+900
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.794
BORE HOLE 03 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  pile capacity (Uplift)
off Level Friction Pressure Friction pile (compression)
Capacity capacity
C Ø que k pdi tan δ asi α qus Qu QuS
(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.50 189.794 189.294 0.50 0.00 27 1.85 8.34 4.17 9 12.73 14.47 89.04 1.50 2.08 0.37 1.57 1.00 1.81 4.95 1.81 90.85 3.71 0.57
2 CL 2.00 189.294 188.394 0.90 0.25 8 1.90 8.83 7.94 9 10.00 0.86 271.41 1.50 8.14 0.14 2.83 0.87 64.89 19.79 66.70 338.11 13.79 4.29
3 CI 3.50 188.394 187.794 0.60 0.40 6 1.99 9.71 5.83 9 10.00 0.57 420.34 1.50 15.02 0.11 1.88 0.57 46.81 34.64 113.51 533.86 21.77 7.39
4 ML 5.00 187.794 186.294 1.50 0.00 27 1.89 8.73 13.09 9 12.73 14.47 359.87 1.50 24.48 0.37 4.71 1.00 63.85 49.48 177.36 537.23 21.91 11.07
5 ML 6.50 186.294 184.794 1.50 0.00 27 1.99 9.71 14.56 9 12.73 14.47 511.06 1.50 38.31 0.37 4.71 1.00 99.91 64.32 277.27 788.33 32.15 15.98
6 CI 8.00 184.794 183.294 1.50 0.40 6 1.99 9.71 14.56 9 10.00 0.57 751.93 1.50 52.87 0.11 4.71 0.57 145.15 79.17 422.42 1174.35 47.90 22.43
7 SM 9.50 183.294 181.794 1.50 0.00 30 1.90 8.83 13.24 9 21.65 22.40 1325.74 1.50 66.78 0.41 4.71 1.00 195.51 94.01 617.93 1943.67 79.28 30.59
8 SM 11.00 181.794 180.294 1.50 0.00 30 1.89 8.73 13.09 9 21.65 22.40 1547.52 1.50 79.94 0.41 4.71 1.00 234.06 108.86 851.99 2399.51 97.87 40.06
9 SM 12.50 180.294 178.794 1.50 0.00 30 1.88 8.63 12.95 9 21.65 22.40 1766.79 1.50 92.96 0.41 4.71 1.00 272.18 123.70 1124.17 2890.96 117.91 50.82
10 SM 14.00 178.794 177.294 1.50 0.00 31 1.88 8.63 12.95 9 25.84 25.99 2369.12 1.50 105.91 0.43 4.71 1.00 321.63 138.54 1445.80 3814.92 155.60 63.27
11 SM 15.50 177.294 175.794 1.50 0.00 31 1.91 8.92 13.39 9 25.84 25.99 2643.84 1.50 119.07 0.43 4.71 1.00 361.61 153.39 1807.41 4451.25 181.55 77.07
12 SM 17.00 175.794 174.294 1.50 0.00 31 1.92 9.02 13.53 9 25.84 25.99 2919.55 1.50 132.53 0.43 4.71 1.00 402.49 168.23 2209.89 5129.44 209.22 92.27
13 SM 18.00 174.294 173.294 1.00 0.00 31 1.92 9.02 9.02 9 25.84 25.99 3102.68 1.50 143.81 0.43 3.14 1.00 291.16 178.13 2501.05 5603.73 228.56 103.17
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
NAME OF THE PROJECT
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.794
BORE HOLE 03 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.50 189.794 189.294 0.50 0.00 6.00 ‐ 0.60 29580.40 0.05 ‐ 4.75 Short/Intermediate 2.00 9.04 10.09 32.40 3.30 98.61 10.05
2 CL S 2.00 189.294 188.394 0.90 0.25 7.00 ‐ 0.80 29580.40 0.05 ‐ 4.49 Short/Intermediate 2.00 8.53 9.51 37.26 3.80 114.36 11.66
3 CI S 3.50 188.394 187.794 0.60 0.40 9.00 ‐ 1.20 29580.40 0.05 ‐ 4.14 Short/Intermediate 2.00 7.87 8.74 45.27 4.62 140.61 14.34
4 ML S 5.00 187.794 186.294 1.50 0.00 13.00 ‐ 1.83 29580.40 0.05 ‐ 3.80 Short/Intermediate 2.00 7.24 8.01 55.26 5.63 173.94 17.74
5 ML S 6.50 186.294 184.794 1.50 0.00 15.00 ‐ 2.12 29580.40 0.05 ‐ 3.69 Short/Intermediate 2.00 7.03 7.77 59.14 6.03 187.05 19.07
6 CI S 8.00 184.794 183.294 1.50 0.40 20.00 ‐ 2.84 29580.40 0.05 ‐ 3.48 Short/Intermediate 2.00 6.63 7.31 67.67 6.90 216.11 22.04
7 SM S 9.50 183.294 181.794 1.50 0.00 23.00 ‐ 3.27 29580.40 0.05 ‐ 3.38 Short/Intermediate 2.00 6.45 7.09 72.18 7.36 231.63 23.62
8 SM S 11.00 181.794 180.294 1.50 0.00 16.00 ‐ 2.26 29580.40 0.05 ‐ 3.64 Short/Intermediate 2.00 6.94 7.66 60.97 6.22 193.25 19.71
9 SM S 12.50 180.294 178.794 1.50 0.00 19.00 ‐ 2.70 29580.40 0.05 ‐ 3.52 Short/Intermediate 2.00 6.70 7.39 66.07 6.74 210.65 21.48
10 SM S 14.00 178.794 177.294 1.50 0.00 24.00 ‐ 3.42 29580.40 0.05 ‐ 3.35 Long 2.00 6.40 7.03 73.60 7.51 236.55 24.12
11 SM S 15.50 177.294 175.794 1.50 0.00 26.00 ‐ 3.70 29580.40 0.05 ‐ 3.30 Long 2.00 6.29 6.91 76.35 7.78 246.06 25.09
12 SM S 17.00 175.794 174.294 1.50 0.00 28.00 ‐ 3.99 29580.40 0.05 ‐ 3.25 Long 2.00 6.20 6.81 78.96 8.05 255.16 26.02
13 SM S 18.00 174.294 173.294 1.00 0.00 31.00 ‐ 4.42 29580.40 0.05 ‐ 3.19 Long 2.00 6.08 6.66 82.69 8.43 268.16 27.34
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
NAME OF THE PROJECT DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-
21+900
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.794
BORE HOLE 03 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  pile capacity (Uplift)
off Level Friction Pressure Friction pile (compression)
Capacity capacity
C Ø que k pdi tan δ asi α qus Qu QuS
(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.20 189.494 189.294 0.20 0.00 27 1.85 8.34 1.67 9 12.73 14.47 105.86 1.50 0.83 0.37 0.75 1.00 0.35 2.85 0.35 106.20 4.33 0.30
2 CL 1.70 189.294 187.794 1.50 0.25 8 1.90 8.83 13.24 9 10.00 0.86 423.30 1.50 8.29 0.14 5.65 0.87 129.96 24.23 130.30 553.60 22.58 6.90
3 CI 3.20 187.794 186.294 1.50 0.40 6 1.99 9.71 14.56 9 10.00 0.57 736.35 1.50 22.19 0.11 5.65 0.57 146.83 45.60 277.13 1013.48 41.34 14.07
4 ML 4.70 186.294 184.794 1.50 0.00 27 1.89 8.73 13.09 9 12.73 14.47 698.55 1.50 36.02 0.37 5.65 1.00 112.71 66.98 389.83 1088.39 44.39 20.08
5 ML 6.20 184.794 183.294 1.50 0.00 27 1.99 9.71 14.56 9 12.73 14.47 917.88 1.50 49.84 0.37 5.65 1.00 155.98 88.35 545.81 1463.69 59.70 27.56
6 CI 7.70 183.294 181.794 1.50 0.40 6 1.99 9.71 14.56 9 10.00 0.57 1213.84 1.50 64.41 0.11 5.65 0.57 184.47 109.73 730.28 1944.12 79.30 36.01
7 SM 9.20 181.794 180.294 1.50 0.00 30 1.90 8.83 13.24 9 21.65 22.40 2213.84 1.50 78.31 0.41 5.65 1.00 275.14 131.10 1005.41 3219.26 131.30 47.54
8 SM 10.70 180.294 178.794 1.50 0.00 30 1.89 8.73 13.09 9 21.65 22.40 2532.95 1.50 91.47 0.41 5.65 1.00 321.40 152.48 1326.81 3859.76 157.43 60.65
9 SM 12.20 178.794 177.294 1.50 0.00 30 1.88 8.63 12.95 9 21.65 22.40 2848.45 1.50 104.49 0.41 5.65 1.00 367.14 173.85 1693.95 4542.40 185.27 75.30
10 SM 13.70 177.294 175.794 1.50 0.00 31 1.88 8.63 12.95 9 25.84 25.99 3774.00 1.50 117.44 0.43 5.65 1.00 427.98 195.23 2121.93 5895.93 240.48 92.03
11 SM 15.20 175.794 174.294 1.50 0.00 31 1.91 8.92 13.39 9 25.84 25.99 4170.47 1.50 130.60 0.43 5.65 1.00 475.96 216.60 2597.89 6768.35 276.06 110.39
12 SM 16.70 174.294 172.794 1.50 0.00 31 1.92 9.02 13.53 9 25.84 25.99 4567.77 1.50 144.06 0.43 5.65 1.00 525.01 237.98 3122.90 7690.67 313.68 130.41
13 SM 17.70 172.794 171.794 1.00 0.00 31 1.92 9.02 9.02 9 25.84 25.99 4831.48 1.50 155.34 0.43 3.77 1.00 377.41 252.23 3500.31 8331.79 339.83 144.69
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
NAME OF THE PROJECT
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 191.794
