You are on page 1of 76

Fire Stopping Standard Details

Interested?
Fire Stopping For further information on

Standard Details ROCKWOOL FIREPRO®


products and solutions, contact
the Technical Solutions Team
on 01656 868 490 or
The ROCKWOOL FIREPRO® range of
email: info@rockwool.co.uk.
products provides fire stopping and
fire resistance throughout the whole Visit www.rockwool.com/uk
construction process; intended to make to view our complete range of
buildings and their inhabitants safer in the products and services.
event of fire.
Beyond ROCKWOOL insulation’s inherent fire resistant
qualities, our specialist range of products help architects,
contractors and developers conform to current fire regulations.
Our range of fire resistance products cater for most general
purpose and specialty building applications:

▪ Structural protection
▪ Penetration seals
▪ Joints
▪ Cavity barriers
▪ Building services protection

(V9/AUG21) 2
Contents
Page FIREPRO® product Application area Orientation of use Drawing no.
9 50mm Ablative Batt Multiple service penetrations Vertical SD-112-RDW
10 2 x 50mm Ablative Batt Multiple service penetrations Vertical SD-122-RDW
11 50mm Ablative Batt (Face Fix) Multiple service penetrations Vertical SD-113-RDW
12 2 x 50mm Ablative Batt Multiple service penetrations (service spacing) Vertical SD-250-RDW
13 2 x 50mm Ablative Batt Multiple service penetrations (single sided install) Vertical SD-145-RDW
14 2 x 50mm Ablative Batt Timber penetrations Vertical SD-310-RW
15 60mm Ablative Batt Multiple service penetrations Vertical SD-106-RDW
16 2 x 60mm Ablative Batt Multiple service penetrations Vertical SD-107-RDW
17 60mm Ablative Batt (Face Fix) Multiple service penetrations Vertical SD-111-RDW
18 Soft Seal Multiple service penetrations Vertical SD-149-RDW
19 Soft Seal Multiple service penetrations Vertical SD-150-RDW
20 Soft Seal Service penetrations - plastic pipes Vertical SD-161-RDW
21 2 x 50mm Ablative Batt Multiple service penetrations Horizontal SD-123-RDW
22 60mm Ablative Batt Multiple service penetrations Horizontal SD-124-RDW
23 FireStop Compound Multiple service penetrations Horizontal SD-132-RDW
24 FireStop Compound Service penetrations - metal pipes Horizontal RWSD-COM-0503
25 FireStop Compound Service penetrations - metal pipes Horizontal RWSD-COM-0510
26 H&V Pipe Section Service penetrations - metal pipes Vertical SD-260-RW
27 H&V Pipe Section Service penetrations - metal pipes Vertical SD-140-RDW
28 H&V Pipe Section Service penetrations - metal pipes Vertical SD-141-RDW
29 Pipe Collar CE Service penetration - plastic pipes Vertical RWSD-COL-0001
30 Pipe Collar CE Service penetration - plastic pipes through batt Vertical RWSD-COL-0002
31 Pipe Collar CE Service penetration - plastic pipes Vertical RWSD-COL-0003
32 Pipe Collar CE Service penetration - plastic pipes Horizontal RWSD-COL-0501
33 Pipe Collar CE Service penetration - plastic pipes Horizontal RWSD-COL-0502
34 Acoustic Intumescent Sealant Service penetrations - metal pipes & cables Vertical SD-128-RDW
35 Acoustic Intumescent Sealant Service penetrations - cables Vertical SD-127-RW
36 Acoustic Intumescent Sealant Service Penetrations - Metal sleeves & cables Vertical RWSD-AIS-0101
37 Acoustic Intumescent Sealant Service penetrations - metal pipes Vertical SD-311-RDW
38 Pipe Wrap CE Service penetrations - plastic pipes Vertical RWSD-PW-0001
39 Pipe Wrap CE Service penetrations - plastic pipes Horizontal RWSD-PW-0501
40 Wrap on a roll (Double) Service penetrations - plastic pipes Horizontal SD-181-RDW
41 Wrap on a roll Service penetrations - plastic pipes flexible wall Vertical SD-185-RDW
42 Wrap on a roll Service penetrations - plastic pipes face fix batt Vertical SD-188-RDW
43 Wrap on a roll Service penetrations - insulated pipes face fix batt Vertical SD-190-RDW
44 Wrap on a roll Service penetrations - insulated pipes batt seal Vertical SD-191-RDW
45 Wrap on a roll Service penetrations - plastic pipes Vertical SD-192-RDW

(V9/AUG21) 3
Contents
Page FIREPRO® product Application area Orientation of use Drawing no.
46 High Expansion Intumescent Sealant Service penetrations - plastic pipes flexible wall Vertical SD-170-RDW
47 High Expansion Intumescent Sealant Service penetrations - plastic pipes flexible wall Vertical SD-171-RDW
48 High Expansion Intumescent Sealant Service penetrations - plastic conduits & cables (single skin flexible walls) Vertical RWSD-HE-0110
49 High Expansion Intumescent Sealant Service penetrations - plastic conduits partial penetrations & plastic pipe Vertical RWSD-HE-0111
50 High Expansion Intumescent Sealant Service penetrations - plastic pipes Horizontal SD-172-RDW
51 High Expansion Intumescent Sealant Service penetrations - cables Horizontal SD-174-RDW
52 High Expansion Intumescent Sealant Service penetrations - plastic pipes through batt Vertical SD-175-RDW
53 High Expansion Intumescent Sealant Service penetrations - plastic pipes through batt Vertical SD-176-RDW
54 High Expansion Intumescent Sealant Service penetrations - plastic pipes through batt Horizontal SD-177-RDW
55 High Expansion Intumescent Sealant Service penetrations - plastic pipes (cpvc) Vertical SD-179-RDW
56 High Expansion Intumescent Sealant Service penetrations - plastic pipes (cpvc) Vertical RWSD-HE-0051
57 Oval Insulated Fire Sleeve Service penetrations - plastic ductwork Vertical SD-220-RDW
58 Insulated Fire Sleeve Service penetrations - plastic pipes through batt Vertical RWSD-IFS-0001
59 Insulated Fire Sleeve Service penetration (single sided install) Vertical RWSD-IFS-0002
60 Insulated Fire Sleeve Service penetration - angled plastic pipes through softseal Vertical RWSD-IFS-0003
61 Insulated Fire Sleeve Service penetrations - plastic pipes Vertical RWSD-IFS-0101
62 Insulated Fire Sleeve Service penetrations - plastic pipes through batt Horizontal RWSD-IFS-0501
63 Insulated Fire Sleeve Service penetrations - plastic pipes Horizontal RWSD-IFS-0601
64 Oval Insulated Fire Sleeve Service penetrations - plastic pipes through softseal Vertical RWSD-IFS-1003
65 EZ path in Ablative Batt Service penetrations - cable management system Vertical SD-200-RDW
66 EZ path with cover plate in Ablative Batt Service penetrations - cable management system Vertical SD-201-RDW
67 EZ path in FireStop Compound Service penetrations - cable management system Horizontal SD-202-RDW
68 50mm Ablative Batt Head of wall Vertical SD-126-RDW
69 60mm Ablative Batt Head of wall Vertical SD-125-RDW
70 Linear & Trapezoidal Fire Stops Head of wall Vertical SD-134-RDW
71 Acoustic Intumescent Sealant Linear joint seal Vertical & Horizontal RWSD-AIS-0001
72 Soft Seal Linear joint seal Vertical & Horizontal SD-160-RDW
73 SP Slab Linear joint seal Vertical & Horizontal SD-230-RDW
74 SP Slab Linear joint seal (penetrations) Horizontal SD-235-RW
75 SP Plus Linear joint seal (service penetrations) Horizontal SD-236-RW

(V9/AUG21) 4
ROCKWOOL®
Fire Stopping Guide
1. ROCKWOOL will not support mixing fire protection of differing manufacturers systems/products of any type in line
with ASFP recommendations, unless proven by fire testing.

2. ROCKWOOL products should be installed in accordance with the relevant product data sheet and within the field
of application identified on the standard details. For applications that fall outside of the parameters identified in
the standard details or data sheets please contact ROCKWOOL for further guidance.

3. Engineering judgements are an appraisal of the likely performance of the installed ROCKWOOL products in
that application when subjected to a fire resistance test. It is offered in lieu of direct formal testing and is based
upon ROCKWOOL’s experiences of product performance during fire resistance testing. For this reason, before
installation, engineering judgements used on-site should be reviewed and accepted by Building Control and/or
the scheme Fire Officer or the overseeing body for the project.

4. All penetrations within the dry lining system shall be framed and lined. As a reflection of the fire test standard, all
partitions are based upon 2 No. 12.5 mm thick plasterboards to each side of the stud. For solutions to partitions
of a different make up including; fewer boards, thinner boards or different finish materials, please contact
ROCKWOOL for further guidance. A pattress fit option with ROCKWOOL Batts is available, but please check for its
suitability.

5. Design of the penetration and its fire stopping should consider and correspond to the integrity and insulation
requirements of the host wall or floor, unless leniency on the insulation rating is provided by the fire officer or
overseeing body via a derogation.

6. Services of different types can pass through the same penetration, with the exception of ventilation (ducts and
dampers) which should pass exclusively through its own penetration, as per the EN test guidance.

7. Support for services passing through walls should be within 500mm on each side. Services passing through floors
should be supported at each level, as per industry and ASFP guidance.

8. With reference to penetration spacings, please refer to the ROCKWOOL Spacing Guidelines Document.

9. Under the CPR it is a requirement that fire dampers are CE marked and as such that they are installed (and fire
stopped) in line with the relevant damper manufacturer’s installation guides. Damper manufacturers can now
provide a tested fire stopping solution for sealing around their damper systems. Therefore, ROCKWOOL’s default
position is to guide the Client and/or Installer to contact the relevant damper manufacturer for its tested and
certified fire stopping solution.

(V9/AUG21) 5
ROCKWOOL® Penetration spacing guidelines
The information below is a direct reflection of our supporting test data, however we can review spacings and performance on a case by case basis, subject to fire ratings, differing
substrates and available testing, please contact ROCKWOOL for further support - Call: 01656 868490 or email: technical.solutions@rockwool.co.uk

Cable trays & ladders through double 50/60mm batt wall seals - Minimum separation
Fire rating (minutes)
Service Aperture size Aperture edge separation Service separation E (integrity) I (insulation)
Ladders ≤350mm wide 1200mm x 600mm 0mm 120 90
Trays ≤500mm wide 1200mm x 600mm 0mm 120 60
Cables ≤80mm 1200mm x 600mm 0mm 50mm between trays / 120 *Variable
Bunches 100mm Dia. 1200mm x 600mm 0mm 0mm between ladders 120 90
Metal Conduits ≤16mm 1200mm x 600mm 0mm 120 60
Plastic Conduits ≤16mm 1200mm x 600mm 0mm 120 120
*Please contact ROCKWOOL Technical with cable size and type

Non-combustible pipes with Rocklap H&V lagging through double 50/60mm batt wall seals - Minimum separation

H&V insulation Aperture edge Service Service Fire rating (minutes)


Pipe Type Pipe Dia. (mm) thk (mm) Aperture size separation separation configuration E (integrity) I (insulation)
Copper 40 - 108 25 1200 x 1200 0mm 0mm Cluster & Linear 90 90
Steel 40 - 168 25 1200 x 1200 0mm 0mm Cluster & Linear 90 90
Copper 40 - 108 40 1200 x 1200 0mm 0mm Cluster & Linear 120 120
Steel 40 - 168 40 1200 x 1200 0mm 0mm Cluster & Linear 120 120
Steel 168 - 220 25 1200 x 1200 0mm 100mm Single 120 120
Copper & steel
pipes under cable 40 - 108 25 1200 x 600 50mm 10mm Single 120 120
tray / ladders

Insulated fire sleeve through double layer ablative batt wall seals

Aperture edge Fire rating (minutes)


Insulated fire sleeve Pipe type Pipe diameter separation Service separation E (integrity) I (insulation)
Combustible pipe through batt as PB / HDPE / PVCu /
>160mm 150mm 150mm 120 120
pattress or aperture seal PVC / ABS

(V9/AUG21) 6
Wrap on a roll in double layer ablative batt wall seals

Aperture edge Fire rating (minutes)


Wrap on a roll application Pipe type Pipe diameter separation Service separation E (integrity) I (insulation)
Combustible pipes with wrap in pattress batts PVCu / PP / HDPE 200mm 50mm 0mm 60 60
Insulated pipes with wrap in pattress batts Refer to SD-190-RDW Refer to SD-190-RDW 128mm 50mm Refer to SD-190-RDW
Insulated pipes with wrap in batts Refer to SD-191-RDW Refer to SD-191-RDW 128mm 50mm Refer to SD-191-RDW

FireStop Compound Floor Seal

Aperture edge Fire rating (minutes)


Seal Penetration Pipe diameter separation Service separation E (integrity) I (insulation)
Non-combustible pipe lagged with H&V pipe
Refer to SD-132-RDW 0mm 50mm Refer to SD-132-RDW
section 40mm
Min. 100mm Non-combustible pipe un-lagged Refer to SD-132-RDW 0mm 50mm Refer to SD-132-RDW
thick FireStop
compound 150mm between
Cable tray 500mm wide 0mm 120 120
trays (vertical)
Combustible pipe with pipe wrap ≤168mm 50mm 50mm Refer to SD-132-RDW

Cable trays & ladders through single 50/60mm batt wall seals - Minimum separation
Fire rating (minutes)
Service Aperture size Aperture edge separation Service separation E (integrity) I (insulation)
Ladders ≤350mm wide 1200mm x 600mm 0mm 110mm 120 90
Trays ≤500mm wide 1200mm x 600mm 0mm 75mm 120 60
Cables ≤80mm 1200mm x 600mm 0mm 110mm 120 *Variable
Bunches 100mm Dia. 1200mm x 600mm 0mm 75mm 120 90
Metal Conduits ≤16mm 1200mm x 600mm 0mm 110mm 120 60
Plastic Conduits ≤16mm 1200mm x 600mm 0mm 75mm 120 120
*Please contact ROCKWOOL Technical with cable size and type

High expansion sealant in single 60mm batt wall seals


Spacings
Wall Pipe diameter Pipe type Annular Seal depth Backer E (integrity) I (insulation) Aperture Services
100mm Drywall 40mm Pvc & HDPE 20mm 60mm None - Full depth 120 60 30mm 30mm
100mm Drywall 40 - 63mm Pvc & HDPE 20mm 60mm None - Full depth 90 60 30mm 30mm

(V9/AUG21) 7
High expansion sealant in double 50mm ablative batt wall seals
Spacings
Wall Pipe diameter Pipe type Annular Seal depth Backer E (integrity) I (insulation) Aperture Services
100mm Drywall 40-63mm PVC & HDPE 20mm 25mm (each face) PE Rod 120 120 30mm 30mm

High expansion sealant in double 50mm ablative batt wall seals


Fire rating (minutes)
Seal Penetration Pipe diameter / size Aperture edge separation Service separation E (integrity) I (insulation)
Combustible pipes Refer to SD-176-RDW 110mm 140mm 120 120
Double 50mm ablative batt
Cable tray ≤500mm x 50mm 75mm - 120 120

Single 60mm ablative batt wall seals


Spacings
E (integrity) I (insulation) Aperture Services
Ladders ≤250 60 60 0mm 0mm laterally / 30mm vertically
Ladders ≤350 60 30 0mm 0mm laterally / 30mm vertically
Perf Trays ≤450 90 30 0mm 30mm
Trays ≤450 90 30 0mm 30mm
Cables ≤21 90 60 0mm 30mm
Cables 22 - 28 90 30 0mm 30mm
Cables 29 - 50 90 60 0mm 30mm
Cables 51 - 80 60 60 0mm 30mm
Metal Conduits 90 15 0mm 30mm
Plastic Conduits 90 60 0mm 30mm
Bunch 90 30 0mm 30mm
Trunking 300 x 150 (Empty) 30 0 100mm 100mm
Trunking 300 x 150 (300mm RWA45) 120 30 100mm 100mm

(V9/AUG21) 8
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : CF5868 / WF335645
Drywall substrate

1. Make sure that the area within the aperture is clean of The supporting construction must be capable of achieving the
40mm ROCKWOOL FireTube, or,
any debris and remove any dust from the edges. Rocklap H&V Pipe Section installed
required fire rating of the proposed Firestop.
500mm either side of the seal
Flexible wall construction must be installed in accordance with the
2. Cut Rockwool ablative coated batt to the size and shape
manufacturer's guidelines with the aperture being fully framed and
required to fit the aperture ensuring the batt will make a lined out. The Wall construction should be of a minimum thickness of
tight fit with all edges of the aperture. Insulated non-combustible pipe 100mm.

3. Setout the service penetrations and cut the coated batt All service items should be adequately supported either side of the
Firestop to ensure that no load is transferred onto the coated batt.
at the mid point of each service to enable the batt to be
15mm bead ROCKWOOL
fitted into the aperture. For specific installation details not cover by this detail (such as
Acoustic Intumescent Sealant
Damper installation) then please consult the relevant Standard detail
4. Apply Rockwool acoustic intumescent sealant to all Non-combustible pipe or the Rockwool Fire stopping Technical manual.
edges of the batt, ensuring that an even cover is achieved
All ROCKWOOL to ROCKWOOL joints of locally interrupted pipe
over the entire thickness of the batt. This should include the
lagging of Fire Tube to be filled with FirePro Glue prior to application.
outer edges of the batt and the edges of the cut made 50mm ROCKWOOL
All joints to be held firmly together with temporary bands at 200mm
through the batt to allow fitting into the aperture. There is no Ablative Coated Batt
centres until adhesive within joints has fully cured.
requirement to apply sealant to the edges of the holes cut ≤ Ø100mm bunched cables
to accommodate each service penetration. Locally continuous pipe lagging of ROCKWOOL Fire Tube or
ROCKLAP H&V pipe section does not require glue and/or temporary
≤ Ø80mm single sheathed cables restraint bands or clips.
6. Insert the batt into the aperture. ≤ Ø16 PVC or non-combustible conduits
Refer to SD-140/141-RW for ROCKLAP H&V Pipe Section
7. Apply a bead of Rockwool acoustic intumescent sealant, ≤ 480mm (w) x 25mm (d) cable tray, or application.
approximately 15 mm wide, around the perimeter of the ≤ 340mm (w) x 80mm (d) cable ladder
batt ensuring that all gaps between the batt and Refer to SD-221-RW for Insulated Fire Sleeve applications.
surrounding edges are fully filled. ROCKWOOL Insulated Fire Sleeve
Refer to relevant product data sheets for further insulation guidelines.

