17 Details
Activity Option - 1
(i) Upload Alignment Map Enclosed
(ii) Number of Bypasses -
(iii) Length of Alignment (Km.) 8+950
(iv) Proposed ROW 60
(v) Total Land Required in Hect. 40.275
(vi) Govt. Land in Hect. 8.95
(vii) Additional Land Required (in Hect.) 31.325
(viii) Length affected by structure (approx.No./Area) 60
21 Remark
ent Approval
8.95
2 Lane
6 Lane
6 Lane
15
60
0.49
Option - 2
Enclosed
-
10+900
60
65.4
10.9
54.5
10
Nil
₹ 26.71
₹ 80.53
₹ 8.90
₹ 116.14
S.No. Project Development for Alignment Approval
17 Details
Activity Option - 1
(i) Upload Alignment Map Enclosed
(ii) Number of Bypasses -
(iii) Length of Alignment (Km.) 7+300
(iv) Proposed ROW 60
(v) Total Land Required in Hect. 43.8
(vi) Govt. Land in Hect. 10.95
(vii) Additional Land Required (in Hect.) 32.85
(viii) Length affected by structure (approx.No./Area)
(ix) Any religious or cultural or other structure difficult
to acquire
(x) Estimated LA Cost (INR Crore) ₹ 74.90
(xi) Estimated Civil Cost and Centages (INR Crore) ₹ 151.80
(xii) Other Preconstruction Costs ₹ 16.70
(xiii) Estimated Total Capital Cost (INR Crore) ₹ 243.40
21 Remark
ent Approval
7+700
2 Lane
4 Lane
2 Lane
15m
60m
2.28
Option - 1
Enclosed
-
7+300
60
43.8
10.95
32.85
₹ 74.90
₹ 151.80
₹ 16.70
₹ 243.40