BORE HOLE 03 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.20 189.494 189.294 0.20 0.00 6.00 ‐ 0.60 29580.40 0.10 ‐ 5.50 Short/Intermediate 2.30 10.46 11.68 52.22 5.32 158.81 16.19
2 CL S 1.70 189.294 187.794 1.50 0.25 7.00 ‐ 0.80 29580.40 0.10 ‐ 5.19 Short/Intermediate 2.30 9.87 11.00 60.08 6.13 184.20 18.78
3 CI S 3.20 187.794 186.294 1.50 0.40 9.00 ‐ 1.20 29580.40 0.10 ‐ 4.79 Short/Intermediate 2.30 9.11 10.12 73.00 7.44 226.53 23.10
4 ML S 4.70 186.294 184.794 1.50 0.00 13.00 ‐ 1.83 29580.40 0.10 ‐ 4.40 Short/Intermediate 2.30 8.37 9.27 89.13 9.09 280.28 28.58
5 ML S 6.20 184.794 183.294 1.50 0.00 15.00 ‐ 2.12 29580.40 0.10 ‐ 4.27 Short/Intermediate 2.30 8.13 8.99 95.41 9.73 301.44 30.74
6 CI S 7.70 183.294 181.794 1.50 0.40 20.00 ‐ 2.84 29580.40 0.10 ‐ 4.03 Short/Intermediate 2.30 7.68 8.46 109.18 11.13 348.32 35.52
7 SM S 9.20 181.794 180.294 1.50 0.00 23.00 ‐ 3.27 29580.40 0.10 ‐ 3.92 Short/Intermediate 2.30 7.46 8.21 116.47 11.88 373.37 38.07
8 SM S 10.70 180.294 178.794 1.50 0.00 16.00 ‐ 2.26 29580.40 0.10 ‐ 4.21 Short/Intermediate 2.30 8.03 8.87 98.36 10.03 311.44 31.76
9 SM S 12.20 178.794 177.294 1.50 0.00 19.00 ‐ 2.70 29580.40 0.10 ‐ 4.07 Short/Intermediate 2.30 7.76 8.55 106.60 10.87 339.51 34.62
10 SM S 13.70 177.294 175.794 1.50 0.00 24.00 ‐ 3.42 29580.40 0.10 ‐ 3.88 Short/Intermediate 2.30 7.40 8.14 118.77 12.11 381.31 38.88
11 SM S 15.20 175.794 174.294 1.50 0.00 26.00 ‐ 3.70 29580.40 0.10 ‐ 3.82 Short/Intermediate 2.30 7.28 8.00 123.20 12.56 396.65 40.45
12 SM S 16.70 174.294 172.794 1.50 0.00 28.00 ‐ 3.99 29580.40 0.10 ‐ 3.76 Long 2.30 7.17 7.88 127.43 12.99 411.35 41.94
13 SM S 17.70 172.794 171.794 1.00 0.00 31.00 ‐ 4.42 29580.40 0.10 ‐ 3.69 Long 2.30 7.03 7.71 133.45 13.61 432.33 44.08
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
NAME OF THE PROJECT DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-
21+900
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.147
BORE HOLE 04 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 10.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  pile capacity (Uplift)
off Level Friction Pressure Friction pile (compression)
Capacity capacity
C Ø que k pdi tan δ asi α qus Qu QuS
(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.50 190.147 189.647 0.50 0.00 27 1.84 8.24 4.12 9 12.73 14.47 88.00 1.50 2.06 0.37 1.57 1.00 1.79 4.95 1.79 89.79 3.66 0.57
2 ML 2.00 189.647 188.147 1.50 0.00 27 1.88 8.63 12.95 9 12.73 14.47 219.67 1.50 10.59 0.37 4.71 1.00 27.62 19.79 29.41 249.08 10.16 3.02
3 ML 3.50 188.147 187.247 0.90 0.00 29 1.85 8.34 7.50 9 18.14 19.34 413.29 1.50 20.82 0.40 2.83 1.00 35.22 34.64 64.63 477.92 19.49 5.73
4 CI 5.00 187.247 186.647 0.60 0.45 6 2.02 10.00 6.00 9 10.00 0.57 554.27 1.50 27.57 0.11 1.88 0.52 51.14 49.48 115.77 670.05 27.33 8.98
5 SM 6.50 186.647 185.147 1.50 0.00 29 1.85 8.34 12.50 9 18.14 19.34 676.93 1.50 36.82 0.40 4.71 1.00 103.84 64.32 219.61 896.54 36.57 14.02
6 CI 8.00 185.147 183.647 1.50 0.45 6 2.05 10.30 15.45 9 10.00 0.57 773.86 1.50 50.80 0.11 4.71 0.52 145.12 79.17 364.73 1138.58 46.44 20.47
7 CI 9.50 183.647 182.147 1.50 0.45 6 2.05 10.30 15.45 9 10.00 0.57 895.17 1.50 66.24 0.11 4.71 0.52 156.59 94.01 521.32 1416.49 57.77 27.31
8 SM 11.00 182.147 180.647 1.50 0.00 30 1.88 8.63 12.95 9 21.65 22.40 1553.82 1.50 80.44 0.41 4.71 1.00 235.51 108.86 756.83 2310.65 94.25 36.82
9 CL 12.50 180.647 179.147 1.50 0.30 12 1.88 8.63 12.95 9 10.00 1.69 997.95 1.50 93.38 0.21 4.71 0.74 242.58 123.70 999.41 1997.36 81.47 46.58
10 CL 14.00 179.147 177.647 1.50 0.30 12 1.88 8.63 12.95 9 10.00 1.69 1099.62 1.50 106.33 0.21 4.71 0.74 262.03 138.54 1261.44 2361.06 96.30 57.00
11 CL 15.50 177.647 176.147 1.50 0.30 12 1.88 8.63 12.95 9 10.00 1.69 1201.29 1.50 119.27 0.21 4.71 0.74 281.48 153.39 1542.92 2744.22 111.93 68.08
12 CI 17.00 176.147 174.647 1.50 0.50 7 2.06 10.40 15.59 9 10.00 0.71 1459.56 1.50 133.54 0.12 4.71 0.47 224.65 168.23 1767.57 3227.13 131.63 77.23
13 CI 18.00 174.647 173.647 1.00 0.50 7 2.06 10.40 10.40 9 10.00 0.71 1541.21 1.50 146.54 0.12 3.14 0.47 157.28 178.13 1924.85 3466.06 141.37 83.59
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
NAME OF THE PROJECT
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900
Pile Diameter (mm) 1000 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.00 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.147
BORE HOLE 04 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 10.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.50 190.147 189.647 0.50 0.00 6.00 ‐ 0.60 29580.40 0.05 ‐ 4.75 Short/Intermediate 2.00 9.04 10.09 32.40 3.30 98.61 10.05
2 ML S 2.00 189.647 188.147 1.50 0.00 7.00 ‐ 0.80 29580.40 0.05 ‐ 4.49 Short/Intermediate 2.00 8.53 9.51 37.26 3.80 114.36 11.66
3 ML S 3.50 188.147 187.247 0.90 0.00 9.00 ‐ 1.20 29580.40 0.05 ‐ 4.14 Short/Intermediate 2.00 7.87 8.74 45.27 4.62 140.61 14.34
4 CI S 5.00 187.247 186.647 0.60 0.45 6.00 ‐ 0.60 29580.40 0.05 ‐ 4.75 Short/Intermediate 2.00 9.04 10.09 32.40 3.30 98.61 10.05
5 SM S 6.50 186.647 185.147 1.50 0.00 13.00 ‐ 1.83 29580.40 0.05 ‐ 3.80 Short/Intermediate 2.00 7.24 8.01 55.26 5.63 173.94 17.74
6 CI C 8.00 185.147 183.647 1.50 0.45 15.89 ‐ 29580.40 0.05 4.62 ‐ Short/Intermediate 2.00 7.04 8.54 58.92 6.01 148.66 15.16
7 CI S 9.50 183.647 182.147 1.50 0.45 23.00 ‐ 3.27 29580.40 0.05 ‐ 3.38 Short/Intermediate 2.00 6.45 7.09 72.18 7.36 231.63 23.62
8 SM S 11.00 182.147 180.647 1.50 0.00 16.00 ‐ 2.26 29580.40 0.05 ‐ 3.64 Short/Intermediate 2.00 6.94 7.66 60.97 6.22 193.25 19.71
9 CL C 12.50 180.647 179.147 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Short/Intermediate 2.00 7.83 9.52 45.88 4.68 113.99 11.62
10 CL C 14.00 179.147 177.647 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Short/Intermediate 2.00 7.83 9.52 45.88 4.68 113.99 11.62
11 CL C 15.50 177.647 176.147 1.50 0.30 10.59 ‐ 29580.40 0.05 5.12 ‐ Short/Intermediate 2.00 7.83 9.52 45.88 4.68 113.99 11.62
12 CI C 17.00 176.147 174.647 1.50 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Long 2.00 6.85 8.31 62.82 6.41 159.18 16.23
13 CI C 18.00 174.647 173.647 1.00 0.50 17.65 ‐ 29580.40 0.05 4.50 ‐ Long 2.00 6.85 8.31 62.82 6.41 159.18 16.23
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IRC:78-2014
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF
NAME OF THE PROJECT DELHI VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-
21+900
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.147
BORE HOLE 04 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) (1% of pile diameter) 12.00 mm (Assumed)