8. Apply a bead of Rockwool acoustic intumescent sealant, These products should only be utilised for applications as outlined in
approximately 15 mm wide, where the service penetrations Plastic pipe (HDPE, PVC, PP & ABS) the relevant ROCKWOOL product data sheet and in accordance with
pass through the batt. Ensure that the sealant fully the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
encloses each cable within the tray or ladder and that all
40 min. ROCKWOOL guidelines. For further information please visit
gaps are fully filled. www.rockwool.co.uk or contact our Technical Solutions Team on
01656 868490.
9. Repeat step 7 and 8 on the other side of the batt
Solid wall substrate
Integrity Performance: Insulation Performance:

Up to 120 Minutes Up to 60 Minutes

30 Minutes 60 Minutes 90 Minutes 120 Minutes


Service type
Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation
50mm ROCKWOOL
Maximum aperture size m² (60 Min Insulation Performance) 2.38m² 2.3m² 2.23m² 2.1m²
Maximum aperture size m² in Min 130mm thick wall 4.14m² 4.14m² 2.88m² 2.88m²
Ablative Coated Batt
Cable ladders ≤450 x 25mm & Cable ladders ≤ 340 x 100mm
bunched cables ≤100mm
ü
ü
ü
ü
ü
ü
ü
ü
ü ü Pencoed, Bridgend,
0-15mm sheathed cables ü ü ü ü ü ü South Wales CF35 6NY
16-21mm sheathed cables
22-50mm sheathed cables
ü
ü
ü
ü
ü
ü
ü*
ü
ü ü
100 min. t: 01656 868490
50-80mm sheathed cables ü ü ü ü* technical.solutions@rockwool.co.uk
PVC Conduits ≤ 15mm ü ü ü
Steel pipes ≤168mm lagged with Fire Tube / H&V ü ü ü ü 100mm pigtail screw
Copper pipes ≤ 108mm lagged with Fire Tube / H&V ü ü ü ü with 25mm washer
Steel pipes ≤60mm unlagged
Drawing Title:
ü ü ü ü ü
Steel pipes 61 - 168mm unlagged
Copper pipes ≤ 108mm unlagged
ü ü
50mm Ablative Coated Batt Application Range
ü ü
Steel ductwork 455mm x 455mm Max. ü ü ü
* With additional protection of patress piece of coated batt Min 100mm around the cable (Min 4 pigtail screw fixings)

ADDITIONAL CABLE PROTECTION


TO ACHIEVE INSULATION RATING Scale: Date:
1:10 AUG 18

Sheet Size: Drawn By: Checked By:


A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-112-RW E

(V9/AUG21) 9
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence: CF5868 / WF335645
100mm min. drywall substrate

1. Make sure that the area within the aperture is clean of The supporting construction must be capable of achieving the
40mm ROCKWOOL FireTube, or,
any debris and remove any dust from the edges. Rocklap H&V Pipe Sectioninstalled
required fire rating of the proposed Firestop.
500mm either side of the seal
Flexible wall construction must be installed in accordance with the
2. Cut Rockwool ablative coated batt to the size and shape
manufacturer's guidelines with the aperture being fully framed and
required to fit the aperture ensuring the batt will make a lined out. The Wall construction should be of a minimum thickness of
tight fit with all edges of the aperture. Insulated non-combustible pipe 100mm.

3. Setout the service penetrations and cut the coated batt All service items should be adequately supported either side of the
Firestop to ensure that no load is transferred onto the coated batt.
at the mid point of each service to enable the batt to be
15mm bead ROCKWOOL
fitted into the aperture. Acoustic Intumescent Sealant For specific installation details not cover by this detail (such as
Damper installation) then please consult the relevant Standard detail
4. Apply Rockwool acoustic intumescent sealant to all Non-combustible pipe or the Rockwool Fire stopping Technical manual.
edges of the batt, ensuring that an even cover is achieved
All ROCKWOOL to ROCKWOOL joints of locally interrupted pipe
over the entire thickness of the batt. This should include the
2no. 50mm ROCKWOOL
lagging of Fire Tube to be filled with FirePro Glue prior to application.
outer edges of the batt and the edges of the cut made All joints to be held firmly together with temporary bands at 200mm
Ablative Coated Batt
through the batt to allow fitting into the aperture. There is no centres until adhesive within joints has fully cured.
requirement to apply sealant to the edges of the holes cut ≤ Ø61mm single or bunched
to accommodate each service penetration. sheathed cables Locally continuous pipe lagging of ROCKWOOL Fire Tube or
ROCKLAP H&V pipe section does not require glue and/or temporary
restraint bands or clips.
6. Insert the batt into the aperture.
Refer to SD-140/141-RDW for ROCKLAP H&V Pipe Section
7. Apply a bead of Rockwool acoustic intumescent sealant, ≤ 450mm (w) x 25mm (d) cable tray, or application.
approximately 15mm wide, around the perimeter of the batt ≤ 340mm (w) x 80mm (d) cable ladder
ensuring that all gaps between the batt and surrounding Refer to SD-221-RDW for Insulated Fire Sleeve applications.
edges are fully filled. ROCKWOOL Insulated Fire Sleeve
Refer to relevant product data sheets for further insulation guidelines.

8. Apply a bead of Rockwool acoustic intumescent sealant, These products should only be utilised for applications as outlined in
approximately 15mm wide, where the service penetrations Plastic pipe (HDPE, PVC, PP & ABS) the relevant ROCKWOOL product data sheet and in accordance with
pass through the batt. Ensure that the sealant fully the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
encloses each cable within the tray or ladder and that all 25 min. ROCKWOOL guidelines. For further information please visit
gaps are fully filled. www.rockwool.co.uk or contact our Technical Solutions Team on
01656 868490.
9. Repeat step 7 and 8 on the other side of the batt
Solid wall substrate
Integrity Performance: Insulation Performance:

Up to 120 Minutes Up to 120 Minutes

30 Minutes 60 Minutes 90 Minutes 120 Minutes


Service type
Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation
Maximum aperture size m² 2.0m² 1.93m² 1.87m² 1.8m²
Maximum aperture size m² in Min 130mm thick wall 4.14m² Integrity 4.14m² Integrity 2.88m² Integrity 2.88m² Integrity
bunched cables ≤100 mm ü ü ü ü ü ü ü ü₴
0-15mm sheathed cables ü ü ü ü ü ü* ü ü₴
50mm ROCKWOOL
16-21mm sheathed cables ü ü ü ü ü ü* ü ü₴
Ablative Coated Batt Pencoed, Bridgend,
22-50mm sheathed cables
50-80mm sheathed cables
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü₴
ü₴
ü
ü
South Wales CF35 6NY
PVC Conduits ≤ 15 mm ü ü ü ü ü ü ü ü t: 01656 868490
Steel pipes ≤168 mm lagged with Fire Tube / H&V
Steel pipes 169mm - 219mm with Fire Tube / H&V
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü ü
technical.solutions@rockwool.co.uk
100 min.
Steel pipes 219mm - 324mm with 400mm length of ablative coating † ü ü ü ü ü
Copper pipes ≤ 108 mm lagged with Fire Tube / H&V ü ü ü ü ü ü ü ü
Drawing Title:
Steel pipes ≤168 mm Unlagged ü ü ü ü 100mm pigtail screw
Copper pipes ≤ 108 mm Unlagged ü ü ü ü with 25mm washer 50mm Ablative Coated Batt
Steel pipes in min 100mm thick masonry wall ≤ 600mm unlagged ü ü ü ü
Fire Damper ≤ 1 x 1 m (Max aperture 2.4m2 with Firepro Glue) ü ü ü ü
Double Layer Application Range
* With additional protection of patress piece of coated batt Min 100mm around the cable (Min 4 pigtail screw fixings)
† Pipe to receive 400mm length coat back of FirePro Ablative Coating either side of seal
₴ Cables insulated with ROCKWOOL RWA45 insulation 40mm thick 200mm either side of seal - suitable for masonry walls only Scale: Date:
ADDITIONAL CABLE PROTECTION 1:10 AUG 18
TO ACHIEVE INSULATION RATING
Sheet Size: Drawn By: Checked By:
A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-122-RW F

(V9/AUG21) 10
ROCKWOOL Standard Detail:
Supporting Evidence: CF5868 / WF 335645

The supporting construction must be capable of achieving the


required fire rating of the proposed Firestop.

Flexible wall construction must be installed in accordance with the


manufacturer's guidelines. Min wall thickness of 100mm.

The 50mm Rockwool Ablative Coated Batt must be installed with


Combustible pipe protected with ROCKWOOL intumescent sealant bedded between the batt and the
ROCKWOOL Intumescent Pipe
drywall. A fillet of sealant must be installed at the junction between
Sleeve
Intumescent Pipe Sleeve to project
the batt and the drywall to ensure no gaps are visible between the
25mm min. from the seal drywall and the batt. The exposed mineral wool edges should be
50mm ROCKWOOL buttered with a layer of sealant or ablative coating. All batt to batt
Insulated non-combustible pipe
Ablative Coated Batt joints are to receive acoustic intumescent sealant.

Uninsulated non-combustible pipe For applications where a 4 sided fix is not possible or if the 100mm
overlap onto partition is not possible contact ROCKWOOL.

75mm drywall screws All service items should be adequately supported either side of the
75mm drywall screws with 25mm with 25mm washer at
washers at 300mm max. centres. Firestop to ensure that no load is transferred onto the coated batt.
300mm centres
1200 max.
Cable trays and ladders < 500mm wrapped with RWA45 insulation
≤ 500mm (w) x 25mm (d) cable tray achieve EI120 rating - refer to table for cable size parameters.

For specific installation details not cover by this detail please consult
15mm bead of
the relevant Standard detail or the Rockwool Fire stopping Technical
ROCKWOOL Acoustic
manual.
Intumescent Sealant
PVC or HDPE pipe with 25mm
annular spacing sealed with These products should only be utilised for applications as outlined in
100 min. overlap ROCKWOOL High Expansion the relevant ROCKWOOL product data sheet and in accordance with
Sealant to 40mm depth
the relevant ROCKWOOL Fire Resistance Testing. Additionally the
FIXING DETAIL THROUGH FLEXIBLE WALL product must be installed in accordance with the current
≤ Ø 15mm PVC conduit sealed with
ROCKWOOL Acoustic Intumescent ROCKWOOL guidelines. For further information please visit
Sealant www.rockwool.co.uk or contact our Technical Solutions Team on
1200 max. 01656 868490.

Acoustic Performance:

Up to 53 dB
Integrity Performance: Insulation Performance:

Up to 120 Minutes Up to 120 Minutes


30 Minutes 60 Minutes 90 Minutes 120 Minutes
Service type
Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation
Max aperture size 1000mm x 1000mm (Min 100mm wall) ü ü ü ü ü ü ü ü
bunched cables ≤100 mm ü ü ü ü ü₴ ü₴ ü₴ ü₴
0-15mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
16-21mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴ Pencoed, Bridgend,
22-50mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
50-80mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
South Wales CF35 6NY
PVC Conduits ≤ 15 mm (with Acoustic Intumescent Sealant) ü ü ü ü ü₴ ü₴ ü₴ ü₴ t: 01656 868490
PVC & HDPE pipes ≤ 110 mm (with High expansion sealant)* ü ü ü ü ü ü ü ü technical.solutions@rockwool.co.uk
Steel pipes ≤168 mm ü ü ü ü
Steel pipes ≤168 mm lagged with Fire Tube or H&V pipe section ü ü ü ü ü ü ü ü Drawing Title:
Copper pipes ≤ 108 mm ü ü ü ü
Copper pipes ≤ 108 mm lagged with Fire Tube or H&V Pipe section ü ü ü ü ü ü ü ü 50mm Ablative Coated Batt
PVC pipes ≤ 160 mm with Fire Sleeve ü ü ü Face Fix Application Range
HDPE pipes ≤ 56 mm with Fire Sleeve ü ü ü ü
ABS pipes ≤ 164 mm with Fire Sleeve ü ü
Scale: Date:
* Requires Min 25mm annular space around the pipe with minimum sealant depth of 40mm in each batt NTS AUG 18
₴ Cables insulated with ROCKWOOL RWA45 insulation 40mm thick 300mm either side of seal - insulation secured with at least 2 no. 0.8mm steel bands
Sheet Size: Drawn By: Checked By:
A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-113-RW E

(V9/AUG21) 11
ROCKWOOL Standard Detail:
Supporting Evidence : WF 385718

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.

All service items should be adequately supported either


side of the seal.

These products should only be utilised for applications as


outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines.

For further information or alternative products please visit


www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490

Non combustible pipes with Rocklpa H&V lagging through double 50/60mm batt - Minimum separation Cable trays & ladders through double 50/60mm batt - Minimum Separation
H&V Aperture Edge Service Fire Rating Integrity
Aperture Edge Service Fire Rating (minutes)
Pipe Type Pipe Dia. (mm) Aperture Size Service Separation Service Aperture Size Performance: Insulation Performance:
Insulation Separation Configuration E I Separation Separation E (Integrity) I (Insulation)
Copper 40 - 108 Ladders ≤350mm wide Up to 120 Minutes Up to 120 Minutes 90
25 90 90
Steel 40 - 168 Trays ≤500mm wide 60
0mm Cluster & Linear 50mm between
Copper 40 - 108 1200 x 1200 0mm Cables ≤80mm 1200mm x *Variable
40 120 120 0mm trays / 0mm 120
Steel 40 - 168 Bunches 100mm Dia. 600mm 90
between ladders
Steel 40 - 220 100mm Metal Conduits ≤16mm 60
25 Single 120 120
Copper & steel 40 - 108 1200 x 600 50mm 10mm Plastic Conduits ≤16mm 120
*Please contact ROCKWOOL Technical with cable size and type
Pencoed, Bridgend,
South Wales CF35 6NY
Cable trays & ladders through double 50/60mm batt - Minimum Separation t: 01656 868490
ing
Service Aperture Size
Aperture Edge Service Fire Rating (minutes) technical.solutions@rockwool.co.uk
I Separation Separation E (Integrity) I (Insulation)
Ladders ≤350mm wide 90
90 Drawing Title:
Trays ≤500mm wide 60
50mm between Double batt seal with lagged metal pipes
Cables ≤80mm 1200mm x *Variable
120 0mm trays / 0mm 120 Minimum Seperation Detail
Bunches 100mm Dia. 600mm 90
between ladders
Metal Conduits ≤16mm 60
120
Plastic Conduits ≤16mm 120
Scale: Date:
*Please contact ROCKWOOL Technical with cable size and type NTS May 18

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-250-RW C

(V9/AUG21) 12
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF385718/WF385719/WF 407899
1. Make sure that the area within the aperture is clean of Not Accessible Accessible
This detail is to be read in conjunction with the
any debris and remove any dust from the edges.
2no. layers 50mm ROCKWOOL ROCKWOOL Ablative Coated Batt data sheet specific
2. Cut ROCKWOOL Ablative Coated Batt to the size and Ablative Coated Batt installation instructions.
the shape required to fit the aperture, ensuring the batt
will make a tight fit with all edges of the opening. Metal based services lagged with H&V pipe section can be
ROCKWOOL Acoustic Intumescent installed with 0mm separation between services and 0mm
3. Cut rectangular holes from the coated batt to Sealant aperture edge separation. 0mm separation for metal based
accommodate the cable tray or ladder containing services lagged with H&V pipe section only - please
cable, or, circular holes from the coated batt for pipes. contact ROCKWOOL technical for combustible pipe
Copper or steel service pipe up to separation.
4. Cut the coated batt across its width at the mid-point of Ø 108mm supported within 500mm of
each hole to enable batt to be fitted into the aperture. each side of seal For single sided fire seal installations with combustible
25mm ROCKWOOL H&V pipe penetrations please contact ROCKWOOL Technical
5. Apply Rockwool Acoustic Intumescent Sealant to all
Pipe Section installed as a continuous Solutions.
edges of the batt, ensuring that an even cover is Single sheathed cables ≤ Ø 80mm
achieved over the entire thickness of the batt. This
1000mm length through seal
PVC or non-combustible conduits ≤ Ø These products should only be utilised for applications as
should include the outer edges of the batt and the 16mm
edges of the cut made across the batt to allow fitting outlined in the relevant ROCKWOOL product data sheet
into the aperture. There is no requirement to apply and in accordance with the relevant ROCKWOOL Fire
sealant to the edges of the holes cut to accommodate Cable tray up to 500mm x 60mm Resistance Testing. Additionally the product must be
each cable tray or ladder. Cable ladder up to 350mm x 100mm ROCKWOOL Acoustic Intumescent installed in accordance with the current ROCKWOOL
Sealant applied to all abutments to guidelines. For further information please visit
6. Insert the first layer of batt into the aperture. substrate, joints in batt and perimeter www.rockwool.co.uk or contact our Technical Solutions
of aperture Team on 01656 868490.
7. Apply a bead of ROCKWOOL Acoustic Intumescent
Sealant, approximately 15mm wide, around the
perimeter of the batt ensuring that all gaps Fire rated flexible wall / plasterboard
between the batt and surrounding edges are fully partition
sealed.
100mm min.
8. Apply a bead of Rockwool Acoustic Intumescent
Sealant, approximately 15mm wide, where the
penetrations pass through the batt. Ensure that the
sealant fully encloses each service penetration and
that all gaps are fully filled.

9. Apply Rockwool Acoustic Intumescent Sealant to all Integrity Performance: Insulation Performance:
edges of the second layer of batt, ensuring that an
even cover is achieved over the entire thickness of the 30 Minutes 60 Minutes 90 Minutes 120 Minutes Up to 90 Minutes Up to 90 Minutes
Service type
batt. This should include the outer edges of the batt Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation
and the edges of the cut made across the batt to allow Maximum aperture size m² (90 Min Insulation Performance) 0.72m² 0.72m² 0.72m² 0.72m²
fitting into the aperture. Solid and perforated cable trays ≤500 x 60mm ü ü ü ü ü ü
Cable Ladder ≤350 x 100mm ü ü ü ü ü ü
0-15mm sheathed cables ü ü ü ü ü ü ü
10. Insert the second layer of batt into the aperture and
16-21mm sheathed cables ü ü ü ü ü ü ü
repeat step 7 and 8. 22-50mm sheathed cables ü ü ü ü ü ü ü
51-80mm sheathed cables ü ü ü ü ü Pencoed, Bridgend,
Bunched cables ≤100 mm
Non combustable conduits ≤16mm
ü
ü
ü ü
ü
ü ü
ü
ü ü
ü
South Wales CF35 6NY
PVC conduits ≤16mm ü ü ü ü ü ü t: 01656 868490
Copper pipes 15mm lagged with 20mm H&V
Steel pipes ≤ 60mmlagged with 20mm H&V
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
technical.solutions@rockwool.co.uk
Copper pipes 42mm - 108mm lagged with 25mm H&V ü ü ü ü ü
Steel pipes 42mm - 168mm lagged with 25mm H&V ü ü ü ü ü ü
Copper pipes 42mm - 108mm lagged with 40mm H&V Drawing Title:
ü ü ü ü ü ü ü
Steel pipes 42mm - 168mm lagged with 40mm H&V ü ü ü ü ü ü ü ü Single sided installation of Ablative Coated Batt
Steel pipes ≤ 219mm unlagged ü ü ü ü
Copper pipes ≤ 159mm unlagged ü ü ü ü with service penetrations
Cable trays and ladders 0mm distance from aperture opening
Metal pipes lagged with H&V pipe section can be fitted with 0mm seperation between services and 0mm to substrate
For combustible pipes, please contact ROCKWOOL Technical Department Scale: Date:
NTS JUN 19

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-145-RW D

(V9/AUG21) 13
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 380565 (BS EN 1366-3)

1. Cut the Ablative Coated Batt so that it tightly This detail is to be read in conjunction with the relevant
accommodates the timber penetration. ROCKWOOL product data sheet.