Calculation sheet for Vertical Compressive and Uplift Load Carrying Capacity
Total 
Pile Length  Angle of  Effective  Total Net  Self  Safe Pile 
Layer  Type of Soil  RL of Layer  RL of Layer  Thickness  Submerged  Ultimate End  Total Skin  Total Ultimate  Safe Pile Capacity 
Below Cut‐ Cohesion Internal  Bulk Density Overburden  Bearing Capacity Factor Factors for Skin Friction Skin  Weight of  Capacity 
no Layer Top Bottom of Layer Bulk Density Bearing  friction  pile capacity (Uplift)
off Level Friction Pressure Friction pile (compression)
Capacity capacity
C Ø que k pdi tan δ asi α qus Qu QuS
(m) (m) (m) (m) Kg/cm2 ° (gms/cc) (kN/m3) (kN/m2) Nc Nq Nγ (kN) (kN/m2) (m2) (kN) (kN) (kN) (kN) (Tonnes) (Tonnes)

1 ML 0.20 189.847 189.647 0.20 0.00 27 1.84 8.24 1.65 9 12.73 14.47 104.61 1.50 0.82 0.37 0.75 1.00 0.34 2.85 0.34 104.95 4.28 0.30
2 ML 1.70 189.647 188.147 1.50 0.00 27 1.88 8.63 12.95 9 12.73 14.47 294.86 1.50 8.12 0.37 5.65 1.00 25.41 24.23 25.75 320.61 13.08 3.35
3 ML 3.20 188.147 187.247 0.90 0.00 29 1.85 8.34 7.50 9 18.14 19.34 562.67 1.50 18.34 0.40 3.39 1.00 37.25 45.60 63.00 625.67 25.52 6.79
4 CI 4.70 187.247 186.647 0.60 0.45 6 2.02 10.00 6.00 9 10.00 0.57 770.85 1.50 25.10 0.11 2.26 0.52 60.49 66.98 123.49 894.34 36.48 11.03
5 SM 6.20 186.647 185.147 1.50 0.00 29 1.85 8.34 12.50 9 18.14 19.34 942.31 1.50 34.35 0.40 5.65 1.00 116.24 88.35 239.73 1182.05 48.21 17.16
6 CI 7.70 185.147 183.647 1.50 0.45 6 2.05 10.30 15.45 9 10.00 0.57 1087.07 1.50 48.32 0.11 5.65 0.52 171.93 109.73 411.67 1498.74 61.13 25.18
7 CI 9.20 183.647 182.147 1.50 0.45 6 2.05 10.30 15.45 9 10.00 0.57 1261.76 1.50 63.77 0.11 5.65 0.52 185.71 131.10 597.37 1859.13 75.83 33.67
8 SM 10.70 182.147 180.647 1.50 0.00 30 1.88 8.63 12.95 9 21.65 22.40 2198.86 1.50 77.97 0.41 5.65 1.00 273.93 152.48 871.30 3070.16 125.22 45.16
9 CL 12.20 180.647 179.147 1.50 0.30 12 1.88 8.63 12.95 9 10.00 1.69 1410.74 1.50 90.91 0.21 5.65 0.74 286.64 173.85 1157.95 2568.69 104.77 57.09
10 CL 13.70 179.147 177.647 1.50 0.30 12 1.88 8.63 12.95 9 10.00 1.69 1557.15 1.50 103.86 0.21 5.65 0.74 309.98 195.23 1467.93 3025.08 123.38 69.80
11 CL 15.20 177.647 176.147 1.50 0.30 12 1.88 8.63 12.95 9 10.00 1.69 1703.56 1.50 116.80 0.21 5.65 0.74 333.32 216.60 1801.25 3504.81 142.95 83.31
12 CI 16.70 176.147 174.647 1.50 0.50 7 2.06 10.40 15.59 9 10.00 0.71 2074.65 1.50 131.07 0.12 5.65 0.47 267.00 237.98 2068.25 4142.91 168.98 94.56
13 CI 17.70 174.647 173.647 1.00 0.50 7 2.06 10.40 10.40 9 10.00 0.71 2192.22 1.50 144.06 0.12 3.77 0.47 187.02 252.23 2255.28 4447.50 181.40 102.37
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED PILE CALCULATION

SAFE LOAD CARRYING CAPACITY OF BORED CAST IN SITU PILES AS PER IS: 2911 (PART I/SECTION 2)-2010
ESTIMATION OF VERTICAL COMPRESSIVE, UPLIFT AND LATERAL LOAD CARRYING CAPACITY OF CONCRETE PILE
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI
NAME OF THE PROJECT
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900
Pile Diameter (mm) 1200 Ground Water Table (m) 0.00 FOS In Compression 2.50
Pile Cut off Length (m) 2.30 Average Void Factor (%) 10.00 FOS in Uplift 3.00
Parameters of Pile Reduced Level of Borehole (m) 192.147
BORE HOLE 04 Critical Depth (Pdi Level) 18.00 X Pile Diameter Grade of Concrete (M) 35
(Assumed) Deflection (Assumed) (y) 12.00 mm (Assumed)

Calculation sheet for Lateral Load Carrying Capacity


Preferable  Pile Length  Young's 
Type of Soil  RL of Layer  RL of Layer  Thickness of  Moment of  Cantilever 
Layer no strata up to  Below Cut‐ Cohesion SPT Value Value of Constant Modulus of  Stiffness factor Type of pile behaviour  Depth of Fixity (Zf) Load Capacity of Pile (Lateral)
Layer Top Bottom Layer Inertia of Pile Length
depth off Level pile material

C = Clay C N k1 ŋh Ec I R T e=L1 Free Head Fixed Head Free Head Fixed Head

S = Sand (m) (m) (m) (m) Kg/cm2 Average MN/m3 MN/m3 Mpa (m4) (m) (m) (m) (m) (kN) (Tonnes) (kN) (Tonnes)

1 ML S 0.20 189.847 189.647 0.20 0.00 6.00 ‐ 0.60 29580.40 0.10 ‐ 5.50 Short/Intermediate 2.30 10.46 11.68 52.22 5.32 158.81 16.19
2 ML S 1.70 189.647 188.147 1.50 0.00 7.00 ‐ 0.80 29580.40 0.10 ‐ 5.19 Short/Intermediate 2.30 9.87 11.00 60.08 6.13 184.20 18.78
3 ML S 3.20 188.147 187.247 0.90 0.00 9.00 ‐ 1.20 29580.40 0.10 ‐ 4.79 Short/Intermediate 2.30 9.11 10.12 73.00 7.44 226.53 23.10
4 CI S 4.70 187.247 186.647 0.60 0.45 6.00 ‐ 0.60 29580.40 0.10 ‐ 5.50 Short/Intermediate 2.30 10.46 11.68 52.22 5.32 158.81 16.19
5 SM S 6.20 186.647 185.147 1.50 0.00 13.00 ‐ 1.83 29580.40 0.10 ‐ 4.40 Short/Intermediate 2.30 8.37 9.27 89.13 9.09 280.28 28.58
6 CI C 7.70 185.147 183.647 1.50 0.45 15.89 ‐ 29580.40 0.10 5.55 ‐ Short/Intermediate 2.30 8.47 10.28 86.84 8.85 217.67 22.20
7 CI S 9.20 183.647 182.147 1.50 0.45 23.00 ‐ 3.27 29580.40 0.10 ‐ 3.92 Short/Intermediate 2.30 7.46 8.21 116.47 11.88 373.37 38.07
8 SM S 10.70 182.147 180.647 1.50 0.00 16.00 ‐ 2.26 29580.40 0.10 ‐ 4.21 Short/Intermediate 2.30 8.03 8.87 98.36 10.03 311.44 31.76
9 CL C 12.20 180.647 179.147 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Short/Intermediate 2.30 9.41 11.45 67.48 6.88 166.64 16.99
10 CL C 13.70 179.147 177.647 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Short/Intermediate 2.30 9.41 11.45 67.48 6.88 166.64 16.99
11 CL C 15.20 177.647 176.147 1.50 0.30 10.59 ‐ 29580.40 0.10 6.14 ‐ Short/Intermediate 2.30 9.41 11.45 67.48 6.88 166.64 16.99
12 CI C 16.70 176.147 174.647 1.50 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
13 CI C 17.70 174.647 173.647 1.00 0.50 17.65 ‐ 29580.40 0.10 5.40 ‐ Short/Intermediate 2.30 8.24 10.00 92.65 9.45 233.17 23.78
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI 
Project Name ‐ 
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE‐21+900

Existing Ground Water Level ‐  1.20 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV


Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 1
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24
1 191.048 188.048 3.00 2.30 4 57 1.84 18.04 41.50 30.72 0.98 0.211 1.46 0.75 1.05 0.75 1.2 4.14 0.106 1.23 0.727 L
2 188.048 186.548 1.50 3.80 7 44 1.84 18.04 68.57 43.07 0.97 0.242 1.35 0.75 1.05 0.80 1.2 7.14 0.142 1.19 0.845 L
3 186.548 185.048 1.50 5.30 13 95 2.04 20.01 98.58 58.37 0.96 0.254 1.23 0.75 1.05 0.85 1.2 12.88 0.223 1.16 1.266 NL
4 185.048 183.548 1.50 6.80 14 96 2.03 19.91 129.79 74.87 0.95 0.257 1.13 0.75 1.05 0.95 1.2 14.19 0.245 1.09 1.375 NL
5 183.548 182.048 1.50 8.30 18 85 2.04 20.01 159.80 90.17 0.93 0.258 1.05 0.75 1.05 0.95 1.2 16.92 0.301 1.03 1.680 NL
6 182.048 180.548 1.50 9.80 21 32 1.88 18.44 187.45 103.11 0.91 0.258 0.99 0.75 1.05 0.95 1.2 18.59 0.346 0.99 1.935 NL
7 180.548 179.048 1.50 11.30 22 36 1.89 18.54 215.25 116.20 0.88 0.253 0.93 0.75 1.05 1.00 1.2 19.36 0.373 0.95 2.127 NL
8 179.048 177.548 1.50 12.80 19 87 1.95 19.12 243.94 130.18 0.83 0.243 0.88 0.75 1.05 1.00 1.2 15.79 0.276 0.92 1.634 NL
9 177.548 176.048 1.50 14.30 24 88 2.05 20.10 274.10 145.62 0.78 0.230 0.83 0.75 1.05 1.00 1.2 18.78 0.352 0.88 2.205 NL
10 176.048 174.548 1.50 15.80 27 87 2.06 20.20 304.40 161.22 0.73 0.216 0.78 0.75 1.05 1.00 1.2 19.96 0.401 0.85 2.671 NL
11 174.548 173.048 1.50 17.30 30 86 2.06 20.20 334.70 176.81 0.69 0.203 0.74 0.75 1.05 1.00 1.2 21.01 0.365 0.81 2.594 NL
12 173.048 171.548 1.50 18.80 29 89 2.09 20.50 365.45 192.84 0.65 0.191 0.70 0.75 1.05 1.00 1.2 19.27 0.370 0.80 2.791 NL
13 171.548 170.048 1.50 20.30 33 88 2.07 20.30 395.90 208.59 0.61 0.181 0.67 0.75 1.05 1.00 1.2 20.88 0.325 0.77 2.587 NL
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI 
Project Name ‐ 
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE‐21+900

Existing Ground Water Level ‐  1.35 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV


Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 2
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24
1 191.048 188.048 3.00 2.30 6 66 1.85 18.14 41.73 32.41 0.98 0.201 1.44 0.75 1.05 0.75 1.2 6.14 0.130 1.25 0.930 L
2 188.048 186.548 1.50 3.80 7 80 1.88 18.44 69.38 45.36 0.97 0.232 1.33 0.75 1.05 0.80 1.2 7.04 0.140 1.18 0.872 L
3 186.548 185.048 1.50 5.30 9 87 1.95 19.12 98.07 59.33 0.96 0.248 1.23 0.75 1.05 0.85 1.2 8.87 0.164 1.13 0.952 L
4 185.048 183.548 1.50 6.80 13 42 1.89 18.54 124.86 71.41 0.95 0.259 1.15 0.75 1.05 0.95 1.2 13.41 0.232 1.10 1.288 NL
5 183.548 182.048 1.50 8.30 15 99 2.03 19.91 154.73 86.57 0.93 0.260 1.07 0.75 1.05 0.95 1.2 14.34 0.248 1.04 1.374 NL
6 182.048 180.548 1.50 9.80 20 56 1.89 18.54 182.53 99.66 0.91 0.260 1.00 0.75 1.05 0.95 1.2 17.98 0.328 1.00 1.821 NL
7 180.548 179.048 1.50 11.30 23 52 1.89 18.54 210.33 112.75 0.88 0.255 0.95 0.75 1.05 1.00 1.2 20.54 0.445 0.96 2.516 NL
8 179.048 177.548 1.50 12.80 16 88 1.95 19.12 239.02 126.73 0.83 0.245 0.89 0.75 1.05 1.00 1.2 13.48 0.233 0.94 1.370 NL
9 177.548 176.048 1.50 14.30 19 87 1.95 19.12 267.70 140.70 0.78 0.233 0.84 0.75 1.05 1.00 1.2 15.15 0.263 0.90 1.630 NL
10 176.048 174.548 1.50 15.80 24 95 2.03 19.91 297.56 155.85 0.73 0.219 0.80 0.75 1.05 1.00 1.2 18.09 0.331 0.86 2.182 NL
11 174.548 173.048 1.50 17.30 26 93 2.03 19.91 327.43 171.00 0.69 0.205 0.76 0.75 1.05 1.00 1.2 18.57 0.345 0.84 2.427 NL
12 173.048 171.548 1.50 18.80 28 92 2.04 20.01 357.44 186.30 0.65 0.193 0.72 0.75 1.05 1.00 1.2 19.00 0.360 0.81 2.683 NL
13 171.548 170.048 1.50 20.30 31 93 2.05 20.10 387.59 201.75 0.61 0.183 0.68 0.75 1.05 1.00 1.2 20.03 0.404 0.78 3.181 NL
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI 
Project Name ‐ 
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE‐21+900
Existing Ground Water Level ‐  1.30 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV
Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 3
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24
1 191.048 188.048 3.00 2.30 6 82 1.85 18.14 41.73 31.92 0.98 0.204 1.45 0.75 1.05 0.75 1.2 6.16 0.130 1.26 0.917 L
2 188.048 186.548 1.50 3.80 7 85 1.90 18.63 69.68 45.16 0.97 0.234 1.33 0.75 1.05 0.80 1.2 7.05 0.141 1.18 0.865 L
3 186.548 185.048 1.50 5.30 9 52 1.89 18.54 97.48 58.25 0.96 0.251 1.23 0.75 1.05 0.85 1.2 8.92 0.165 1.13 0.944 L
4 185.048 183.548 1.50 6.80 13 54 1.89 18.54 124.86 70.92 0.95 0.261 1.15 0.75 1.05 0.95 1.2 13.45 0.232 1.10 1.283 NL
5 183.548 182.048 1.50 8.30 15 99 1.99 19.52 154.14 85.49 0.93 0.263 1.07 0.75 1.05 0.95 1.2 14.42 0.249 1.05 1.369 NL
6 182.048 180.548 1.50 9.80 20 42 1.90 18.63 182.09 98.73 0.91 0.261 1.01 0.75 1.05 0.95 1.2 18.06 0.330 1.00 1.820 NL
7 180.548 179.048 1.50 11.30 23 45 1.89 18.54 209.89 111.82 0.88 0.256 0.95 0.75 1.05 1.00 1.2 20.63 0.365 0.96 2.053 NL
8 179.048 177.548 1.50 12.80 16 43 1.88 18.44 237.55 124.76 0.83 0.247 0.90 0.75 1.05 1.00 1.2 13.59 0.235 0.94 1.368 NL
9 177.548 176.048 1.50 14.30 19 44 1.88 18.44 265.20 137.71 0.78 0.236 0.85 0.75 1.05 1.00 1.2 15.33 0.267 0.91 1.631 NL
10 176.048 174.548 1.50 15.80 24 49 1.88 18.44 292.86 150.66 0.73 0.223 0.81 0.75 1.05 1.00 1.2 18.44 0.341 0.87 2.209 NL
11 174.548 173.048 1.50 17.30 26 41 1.91 18.73 320.95 164.04 0.69 0.210 0.77 0.75 1.05 1.00 1.2 19.03 0.361 0.85 2.480 NL
12 173.048 171.548 1.50 18.80 28 46 1.92 18.83 349.20 177.58 0.65 0.198 0.74 0.75 1.05 1.00 1.2 19.56 0.381 0.82 2.775 NL
13 171.548 170.048 1.50 20.30 31 99 2.04 20.01 379.21 192.87 0.61 0.188 0.70 0.75 1.05 1.00 1.2 20.60 0.452 0.79 3.476 NL
ANNEXURE I

ARUN SOIL LAB PRIVATE LIMITED LIQUEFACTION ANALYSIS

Assessment of Liquefaction Potential by  Youd et al. (2001) Method
(Based on in‐situ SPT Tests Results Approaches)

EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI 
Project Name ‐ 
VADODRA GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE‐21+900

Existing Ground Water Level ‐  1.20 meter Earthquake Magnitude , Mw ‐ 6.50 Earthquake Zone IV