2. Apply ROCKWOOL Acoustic Intumescent For head of wall applications with timber penetrations
Sealant liberally around all edges, of the Ablative please contact ROCKWOOL technical.
Coated Batt, before offering the batt up to the
timber section. These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
3. If the batt needs to be jointed with another batt, Concrete/masonry wall
and in accordance with the relevant ROCKWOOL Fire
follow a stretcher bond arrangement to stagger Resistance Testing. Additionally the product must be
the joints and apply Acoustic Intumescent installed in accordance with the current ROCKWOOL
Sealant to all meeting edges, including guidelines. For further information please visit
Timber lintel
batt-to-batt and batt-to-substrate edges, following www.rockwool.co.uk or contact our Technical Solutions
the Ablative Coated Batt standard install details. 35mm x 100mm timber joist Team on 01656 868490.
65mm x 245mm timber joist
4. Repeat the process on the opposite side of the 35mm x 245mm timber joist
void to create a double layer of Ablative Coated
Batt, ensuring that the joints are staggered.
65mm x 100mm timber joist
2no. layers 50mm Ablative
Coated Batt

100

Concrete/masonry wall Integrity Performance: Insulation Performance:

120 Minutes 120 Minutes

Timber lintel

Pencoed, Bridgend,
Timber joist
ROCKWOOL Acoustic Intumescent Sealant
South Wales CF35 6NY
t: 01656 868490
technical.solutions@rockwool.co.uk

Drawing Title:

Timber penetrations through 2no. layer of


50mm Ablative Coated Batt

Scale: Date:
NTS 18.01.18

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-310-RW B

(V9/AUG21) 14
ROCKWOOL Standard Detail:
INSTALLATION NOTES
Supporting Evidence : CF5868 / WF335645

1. Make sure that the area within the aperture is clean of any Drywall substrate The supporting construction must be capable of achieving the
debris and remove any dust from the edges. required fire rating of the proposed Firestop.
40mm ROCKWOOL FireTube, or,
2. Cut Rockwool ablative coated batt to the size and shape Rocklap H&V Pipe Section installed Flexible wall construction must be installed in accordance with the
500mm either side of the seal manufacturer's guidelines with the aperture being fully framed and
required to fit the aperture ensuring the batt will make a tight fit
lined out. The Wall construction should be of a minimum thickness of
with all edges of the aperture. 100mm.
Insulated non-combustible pipe
3. Setout the service penetrations and cut the coated batt at the All service items should be adequately supported either side of the
mid point of each service to enable the batt to be fitted into the Firestop to ensure that no load is transferred onto the coated batt.
aperture.
For specific installation details not cover by this detail (such as
15mm bead ROCKWOOL Damper installation) then please consult the relevant Standard detail
4. Apply Rockwool acoustic intumescent sealant to all edges of Acoustic Intumescent Sealant or the Rockwool Fire stopping Technical manual.
the batt, ensuring that an even cover is achieved over the
Non-combustible pipe All ROCKWOOL to ROCKWOOL joints of locally interrupted pipe
entire thickness of the batt. This should include the outer edges
of the batt and the edges of the cut made through the batt to lagging of Fire Tube to be filled with FirePro Glue prior to application.
All joints to be held firmly together with temporary bands at 200mm
allow fitting into the aperture. There is no requirement to apply 60mm ROCKWOOL centres until adhesive within joints has fully cured.
sealant to the edges of the holes cut to accommodate each Ablative Coated Batt
service penetration. For seals over 1200mm x 1200mm batt to batt joints are to be fully
≤ Ø61mm single or bunched coated with FirePro Glue in place of sealant.
sheathed cables
6. Insert the batt into the aperture.
Locally continuous pipe lagging of ROCKWOOL Fire Tube or
ROCKLAP H&V pipe section does not require glue and/or temporary
7. Apply a bead of Rockwool acoustic intumescent sealant, restraint bands or clips.
approximately 15mm wide, around the perimeter of the batt ≤ 480mm (w) x 25mm (d) cable tray, or
ensuring that all gaps between the batt and surrounding edges ≤ 340mm (w) x 80mm (d) cable ladder Refer to SD-140/141-RDW for ROCKLAP H&V Pipe Section
are fully filled. application.

ROCKWOOL Insulated Fire Sleeve Refer to SD-221-RDW for Insulated Fire Sleeve applications.
8. Apply a bead of Rockwool acoustic intumescent sealant,
approximately 15mm wide, where the service penetrations pass These products should only be utilised for applications as outlined in
through the batt. Ensure that the sealant fully encloses each Plastic pipe (HDPE, PVC, PP & ABS) the relevant ROCKWOOL product data sheet and in accordance with
cable within the tray or ladder and that all gaps are fully filled. the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
ROCKWOOL guidelines. For further information please visit
9. Repeat step 7 and 8 on the other side of the batt 40 min.
www.rockwool.co.uk or contact our Technical Solutions Team on
01656 868490.

Solid wall substrate Integrity Performance: Insulation Performance:

Up to 120 Minutes Up to 120 Minutes


60 Minutes 90 Minutes 120 Minutes
Service type
Integrity Insulation Integrity Insulation Integrity Insulation
Maximum aperture size m² in Min 130mm thick masonry wall 4.14m² 2.88m² 2.88m²
Blank seal up to 1200 mm x 600 mm ü ü ü ü ü ü
Blank seal up to 2.4 m x 2.88 m ü ü ü ü
Single/bunched cables ≤61 mm ü ü üC üC 60mm ROCKWOOL
Single Cables 62-80mm ü ü* Ablative Coated Batt Pencoed, Bridgend,
bunched cables ≤100 mm ü ü
Cable trays ≤480 mm ü ü üC üC South Wales CF35 6NY
Steel pipes ≤168 mm lagged with Fire Tube / H&V ü ü ü ü ü ü t: 01656 868490
Steel pipes ≤168 Unlagged
Copper pipes ≤ 108 mm lagged with Fire Tube / H&V
ü ü ü
100 min. technical.solutions@rockwool.co.uk
ü ü ü ü
Copper pipes ≤ 108 mm unlagged ü ü ü
Circular steel duct ≤ 360 mm lagged with Fire Duct ü ü ü ü ü ü 100mm pigtail screw Drawing Title:
Square steel duct ≤ 450 mm lagged with Fire Duct ü ü ü ü ü ü with 25mm washer
Square steel duct ≤ 450mm ü ü ü 60mm Ablative Coated Batt
Fire Damper ≤ 1000 x 1000 mm ü ü ü Single Layer Application Range
ü* With additional protection of patress piece of coated batt Min 100mm around the cable (Min 4 pigtail screw fixings)
üC using 1 mm thick coatback along 100 mm of service item either side of the seal
Scale: Date:
ADDITIONAL CABLE PROTECTION 1:10 06.08.18
TO ACHIEVE INSULATION RATING
Sheet Size: Drawn By: Checked By:
A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-106-RW E

(V9/AUG21) 15
ROCKWOOL Standard Detail:
INSTALLATION NOTES
120mm min. drywall substrate Supporting Evidence : CF5868 / CHILT A08152-E
1. Make sure that the area within the aperture is clean of The supporting construction must be capable of achieving the
any debris and remove any dust from the edges. 40mm ROCKWOOL FireTube, or,
required fire rating of the proposed Firestop.
Rocklap H&V Pipe Sectioninstalled
500mm either side of the seal
2. Cut Rockwool ablative coated batt to the size and shape Flexible wall construction must be installed in accordance with the
required to fit the aperture ensuring the batt will make a manufacturer's guidelines with the aperture being fully framed and
lined out. The Wall construction should be of a minimum thickness of
tight fit with all edges of the aperture. Insulated non-combustible pipe 120mm.

3. Setout the service penetrations and cut the coated batt All service items should be adequately supported either side of the
at the mid point of each service to enable the batt to be Firestop to ensure that no load is transferred onto the coated batt.
fitted into the aperture. 15mm bead ROCKWOOL
Acoustic Intumescent Sealant For specific installation details not cover by this detail (such as
Damper installation) then please consult the relevant Standard detail
4. Apply Rockwool acoustic intumescent sealant to all Non-combustible pipe or the Rockwool Fire stopping Technical manual.
edges of the batt, ensuring that an even cover is achieved
over the entire thickness of the batt. This should include the All ROCKWOOL to ROCKWOOL joints of locally interrupted pipe
outer edges of the batt and the edges of the cut made 2no. 60mm ROCKWOOL lagging of Fire Tube to be filled with FirePro Glue prior to application.
Ablative Coated Batt All joints to be held firmly together with temporary bands at 200mm
through the batt to allow fitting into the aperture. There is no
centres until adhesive within joints has fully cured.
requirement to apply sealant to the edges of the holes cut ≤ Ø61mm single or bunched
to accommodate each service penetration. sheathed cables For seals over 1200mm x 1200mm batt to batt joints are to be fully
coated with FirePro Glue in place of sealant.
6. Insert the batt into the aperture.
Locally continuous pipe lagging of ROCKWOOL Fire Tube or
ROCKLAP H&V pipe section does not require glue and/or temporary
7. Apply a bead of Rockwool acoustic intumescent sealant, ≤ 450mm (w) x 25mm (d) cable tray, or restraint bands or clips.
approximately 15mm wide, around the perimeter of the batt ≤ 340mm (w) x 80mm (d) cable ladder
ensuring that all gaps between the batt and surrounding Refer to SD-140/141-RDW for ROCKLAP H&V Pipe Section
edges are fully filled. ROCKWOOL Insulated Fire Sleeve application.

Refer to SD-221-RDW for Insulated Fire Sleeve applications.


8. Apply a bead of Rockwool acoustic intumescent sealant,
approximately 15mm wide, where the service penetrations Plastic pipe (HDPE, PVC, PP & ABS) These products should only be utilised for applications as outlined in
pass through the batt. Ensure that the sealant fully the relevant ROCKWOOL product data sheet and in accordance with
encloses each cable within the tray or ladder and that all the relevant ROCKWOOL Fire Resistance Testing. Additionally the
25 min. product must be installed in accordance with the current
gaps are fully filled.
ROCKWOOL guidelines. For further information please visit
www.rockwool.co.uk or contact our Technical Solutions Team on
9. Repeat step 7 and 8 on the other side of the batt 01656 868490.
Solid wall substrate

Integrity Performance: Insulation Performance:


60 Minutes 90 Minutes 120 Minutes 240 Minutes
Service type
Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation
Up to 240 Minutes Up to 240 Minutes
Blank seal up to 1200mm x 600mm ü ü ü ü ü ü ü
Blank seal up to 1200mm x 600mm (95mm Air Gap) ü ü ü ü ü ü ü
Blank seal up to 2.4 m x 2.88 m ü ü ü ü ü
Single/bunched cables ≤100mm ü ü ü ü ü ü₴
bunched cables ≤100 mm ü ü ü ü ü
0-15mm sheathed cables ü ü ü ü*₴ ü ü₴
16-21mm sheathed cables ü ü ü ü*₴ ü ü₴
22-50mm sheathed cables ü ü ü ü₴ ü
60mm ROCKWOOL
50-80mm sheathed cables ü ü ü ü* ü
Ablative Coated Batt Pencoed, Bridgend,
Steel pipes ≤168 mm lagged with Fire Tube / H&V ü ü ü ü ü ü ü
Steel pipes ≤168 Unlagged ü ü ü ü South Wales CF35 6NY
Steel pipes 219mm - 324mm with 400mm length of ablative coating † ü ü ü t: 01656 868490
Steel pipes in min 100mm thick masonry wall ≤ 600mm unlagged ü ü ü
Copper pipes ≤ 108 mm lagged with Fire Tube (95mm Air gap) ü ü ü ü ü ü ü technical.solutions@rockwool.co.uk
Copper pipes ≤ 108 mm lagged with Fire Tube / H&V ü ü ü ü ü ü 100 min.
Copper pipes ≤ 108 mm unlagged ü ü ü ü
Circular steel duct ≤ 360 mm lagged with Fire Duct# ü ü ü ü ü ü Drawing Title:
Square steel duct ≤ 400 mm lagged with Fire Duct#
100mm pigtail screw
ü ü ü ü ü ü
Square steel duct ≤ 445mm with 25mm washer 60mm Ablative Coated Batt
ü ü ü
Fire Damper ≤ 1000 x 1000 mm ü ü ü Double Layer Application Range
# See Rockwool Technical manual for specific sizes and Maximum Fire ratings
* With additional protection of patress piece of coated batt Min 100mm around cable (Min 4 pigtail screw fixings)
† Pipe to receive 400mm length coat back of FirePro Ablative Coating either side of seal
₴ Cables insulated with ROCKWOOL RWA45 insulation 40mm thick 200mm either side of seal - suitable for masonry walls only Scale: Date:
ADDITIONAL CABLE PROTECTION 1:10 06.08.18
TO ACHIEVE INSULATION RATING
Sheet Size: Drawn By: Checked By:
A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-107-RW E

(V9/AUG21) 16
ROCKWOOL Standard Detail:
Supporting Evidence : CF5868 / CHILT A08152-E

The supporting construction must be capable of achieving the


required fire rating of the proposed Firestop.

Flexible wall construction must be installed in accordance with the


manufacturer's guidelines.

Combustible pipe protected with The 60 mm Rockwool Ablative Coated Batt must be installed with
ROCKWOOL Intumescent Pipe ROCKWOOL intumescent sealant bedded between the batt and the
Sleeve drywall. A fillet of sealant must be installed at the junction between
Intumescent Pipe Sleeve to project the batt and the drywall to ensure no gaps are visible between the
25mm min. from the seal drywall and the batt. The exposed mineral wool edges should be
Insulated non-combustible pipe 60mm ROCKWOOL buttered with a layer of sealant or ablative coating. All batt to batt
Ablative Coated Batt joints are to receive acoustic intumescent sealant.

Uninsulated non-combustible pipe For applications where a 4 sided fix is not possible or in the 100mm
overlap onto partition is not possible contact ROCKWOOL.

85mm drywall screws All service items should be adequately supported either side of the
85mm drywall screws with 25mm with 25mm washer at Firestop to ensure that no load is transferred onto the coated batt.
washers at 300mm max. centres. 300mm centres

1200 max. For specific installation details not cover by this detail please consult
the relevant Standard detail or the Rockwool Fire stopping Technical
≤ 500mm (w) x 25mm (d) cable tray manual.
15mm bead of
These products should only be utilised for applications as outlined in
ROCKWOOL Acoustic
the relevant ROCKWOOL product data sheet and in accordance with
Intumescent Sealant
the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
PVC or HDPE pipe with 25mm ROCKWOOL guidelines. For further information please visit
annular spacing sealed with www.rockwool.co.uk or contact our Technical Solutions Team on
ROCKWOOL High Expansion FIXING DETAIL THROUGH FLEXIBLE WALL 01656 868490.
100 min. overlap
Sealant to 40mm depth

≤ Ø 15mm PVC conduit sealed with


ROCKWOOL Acoustic Intumescent
Sealant
1200 max.
Acoustic Performance:

Up to 53 dB
Integrity Performance: Insulation Performance:
30 Minutes 60 Minutes 90 Minutes 120 Minutes
Service type
Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation Up to 120 Minutes Up to 120 Minutes
Max aperture size 1000mm x 1000mm (Min 100mm wall) ü ü ü ü ü ü ü ü
bunched cables ≤100 mm ü ü ü ü ü₴ ü₴ ü₴ ü₴
0-15mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
16-21mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
22-50mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
51-80mm sheathed cables ü ü ü ü ü₴ ü₴ ü₴ ü₴
PVC Conduits ≤ 15 mm (with Acoustic Intumescent Sealant) ü ü ü ü ü₴ ü₴ ü₴ ü₴ Pencoed, Bridgend,
PVC & HDPE pipes ≤ 110 mm (with High pressure sealant)* ü ü ü ü ü ü ü ü South Wales CF35 6NY
Steel pipes ≤168 mm lagged with Fire Tube or H&V pipe section ü ü ü ü ü ü ü ü
Steel pipes ≤168 mm ü ü ü ü
t: 01656 868490
Copper pipes ≤ 108 mm lagged with Fire Tube or H&V Pipe section ü ü ü ü ü ü ü ü technical.solutions@rockwool.co.uk
Copper pipes ≤ 108 mm ü ü ü ü
PVC pipes ≤ 160 mm with Fire Sleeve ü ü ü ü ü ü ü ü Drawing Title:
HDPE pipes ≤ 110mm with Fire Sleeve ü ü ü ü ü ü ü ü
HDPE pipes ≤ 160mm with Fire Sleeve ü ü ü ü 60mm Ablative Coated Batt
PB ≤ 28mm with Fire Sleeve ü ü ü ü ü ü ü ü Face Fix application Range
ABS pipes ≤ 164 mm with Fire Sleeve ü ü
* Requires Min 25mm annular space around the pipe with minimum sealant depth of 40mm in each batt
₴ Cables insulated with ROCKWOOL RWA45 insulation 40mm thick 300mm either side of seal - insulation secured with at least 2 no. 0.8mm steel bands to each side of seal Scale: Date:
NTS NOV 18

Sheet Size: Drawn By: Checked By:


A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-111-RW E

(V9/AUG21) 17
ROCKWOOL Standard Detail:
100 min.
Supporting Evidence : WF 352441

100 min. The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.Flexible
Drywall partition
wall construction must be installed in accordance with the
Drywall partition manufacturer's guidelines with the aperture being fully
2no layers 50mm Ablative Coated framed and lined out. The Wall construction should be of a
Batt minimum thickness of 100mm.
200 40mm thick ROCKWOOL RWA45 200 40mm thick ROCKWOOL RWA45
All service items should be adequately supported either
side of the seal.

As part of the testing to BS EN 1366-4, FIREPRO


SoftSeal was assessed for its movement capabilities,
prior to conducting the fire test. The product was tested
≤ Ø160mm steel or copper pipe ≤ Ø160mm steel or copper pipe
ROCKWOOL SoftSeal Intumescent ROCKWOOL SoftSeal Intumescent
to accommodate movement (expansion and contraction)
Sealant applied to joints of SoftSeal Sealant applied to joints of SoftSeal of +/-15%.

RWA45 Insulation secured to penetrations with 2 No. 5mm


wide steel tie wraps wither side of seal.

For plastic pipe penetrations refer to SD-161-RDW.


≤ Ø100mm bunched cables ≤ Ø100mm bunched cables
ROCKWOOL SoftSeal ROCKWOOL SoftSeal
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines.
≤ 450mm wide x 25mm deep cable tray, or, ≤ 450mm wide x 25mm deep cable tray, or,
≤ 340mm wide x 80mm deep cable ladder ROCKWOOL SoftSeal Intumescent ≤ 340mm wide x 80mm deep cable ladder ROCKWOOL SoftSeal Intumescent
Sealant applied to drywall and Sealant applied to SoftSeal and For further information or alternative products please visit
SoftSeal interface Ablative Coated Batt joint www.rockwool.co.uk or contact our Technical Solutions
ROCKWOOL Acoustic Intumescent Team on 01656 868490
Sealant applied to drywall and
Ablative Coated Batt interface

VERTICAL SOFTSEAL PENETRATION SEAL BETWEEN


Integrity Performance: Insulation Performance:
FLEXIBLE WALLING
MAX. SEAL SIZE: 1000MM x 1000MM
Up to 120 Minutes Up to 120 Minutes

60 Minutes 90 Minutes 120 Minutes


Service type
Integrity Insulation Integrity Insulation Integrity Insulation
Blank seal up to 800 mm x 800mm ü ü ü ü ü ü Pencoed, Bridgend,
Blank seal within 2 x 50mm ROCKWOOL Ablative Batt picture frame 800mm x 430mm ü ü ü ü ü ü South Wales CF35 6NY
Electrical cables 21mm-50mm diameter ü ü ü ü t: 01656 868490
Electrical cables 51mm-80mm diameter ü ü ü
technical.solutions@rockwool.co.uk
Cable tray and ladders ü ü ü ü
Bunched cables ≤100 mm ü ü ü ü ü ü
Unsheathed electrical cables ≤24 mm ü ü ü Drawing Title:
Steel or copper conduits ≤16 mm ü ü ü FirePro Softseal
Steel pipes ≤160 mm diameter ü ü ü ü Vertical Seal - Flexible Wall
Steel or copper pipes ≤40 mm ü ü ü ü ü ü
All services insulated with RWA45 40mm thick, 200mm either side of seal.
Please contact ROCKWOOL Technical department for the protection of plastic pipes Scale: Date:
NTS NOV 18

Sheet Size: Drawn By: Checked By:


A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-149-RW D

(V9/AUG21) 18
ROCKWOOL Standard Detail:
Supporting Evidence : WF 352441

The supporting construction must be capable of achieving


Masonry wall
the required fire rating of the proposed Firestop.
Masonry wall
2no layers 50mm Ablative Coated All service items should be adequately supported either
Batt side of the seal.
200 40mm thick ROCKWOOL RWA45 200 40mm thick ROCKWOOL RWA45
As part of the testing to BS EN 1366-4, FIREPRO
SoftSeal was assessed for its movement capabilities,
prior to conducting the fire test. The product was tested
to accommodate movement (expansion and contraction)
of +/-15%.

≤ Ø160mm steel or copper pipe ≤ Ø160mm steel or copper pipe RWA45 Insulation secured to penetrations with 2 No. 5mm
ROCKWOOL SoftSeal Intumescent ROCKWOOL SoftSeal Intumescent
Sealant applied to joints of SoftSeal Sealant applied to joints of SoftSeal
wide steel tie wraps wither side of seal.

For plastic pipe penetrations refer to SD-161-RDW.

These products should only be utilised for applications as


outlined in the relevant ROCKWOOL product data sheet
≤ Ø100mm bunched cables ≤ Ø100mm bunched cables and in accordance with the relevant ROCKWOOL Fire
ROCKWOOL SoftSeal ROCKWOOL SoftSeal Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines.

For further information or alternative products please visit


www.rockwool.co.uk or contact our Technical Solutions
≤ 450mm wide x 25mm deep cable tray, or, ≤ 450mm wide x 25mm deep cable tray, or, Team on 01656 868490
≤ 340mm wide x 80mm deep cable ladder ROCKWOOL SoftSeal Intumescent ≤ 340mm wide x 80mm deep cable ladder ROCKWOOL SoftSeal Intumescent
Sealant applied to drywall and Sealant applied to SoftSeal and
SoftSeal interface Ablative Coated Batt joint

ROCKWOOL Acoustic Intumescent


Sealant applied to masonry and
Ablative Coated Batt interface

VERTICAL SOFTSEAL PENETRATION SEAL BETWEEN Integrity Performance: Insulation Performance:


MASONRY
MAX. SEAL SIZE: 1000MM x 1000MM
Up to 120 Minutes Up to 120 Minutes

60 Minutes 90 Minutes 120 Minutes


Service type
Integrity Insulation Integrity Insulation Integrity Insulation
Blank seal up to 1200 mm x 730mm ü ü ü ü ü ü
Blank seal within 2 x 50mm ROCKWOOL Ablative Batt picture frame 900mm x 530mm ü ü ü ü ü ü
Electrical cables ≤21mm diameter ü ü ü ü ü ü Pencoed, Bridgend,
Electrical cables 22mm-50mm diameter ü ü ü South Wales CF35 6NY
Electrical cables 51mm-80mm diameter ü ü t: 01656 868490
Cable tray and ladders ü ü ü technical.solutions@rockwool.co.uk
Bunched cables ≤100 mm ü ü ü ü ü ü
Unsheathed electrical cables ≤24 mm ü ü ü ü ü ü
Drawing Title:
Steel or copper conduits ≤16 mm ü ü ü ü ü ü
Steel pipe 161mm - 200mm diameter ü 30 ü FirePro Softseal
Steel pipes ≤160 mm diameter ü ü ü ü ü ü Vertical Seal - Solid Wall
Steel or copper pipes ≤40 mm ü ü ü ü ü ü
All services insulated with RWA45 40mm thick, 200mm either side of seal.
Scale: Date:
Please contact ROCKWOOL Technical department for the protection of plastic pipes NTS NOV 18

Sheet Size: Drawn By: Checked By:


A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-150-RW D

(V9/AUG21) 19
INSTALLATION NOTES ROCKWOOL Standard Detail:

1) Measure the height of the aperture to be sealed.


Supporting Evidence : WF 371988B (BS EN 1366-3)
2) Cut the FIREPRO® SoftSeal Coated Strips 15% bigger than the height of the void to be filled, so when
The supporting construction must be capable of achieving
installed they are under compression.
the required fire rating of the proposed Firestop.Flexible
wall construction must be installed in accordance with the
3) Ensure substrate is clean and free of dust and debris.
manufacturer's guidelines with the aperture being fully
framed and lined out. The Wall construction should be of a
4) Apply a bead of FIREPRO® SoftSeal Acoustic Intumescent Sealant around the internal edges of the aperture.
minimum thickness of 100mm.
5) Install the FIREPRO® SoftSeal Coated Strips horizontally, so that the lamellas are running horizontally.
All service items should be adequately supported either
side of the seal.
6) Apply a bead of FIREPRO® Acoustic Intumescent Sealant to butt joints between different sections of SoftSeal Coated Strips.
As part of the testing to BS EN 1366-4, FIREPRO
7) FIREPRO® High Expansion Intumescent Sealant shall be used around plastic pipes in accordance with ROCKWOOL standard details.
SoftSeal was assessed for its movement capabilities,
prior to conducting the fire test. The product was tested
8) Apply FIREPRO® SoftSeal Flexible Coating to the face of all joints between SoftSeal
to accommodate movement (expansion and contraction)
of +/-15%.
Flexible/Partition wall - Min 100mm thick
These products should only be utilised for applications as
ROCKWOOL Acoustic Intumescent sealant outlined in the relevant ROCKWOOL product data sheet
to all batt edges to substrate and batt to and in accordance with the relevant ROCKWOOL Fire
Flexible/Partition wall - Min 100mm thick substrate perimeter
Resistance Testing. Additionally the product must be
50
2 No layers of ROCKWOOL 50mm Ablative installed in accordance with the current ROCKWOOL
ROCKWOOL SoftSeal Acoustic Intumescent Coated Batt guidelines.
Sealant to substrate joint
100
100
ROCKWOOL SoftSeal - 100mm thick For further information or alternative products please visit

Double 50mm Ablative Batt to perimeter for apertures > 1000 x 1000mm
ROCKWOOL SoftSeal - 100mm thick
installed under compression
installed under compression www.rockwool.co.uk or contact our Technical Solutions
25 Team on 01656 868490
ROCKWOOL SoftSeal Acoustic Intumescent 20
25 between soft seal joints
1000 x 1000mm max. aperture size for stand alone seal

20 uPVC pipe 40mm Dia. / 1.9mm wall


thickness
uPVC pipe 40mm Dia. / 1.9mm wall

Max. 1000 x 1000mm


thickness ROCKWOOL FirePro High Expansion (HE)
25 20 Intumescent Sealant to 20mm annular gap
ROCKWOOL FirePro High Expansion (HE) & 25mm depth to both sides of seal/pipe
Intumescent Sealant to 20mm annular gap
25 & 25mm depth to both sides of seal/pipe
20 Integrity Performance: Insulation Performance:
uPVC pipe 200mm Dia. / 8mm wall
thickness
60 Minutes 60 Minutes
uPVC pipe 200mm Dia. / 8mm wall
thickness
ROCKWOOL FirePro High Expansion (HE)
Intumescent Sealant to 20mm annular gap
100 & 25mm depth to both sides of seal/pipe

ROCKWOOL FirePro High Expansion (HE) ROCKWOOL SoftSeal Acoustic Intumescent


Intumescent Sealant to 20mm annular gap between soft seal joints
& 25mm depth to both sides of seal/pipe
50 Pencoed, Bridgend,
100 ROCKWOOL Acoustic Intumescent sealant
South Wales CF35 6NY
to all batt edges to substrate and batt to t: 01656 868490
substrate perimeter
technical.solutions@rockwool.co.uk
Masonry wall min. 100mm thick Masonry wall min. 100mm thick
Drawing Title:

FirePro SoftSeal Vertical Seal


PVC Pipe Penetrations

ROCKWOOL SOFTSEAL USED AS STAND ALONE SEAL ROCKWOOL SOFTSEAL USED WITH DOUBLE 50mm
(APERTURE NO GREATER THAN 1000 X 1000mm) ABLATIVE COATED BATT TO PERIMETER Scale: Date:
uPVC Pipe Penetrations (APERTURE GREATER THAN 1000 X 1000mm) NTS March 19
uPVC Pipe Penetrations
Sheet Size: Drawn By: Checked By:
A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-161-RDW C

(V9/AUG21) 20
ROCKWOOL Standard Detail:
INSTALLATION NOTES
Supporting Evidence : CF5868 / WF335645

1. Make sure that the area within the aperture is clean The supporting construction must be capable of achieving the
of any debris and remove any dust from the edges. required fire rating of the proposed Firestop.

2. Cut Rockwool ablative coated batt to the size and ROCKWOOL FirePro Glue to The Floor construction should be of a minimum thickness of 150mm.
batt-to-batt joints and For thinner substrates please contact ROCKWOOL Technical
shape required to fit the aperture ensuring the batt will batt-to-substrate Solutions.
make a tight fit with all edges of the aperture.
≤ Ø80mm single sheathed cables All service items should be adequately supported either side of the
3. Setout the service penetrations and cut the coated ≤ Ø16mm PVC or non-combustible conduit Firestop to ensure that no load is transferred onto the coated batt.
batt at the mid point of each service to enable the batt Insulated non-combustible pipe
For specific installation details not cover by this detail (such as
to be fitted into the aperture.
Damper installation) then please consult the relevant Standard detail
or the Rockwool Fire stopping Technical manual.
4. Apply Rockwool FirePro Glue to all edges of the batt, ROCKWOOL Fire Tube
ensuring that an even cover is achieved over the entire 15mm bead ROCKWOOL 500mm min. either side of seal These products should only be utilised for applications as outlined in
Acoustic Intumescent Sealant the relevant ROCKWOOL product data sheet and in accordance with
thickness of the batt. This should include the outer
edges of the batt and the edges of the cut made across the relevant ROCKWOOL Fire Resistance Testing. Additionally the
product must be installed in accordance with the current
the batt to allow fitting into the aperture. There is no ROCKWOOL guidelines. For further information please visit
requirement to apply FirePro Glue to the edges of the www.rockwool.co.uk or contact our Technical Solutions Team on
holes cut to accommodate each cable tray or ladder. 01656 868490.

5. Insert the batt into the aperture.


2no. layers ROCKWOOL
6. Apply a bead of Rockwool acoustic intumescent Ablative Coated Batt
sealant, approximately 15mm wide, around the ≤ 500mm (w) x 25mm (d) cable tray, or,
perimeter of the batt ensuring that all gaps between the ≤ 340mm (w) x 100mm (d) cable ladder
batt and surrounding edges are fully filled.

7. Apply a bead of Rockwool acoustic intumescent


sealant, approximately 15mm wide, where the cables
pass through the batt. Ensure that the sealant fully
encloses each cable within the tray or ladder and that ≤ Ø100mm cable bundle Non-combustible pipe
all gaps are fully filled.

8. Repeat step 7 and 8 on the other side of the batt

Integrity Performance: Insulation Performance:

Up to 120 Minutes Up to 120 Minutes

30 Minutes 60 Minutes 90 Minutes 120 Minutes


Service type
Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation
Maximum aperture size m² (120 Min Insulation Performance) 2.46m² 2.46m² 2.37m² 2.28m²
bunched cables ≤100 mm ü ü ü ü ü ü ü ü 50mm ROCKWOOL
Cable tray ≤500 x 25mm Cable Ladder 340 x 100mm ü ü ü ü ü ü* ü Ablative Coated Batt
0-15mm sheathed cables ü ü ü ü ü ü ü ü*
16-21mm sheathed cables ü ü ü ü₴* ü ü
Pencoed, Bridgend,
22-50mm sheathed cables ü ü ü ü₴* ü ü South Wales CF35 6NY
50-80mm sheathed cables ü ü ü ü₴* ü ü t: 01656 868490
PVC Conduits ≤15mm ü ü ü ü ü ü ü
Steel pipes ≤168 mm lagged with Fire Tube ü ü ü ü ü ü ü ü
technical.solutions@rockwool.co.uk
Steel pipes ≤168 mm unlagged ü ü ü ü
Copper pipes ≤ 54 mm lagged with Fire Tube ü ü ü ü ü ü ü 100mm pigtail screw
Drawing Title:
Copper pipes ≤ 54 mm unlagged ü ü ü ü
Fire Damper ≤ 1 x 1 m (Max aperture 2.4m2 with Firepro Glue) ü ü ü ü 50mm Ablative Coated Batt
All batt to batt and batt to substrate joints shall be sealed using Firepro glue Double Layer Application Range - Horizontal Seal
* With additional protection of patress piece of coated batt Min 100mm around the cable (Min 4 pigtail screw fixings)
100mm min.
₴ Cables insulated with ROCKWOOL RWA45 insulation 40mm thick 300mm either side of seal
Scale: Date:
ADDITIONAL CABLE PROTECTION NTS AUG 18
TO ACHIEVE INSULATION RATING
Sheet Size: Drawn By: Checked By:
A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-123-RW D

(V9/AUG21) 21
ROCKWOOL Standard Detail:
Supporting Evidence : Chilt A08152/E
INSTALLATION NOTES
The supporting construction must be capable of achieving the
1. Make sure that the area within the aperture is clean of required fire rating of the proposed Firestop.
any debris and remove any dust from the edges. The Floor construction should be of a minimum thickness of 150mm.
ROCKWOOL FirePro Glue to For thinner substrates please contact ROCKWOOL Technical
2. Cut Rockwool ablative coated batt to the size and batt-to-batt joints and Solutions.
shape required to fit the aperture ensuring the batt will batt-to-substrate
make a tight fit with all edges of the aperture. All service items should be adequately supported either side of the
≤ Ø60mm bunched cables Firestop to ensure that no load is transferred onto the coated batt.

3. Setout the service penetrations and cut the coated batt ≤ Ø23mm sheathed cables
Insulated non-combustible pipe For specific installation details not cover by this detail (such as
at the mid point of each service to enable the batt to be Damper installation) then please consult the relevant Standard detail
fitted into the aperture. or the Rockwool Fire stopping Technical manual.

These products should only be utilised for applications as outlined in


4. Apply Rockwool FirePro Glue to all edges of the batt, ROCKWOOL Fire Tube, or, H&V
15mm bead ROCKWOOL the relevant ROCKWOOL product data sheet and in accordance with
ensuring that an even cover is achieved over the entire Pipe Section
the relevant ROCKWOOL Fire Resistance Testing. Additionally the
Acoustic Intumescent Sealant 500mm min. either side of seal
thickness of the batt. This should include the outer edges product must be installed in accordance with the current
of the batt and the edges of the cut made across the batt ROCKWOOL guidelines. For further information please visit
to allow fitting into the aperture. All batt to batt joints www.rockwool.co.uk or contact our Technical Solutions Team on
01656 868490.
should receive FirePro Glue. There is no requirement to
apply FirePro Glue to the edges of the holes cut to
accommodate each service penetration.
2no. layers ROCKWOOL
5. Insert the batt into the aperture. Ablative Coated Batt

6. Apply a bead of Rockwool acoustic intumescent ≤ 450mm (w) x 25mm (d) cable tray
sealant, approximately 15mm wide, around the perimeter
of the batt ensuring that all gaps between the batt and
surrounding edges are fully filled.

7. Apply a bead of Rockwool acoustic intumescent


sealant, approximately 15mm wide where service
penetrations pass through the batt. Non-combustible pipe

8. Repeat step 6 and 7 on the other side of the batt.

Integrity Performance: Insulation Performance:

Up to 240 Minutes Up to 240 Minutes

60 Minutes 90 Minutes 120 Minutes 240 Minutes


Service type Rockwool 60mm ablative coated batt.
Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation All batt to substrate and batt to batt
Max aperture size m²* Integrity Only 5.8m² 5.8m² 5.8m² 0.6m² joints to be sealed with Rockwool Fire
Pro Glue
Max aperture size Unsupported (Max 120 min Insulation) 1200 x 600 mm 1200 x 600 mm 1200 x 600 mm 600 x 600 mm
bunched cables ≤60 mm ü ü ü ü ü ü ü ü
Pencoed, Bridgend,
0-23mm sheathed cables ü ü ü ü South Wales CF35 6NY
Cable trays ≤450 x 25mm
Steel pipes ≤168 mm unlagged
ü ü ü ü 60 t: 01656 868490
ü ü ü ü
Steel pipes ≤168 mm lagged with Fire Tube ü ü ü ü ü ü ü technical.solutions@rockwool.co.uk
Copper pipes ≤ 108mm unlagged ü ü ü ü
Steel angle fixed back to
Copper pipes ≤ 108 mm lagged with Fire Tube ü ü ü ü ü ü ü supporting substrate with steel
PVC pipes ≤110mm see Rockwool detail NSD-119 ü ü fixing. Drawing Title:
50x50x2mm for E 60/90
Fire Damper ≤ 1 x 1 m (Max aperture 2.4m2 with Firepro Glue)* ü ü ü ü 50x50x6mm for E 120 60mm Ablative Coated Batt
*All batt to batt and batt to substrate joints shall be sealed using Firepro glue. Steel support angle as detailed shall be incorporated into the aperture.
Single Layer Application Range - Horizontal Seal
PERIMETER ANGLE

Scale: Date:
1:10 AUG 18

Sheet Size: Drawn By: Checked By:


A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-124-RW E

(V9/AUG21) 22
INSTALLATION NOTES ROCKWOOL Standard Detail:
A permanent shuttering made from 50mm ROCKWOOL slab Uninsulated Metallic Pipe Supporting Evidence : BMTFEIF14015
(minimum density 140kg/m3) is cut and friction fitted
between services and the edges of the floor slab. Firestop ≤160mm PVC, uPVC, PP, MDPE The supporting construction must be capable of achieving
Compound is then trowelled over the shutter to a depth of & HDPE Pipe the required fire rating of the proposed Firestop.
25mm thick. This is allowed to cure. Further Firestop
Cable tray 500mm x 50mm
Compound is then mixed to a pouring grade and tops the All service items should be adequately supported either
seal up to the required depth. side of the Firestop to ensure that no permanent load is
Floor openings transferred onto the coated batt.

1) A bag of compound to 10 litres water (3:1) by volume. Insulated Metallic Pipe


The Firestop compound is designed to accommodate light
Vary to suit site conditions with 40mm thick Fire Tube
foot traffic in line with BS6399 for workspaces and
or H&V pipe section

Compound Min 75mm


2) Set the shuttering into the opening ensuring a tight fit so cupboards.