Peak Horizontal Acceleration ‐ 0.24 FOS against Liquefaction ‐ 1.00
Bore Hole No. ‐ 4
Bulk σvo (kPa)
Starting  Thickness  Field  Bulk σ' vo (kPa)
End RL Depth of  Density, for
S. No. RL of of Layer SPT Nm  %FINES Density, for design rd CSR CN CE CB CR CS (N1)60 CRR7.5 Kϭ FOS REMARKS
of Layer SPT (m) ρ  design
Layer (m) Value ρ (gms/cc) WT
(kN/m3) WT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24
1 191.048 188.048 3.00 2.30 6 56 1.84 18.04 41.50 30.72 0.98 0.211 1.46 0.75 1.05 0.75 1.2 6.21 0.130 1.27 0.892 L
2 188.048 186.548 1.50 3.80 7 60 1.88 18.44 69.16 43.66 0.97 0.241 1.34 0.75 1.05 0.80 1.2 7.11 0.141 1.19 0.847 L
3 186.548 185.048 1.50 5.30 9 44 1.85 18.14 96.37 56.16 0.96 0.258 1.25 0.75 1.05 0.85 1.2 9.03 0.166 1.14 0.929 L
4 185.048 183.548 1.50 6.80 13 32 1.88 18.44 124.20 69.28 0.95 0.266 1.16 0.75 1.05 0.95 1.2 13.57 0.234 1.11 1.270 NL
5 183.548 182.048 1.50 8.30 15 88 2.04 20.01 154.21 84.58 0.93 0.265 1.08 0.75 1.05 0.95 1.2 14.48 0.250 1.05 1.361 NL
6 182.048 180.548 1.50 9.80 20 86 2.05 20.10 184.36 100.02 0.91 0.261 1.00 0.75 1.05 0.95 1.2 17.95 0.327 1.00 1.805 NL
7 180.548 179.048 1.50 11.30 23 48 1.88 18.44 212.02 112.97 0.88 0.256 0.94 0.75 1.05 1.00 1.2 20.53 0.442 0.96 2.488 NL
8 179.048 177.548 1.50 12.80 16 87 1.96 19.22 240.85 127.09 0.83 0.246 0.89 0.75 1.05 1.00 1.2 13.46 0.232 0.94 1.361 NL
9 177.548 176.048 1.50 14.30 19 89 1.94 19.03 269.39 140.92 0.78 0.234 0.84 0.75 1.05 1.00 1.2 15.14 0.263 0.90 1.621 NL
10 176.048 174.548 1.50 15.80 24 88 1.96 19.22 298.22 155.04 0.73 0.220 0.80 0.75 1.05 1.00 1.2 18.14 0.332 0.87 2.176 NL
11 174.548 173.048 1.50 17.30 26 84 2.05 20.10 328.38 170.48 0.69 0.206 0.76 0.75 1.05 1.00 1.2 18.61 0.346 0.84 2.420 NL
12 173.048 171.548 1.50 18.80 28 86 2.06 20.20 358.68 186.08 0.65 0.194 0.72 0.75 1.05 1.00 1.2 19.02 0.360 0.81 2.674 NL
13 171.548 170.048 1.50 20.30 31 83 2.06 20.20 388.98 201.67 0.61 0.184 0.68 0.75 1.05 1.00 1.2 20.04 0.405 0.78 3.170 NL
ANNEXURE II
RESULT SHEET
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA
NAME OF THE PROJECT
GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900
Client Name APCO INFRATECH PRIVATE LIMITED
Bore Hole No. 1 Easting 710709.33 Depth of Water Level (m bgl) 1.20
Total depth of Coordinate Northing 3114637.49 Commenced on 15/4/2019 ARUN SOIL LAB PVT. LTD.
20.00
Bore Hole (m) Elevation 192.048 Completed on 25/4/2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor
Void Ratio

overburden
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.00 - 0.50 192.048 - 191.548 DS - - - 100 100 100 52 - NON-PLASTIC ML - - - - - - - - 0.014 0.45 7.35 0 48 49 3
0.012 0.50 7.45
1.00 - 1.45 191.048 - 190.598 UD - - - 100 100 100 57 - NON-PLASTIC ML 1.84 24.2 1.48 - - - - - 0.018 0.48 7.34 0 43 54 3
1.45 - 1.90 190.598 - 190.148 SPT 4 6.43 6.43 - -

2.50 - 2.95 189.548 - 189.098 UD - - - 100 100 97 44 - NON-PLASTIC ML 1.84 22.8 1.50 2.54 0.693 0 28° - - - - 0 56 42 2
2.95 - 3.40 189.098 - 188.648 SPT 7 9.88 9.88 - -

4.00 - 4.45 188.048 - 187.598 UD - - - 100 100 100 95 - 38 23 15 CI 2.04 21.9 1.67 2.65 0.587 0.45 6° 0.123 - - - 0 5 69 26
4.45 - 4.90 187.598 - 187.148 SPT 13 16.43 15.72 - -

5.50 - 5.95 186.548 - 186.098 UD - - - 100 100 100 96 - 38 23 15 CI 2.03 21.5 1.67 - - - - - - - - 0 4 70 26
5.95 - 6.40 186.098 - 185.648 SPT 14 16.29 15.65 - -

7.00 - 7.45 185.048 - 184.598 UD - - - 94 92 88 -85 38 23 15 CI 2.04 20.7 1.69 2.67 0.580 0.45 7° 0.113 - - - 6 9 63 22
7.45 - 7.90 184.598 - 184.148 SPT 18 19.54 17.27 - -
SAND STARTS FROM 7.90 METRE
8.50 - 8.95 183.548 - 183.098 UD - - - 100 100 97 32 - NON-PLASTIC SM 1.88 21.5 1.55 2.56 0.652 0 31° - - - - 0 68 31 1
8.95 - 9.40 183.098 - 182.648 SPT 21 21.67 18.34 - -

10.00 - 10.45 182.048 - 181.598 UD - - - 100 100 95 - 36


NON-PLASTIC SM 1.89 22.0 1.55 - - - - - - - - 0 64 35 1
10.45 - 10.90 181.598 - 181.148 SPT 22 21.67 18.34 - -
CLAY STARTS FROM 10.90 METRE DEPTH
11.50 - 11.95 180.548 - 180.098 UD - - - 97 92 90 87 - 30 20 10 CL 1.95 18.9 1.64 2.65 0.616 0.30 12° 0.110 - - - 3 10 70 17
11.95 - 12.40 180.098 - 179.648 SPT 19 17.88 16.44 - -

13.00 - 13.45 179.048 - 178.598 UD - - - 98 94 90 88 - 36 22 14 CI 2.05 20.3 1.70 - - - - - - - - 2 10 68 20


13.45 - 13.90 178.598 - 178.148 SPT 24 21.57 18.29 - -

14.50 - 14.95 177.548 - 177.098 UD - - - 96 93 91 87 - 36 22 14 CI 2.06 19.9 1.72 2.67 0.552 0.50 8° 0.083 - - - 4 9 67 20
14.95 - 15.40 177.098 - 176.648 SPT 27 23.24 19.12 - -

16.00 - 16.45 176.048 - 175.598 UD - - - 95 94 90 86 - 36 22 14 CI 2.06 19.2 1.73 - - - - - - - - 5 9 66 20


16.45 - 16.90 175.598 - 175.148 SPT 30 24.79 19.90 - -

17.50 - 17.95 174.548 - 174.098 UD - - - 94 92 90 89 - 36 22 14 CI 2.09 20.7 1.73 - - - - - - - - 6 5 68 21


17.95 - 18.40 174.098 - 173.648 SPT 29 23.05 19.03 - -

19.00 - 19.45 173.048 - 172.598 UD - - - 95 93 91 88 - 36 22 14 CI 2.07 18.9 1.74 - - - - - - - - 5 7 67 21


19.45 - 19.90 172.598 - 172.148 SPT 33 25.28 20.14 - -

19.90 - 20.00 172.148 - 172.048 DS - - - 95 92 90 89 36 22 14 CI - - 5 2 72 21


ANNEXURE III
RESULT SHEET
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA
NAME OF THE PROJECT
GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900

Client Name APCO INFRATECH PRIVATE LIMITED


Bore Hole No. 2 Easting 710745.87 Depth of Water Level (m bgl) 1.35
Total depth of Coordinate Northing 3114584.33 Commenced on 15/4/2019 ARUN SOIL LAB PVT. LTD.
20.00
Bore Hole (m) Elevation 191.823 Completed on 25/4/2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor
Void Ratio

overburden
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

Angle of

corrected due to
corrected due to
Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.00 - 0.50 191.823 - 191.323 DS - - - 100 100 97 62 - NON-PLASTIC ML - - - - - - - - 0.014 0.25 7.54 0 38 58 4
0.016 0.92 7.41
1.00 - 1.45 190.823 - 190.373 UD - - - 100 100 98 66 - NON-PLASTIC ML 1.85 23.5 1.50 2.54 0.693 0 26° - 0.008 0.77 7.52 0 34 62 4
1.45 - 1.90 190.373 - 189.923 SPT 6 9.60 9.60 - -

2.50 - 2.95 189.323 - 188.873 UD - - - 100 100 100 80 - NON-PLASTIC ML 1.88 22.7 1.53 - - - - - - - - 0 20 75 5
2.95 - 3.40 188.873 - 188.423 SPT 7 9.81 9.81 - -