Min 500mm
that once the required depth of Compound is installed it
finishes flush with the floor slab/screed unless otherwise Combustible pipes passing through the compound shall be
specified provided with either ROCKWOOL Firestop Collar or Wrap.
It is important to ensure that the collar or wrap shall remain
3) Mix and pour compound until the required thickness is
exposed at the soffit (therefore to direct fire exposure). If
achieved.
the shuttering batt is to remain in place then care shall be
Reinforcement taken to ensure the intumescent device remains exposed.
One option to achieve this would be to use a PE backing

Min. 150mm
Reinforcing of the compound requires either 12mm diameter
bars or 40mm (high) x 60mm steel angle fixed across the
rod between the pipe and the batt to ensure the shuttering
short span of the aperture. The bars should be installed at
allows the compound to be poured yet burns away quickly
200mm centres across the aperture and may be installed to expose the intumescent. A width of 15mm is suggested.
such that they are recessed into the surrounding structure by
minimum 50mm on both sides or supported on an steel 15 These products should only be utilised for applications as
angle securely fixed to the structure. Rockwool FirePro outlined in the relevant ROCKWOOL product data sheet
Rockwool Firestop Pipe Wrap and in accordance with the relevant ROCKWOOL Fire
Steel angle reinforcement shall be installed at 250mm Resistance Testing. Additionally the product must be
Compound
centres and shall be bolted back to supporting angle, which
NOTE: installed in accordance with the current ROCKWOOL
is fixed back to the structure. The support angle for rod or
for single Pipe Wrap CE guidelines. For further information please visit
angle reinforcement shall be 50mm x 50mm x 1.6mm and
applications contact ROCKWOOL www.rockwool.co.uk or contact our Technical Solutions
shall be securely fixed back to the structure with nominally
Technical Solutions Team on 01656 868490.
8mm steel anchor bolts at a maximum of 200mm centres. Rockwool 50mm
In all instances the reinforcement shall be positioned Shuttering Batt
approximately 30mm above the bottom surface of the
compound to ensure adequate fire protection from below.
Integrity Performance: Insulation Performance:

Up to 240 minutes Up to 240 minutes


60 Minutes 90 Minutes 120 Minutes 240 Minutes
Service type
Integrity Insulation Integrity Insulation Integrity Insulation Integrity Insulation
75mm Blank seal up to 500 mm x 500 mm* ü ü ü ü ü ü
100mm Blank seal up to 750 mm x 750 mm* ü ü ü ü ü ü ü ü
75mm Seal with services no reinforcement - 500mm x any length* ü ü ü ü ü ü
100mm Seal with services no reinforcement - 750mm x any length* ü ü ü ü ü ü ü ü
100mm Seal with services, Simply Reinforced - 1500mm x any length* ü ü ü ü ü ü ü ü Pencoed, Bridgend,
Cable Tray ≤ 500mm x 50mm ü ü ü ü ü ü South Wales CF35 6NY
Bunched cables ≤100 mm ü ü ü ü
Electrical cables up to 21mm ü ü ü ü ü ü
t: 01656 868490
Electrical cables 21mm - 50mm ü ü ü ü ü technical.solutions@rockwool.co.uk
Electrical cables 51mm - 80mm ü ü ü ü
Steel pipes ≤165 Unlagged ü ü ü ü Drawing Title:
Steel pipes ≤165 lagged with Fire Tube ü ü ü ü ü ü ü
Copper pipes ≤ 108 mm lagged with Fire Tube ü ü ü ü ü ü ü FireStop Copound
Copper pipes ≤ 108 mm unlagged ü ü ü ü Floor Seal
≤160mm PVC, uPVC, PP, MDPE & HDPE pipe Rockwool Pipe Wrap ü ü ü ü ü ü
* Load bearing performance in line with BS6399 for workspaces and cupboards
For Fire Dampers see specific standard details Scale: Date:
NTS 22.08.18

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-132-RDW E

(V9/AUG21) 23
ROCKWOOL Standard Detail:
Ø159 Ø219 Supporting Evidence : WF 427399 (BS EN 1366-3)
80
The supporting construction must be capable of achieving
40 Pipes testing in cluster the required fire rating of the proposed fire stop.
formation with 0mm edge
separation & 0mm pipe Please refer to SD-132-RW for compound size limitations
Steel pipe up to 219mm Dia separation between lagging and other service penetration details.
Copper pipe up to 159mm Dia
All service items should be adequately supported either
500mm of 40mm thick side of the Firestop.
40mm thick ROCKWOOL H&V ROCKWOOL H&V pipe
500 pipe section to extend 500mm lagging to top of slab only
above floor slab The tested cluster formation provides coverage for a linear
Floor slab Min. 150mm arrangement.
thick 40
80 These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
Ø42 80 and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
ROCKWOOL Standard or installed in accordance with the current ROCKWOOL
HS Compound guidelines. For further information please visit
Min. 100mm thick www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490.
Edge of seal
ROCKWOOL Standard or ROCKWOOL Ablative
HS Compound coated batt as shuttering
Min. 100mm thick

COMPOUND SECTION PLAN VIEW ABOVE SEAL

Integrity Performance: Insulation Performance:

Up to 240 Minutes Up to 120 Minutes


Performance Table:

Service Substrate Supporting Performance


Penetration Type/Size (mm) Formation Insulation Thickness (mm) Seal
Separation Separation construction Integrity Insulation
Copper 42
40mm H&V pipe lagging - 500mm to top 100mm thick ROCKWOOL Standard 0mm 0mm
150mm thick 240 120 Pencoed, Bridgend,
Copper 43 - 159 Cluster AAC concrete 120 45 South Wales CF35 6NY
of slab only Compound (From lagging) (From lagging)
Steel < 219 slab (650 kg/m³) 240 120
t: 01656 868490
technical.solutions@rockwool.co.uk

Drawing Title:

ROCKWOOL Standard Compound


H&V Pipe Section to top of slab

Scale: Date:
N/A APR 20

Sheet Size: Drawn By: Checked By:


A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-COM-0503 B

(V9/AUG21) 24
ROCKWOOL Standard Detail:
ROCKWOOL Standard 8
Compound with ROCKWOOL Supporting Evidence : WF 427399 (BS EN 1366-3)
50mm shuttering batt 8mm annular sealed with Min
20 20mm depth Acoustic The supporting construction must be capable of achieving
Intumescent Sealant the required fire rating of the proposed fire stop.
Non combustible sleeve
RWA45 backing as Please refer to SD-132-RW for compound size limitations
SECTION THROUGH LAGGED depth control SECTION THROUGH UN-LAGGED
PIPE WITH SLEEVE PIPE WITH SLEEVE and other service penetration details.

All service items should be adequately supported either


side of the Firestop.
40mm ROCKWOOL
Steel pipe up to 219mm Dia
H&V pipe section Pipe lagging where applicable to be a 1000mm continuous
with 40mm thick ROCKWOOL Steel pipe up to 219mm Dia length positioned centrally to the seal (L/S).
H&V Pipe Section
Annular gap between sleeve and
Annular gap between sleeve and pipe up to 48mm filled with 20mm These products should only be utilised for applications as
pipe up to 48mm filled with 20mm depth Acoustic Intumescent outlined in the relevant ROCKWOOL product data sheet
depth Acoustic Intumescent Sealant & 100mm depth of and in accordance with the relevant ROCKWOOL Fire
Sealant & 100mm depth of RWA45 500 RWA45 Resistance Testing. Additionally the product must be
324 324
Concrete floor slab Concrete floor slab installed in accordance with the current ROCKWOOL
8 48 guidelines. For further information please visit
www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490.

150 150

ROCKWOOL Standard Compound <48mm annular sealed ROCKWOOL Standard Compound


with Min 20mm depth
500 Acoustic Intumescent
Annular gap between sleeve and Sealant Annular gap between sleeve and
pipe up to 48mm filled with pipe up to 48mm filled with
20mm depth Acoustic 48 20mm depth Acoustic
Intumescent Sealant & 100mm Intumescent Sealant & 100mm
depth of RWA45 depth of RWA45
20
Integrity Performance: Insulation Performance:

Non combustible 120 Minutes Up to 120 Minutes


sleeve
100

100mm RWA45
ROCKWOOL Standard backing
Compound with ROCKWOOL Pencoed, Bridgend,
50mm shuttering batt
South Wales CF35 6NY
Performance Table:
t: 01656 868490
technical.solutions@rockwool.co.uk
Penetration Type/Size Service Substrate Supporting Performance
Formation Insulation Thickness (mm) Seal
(mm) Separation Separation construction Integrity Insulation Drawing Title:
40mm H&V pipe section -
0mm 0mm 150mm thick AAC ROCKWOOL Standard Compound
Steel < 219 Single 1000mm length through the 100mm thick ROCKWOOL 120 120
(Between (Between concrete slab (650 Sleeved Pipe Penetrations
seal (L/S) Standard Compound
sleeves) sleeves) kg/m³)
Steel < 219 Single N/A 120 15
Scale: Date:
N/A APR 20

Sheet Size: Drawn By: Checked By:


A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-COM-0510 B

(V9/AUG21) 25
ROCKWOOL Standard Detail:
Supporting Evidence : WF 410975
Flexible wall Flexible wall
Fire resistant to at least the fire rating Fire resistant to at least the fire rating The supporting construction must be capable of achieving
requirement of the service penetration requirement of the service penetration
the required fire rating of the proposed firestop.
ROCKWOOL RWA45
backer with Acoustic Acoustic Intumescent Flexible wall construction must be installed in accordance
Intumescent Sealant Sealant with the manufacturers guidelines. The wall thickness shall
The annular gap should be sealed with
The RWA45 backer should be full depth ≤ 10 Acoustic Intumescent Sealant through be a minimum of 100mm,
of the wall, allowing for 12.5mm deep
≤ 50 Acoustic Intumescent Sealant to both the full depth of the wall
sides of the wall
All services should be adequately supported both sides of
the firestop to ensure the no load is transferred to the wall.

These products should only be utilised for applications as


outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
Copper or steel pipe Copper or steel pipe installed in accordance with the current ROCKWOOL
See Table for pipe sizes See Table for pipe sizes
guidelines. For further information please visit
Rocklap H&V Pipe Section Rocklap H&V Pipe Section www.rockwool.co.uk or contact our Technical Solutions
Installed continuously through the wall for Installed continuously through the wall Team on 01656 868490.
min. 1000mm length. for min. 1000mm length.

Acoustic Intumescent Acoustic Intumescent


Sealant Sealant
5mm bead to interface of H&V pipe 5mm bead to interface of H&V pipe
section and drywall section and drywall

ROCKLAP H&V PIPE SECTION THROUGH DRYWALL WITH ROCKLAP H&V PIPE SECTION THROUGH DRYWALL WITH
ANNULAR SPACE UP TO 50mm ANNULAR SPACE LESS THAN 11mm

Acoustic Intumescent
Sealant
≤ 50 5mm bead to interface of H&V pipe
section and drywall

≤ 50 ≤ 50

Rocklap H&V Pipe Section


Installed continuously through the wall
for min. 1000mm length.
Integrity Performance: Insulation Performance:
Flexible wall
Fire resistant to at least the fire rating
requirement of the service penetration See Table See Table

ROCKLAP H&V PIPE SECTION CLUSTER THROUGH


DRYWALL WITH ANNULAR SPACE UP TO 50mm
Performance (mins) Performance (mins) Service separation
H&V Test
Service type Annular gap Locally Sustained Continuously Sustained minimum (mm) Notes
Thickness Standard
Integrity Insulation Integrity Insulation Aperture Services
Copper pipe ≤ Ø 15mm
≤ 10mm
Annular space sealed with Acoustic
Intumescent Sealant through full wall
Pencoed, Bridgend,
Steel pipe ≤ Ø 60mm thickness South Wales CF35 6NY
Copper pipe ≤ Ø 15mm 20mm 120 120 120 120
11 - 50mm
Annular space filled with RWA45 and
finished with 12.5mm Acoustic
t: 01656 868490
Steel pipe ≤ Ø 60mm
Copper pipe custer Ø 15 - 60mm
Intumescent Sealant technical.solutions@rockwool.co.uk
Copper pipe ≤ Ø 15mm 120
120 120 120 Annular space sealed with Acoustic
Ø 16mm - 108mm 60 Drawing Title:
≤ 10mm Intumescent Sealant through full wall
Steel pipe ≤ Ø 114mm EN 0 0 thickness
90 Rocklap H&V Pipe Section
Ø 114mm - 219mm 90 90 90
25mm
Copper pipe ≤ Ø 15mm 120 Non-combustible pipes through drywall
120
Ø 16mm - 108mm
11 - 50mm 120 90 120 Annular space filled with RWA45 and
Steel pipe ≤ Ø 114mm
90 finished with 12.5mm Acoustic
Ø 114mm - 219mm 60 Scale: Date:
Intumescent Sealant
NTS MAY 19
Copper pipe cluster Ø 15mm - 108mm 60
25mm ≤ 50mm 120 120 120
Steel pipe cluster Ø 15mm - 114mm 120 Sheet Size: Drawn By: Checked By:
A3 S. HIRONS RW TECH
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-260-RW B

(V9/AUG21) 26
(V9/AUG21) 27
(V9/AUG21) 28
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5738

The supporting construction must be capable of achieving


the required fire rating of the proposed firestop.

Flexible wall constructions must be installed in accordance


with the manufacturer's guidelines. The wall construction
should be a minimum thickness of 100mm. This detail can
Flexible wall also be applied to rigid wall constructions of 100mm
• min. 100mm thick minimum thickness.
• min. 2no. board layers
• Fire rated to at least the same fire rating as the firestop seal
All service items should be adequately supported both
sides of the firestop to ensure that no load is transferred
onto the firestop seal.

ROCKWOOL FIREPRO® Pipe Refer to relevant product datasheet for further installation
guidelines.
Collar CE
• Ø32 - 160mm pipes
• PE, PVC, and PP pipes These products should only be utilised for applications as
• Fixed with Ø8mm x 65mm long Fischer FM 6x65S steel anchors outlined in the relevant ROCKWOOL product data sheet
through each fixing tab.
• Pipe Collar CE must match the outside diameter of the pipe (e.g. and in accordance with the relevant ROCKWOOL Fire
Ø110mm Pipe Collar CE can only be used with Ø110mm pipes) Resistance Testing. Additionally the product must be
• Annular gaps ≤10mm between substrate and pipe to be sealed with
min. 10mm depth of ROCKWOOL FIREPRO® Acoustic Intumescent
installed in accordance with the current ROCKWOOL
Sealant guidelines.
• Annular gaps >10mm between substrate and pipe to be sealed with
ROCKWOOL Firestop Compound
For further information please visit www.rockwool.co.uk or
contact our Technical Solutions Team on 01656 868490.

Flexible / rigid wall


Test Service separation
Service type (min. 100mm thick)
Standard
Integrity Insulation Aperture Services
PVC pipes Ø 32 - 50mm (1.8mm wall thickness) Integrity Performance: wall Insulation Performance:
Ø 55 - 63mm (2.3 - 3mm wall thickness)
Ø 75 - 82mm (3.1 - 4.8mm wall thickness) 120 mins 120 mins
Ø 90 - 110mm (4.2 - 7.4mm wall thickness) 120 120 EN N/A 200mm
Ø 125mm (6mm wall thickness)
Ø 140mm (6.1 - 7.5mm wall thickness)
Ø 160mm (6.2 - 9.5mm wall thickness)
PP pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 55 - 63mm (2.9- 4.4mm wall thickness)
Ø 75 - 82mm (2.8- 6.7mm wall thickness) Pencoed, Bridgend,
Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN N/A 200mm South Wales CF35 6NY
Ø 125mm (3.1mm wall thickness) t: 01656 868490
Ø 140mm (3.5 - 8mm wall thickness) technical.solutions@rockwool.co.uk
Ø 160mm (4 - 14.6mm wall thickness)
PE pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 55 - 63mm (2.9- 4.4mm wall thickness) Drawing Title:

Ø 75 - 82mm (2.8- 6.7mm wall thickness) PIPE COLLAR CE


Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN N/A 200mm Direct Through Wall
Ø 125mm (3.1mm wall thickness)
Ø 140mm (3.9 - 5.8mm wall thickness)
Ø 160mm (4.9 - 9.5mm wall thickness) Scale: Date:
NTS SEP 20

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-COL-0001 B

(V9/AUG21) 29
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5578

The supporting construction must be capable of achieving


the required fire rating of the proposed firestop.

Flexible wall constructions must be installed in accordance


Flexible wall with the manufacturer's guidelines with the aperture being
• min. 100mm thick fully framed and lined out. The wall construction should be
• Aperture framed and lined as per wall manufacturers details
• min. 2no. board layers
a minimum thickness of 100mm. This detail can also be
• Fire rated to at least the same fire rating as the firestop seal applied to rigid wall constructions of 100mm minimum
thickness.
ROCKWOOL FIREPRO® Pipe All service items should be adequately supported both
Collar CE sides of the firestop to ensure that no load is transferred
• Ø32 - 160mm pipes
onto the firestop seal.
• PE, PVC, and PP pipes
• Fixed to batt with 80mm long steel pig tail screws through each fixing
tab. Refer to relevant product datasheet for further installation
• Pipe Collar CE must match the outside diameter of the pipe (e.g.
Ø110mm Pipe Collar CE can only be used with Ø110mm pipes)
guidelines.

These products should only be utilised for applications as


ROCKWOOL FIREPRO® 50mm outlined in the relevant ROCKWOOL product data sheet
Ablative Coated Batt and in accordance with the relevant ROCKWOOL Fire
• 50mm thickness
Resistance Testing. Additionally the product must be
• Installed in 2no. layer within the aperture
• max. 1200mm x 730mm aperture installed in accordance with the current ROCKWOOL
• Edges of the batt to be buttered with Acoustic Intumescent Sealant guidelines.
• All batt-to-batt and batt-to-substrate joints to be sealed with Acoustic
Intumescent Sealant
For further information please visit www.rockwool.co.uk or
contact our Technical Solutions Team on 01656 868490.

Flexible / rigid wall


Test Service separation
Service type (min. 100mm thick)
Standard
Integrity Insulation Aperture Services
PVC pipes Ø 32 - 50mm (1.8mm wall thickness) Integrity Performance: Insulation Performance:
Ø 55 - 63mm (2.3 - 3mm wall thickness)
Ø 75 - 82mm (3.1 - 4.8mm wall thickness) 120 mins 120 mins
Ø 90 - 110mm (4.2 - 7.4mm wall thickness) 120 120 EN 50mm 0mm
Ø 125mm (6mm wall thickness)
Ø 140mm (6.1 - 7.5mm wall thickness)
Ø 160mm (6.2 - 9.5mm wall thickness)
PP pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 55 - 63mm (2.9- 4.4mm wall thickness)
Ø 75 - 82mm (2.8- 6.7mm wall thickness) Pencoed, Bridgend,
Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN 50mm 0mm
South Wales CF35 6NY
Ø 125mm (3.1mm wall thickness)
Ø 140mm (3.5 - 8mm wall thickness)
t: 01656 868490
Ø 160mm (4 - 14.6mm wall thickness) technical.solutions@rockwool.co.uk
PE pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 55 - 63mm (2.9- 4.4mm wall thickness) Drawing Title:
Ø 75 - 82mm (2.8- 6.7mm wall thickness)
Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN 50mm 0mm PIPE COLLAR CE
Ø 125mm (3.1mm wall thickness) Ablative Coated Batt Wall Aperture
Ø 140mm (3.9 - 5.8mm wall thickness)
Ø 160mm (4.9 - 9.5mm wall thickness)
Scale: Date:
NTS SEP 20

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-COL-0002 B

(V9/AUG21) 30
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5578

The supporting construction must be capable of achieving


the required fire rating of the proposed firestop.

Flexible wall constructions must be installed in accordance


Flexible wall with the manufacturer's guidelines. The wall construction
• min. 100mm thick should be a minimum thickness of 100mm. This detail can
• min. 2no. board layers
• Fire rated to at least the same fire rating as the firestop seal
also be applied to rigid wall constructions of 100mm
minimum thickness.

All service items should be adequately supported both


ROCKWOOL FIREPRO® Pipe sides of the firestop to ensure that no load is transferred
Collar CE onto the firestop seal.
• Ø32 - 160mm pipes
• PE, PVC, and PP pipes
• Fixed to batt with 80mm long steel pig tail screws through each fixing Refer to relevant product datasheet for further installation
tab. guidelines.
• Pipe Collar CE must match the outside diameter of the pipe (e.g.
Ø110mm Pipe Collar CE can only be used with Ø110mm pipes)
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
ROCKWOOL FIREPRO® 50mm and in accordance with the relevant ROCKWOOL Fire
Ablative Coated Batt Resistance Testing. Additionally the product must be
• 50mm thickness
installed in accordance with the current ROCKWOOL
• Installed in 1no. face-fixed layer to both sides of the aperture
• max. 1200mm x 730mm aperture guidelines.
• Fixed to substrate with 80mm non-combustible screws with 25mm
washer at max. 300mm centres
• Ablative Coated Batt should overlap the aperture by min. 50mm
For further information please visit www.rockwool.co.uk or
• Edges of the batt to be buttered with Acoustic Intumescent Sealant contact our Technical Solutions Team on 01656 868490.
• All batt-to-batt and batt-to-substrate joints to be sealed with Acoustic
Intumescent Sealant

Flexible / rigid wall


Test Service separation
Service type (min. 100mm thick)
Standard
Integrity Insulation Aperture Services
Integrity Performance: Insulation Performance:
PVC pipes Ø 32 - 50mm (1.8mm wall thickness)
Ø 55 - 63mm (2.3 - 3mm wall thickness)
120 mins 120 mins
Ø 75 - 82mm (3.1 - 4.8mm wall thickness)
Ø 90 - 110mm (4.2 - 7.4mm wall thickness) 120 120 EN 50mm 0mm
Ø 125mm (6mm wall thickness)
Ø 140mm (6.1 - 7.5mm wall thickness)
Ø 160mm (6.2 - 9.5mm wall thickness)
PP pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 55 - 63mm (2.9- 4.4mm wall thickness)
Pencoed, Bridgend,
Ø 75 - 82mm (2.8- 6.7mm wall thickness)
Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN 50mm 0mm South Wales CF35 6NY
Ø 125mm (3.1mm wall thickness) t: 01656 868490
Ø 140mm (3.5 - 8mm wall thickness) technical.solutions@rockwool.co.uk
Ø 160mm (4 - 14.6mm wall thickness)
PE pipes Ø 32 - 50mm (2.9mm wall thickness)
Drawing Title:
Ø 55 - 63mm (2.9- 4.4mm wall thickness)
Ø 75 - 82mm (2.8- 6.7mm wall thickness) PIPE COLLAR CE
Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN 50mm 0mm Face-fix Ablative Coated Batt
Ø 125mm (3.1mm wall thickness)
Ø 140mm (3.9 - 5.8mm wall thickness)
Ø 160mm (4.9 - 9.5mm wall thickness) Scale: Date:
NTS SEP 20

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-COL-0003 B

(V9/AUG21) 31
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5738

The supporting construction must be capable of achieving


the required fire rating of the proposed firestop.