4.00 - 4.45 187.823 - 187.373 UD - - - 97 92 90 87 - 30 23 7 CL-ML 1.95 22.1 1.60 2.62 0.638 0.15 22° 0.117 - - - 3 10 71 16
4.45 - 4.90 187.373 - 186.923 SPT 9 11.41 11.41 - -

5.50 - 5.95 186.323 - 185.873 UD - - - 100 100 97 -42 NON-PLASTIC SM 1.89 23.0 1.54 2.53 0.643 0 29° - - - - 0 58 40 2
5.95 - 6.40 185.873 - 185.423 SPT 13 15.32 15.16 - -
CLAY STARTS FROM 6.40 METRE
7.00 - 7.45 184.823 - 184.373 UD - - - 100 100 100 99 - 38 23 15 CI 2.03 21.5 1.67 2.66 0.593 0.45 6° 0.113 - - - 0 1 71 28
7.45 - 7.90 184.373 - 183.923 SPT 15 16.47 15.74 - -
SAND STARTS FROM 7.90 METRE
8.50 - 8.95 183.323 - 182.873 UD - - - 100 100 97 56 - NON-PLASTIC ML 1.89 20.9 1.56 2.57 0.647 0 28° - - - - 0 44 53 3
8.95 - 9.40 182.873 - 182.423 SPT 20 20.85 17.93 - -

10.00 - 10.45 181.823 - 181.373 UD - - - 100 100 96 52


- NON-PLASTIC ML 1.89 20.4 1.57 - - - - - - - - 0 48 49 3
10.45 - 10.90 181.373 - 180.923 SPT 23 22.86 18.93 - -
CLAY STARTS FROM 11.50 METRE
11.50 - 11.95 180.323 - 179.873 UD - - - 96 92 90 88 - 30 20 10 CL 1.95 18.9 1.64 2.64 0.610 0.25 15° 0.110 - - - 4 8 71 17
11.95 - 12.40 179.873 - 179.423 SPT 16 15.19 15.10 - -

13.00 - 13.45 178.823 - 178.373 UD - - - 97 92 90 87 - 32 20 12 CL 1.95 18.2 1.65 - - - - - - - - 3 10 70 17


13.45 - 13.90 178.373 - 177.923 SPT 19 17.28 16.14 - -

14.50 - 14.95 177.323 - 176.873 UD - - - 100 100 97 95 - 37 22 15 CI 2.03 20.7 1.68 2.67 0.589 0.50 7° 0.083 - - - 0 5 71 24
14.95 - 15.40 176.873 - 176.423 SPT 24 20.92 17.96 - -

16.00 - 16.45 175.823 - 175.373 UD - - - 100 100 95 93 - 37 22 15 CI 2.03 20.2 1.69 - - - - - - - - 0 7 69 24


16.45 - 16.90 175.373 - 174.923 SPT 26 21.77 18.39 - -

17.50 - 17.95 174.323 - 173.873 UD - - - 100 100 96 92 - 37 22 15 CI 2.04 19.5 1.71 - - - - - - - - 0 8 69 23


17.95 - 18.40 173.873 - 173.423 SPT 28 22.56 18.78 - -

19.00 - 19.45 172.823 - 172.373 UD - - - 100 100 97 93 - 37 22 15 CI 2.05 19 1.72 - - - - - - - - 0 7 70 23


19.45 - 19.90 172.373 - 171.923 SPT 31 24.08 19.54 - -

19.90 - 20.00 171.923 - 171.823 DS - - - 100 100 95 91 37 22 15 CI - - 0 9 69 22


ANNEXURE III
RESULT SHEET
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA
NAME OF THE PROJECT
GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900

Client Name APCO INFRATECH PRIVATE LIMITED


Bore Hole No. 3 Easting 710705.25 Depth of Water Level (m bgl) 1.30
Total depth of Coordinate Northing 3114587.65 Commenced on 15/4/2019 ARUN SOIL LAB PVT. LTD.
20.00
Bore Hole (m) Elevation 191.794 Completed on 25/4/2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
pH

SPT Value
SPT Value
LL PL PI
Silt

SPT Value
Silt Factor

overburden
Void Ratio
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

corrected due to
corrected due to
Angle of

Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.00 - 0.50 191.794 - 191.294 DS - - - 100 100 97 78 - NON-PLASTIC ML - - - - - - - - 0.016 0.83 7.69 0 22 74 4
0.014 0.81 7.45
1.00 - 1.45 190.794 - 190.344 UD - - - 100 100 100 82
- NON-PLASTIC ML 1.85 23.5 1.50 2.54 0.693 0 27° - 0.012 0.96 7.45 0 18 77 5
1.45 - 1.90 190.344 - 189.894 SPT 6 9.60 9.60 - -
CLAY STARTS FROM 2.50 METRE
2.50 - 2.95 189.294 - 188.844 UD - - - 97 92 88 85 - 30 20 10 CL 1.90 19.6 1.59 2.60 0.635 0.25 8° 0.127 - - - 3 12 69 16
2.95 - 3.40 188.844 - 188.394 SPT 7 9.78 9.78 - -
3.40 - 4.00 188.394 - 187.794 DS 97 92 90 87 38 23 15 CI

4.00 - 4.45 187.794 - 187.344 UD - - - 97 92 90 52 - NON-PLASTIC ML 1.89 22.8 1.54 2.54 0.649 0 27° - - - - 3 45 49 3
4.45 - 4.90 187.344 - 186.894 SPT 9 11.45 11.45 - -

5.50 - 5.95 186.294 - 185.844 UD - - - 98 95 90 54


- NON-PLASTIC ML 1.89 20.9 1.56 - - - - - - - - 2 44 51 3
5.95 - 6.40 185.844 - 185.394 SPT 13 15.38 15.19 - -
CLAY STARTS FROM 7.00 METRE
7.00 - 7.45 184.794 - 184.344 UD - - - 100 100 100 99 - 37 22 15 CI 1.99 21.2 1.64 2.65 0.616 0.40 6° 0.117 - - - 0 1 74 25
7.45 - 7.90 184.344 - 183.894 SPT 15 16.57 15.79 - -
SAND STARTS FROM 8.50 METRE
8.50 - 8.95 183.294 - 182.844 UD - - - 100 100 97 42 - NON-PLASTIC SM 1.90 22.5 1.55 2.56 0.652 0 30° - - - - 0 58 40 2
8.95 - 9.40 182.844 - 182.394 SPT 20 20.94 17.97 - -

10.00 - 10.45 181.794 - 181.344 UD - - - 100 100 98 45 - NON-PLASTIC SM 1.89 20.9 1.56 - - - - - - - - 0 55 42 3
10.45 - 10.90 181.344 - 180.894 SPT 23 22.96 18.98 - -

11.50 - 11.95 180.294 - 179.844 UD - - - 100 100 97 43 - NON-PLASTIC SM 1.88 20.3 1.56 - - - - - - - - 0 57 41 2
11.95 - 12.40 179.844 - 179.394 SPT 16 15.30 15.15 - -

13.00 - 13.45 178.794 - 178.344 UD - - - 100 100 96 44 - NON-PLASTIC SM 1.88 19.8 1.57 2.58 0.643 0 31° - - - - 0 56 42 2
13.45 - 13.90 178.344 - 177.894 SPT 19 17.46 16.23 - -

14.50 - 14.95 177.294 - 176.844 UD - - - 100 100 98 49 - NON-PLASTIC SM 1.88 19.2 1.58 - - - - - - - - 0 51 46 3
14.95 - 15.40 176.844 - 176.394 SPT 24 21.24 18.12 - -