All service items should be adequately supported both


sides of the firestop to ensure that no load is transferred
onto the firestop seal.
> 10 ≤ 10
Refer to relevant product datasheet for further installation
guidelines.
Rigid floor
• min. 150mm thick
• Fire rated to at least the same fire rating as the firestop seal
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
ROCKWOOL FIREPRO® Pipe guidelines.
Collar CE
• Ø32 - 160mm pipes For further information please visit www.rockwool.co.uk or
• PE, PVC, and PP pipes contact our Technical Solutions Team on 01656 868490.
• Fixed with Ø8mm x 65mm long Fischer FM 6x65S steel anchors
through each fixing tab.
• Pipe Collar CE must match the outside diameter of the pipe (e.g.
Ø110mm Pipe Collar CE can only be used with Ø110mm pipes)
• Annular gaps ≤10mm between substrate and pipe to be sealed with
min. 10mm depth of ROCKWOOL FIREPRO® Acoustic Intumescent
Sealant
• Annular gaps >10mm between substrate and pipe to be sealed with
ROCKWOOL Firestop Compound

Rigid floor
Test Service separation
Service type (min. 150mm thick)
Standard
Integrity Insulation Aperture Services
PVC pipes Ø 32 - 50mm (1.8mm wall thickness)
Ø 55 - 63mm (2.3 - 3mm wall thickness) Integrity Performance: Insulation Performance:
Ø 75 - 82mm (3.1 - 4.8mm wall thickness)
Ø 90 - 110mm (4.2 - 7.4mm wall thickness) 240 240 EN N/A 200mm 240 mins 240 mins
Ø 125mm (6mm wall thickness)
Ø 140mm (6.1 - 7.5mm wall thickness)
Ø 160mm (6.2 - 9.5mm wall thickness)
PP pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 55 - 63mm (2.9- 4.4mm wall thickness)
Ø 75 - 82mm (2.8- 6.7mm wall thickness) Pencoed, Bridgend,
Ø 90 - 110mm (2.7 - 10mm wall thickness) 240 240 EN N/A 200mm
South Wales CF35 6NY
Ø 125mm (3.1mm wall thickness)
Ø 140mm (3.5 - 8mm wall thickness) t: 01656 868490
Ø 160mm (4 - 14.6mm wall thickness) technical.solutions@rockwool.co.uk
PE pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 55 - 63mm (2.9- 4.4mm wall thickness) Drawing Title:
Ø 75 - 82mm (2.8- 6.7mm wall thickness)
240 240 EN N/A 200mm PIPE COLLAR CE
Ø 90 - 110mm (2.7 - 10mm wall thickness)
Ø 125mm (3.1mm wall thickness) Solid Floor
Ø 140mm (3.9 - 5.8mm wall thickness)
Ø 160mm (4.9 - 9.5mm wall thickness)
Scale: Date:
NTS SEP 20

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-COL-0501 B

(V9/AUG21) 32
ROCKWOOL Standard Detail:
Supporting Evidence : WF 428682

The supporting construction must be capable of achieving


the required fire rating of the proposed firestop.

ROCKWOOL FIREPRO® Firestop All service items should be adequately supported to


® Compound ensure that no load is transferred onto the firestop seal.
ROCKWOOL FIREPRO Acoustic • Suitable for annular gaps >25mm between pipe and substrate
Intumescent Sealant • min. 75mm thickness
• ROCKWOOL FIREPRO® 50mm Ablative Coated Batt shuttering Refer to relevant product datasheet for further installation
• Suitable for annular gaps ≤25mm between pipe and substrate
• 15mm depth
guidelines.
• ROCKWOOL RWA45 backing full depth of metal deck slab
• Applied to top and bottom of annular gap Rigid floor These products should only be utilised for applications as
• min. 150mm thick
• Fire rated to at least the same fire rating as the firestop seal
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
ROCKWOOL FIREPRO® 50mm guidelines.
Ablative Coated Batt
ROCKWOOL FIREPRO® Pipe • 50mm thickness
• Installed with the profiles of the metal deck
For further information please visit www.rockwool.co.uk or
Collar CE • Face-fixed to metal deck trough min. 100mm from service penetration contact our Technical Solutions Team on 01656 868490.
• Ø32 - 160mm pipes • Fixed with min. 75mm long steel fixing anchor that are suitable for the
• PE, PVC, and PP pipes substrate

≤25 >25
• Fixed with min. 52mm long pig tail screws through each fixing tab. • Edges of the batt to be buttered with Acoustic Intumescent Sealant
• Pipe Collar CE must match the outside diameter of the pipe (e.g. • All batt-to-batt and batt-to-substrate joints to be sealed with Acoustic
Ø110mm Pipe Collar CE can only be used with Ø110mm pipes) Intumescent Sealant

Rigid floor
Test Service separation
Service type (min. 150mm thick)
Standard Integrity Performance: Insulation Performance:
Integrity Insulation Aperture Services
PVC pipes Ø 32 - 50mm (1.8mm wall thickness)
120 mins 120 mins
Ø 55 - 63mm (2.3 - 3mm wall thickness)
Ø 75 - 82mm (3.1 - 4.8mm wall thickness)
Ø 90 - 110mm (4.2 - 7.4mm wall thickness) 120 120 EN N/A 200mm
Ø 125mm (6mm wall thickness)
Ø 140mm (6.1 - 7.5mm wall thickness)
Ø 160mm (6.2 - 9.5mm wall thickness)
HDPE pipes Ø 32 - 50mm (2.9mm wall thickness) Pencoed, Bridgend,
Ø 55 - 63mm (2.9- 4.4mm wall thickness) South Wales CF35 6NY
Ø 75 - 82mm (2.8- 6.7mm wall thickness)
Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN N/A 200mm
t: 01656 868490
Ø 125mm (3.1mm wall thickness) technical.solutions@rockwool.co.uk
Ø 140mm (3.9 - 5.8mm wall thickness)
Ø 160mm (4.9 - 9.5mm wall thickness) Drawing Title:
PP pipes Ø 32 - 50mm (2.9mm wall thickness)
PIPE COLLAR CE
Ø 55 - 63mm (2.9- 4.4mm wall thickness)
Ø 75 - 82mm (2.8- 6.7mm wall thickness) Metal Deck Floor
Ø 90 - 110mm (2.7 - 10mm wall thickness) 120 120 EN N/A 200mm
Ø 125mm (3.1mm wall thickness)
Scale: Date:
Ø 140mm (3.5 - 8mm wall thickness) NTS SEP 20
Ø 160mm (4 - 14.6mm wall thickness)
Sheet Size: Drawn By: Checked By:
A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-COL-0502 B

(V9/AUG21) 33
ROCKWOOL Standard Detail:
INSTALLATION NOTES
Supporting Evidence : ETA 15-0326
1. Make sure that the area within the aperture is
The supporting construction must be capable of achieving
clean of any debris and remove any dust from
the required fire rating of the proposed Firestop.
the edges.
Flexible wall construction must be installed in accordance
2. Ensure that the surface is free from any bond Blockwork wall Fire rated drywall with the manufacturer's guidelines. The Wall construction
breaking contaminants prior to application of
should be of a minimum thickness of 120mm.
sealant.

Ø 159mm max. Ø 159mm max. Where insulation is required from metallic pipes then the
3. Install the backing material around the service 25 min. 10 max. 25 min. 10 max.
non-combustible pipe non-combustible pipe service item will need to be lagged with Rockwool Fire
item to allow for the minimum allowable seal
Tube or RockLap H&V Pipe Section. Please contact
depth. The backing material can consist of either
ROCKWOOL technical for further details.
ROCKWOOL RWA45 / RW4 packed around the
service or a PE backing rod.
Backing material to control depth of sealant can be either a
ROCKWOOL Acoustic ROCKWOOL Acoustic PE backing rod or ROCKWOOL RW 4 insulation packed
4. Install the Rockwool Acoustic Intumescent Intumescent Sealant Intumescent Sealant into the annular space.
Sealant to the required depth ensuring a smooth
tight finish with both the service item and the
These products should only be utilised for applications as
substrate. PE backing rod, or, ROCKWOOL
RWA45 insulation outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
5. Repeat step 3 and 4 on the other side of the
Resistance Testing. Additionally the product must be
wall. 120 min. installed in accordance with the current ROCKWOOL
guidelines.

For further information or alternative products please visit


www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490

Pipe Integrity Performance:

Up to 120 Minutes
ROCKWOOL RW4 backing
Integrity Performance: (Cables) Insulation Performance: (Cables)
490 450mm (w) x 25mm (h) cable
tray with 21mm max. 120 Minutes 90 Minutes
450mm (w) x 25mm (h) cable cables (21-50mm Cables 90 Minutes) (21-50mm Cables 60 Minutes)
tray with 21mm max.
cables 100

ROCKWOOL Acoustic ROCKWOOL Acoustic


Intumescent Sealant Intumescent Sealant
Pencoed, Bridgend,
50mm max. cables
South Wales CF35 6NY
100
t: 01656 868490
200 25 min. technical.solutions@rockwool.co.uk
50mm max. cables

Drawing Title:

Acoustic Intumescent Sealant with single pipe/cable

Scale: Date:
NTS NOV 18

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-128-RW D

(V9/AUG21) 34
ROCKWOOL Standard Detail:
Supporting Evidence : WF 378958

The supporting construction must be capable of achieving


the required fire rating of the proposed firestop.
100 min.
Flexible wall construction must be installed in accordance
with the manufacturers guidelines. The wall construction
should be a minimum of 100mm thick.
ROCKWOOL RWA45 backer
Installed in 40mm wide x 20mm thick strips This detail is also suitable for max. Ø 180mm core hole
horizontal strips to both sides of the seal.
through wall.
20
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
20
≤ Ø 50mm cable, or, ≤ Ø 50mm cable, or, and in accordance with the relevant ROCKWOOL Fire
≤ Ø 100mm cable bunch ≤ Ø 100mm cable bunch Resistance Testing. Additionally the product must be
Refer to Table for fire rating performance Refer to Table for fire rating performance installed in accordance with the current ROCKWOOL
guidelines. For further information please visit
www.rockwool.co.uk or contact our Technical Solutions
max. 180 Team on 01656 868490.

ROCKWOOL Acoustic ROCKWOOL Acoustic


Intumescent Sealant Intumescent Sealant
Fully filling the aperture to a depth of 20mm Fully filling the aperture to a depth of 20mm
max. 180

Flexible wall min. 100mm Flexible wall min. 100mm

Integrity Performance: Insulation Performance:

Up to 120 Minutes Up to 120 Minutes

Flexible / rigid wall


Test
Service type (min. 100mm thick)
Standard Pencoed, Bridgend,
Integrity Insulation
Blank seal ≤ 180mm x 180mm
South Wales CF35 6NY
120 120
Electrical cable ≤ Ø 21mm
EN
t: 01656 868490
Ø 22mm - 50mm 90 60
technical.solutions@rockwool.co.uk
Telecomm cables ≤ Ø 100mm bundle 120 15

Drawing Title:

Acoustic Intumescent Sealant


Through Drywall

Scale: Date:
NTS MAY 19

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS RW TECH
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-127-RW B

(V9/AUG21) 35
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411460 (BS EN 1366-3:2009)

The supporting construction must be capable of achieving


the required fire rating of the proposed firestop.

Flexible wall constructions must be installed in accordance


42mm Dia. COPPER SLEEVE WITH CABLES 76mm Dia. COPPER SLEEVE WITH CABLES with the manufacturer's guidelines. The wall construction
THROUGH 75mm FLEXIBLE WALL THROUGH 75mm FLEXIBLE WALL should be a minimum thickness of 75mm.
EI 60 EI 60/30 All service items should be adequately supported both
sides of the firestop to ensure that no load is transferred
onto the firestop seal.

Point any gaps between copper sleeve and flexible wall


Flexible wall Flexible wall with a bead of ROCKWOOL Acoustic Intumescent
12.5 • min. 75mm thick
12.5 • min. 75mm thick Sealant.
• min. 1no. board layers
125 • min. 1no. board layers

125 • Fire rated to at least the same fire rating as the firestop seal • Fire rated to at least the same fire rating as the firestop seal
12.5 12.5 Applications in flexible wall constructions can be used in
masonry wall constructions.

Refer to relevant product datasheet for further installation


Cable - Bundle Cable - Bundle guidelines.
Note: • max. 3no. telecommunication cables
Note: • max. 3no. telecommunication cables
These products should only be utilised for applications as
Point any gaps between sleeve Point any gaps between sleeve
and partition with a bead of Copper sleeve and partition with a bead of Copper sleeve outlined in the relevant ROCKWOOL product data sheet
acoustic intumescent sealant acoustic intumescent sealant
• Ø 42mm x 1mm • Ø 76mm x 1mm and in accordance with the relevant ROCKWOOL Fire
• min. 125mm length • min. 125mm length
• ROCKWOOL RWA45 packed around cables within sleeve • ROCKWOOL RWA45 packed around cables within sleeve Resistance Testing. Additionally the product must be
75 • min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent 75 • min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent installed in accordance with the current ROCKWOOL
Sealant to seal within sleeve Sealant to seal within sleeve
guidelines.

For further information please visit www.rockwool.co.uk or


Flexible wall Flexible wall contact our Technical Solutions Team on 01656 868490.
• min. 75mm thick • min. 75mm thick
• min. 1no. board layers • min. 1no. board layers
• Fire rated to at least the same fire rating as the firestop seal • Fire rated to at least the same fire rating as the firestop seal

Note: Copper sleeve Note: Copper sleeve


Point any gaps between sleeve • Ø 42mm Point any gaps between sleeve • Ø 76mm Integrity Performance: Insulation Performance:
and partition with a bead of Ø42 • min. 125mm length and partition with a bead of
Ø76 • min. 125mm length
acoustic intumescent sealant • ROCKWOOL RWA45 packed around cables within sleeve acoustic intumescent sealant • ROCKWOOL RWA45 packed around cables within sleeve
• min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent • min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent 60 minutes up to 60 minutes
Sealant to seal within sleeve Sealant to seal within sleeve

ELEVATION - 42mm Dia. COPPER SLEEVE ELEVATION - 76mm Dia. COPPER SLEEVE
THROUGH 75mm FLEXIBLE WALL THROUGH 75mm FLEXIBLE WALL
EI 60 EI 60/30

Pencoed, Bridgend,
South Wales CF35 6NY
t: 01656 868490
technical.solutions@rockwool.co.uk

Drawing Title:

ROCKWOOL FIREPRO® Acoustic Intumescent Sealant


75mm Flexible Wall - 1no. Board - Cu. Sleeved Cables

Scale: Date:
NTS NOV 20

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-AIS-0101 B

(V9/AUG21) 36
ROCKWOOL Standard Detail:
Supporting Evidence : WF 398664 (BS EN 1366-3)

The masonry wall must be capable of achieving the


required 120 minutes Fire Rating as detailed within this
1) Sleeved non combustible pipe through batt seal 2) Sleeved non combustible pipe through compound seal drawing.

Annular Space: The annular space between pipe and


sleeve should be between 14-47mm. For annular gaps
greater than 47mm please contact ROCKWOOL technical

Masonry wall Masonry wall Spacing: There can be 0mm distance from sleeving to
aperture edge.

These products should only be utilised for applications as


outlined in the relevant ROCKWOOL product data sheet
2no. layers 50mm Ablative Coated Batt 100mm Firestop Compound
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
Ø42-108 copper sleeving around Ø42-108 copper sleeving around
installed in accordance with the current ROCKWOOL
Ø15-76 copper pipe Ø15-76 copper pipe guidelines. For further information please visit
www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490.

15mm depth of Acoustic Intumescent Sealant 15mm depth of Acoustic Intumescent Sealant
to both sides of seal to both sides of seal
15 14-47 annular
ROCKWOOL RWA45 backing ROCKWOOL RWA45 backing

100 100

Integrity Performance: Insulation Performance:

Min 15mm depth of acoustic RWA45 backing between 120 Minutes Up to 15 Minutes
intumescent sealant to pipe sleeve and pipe to full
annular gap up to 47mm depth of seal

Copper sleeve through


batt/compound seal
Pencoed, Bridgend,
South Wales CF35 6NY
t: 01656 868490
Performance Table:
technical.solutions@rockwool.co.uk
Sealant
Sleeve Pipe Seal Aperture Size Annular Gap Backer EI Rating Spacing
Depth Drawing Title:
42 - 108mm 15 - 76mm Compound 440 x 330 14 - 47mm RWA45 15mm 120/10 0mm From Aperture Edge Ablative Coated Batt / Firestop Compound
42 - 108mm 15 - 76mm Double 50mm ACB 440 x 330 14 - 47mm RWA45 15mm 120/15 0mm From Aperture Edge Sleeved Pipe Penetrations

Scale: Date:
NTS APR 19

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-311-RW C

(V9/AUG21) 37
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5891 / ETA 20-0682

The supporting construction must be capable of achieving


the required fire rating of the proposed firestop.

Flexible wall All pipes tested in uncapped/capped applications.


• min. 100mm thick
• min. 2no. board layers Flexible wall constructions must be installed in accordance
• Fire rated to at least the same fire rating as the firestop seal
with the manufacturer's guidelines. The wall construction
should be a minimum thickness of 100mm. This detail can
Pipe - Combustible also be applied to rigid wall constructions, 650kg/m^3
• max. Ø 200mm minimum density, of 100mm minimum thickness and
• PVC, PE, or PP
ROCKWOOL FIrestop Compound seals.

All service items should be adequately supported both


sides of the firestop to ensure that no load is transferred

ROCKWOOL FIREPRO® onto the firestop seal.


40 Intumescent Pipe Wrap CE Refer to relevant product datasheet for further installation
• Ø32 - 200mm pipes guidelines.
• 40mm width
• 2-12mm thickness depending on pipe diameter For pipe spacing less than 200mm please contact
• Installed to both sides of the wall ROCKWOOL Technical Solutions.
• Finished with bead of ROCKWOOL Acoustic Intumescent Sealant
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines.

For further information please visit www.rockwool.co.uk or


contact our Technical Solutions Team on 01656 868490.

Flexible / rigid wall Intumescent Thickness


Test Service separation Integrity Performance: Insulation Performance:
Service type (min. 100mm thick) Pipe Diameter Intumescent Material
Standard
Integrity Insulation Aperture Services Ø32 - 50mm 40mm (w) x 2mm (t)
max. 120 minutes max. 120 minutes
PVC pipes Ø 32 - 50mm (1.8mm wall thickness) 120 120 Ø51 - 82mm 40mm (w) x 4mm (t)
Ø 160mm (6.2mm wall thickness) 90 90 Ø83 - 115mm 40mm (w) x 6mm (t)
EN N/A 200mm
Ø 160mm (9.5mm wall thickness) Ø116 - 160mm 40mm (w) x 8mm (t)
120 120
Ø 200mm (7.7 - 9.6mm wall thickness) Ø161 - 200mm 40mm (w) x 10mm (t)
PP pipes Ø 32 - 50mm (2.9mm wall thickness) 120 Ø201 - 250mm 40mm (w) x 12mm (t)
Ø 160mm (4mm wall thickness) 90
Ø 160mm (14.6mm wall thickness) 120
120 EN N/A 200mm
Ø 200mm (4.9mm wall thickness) 90 Pencoed, Bridgend,
Ø 200mm (18.2mm wall thickness) 120 South Wales CF35 6NY
Ø 250mm (10.1mm wall thickness) 15
PE pipes Ø 32 - 50mm (2.9mm wall thickness) 120 120
t: 01656 868490
Ø 160mm (9.5mm wall thickness) 90 90 EN N/A 200mm technical.solutions@rockwool.co.uk
Ø 200mm (18.4mm wall thickness) 120 120

Drawing Title:

PIPE WRAP CE
Direct Through Wall

Scale: Date:
NTS OCT 20

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-PW-0001 B

(V9/AUG21) 38
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5891 / ETA 20-0682

The supporting construction must be capable of achieving


ROCKWOOL FIREPRO® ROCKWOOL FIREPRO® the required fire rating of the proposed firestop.
Intumescent Pipe Wrap CE Intumescent Pipe Wrap CE All pipes tested in uncapped/capped applications.
• Ø32 - 200mm pipes • Ø32 - 200mm pipes
• 40mm width • 40mm width
• 2-12mm thickness depending on pipe diameter • 2-12mm thickness depending on pipe diameter Rigid floor constructions must have a minimum density of
• Installed to both sides of the floor • Installed to both sides of the floor 650kg/m^3. The floor construction should be a minimum
• Finished with bead of ROCKWOOL Acoustic Intumescent Sealant • Finished with bead of ROCKWOOL Acoustic Intumescent Sealant
thickness of 150mm. This detail can also be applied to
ROCKWOOL Firestop Compound floor seals of 150mm
Rigid floor minimum thickness.
Rigid floor • min. 150mm thick
• Fire rated to at least the same fire rating as the firestop seal
• min. 150mm thick
• Fire rated to at least the same fire rating as the firestop seal
All service items should be adequately supported both
sides of the firestop to ensure that no load is transferred
ROCKWOOL FIREPRO® Firestop onto the firestop seal.
Compound
Pipe - Combustible • min. 150mm thickness Refer to relevant product datasheet for further installation
• max. Ø 200mm guidelines.
• PVC, PE, or PP

For pipe spacing less than 200mm please contact


Pipe - Combustible ROCKWOOL Technical Solutions.
• max. Ø 200mm
• PVC, PE, or PP
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines.

For further information please visit www.rockwool.co.uk or


contact our Technical Solutions Team on 01656 868490.

Integrity Performance: Insulation Performance:

max. 120 minutes max. 120 minutes


40 40

Pencoed, Bridgend,
Rigid floor
Service separation
Intumescent Thickness South Wales CF35 6NY
Test
Service type (min. 150mm thick)
Standard
Pipe Diameter Intumescent Material t: 01656 868490
Integrity Insulation Aperture Services Ø32 - 50mm 40mm (w) x 2mm (t)
PVC pipes Ø 32 - 50mm (1.8mm wall thickness) 120 Ø51 - 82mm 40mm (w) x 4mm (t)
technical.solutions@rockwool.co.uk
120
Ø 200mm (7.7mm wall thickness) 90 EN N/A 200mm Ø83 - 115mm 40mm (w) x 6mm (t)
Ø 200mm (9.6mm wall thickness) 60 60 Ø116 - 160mm 40mm (w) x 8mm (t) Drawing Title:
PP pipes Ø 32 - 50mm (2.9mm wall thickness) 120 120 Ø161 - 200mm 40mm (w) x 10mm (t)
Ø 200mm (4.9mm wall thickness) 15 15 EN N/A 200mm PIPE WRAP CE
Ø 200mm (18.2mm wall thickness) 120 90 Solid Floor
HDPE pipes Ø 32 - 50mm (2.9mm wall thickness)
Ø 200mm (4.9mm wall thickness) 120 120 EN N/A 200mm
Ø 200mm (11.4mm wall thickness) Scale: Date:
NTS OCT 20

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-PW-0501 B

(V9/AUG21) 39
ROCKWOOL Standard Detail:
Supporting Evidence : WF352080/4 - CF5579

INSTALLATION NOTES TABLE 1: The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.
1) Check that pipe surface and substrate are clean and clear of any debris. Pipe Size (mm) Wrap Thickness Layers
2) Ensure the correct number of layers of wrap as detailed in Table 1 or refer to data sheet. 32-50 40mm (W) x 2mm (T) 1 All service items should be adequately supported either
3) Install the wrap into the floor recessed by 5mm from the face of the floor. 51-82 40mm (W) x 4mm (T) 2 side of the seal.
4) Fill the annular space with Rockwool® FirePro® Acoustic Intumescent Sealant to seal off the 5mm gap to the 83-115 40mm (W) x 6mm (T) 3
edge of the substrate. 116-150 40mm (W) x 8mm (T) 4 This detail is to be read in conjunction with the
5) Maintain a record of the installation. 151-200 40mm (W) x 10mm (T) 5 ROCKWOOL FIREPRO Intumescent Pipewrap Roll data
sheet specific installation instructions.

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.

Refer to Table 1 for number or Pipewrap Roll layers.

These products should only be utilised for applications as


outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
COMBUSTIBLE PIPES IN RIGID FLOOR WRAP APPLIED TO BOTH SIDES OF SEAL Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines.

For further information or alternative products please visit


No. of Wrap Layers No. of Wrap Layers No. of Wrap Layers No. of Wrap Layers www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
PVC Pipe Dia. HDPE Pipe Dia. PP Pipe Dia. PP Pipe Dia.

Annular space around pipe to suit total Annular space around pipe to suit total
thickness of Pipewrap Roll. Refer to table 1 thickness of Pipewrap Roll. Refer to table 1
for number of layers for number of layers

40 5 5 40 5 40 5 40 Integrity Performance: Insulation Performance:


Floor Floor
Up to 120 Minutes Up to 120 Minutes
150 40 40 40 40 150

5 5 5 5

Pipewrap Roll installed to both sides of floor Pipewrap Roll installed to both sides of floor
with 5mm recess to finished face. Recess with 5mm recess to finished face. Recess
filled with ROCKWOOL Acoustic filled with ROCKWOOL Acoustic
Pencoed, Bridgend,
Intumescent Sealant Intumescent Sealant South Wales CF35 6NY
t: 01656 868490
technical.solutions@rockwool.co.uk

PVC PIPE HDPE PIPE PP PIPE PP PIPE


Drawing Title:
32 - 50mm O/A DIA. 32 - 50mm O/A DIA. 50 - 200mm O/A DIA. 32 - 50mm O/A DIA.
1.8 mm WALL THICKNESS 2.9 mm WALL THICKNESS 18.2mm WALL THICKNESS 2.9mm WALL THICKNESS FirePro Intumescent Pipe Wrap Roll
EI 120 EI 120 EI 90 EI 120 Combustibles Pipe Penetrations - Floor double sided

PVC PIPE HDPE PIPE


50 - 200mm O/A DIA. 50 - 200mm O/A DIA. Scale: Date:
NTS MARCH 18
7.7 - 9.6mm WALL THICKNESS 2.9 - 11.4mm WALL THICKNESS
EI60 EI 120 Sheet Size: Drawn By: Checked By:
A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-181-RDW C

(V9/AUG21) 40
ROCKWOOL Standard Detail:
Supporting Evidence : CF5579

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.
SECTION THROUGH FLEXIBLE WALL WITH COMBUSTIBLE
PIPE PENETRATION WITH WRAP ON A ROLL All service items should be adequately supported either
Wrap sealed with Nominal 5mm side of the seal.
bead of ROCKWOOL Acoustic
Intumescent Sealant Min. 100mm This detail is to be read in conjunction with the
ROCKWOOL FIREPRO Intumescent Pipewrap Roll data
Flexible or Rigid wall sheet specific installation instructions.
5 5
Refer to Table 1 for number or Pipewrap Roll layers.
Annular space around pipe to suit total
thickness of Pipewrap Roll. Refer to table 1
These products should only be utilised for applications as
40 40 for number of layers
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
40
Resistance Testing. Additionally the product must be
PIPE PIPE Pipe penetration installed in accordance with the current ROCKWOOL
guidelines.

For further information or alternative products please visit


www.rockwool.co.uk or contact our Technical Solutions
ROCKWOOL Wrap on a roll
Pipewrap Roll installed to both sides of wall
Team on 01656 868490
applied to both sides of partition
with 5mm recess to finished face of wall.
Recess filled with ROCKWOOL Acoustic
Intumescent Sealant

TABLE 1: INSTALLATION NOTES

Integrity Performance: Insulation Performance:


ROCKWOOL Pipe Wrap Roll to both sides of flexible or ridgid wall (Min 100mm thick) 1) Check that pipe surface and substrate are
Pipe Material Pipe Size & Wall Thickness (mm) Wrap Layers Annulus (mm) Classification clean and clear of any debris. Up to 120 Minutes Up to 120 Minutes
PVC 32 - 50 O/A Dia - 1.8mm Wall 1 No. 40mm (W) x 2mm (T) 4 EI 120 2) Ensure the correct number of layers of wrap
PVC 160 O/A Dia - 6.2 - 9.5mm Wall 4 No. 40mm (W) x 2mm (T) 10 EI 90 as detailed in Table 1 or refer to data sheet.
PVC 200 O/A Dia. 7.7 - 9.6mm Wall 5 No. 40mm (W) x 2mm(T) 12 EI120 3) Install the wrap into the wall recessed by 5mm
PP 32 - 50 O/A Dia. - 2.9mm Wall 1 No. 40mm (W) x 2mm (T) 4 EI 120
from the face of the wall.
PP 160 O/A Dia - 4mm Wall 5 No. 40mm (W) x 2mm (T) 10 E 120 (EI90)
4) Fill the annular space with Rockwool® FirePro® Pencoed, Bridgend,
PP 160 O/A Dia - 14.6mm Wall 45No. 40mm (W) x 2mm (T) 10 EI 120
PP 200 O/A Dia. - 4.9mm Wall 5 No. 40mm (W) x 2mm(T) 12 E 120 (EI90) Acoustic Intumescent Sealant to seal off the South Wales CF35 6NY
PP 200 O/A Dia. - 18.2mm Wall 5 No. 40mm (W) x 2mm(T) 12 EI 120 5mm gap to the edge of the substrate. t: 01656 868490
PP 250 O/A Dia. - 10.1mm Wall 6 No. 40mm (W) x 2mm(T) 14 E 120 5) Maintain a record of the installation. technical.solutions@rockwool.co.uk
PE 32 - 50 O/A Dia. - 2.9mm Wall 1 No. 40mm (W) x 2mm (T) 4 EI 120
PE 160 O/A Dia - 9.5mm Wall 4 No. 40mm (W) x 2mm (T) 10 EI 90 Drawing Title:
PE 200 O/A Dia. - 18.4mm Wall 5 No. 40mm (W) x 2mm(T) 12 EI 120 FirePro Intumescent Pipe Wrap Roll
Combustibles Pipe Penetrations - Flexible Wall

Scale: Date:
NTS MARCH 18

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-185-RDW C

(V9/AUG21) 41
ROCKWOOL Standard Detail:
Supporting Evidence : CF5579

Min. 100mm Wrap sealed with Nominal 5mm The supporting construction must be capable of achieving
bead of ROCKWOOL Acoustic the required fire rating of the proposed Firestop.
Intumescent Sealant
ROCKWOOL Acoustic Intumescent sealant bedded between
All service items should be adequately supported either
batt & drywall, applied to all exposed edges of batt and to
side of the seal.
perimeter of batt to substrate

100 100 5
This detail is to be read in conjunction with the
ROCKWOOL FIREPRO Intumescent Pipewrap Roll data
Face fix 50mm Ablative Coated Batt to each side sheet specific installation instructions. For pipe O/A
of partition as SD-113-RDW diameters and pipe wall thickness that fall outside of the
those indicated in Table 1 please consult ROCKWOOL
Acoustic Intumescent Sealant
PIPE PIPE Technical.
40
Refer to Table 1 for number or Pipewrap Roll layers.
Pipe penetration
This detail is to be read in conjunction with SD-111-RDW
Pipewrap Roll - for number of layers refer to Table 1 & SD-113-RDW - Face Fix Details.

These products should only be utilised for applications as


Face fix 50mm Ablative Coated Batt to each side outlined in the relevant ROCKWOOL product data sheet
of partition as SD-113-RDW ROCKWOOL Wrap on a roll and in accordance with the relevant ROCKWOOL Fire
applied to both sides of partition. Resistance Testing. Additionally the product must be
Refer to Table 1 for number of installed in accordance with the current ROCKWOOL
Min 85mm long screws with retention washers wrap layers
at max. 300mm centres guidelines.
INSTALLATION NOTES
For further information or alternative products please visit
Min. 60 minute rated partition
www.rockwool.co.uk or contact our Technical Solutions
1) The Ablative Coated Batt must be Team on 01656 868490
installed with ROCKWOOL Acoustic
Intumescent Sealant bedded between
the batt and the substrate. A fillet of
mastic must also be installed to the
perimeter of the batt against the
Integrity Performance: Insulation Performance:
TABLE 1: substrate. The exposed
edge of batt is to be buttered with a 60 Minutes 60 Minutes
ROCKWOOL Pipe Wrap Roll in 50mm thick face fixed batt even layer of Acoustic
Pipe Material Pipe Size & Wall Thickness (mm) Wrap Layers Annulus (mm) Classification
Intumescent Sealant.
PVC 32 - 50 O/A Dia. - 1.8mm Wall 1 No. 40mm (W) x 2mm (T) 4 EI 60
2) The Ablative Coated Batt must be fixed
PVCu 50 O/A Dia. - 3.7mm Wall 1 No. 40mm (W) x 2mm (T) 4 EI 60
PVC 160 O/A Dia. - 6.2 - 9.5mm Wall 4 No. 40mm (W) x 2mm (T) 10 EI 60 with 85mm long drywall screws and
PVC 200 O/A Dia. - 7.7 - 9.6mm Wall 5 No. 40mm (W) x 2mm(T) 12 EI 60 retention washer at max 300mm centres.
Pencoed, Bridgend,
PP 32 - 50 O/A Dia. - 2.9 - 6.9mm Wall 1 No. 40mm (W) x 2mm (T) 4 EI 60 The batt must overlap the formed South Wales CF35 6NY
PP 160 O/A Dia. - 4 - 14.6mm Wall 4 No. 40mm (W) x 2mm (T) 10 EI 60 opening in the partition by Min. 100mm. t: 01656 868490
PP 200 O/A Dia. - 4.9 - 18.2mm Wall 5 No. 40mm (W) x 2mm(T) 12 EI 60 (Max. opening 1200mm x 1200mm) technical.solutions@rockwool.co.uk
PP 250 O/A Dia. - 10.1mm Wall 6 No. 40mm (W) x 2mm(T) 14 EI 60 Install the wrap into the wall recessed by
PE 32 - 50 O/A Dia. - 2.9 - 4.6mm Wall 1 No. 40mm (W) x 2mm (T) 4 EI 60 5mm from the face of the wall. Drawing Title:
PE 160 O/A Dia. - 6.2 - 9.5mm Wall 4 No. 40mm (W) x 2mm (T) 10 EI 60
3) Check that pipe surface and substrate are FirePro Intumescent Pipe Wrap Roll
PE 200 O/A Dia. - 4.9 - 18.4mm Wall 5 No. 40mm (W) x 2mm(T) 12 EI 60
clean and clear of any debris. Combustibles Pipe Penetrations - Face Fix Batt Seal
4) Ensure the correct number of layers of
wrap as detailed in Table 1 or refer to
Scale: Date:
data sheet. NTS MARCH 18
5) Maintain a record of the installation. Sheet Size: Drawn By: Checked By:
A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-188-RW D

(V9/AUG21) 42
Min. 100mm ROCKWOOL Standard Detail:
ROCKWOOL Acoustic Intumescent Supporting Evidence : CF5579
sealant bedded between batt & drywall,
INSTALLATION NOTES
applied to all exposed edges of batt The supporting construction must be capable of achieving
and to perimeter of batt to substrate
1) Check that pipe surface and substrate are clean and clear of any debris. the required fire rating of the proposed Firestop.
Ensure the correct number of layers of wrap as detailed in Table 1 or refer to data sheet. Apply wrap onto insulated pipe Face fix 50mm Ablative Coated All service items should be adequately supported either
penetration. Batt to each side of partition side of the seal.
2) The Ablative Coated Batt must be installed with ROCKWOOL Acoustic Intumescent Sealant bedded between the batt
and the substrate. A fillet of mastic must also be installed to the perimeter of the batt against the substrate. The exposed
edge of batt is to be buttered with a even layer of Acoustic Intumescent Sealant. Acoustic Intumescent Sealant This detail is to be read in conjunction with the
3) The Ablative Coated Batt must be fixed with 85mm long drywall screws and 25mm retention washer at max 300mm ROCKWOOL FIREPRO Intumescent Pipewrap Roll data
centres. The batt must overlap the formed opening in the partition by Min. 100mm. (Max. opening 1200mm x 1200mm) sheet specific installation instructions. For pipe O/A
4) Point the wrap with ROCKWOOL Acoustic Intumescent Sealant Insulated pipe penetration diameters, pipe wall thickness and insulation thickness
5) Maintain a record of the installation. that fall outside of the those indicated in Table 1 please
Pipewrap Roll - for number of consult ROCKWOOL Technical.
layers refer to Table 1
Refer to Table 1 for number or Pipewrap Roll layers.
Acoustic Intumescent Sealant
This detail is to be read in conjunction with SD-111-RDW
& SD-113-RDW - Face Fix Details.
Face fix 50mm Ablative Coated
Batt ROCKWOOL RockLap H&V pipe section can be used to
replace combustible insulation on metal pipes as it passes
through the seal.
Min. 60 minute rated partition
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
TABLE 1: installed in accordance with the current ROCKWOOL
guidelines.
Pipe Size / Wall / Insulation Classification
Pipe Material Wrap Layers
Pipe Size (mm) Wall Thickness (mm) Insulation Type / Size (mm) Integrity Insulation For further information or alternative products please visit
2 No. 40mm (w) x www.rockwool.co.uk or contact our Technical Solutions
Steel or Copper 42 - 159 1.2 - 14.2 13 - 25 Elastomeric 120 60
2mm (t) Team on 01656 868490
2 No. 40mm (w) x
Steel or Copper 42 - 159 1.2 - 14.2 25 Elastomeric 120 90
2mm (t)
2 No. 40mm (w) x Integrity Performance: Insulation Performance:
Steel or Copper 42 1 - 14.2 13 - 25 Elastomeric 120 120
2mm (t)
2 No. 40mm (w) x Up to 120 Minutes Up to 120 Minutes
Steel or Copper 42 - 108 1.2 - 14.2 25 - 40 Phenolic 120 90
2mm (t)
2 No. 40mm (w) x
Steel or Copper 42 1 - 14.2 25 - 40 Phenolic 120 120
2mm (t)
2 No. 40mm (w) x
Steel or Copper 42 1.2 - 14.2 50 (30kg/m³) Glassfibre 120 90
2mm (t)
25 (30kg/m³) Foil faced 2 No. 40mm (w) x
Steel or Copper 42 - 159 1.2 - 14.2 120 90
Glassfibre 2mm (t) Pencoed, Bridgend,
25 (30kg/m³) Foil faced 2 No. 40mm (w) x South Wales CF35 6NY
Steel or Copper 42 1.2 - 14.2 120 120
Glassfibre 2mm (t)
t: 01656 868490
technical.solutions@rockwool.co.uk

Drawing Title:

FirePro Intumescent Pipe Wrap Roll


Insulated pipe penetrations - Face Fix Batt Seal

Scale: Date:
NTS May 18

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-190-RDW C

(V9/AUG21) 43
Min. 100mm ROCKWOOL Standard Detail:
Supporting Evidence : CF5579

INSTALLATION NOTES The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.
1) Check that pipe surface and substrate are clean and clear of any debris.
Ensure the correct number of layers of wrap as detailed in Table 1 or refer to data sheet. Apply wrap onto insulated pipe All service items should be adequately supported either
penetration. Double 50mm Ablative Coated side of the seal.
2) The Ablative Coated Batt must be installed with ROCKWOOL Acoustic Intumescent Sealant to all edges of batt in Batt as aperture seal
contact with the substrate and all batt to batt joints. A fillet of mastic must also be installed to the perimeter of the batt This detail is to be read in conjunction with the
against the substrate. Acoustic Intumescent Sealant ROCKWOOL FIREPRO Intumescent Pipewrap Roll data
3) Point the wrap with ROCKWOOL Acoustic Intumescent Sealant sheet specific installation instructions. For pipe O/A
4) Maintain a record of the installation. Insulated pipe penetration
diameters, pipe wall thickness and insulation thickness
that fall outside of the those indicated in Table 1 please
Pipewrap Roll - for number of
consult ROCKWOOL Technical.
layers refer to Table 1
Refer to Table 1 for number or Pipewrap Roll layers.
Acoustic Intumescent Sealant
This detail is to be read in conjunction with SD-112-RDW
& SD-122-RDW - Aperture Seal.