16.00 - 16.45 175.794 - 175.344 UD - - - 100 100 97 41 - NON-PLASTIC SM 1.91 18.9 1.61 - - - - - - - - 0 59 39 2
16.45 - 16.90 175.344 - 174.894 SPT 26 22.18 18.59 - -

17.50 - 17.95 174.294 - 173.844 UD - - - 100 100 96 46


- NON-PLASTIC SM 1.92 19.7 1.60 - - - - - - - - 0 54 43 3
17.95 - 18.40 173.844 - 173.394 SPT 28 23.08 19.04 - -
CLAY STARTS FROM 18.40 METRE
19.00 - 19.45 172.794 - 172.344 UD - - - 100 100 100 99 - 36 22 14 CI 2.04 20.6 1.69 2.67 0.580 0.50 7° 0.090 - - - 0 1 75 24
19.45 - 19.90 172.344 - 171.894 SPT 31 24.61 19.81 - -

19.90 - 20.00 171.894 - 171.794 DS 0 0.00 0.00 100 100 100 98 36 22 14 CI - - 0 2 74 24


ANNEXURE III
RESULT SHEET
EIGHT LANE EXPRESSWAY STARTING BEFORE KMP EXPRESSWAY AND ENDS AT CH 7+000 NEAR KHANPUR GHATI (KM 18+500 TO KM 47+000) SECTION OF DELHI VADODRA
NAME OF THE PROJECT
GREEN FIELD ALIGNMENT (NH 148N) ON EPC MODE UNDER BHARATMALA PARIYOJNA IN THE STATE OF HARYANA (PACKAGE II) CHAINGE-21+900

Client Name APCO INFRATECH PRIVATE LIMITED


Bore Hole No. 4 Easting 710741.79 Depth of Water Level (m bgl) 1.20
Total depth of Coordinate Northing 3114534.50 Commenced on 15/4/2019 ARUN SOIL LAB PVT. LTD.
20.00
Bore Hole (m) Elevation 192.147 Completed on 25/4/2019
% Material Passing Shear
Atterberg Limits Particle Size Analysis
IS Sieve Characterisitics
Depth of Bore Reduced Level

Index
Hole (Assumed)

dilatancy
LL PL PI pH

SPT Value
SPT Value
Silt

SPT Value
Silt Factor
Void Ratio

overburden
Clay

(SO4)
Sand

4.750
2.000
0.425
0.075
Gravel

Compression

Internal
Friction
Sulphate

corrected due to
corrected due to
Angle of

Specific Gravity
Cohesion

IS group symbol
Dry Bulk Density

Type of Sample
Wet Bulk Density
Original Moisture
Chloride (CL)
metre metre N N' N" (mm) (mm) (mm) (mm) % % % (gms/cc) % (gms/cc) (G) (Kg/sqcm) (Ø) (Cc) % % % % % %
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

0.00 - 0.50 192.147 - 191.647 DS - - - 100 100 97 62 - NON-PLASTIC ML - - - - - - - - 0.018 0.74 7.30 0 38 58 4
0.014 0.70 7.33
1.00 - 1.45 191.147 - 190.697 UD - - - 100 100 100 56 - NON-PLASTIC ML 1.84 24.0 1.48 2.52 0.703 0 27° - 0.010 0.85 7.36 0 44 53 3
1.45 - 1.90 190.697 - 190.247 SPT 6 9.65 9.65 - -

2.50 - 2.95 189.647 - 189.197 UD - - - 100 100 100 60 - NON-PLASTIC ML 1.88 22.7 1.53 - - - - - - - - 0 40 57 3
2.95 - 3.40 189.197 - 188.747 SPT 7 9.83 9.83 - -
3.40 - 4.00 188.747 - 188.147 DS - 100 100 100 93 27 22 5 ML

4.00 - 4.45 188.147 - 187.697 UD - - - 100 100 100 44 - NON-PLASTIC SM 1.85 23.3 1.50 2.54 0.693 0 29° - - - - 0 56 26 18
4.45 - 4.90 187.697 - 187.247 SPT 9 11.55 11.55 - -
4.90 - 5.50 187.247 - 186.647 DS - 100 100 100 99 38 23 15 CI

5.50 - 5.95 186.647 - 186.197 UD - - - 100 100 100 32


- NON-PLASTIC SM 1.88 21.9 1.54 - - - - - - - - 0 68 30 2
5.95 - 6.40 186.197 - 185.747 SPT 13 15.49 15.25 - -
CLAY STARTS FROM 6.40 METRE
7.00 - 7.45 185.147 - 184.697 UD - - - 96 92 90 88 - 39 23 16 CI 2.04 22.2 1.67 2.66 0.593 0.45 6° 0.120 - - - 4 8 64 24
7.45 - 7.90 184.697 - 184.247 SPT 15 16.61 15.81 - -

8.50 - 8.95 183.647 - 183.197 UD - - - 97 94 90 -86 39 23 16 CI 2.05 21.5 1.69 - - - - - - - - 3 11 62 24


8.95 - 9.40 183.197 - 182.747 SPT 20 20.80 17.90 - -
SAND STARTS FROM 9.40 METRE
10.00 - 10.45 182.147 - 181.697 UD - - - 100 100 97 48 - NON-PLASTIC SM 1.88 20.8 1.56 2.56 0.641 0 30° - - - - 0 52 45 3
10.45 - 10.90 181.697 - 181.247 SPT 23 22.82 18.91 - -

11.50 - 11.95 180.647 - 180.197 UD - - - 96 92 90 87 - 32 20 12 CL 1.96 18.7 1.65 - - - - - - - - 4 9 70 17


11.95 - 12.40 180.197 - 179.747 SPT 16 15.16 15.08 - -

13.00 - 13.45 179.147 - 178.697 UD - - - 97 95 93 89 - 32 20 12 CL 1.94 19.2 1.63 2.64 0.620 0.30 12° 0.110 - - - 3 8 72 17
13.45 - 13.90 178.697 - 178.247 SPT 19 17.26 16.13 - -

14.50 - 14.95 177.647 - 177.197 UD - - - 95 94 90 88 - 32 20 12 CL 1.96 18.8 1.65 - - - - - - - - 5 7 71 17


14.95 - 15.40 177.197 - 176.747 SPT 24 20.94 17.97 - -

16.00 - 16.45 176.147 - 175.697 UD - - - 96 90 88 84 - 36 20 16 CI 2.05 20.7 1.70 2.67 0.571 0.50 7° 0.090 - - - 4 12 62 22
16.45 - 16.90 175.697 - 175.247 SPT 26 21.78 18.39 - -

17.50 - 17.95 174.647 - 174.197 UD - - - 97 93 90 86 - 36 20 16 CI 2.06 20.9 1.70 - - - - - - - - 3 11 63 23


17.95 - 18.40 174.197 - 173.747 SPT 28 22.56 18.78 - -

19.00 - 19.45 173.147 - 172.697 UD - - - 96 90 87 83 - 36 20 16 CI 2.06 19.3 1.73 - - - - - - - - 4 13 62 21


19.45 - 19.90 172.697 - 172.247 SPT 31 24.07 19.54 - -

19.90 - 20.00 172.247 - 172.147 DS - - - 95 90 88 85 36 20 16 CI - - 5 10 63 22


ANNEXURE III
ANNEXURE IV
ANNEXURE IV
ANNEXURE IV
ANNEXURE IV
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE V
ISO/IEC: 17025-2005 accredited lab Triaxial / Direct Shear Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 

 
ANNEXURE VI
ISO/IEC: 17025-2005 accredited lab Consolidation Test Graphs
 

 
 

ARUN SOIL LAB PRIVATE LIMITED


Geotech & Material Testing Consultant
(Civil Engineering Projects) 
 