ROCKWOOL RockLap H&V pipe section can be used to


replace combustible insulation on metal pipes as it passes
Min. 60 minute rated partition
through the seal.

These products should only be utilised for applications as


outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
TABLE 1: Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
Pipe Size / Wall / Insulation Classification guidelines.
Pipe Material Wrap Layers
Pipe Size (mm) Wall Thickness (mm) Insulation Type / Size (mm) Integrity Insulation
2 No. 40mm (w) x For further information or alternative products please visit
Steel or Copper 42 - 159 1.2 - 14.2 13-25 Elastomeric 120 60
2mm (t) www.rockwool.co.uk or contact our Technical Solutions
2 No. 40mm (w) x Team on 01656 868490
Steel or Copper 42 1 - 14.2 13-25 Elastomeric 120 90
2mm (t)
2 No. 40mm (w) x
Steel or Copper 42 - 108 1.2 - 14.2 25 - 40 Phenolic 120 60
2mm (t) Integrity Performance: Insulation Performance:
2 No. 40mm (w) x
Steel or Copper 42 1.2 - 14.2 50 Glass Fibre 120 90
2mm (t) Up to 120 Minutes Up to 120 Minutes

Pipe Size / Wall / Insulation Classification


Pipe Material Wrap Layers
Pipe Size (mm) Wall Thickness (mm) Insulation Type / Size (mm) Integrity Insulation
3 No. 40mm (w) x
Pvc 40 1.9 25 Phenolic 120 90
2mm (t)
3 No. 40mm (w) x
Pvc 40 3 13 Phenolic 120 120
2mm (t) Pencoed, Bridgend,
Pvc 110 4.2 25 Phenolic
5 No. 40mm (w) x
120 90 South Wales CF35 6NY
2mm (t) t: 01656 868490
5 No. 40mm (w) x
Pvc 110 6.6 20 Phenolic
2mm (t)
120 90 technical.solutions@rockwool.co.uk
3 No. 40mm (w) x
Pvc 40 1.9 32 Elastomeric 120 90
2mm (t) Drawing Title:
3 No. 40mm (w) x
PVC 40 3 9 Elastomeric 120 90 FirePro Intumescent Pipe Wrap Roll
2mm (t)
Insulated pipe penetrations - Aperture Seal
5 No. 40mm (w) x
PVC 110 4.2 32 Elastomeric 120 120
2mm (t)
5 No. 40mm (w) x
PVC 110 6.6 13 Elastomeric 120 90 Scale: Date:
2mm (t) NTS May 18

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-191-RDW C

(V9/AUG21) 44
ROCKWOOL Standard Detail:
Supporting Evidence : WF 405625 (BS EN 1366-3)
150 min.
The supporting construction must be capable of achieving
the required fire rating of the proposed Firestop.

All service items should be adequately supported either


Masonry wall
side of the Firestop to ensure that no permanent load is
transferred onto the coated batt.

These products should only be utilised for applications as


5 5 2no. layers 50mm Ablative Coated outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Batt
Resistance Testing. Additionally the product must be
Annular space around pipe to suit installed in accordance with the current ROCKWOOL
guidelines. For further information please visit
40 40 total thickness of Pipewrap Roll. www.rockwool.co.uk or contact our Technical Solutions
Refer to table 1 for number of layers Team on 01656 868490.

PIPE PIPE

HDPE/PP/PVC pipes 40mm -


125mm O/A Diameter

Pipewrap Roll installed to both sides


of wall with 5mm recess to finished
face of wall. The recess is then filled
TABLE 1: with ROCKWOOL Acoustic
Pipe Size (mm) Wrap Thickness Layers Intumescent Sealant
32-50 40mm (W) x 2mm (T) 1
51-82 40mm (W) x 4mm (T) 2
83-115 40mm (W) x 6mm (T) 3
116-125 40mm (W) x 8mm (T) 4 SECTION THROUGH MASONRY WALL WITH COMBUSTIBLE Integrity Performance: Insulation Performance:
PIPE PENETRATION WITH PIPEWRAP ROLL 120 minutes 120 minutes

INSTALLATION NOTES

1) Check that pipe surface and substrate are clean and clear of any Pencoed, Bridgend,
debris. South Wales CF35 6NY
t: 01656 868490
2) Install the 2 No. layers of ablative batts in accordance with installation
email: technical.solutions@rockwool.co.uk
guidelines.
3) Ensure the correct number of layers of wrap as detailed in Table 1 or
Drawing Title:
refer to data sheet.
Pipewrap Roll - Combustible Pipes
4) Install the wrap into the Ablative Coated batt recessed by 5mm from
Double batt aperture seal
the face of the wall.
5) Fill the annular space with Rockwool® FirePro® Acoustic Intumescent
Sealant to seal off the 5mm gap to the edge of the substrate. Scale:
NTS
Date:
Feb 19
6) Maintain a record of the installation.
Sheet Size: Drawn By: Checked By:
A3 S. HIRONS L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-192-RDW B

(V9/AUG21) 45
ROCKWOOL Standard Detail:
Supporting Evidence : ETA 15-0325

The supporting construction must be capable of achieving


Min. 120mm Min. 120mm the required fire rating of the proposed Firestop. Dry wall
partitions should have a minimum of 2 layers of
Stud partition (2 Hour fire resistance) plasterboard on each face of the wall.
Stud partition (2 Hour fire resistance)
25 FirePro High Expansion Intumescent Sealant -
25 FirePro High Expansion Intumescent Sealant - 12.5 All service items should be adequately supported either
Applied to both side of penetration
Applied to both side of penetration side of the seal.
100
90mm o/a Dia. ABS pipe (Wall thickness 6mm)
The size and depth of sealant applied to the penetration
Cables - up to 21mm o/a diameter annular space must be within those identified in this detail
and product data sheet.
100mm high x 300mm wide
opening formed in wall These products should only be utilised for applications as
CABLES - EI 120 ABS PIPE - EI 120 outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
Min. 120mm installed in accordance with the current ROCKWOOL
guidelines.
Stud partition (2 Hour fire resistance) Min. 120mm
For further information or alternative products please visit
25 FirePro High Expansion Intumescent Sealant - www.rockwool.co.uk or contact our Technical Solutions
10 Applied to both side of penetration Stud partition (2 Hour fire resistance) Team on 01656 868490
25
40mm o/a Dia. PVC pipe (Wall thickness 1.9 - 3mm) 20
FirePro High Expansion Intumescent Sealant -
16 Applied to both side of penetration 60mm Dia Copper & Steel with 32mm Armaflex AF
insulation
25
125mm o/a Dia. PVC pipe (Wall thickness 4.8 -
FirePro High Expansion Intumescent Sealant -
7.4mm)
Applied to both side of penetration
ROCKWOOL RW4 (80 Kg/m3) backing
material min. depth 30mm
COPPER/STEEL PIPE WITH
32mm ARMAFLEX CONTINUOUS
PVC PIPES - EI 120 INSULATION - E 120 / I 90
Integrity Performance: Insulation Performance:
Min. 120mm
Up to 120 Minutes Up to 120 Minutes
Stud partition (2 Hour fire resistance)
25 Min. 120mm
FirePro High Expansion Intumescent Sealant -
20 Applied to both side of penetration Stud partition (2 Hour fire resistance)
63mm o/a Dia. HDPE pipe (Wall thickness 25
7.2mm) 15
15mm o/a Dia. Copper pipe (Wall thickness 0.8 - 7mm) with Pencoed, Bridgend,
12.5 13mm Armaflex AF insulation South Wales CF35 6NY
25 FirePro High Expansion Intumescent Sealant - t: 01656 868490
90mm o/a Dia. HDPE pipe (Wall thickness 9.2mm) Applied to both side of penetration technical.solutions@rockwool.co.uk
FirePro High Expansion Intumescent Sealant
- Applied to both side of penetration COPPER/STEEL PIPE WITH Drawing Title:
13mm ARMAFLEX CONTINUOUS
FirePro High Expansion Intumescent Sealant
INSULATION - EI 120
HDPE PIPES - EI 120 Penetrations through 120mm Drywall

Scale: Date:
NTS 07.12.17

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-170-RDW C

(V9/AUG21) 46
ROCKWOOL Standard Detail:
Supporting Evidence : ETA 15-0325

Min. 100mm Min. 100mm The supporting construction must be capable of achieving
the required fire rating of the proposed Firestop. Dry wall
Stud partition
25 Stud partition partitions should have a minimum of 2 layers of
20 25 FirePro High Expansion Intumescent Sealant - plasterboard on each face of the wall.
40mm o/a Dia. PVC pipe (Wall thickness 1.9mm) 20 Applied to both side of penetration
All service items should be adequately supported either
40mm o/a Dia. ABS pipe (Wall thickness 1.9mm) side of the seal.
25 FirePro High Expansion Intumescent Sealant -
20 Applied to both side of penetration The size and depth of sealant applied to the penetration
annular space must be within those identified in this detail
and product data sheet.
125mm o/a Dia. PVC pipe (Wall thickness 9.2mm)

40mm ABS PIPE - EI 120 These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
FirePro High Expansion Intumescent Sealant and in accordance with the relevant ROCKWOOL Fire
- Applied to both side of penetration
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
40mm PVC PIPE - EI 120 guidelines.
125mm PVC PIPE - EI 60
For further information or alternative products please visit
Min. 100mm Min. 100mm www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
Stud partition Stud partition

25 FirePro High Expansion Intumescent Sealant - FirePro High Expansion Intumescent Sealant -
25
20 Applied to both side of penetration 20 Applied to both side of penetration

40mm o/a Dia.Copper/Steel pipe (Wall thickness


40mm o/a Dia. HDPE pipe (Wall thickness 2mm)
1.5 - 14.2mm) with 13mm Armaflex AF

40mm HDPE PIPE - EI 120


40mm COPPER/STEEL PIPE WITH 13mm Integrity Performance: Insulation Performance:
ARMAFLEX CONTINUOUS INSULATION -
E120 / EI 30 Up to 120 Minutes Up to 120 Minutes

Min. 100mm
Stud partition
25
FirePro High Expansion Intumescent Sealant -
20 Applied to both side of penetration Pencoed, Bridgend,
South Wales CF35 6NY
40 - 159mm o/a Dia.Copper/Steel pipe t: 01656 868490
with 32mm Armaflex AF technical.solutions@rockwool.co.uk

Drawing Title:

FirePro High Expansion Intumescent Sealant


Penetrations through 100mm Drywall
40-159mm COPPER/STEEL PIPE WITH
32mm ARMAFLEX CONTINUOUS
INSULATION - E120 / EI 30
Scale: Date:
NTS 05.06.18

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-171-RDW D

(V9/AUG21) 47
63mm Dia. PVC CONDUIT THROUGH 75mm 63mm Dia. PVC CONDUIT THROUGH 75mm ROCKWOOL Standard Detail:
FLEXIBLE WALL FLEXIBLE WALL Supporting Evidence : WF 411460 / WF 411469
EI 60 EI 60 (BS EN 1366-3:2009)
Flexible wall The supporting construction must be capable of achieving
• min. 75mm thick Flexible wall the required fire rating of the proposed firestop.
• min. 1no. board layers • min. 75mm thick
• Fire rated to at least the same fire rating as the firestop seal • min. 1no. board layers
• Fire rated to at least the same fire rating as the firestop seal
Flexible wall constructions must be installed in accordance
ROCKWOOL FIREPRO® High
12.5 Expansion Intumescent Sealant ROCKWOOL FIREPRO® High with the manufacturer's guidelines. The wall construction
20 • 20mm annular Expansion Intumescent Sealant
should be a minimum thickness of 75mm.
• min. 12.5mm depth • 20mm annular
• min. 12.5mm depth All service items should be adequately supported both
sides of the firestop to ensure that no load is transferred
onto the firestop seal.
Cable - Bundle Cable - Single Where possible a 20mm annular gap should be maintained
Note: • max. 8no. telecommunication cables
Note: • telecommunication cable
around the full circumference of the conduit.
Where conduit is tight to
opening point small gaps with PVC sleeve
Where conduit is tight to
opening point small gaps with
PVC sleeve
High Expansion Intumescent • max. Ø 63mm High Expansion Intumescent • max. Ø 63mm Applications in flexible wall constructions can be used in
Sealant Sealant • min. 125mm length
• min. 125mm length
• ROCKWOOL RWA45 packed around cables within sleeve masonry wall constructions.
• ROCKWOOL RWA45 packed around cables within sleeve
• min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent
75 • min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent
Sealant to seal within sleeve
Sealant to seal within sleeve Refer to relevant product datasheet for further installation
guidelines.
ROCKWOOL FIREPRO High ® ROCKWOOL FIREPRO® High
Expansion Intumescent Sealant Expansion Intumescent Sealant These products should only be utilised for applications as
20 • 20mm annular 20 • 20mm annular
• min. 12.5mm depth outlined in the relevant ROCKWOOL product data sheet
Ø83 • min. 12.5mm depth
Ø83 and in accordance with the relevant ROCKWOOL Fire
PVC sleeve PVC sleeve Resistance Testing. Additionally the product must be
• max. Ø 63mm
• max. Ø 63mm installed in accordance with the current ROCKWOOL
Note:
• min. 125mm length
Note: Ø63 • min. 125mm length
• ROCKWOOL RWA45 packed around cables within sleeve Ø63 • ROCKWOOL RWA45 packed around cables within sleeve guidelines.
Where conduit is tight to Where conduit is tight to • min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent
• min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent opening point small gaps with
opening point small gaps with Sealant to seal within sleeve
Sealant to seal within sleeve
High Expansion Intumescent High Expansion Intumescent For further information please visit www.rockwool.co.uk or
Sealant
Flexible wall
Sealant Flexible wall contact our Technical Solutions Team on 01656 868490.
• min. 75mm thick
ELEVATION - 63mm Dia. PVC CONDUIT
• min. 75mm thick
• min. 1no. board layers
ELEVATION - 63mm Dia. PVC CONDUIT • min. 1no. board layers

THROUGH 75mm FLEXIBLE WALL • Fire rated to at least the same fire rating as the firestop seal THROUGH 75mm FLEXIBLE WALL • Fire rated to at least the same fire rating as the firestop seal

EI 60 EI 60
Integrity Performance: Insulation Performance:

Flexible wall 60 minutes 60 minutes


• min. 75mm thick
Note: • min. 1no. board layers
• Fire rated to at least the same fire rating as the firestop seal
ROCKWOOL FIREPRO® High
Where conduit is tight to
opening point small gaps with Note:
High Expansion Intumescent PVC Conduits Expansion Intumescent Sealant
Sealant 75 75 • max. Ø 63mm
Where conduit is tight to
opening point small gaps with 229
High Expansion Intumescent • 20mm annular
20 20
• min. 225mm length
• ROCKWOOL RWA45 packed around cables within sleeve Sealant • min. 12.5mm depth
• min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent Pencoed, Bridgend,
PVC conduits (Linear arrangement)
Sealant to seal within sleeve
20 • max. Ø 63mm - in linear arrangement South Wales CF35 6NY
83 • min. 225mm length
t: 01656 868490
• ROCKWOOL RWA45 packed around cables within sleeve

12.5 • min. 13mm deep ROCKWOOL FIREPRO® Acoustic Intumescent technical.solutions@rockwool.co.uk


Cable - Bundle Sealant to seal within sleeve

• max. 7no. telecommunication cables Ø63


Drawing Title:
®
ROCKWOOL FIREPRO High Flexible wall
ROCKWOOL FIREPRO® High Expansion Int. Sealant
Expansion Intumescent Sealant • min. 75mm thick
• min. 1no. board layers 75mm Flexible Wall - 1no. Board - Conduit Penetrations
• 20mm annular • Fire rated to at least the same fire rating as the firestop seal
75 • min. 12.5mm depth

LINEAR ARRANGEMENT OF 63mm Dia. PVC LINEAR ARRANGEMENT OF 63mm Dia. PVC Scale: Date:
NTS NOV 20
CONDUITS THROUGH 75mm FLEXIBLE WALL CONDUITS THROUGH 75mm FLEXIBLE WALL
EI 60 EI 60 Sheet Size: Drawn By: Checked By:
A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-HE-0110 B

(V9/AUG21) 48
63mm Dia. PVC SLEEVE PARTIAL PENETRATION 3 No. 34mm Dia. PVC SLEEVES PARTIAL PENETRATIONS ROCKWOOL Standard Detail:
75mm FLEXIBLE WALL 75mm FLEXIBLE WALL Supporting Evidence : WF 411469 (BS EN 1366-3:2009)
EI 90 EI 90/60
The supporting construction must be capable of achieving
the required fire rating of the proposed firestop.
Flexible wall Flexible wall
• min. 75mm thick • min. 75mm thick
• min. 1no. board layers • min. 1no. board layers Flexible wall constructions must be installed in accordance
• Fire rated to at least the same fire rating as the firestop seal • Fire rated to at least the same fire rating as the firestop seal with the manufacturer's guidelines. The wall construction
should be a minimum thickness of 75mm.

All service items should be adequately supported both


Sleeved Cable (Single) Sleeved Cable (Linear arrangement) sides of the firestop to ensure that no load is transferred
• max. Ø63mm PVC sleeve • max. Ø34mm Century Hose sleeve
• min. 100mm length within wall • min. 100mm length within wall
onto the firestop seal.
• Partial penetration into the flexible wall • Partial penetration into the flexible wall
• Conduit sleeving telecommunication cable • Conduit sleeving telecommunication cable For further guidance on partial pipe penetrations refer to
• End of conduit plugged with RAW45 & 13mm depth of AIS • End of conduit plugged with RAW45 & 13mm depth of AIS
ASFP advisory note 13.
ROCKWOOL FIREPRO® High
ROCKWOOL FIREPRO® High Expansion Intumescent Sealant
Refer to relevant product datasheet for further installation
Expansion Intumescent Sealant guidelines.
• 20mm annular
• 20mm annular • min. 12.5mm depth
75 • min. 12.5mm depth 75 These products should only be utilised for applications as
Flexible wall outlined in the relevant ROCKWOOL product data sheet
• min. 75mm thick and in accordance with the relevant ROCKWOOL Fire
Flexible wall • min. 1no. board layers
• Fire rated to at least the same fire rating as the firestop seal Resistance Testing. Additionally the product must be
• min. 75mm thick
installed in accordance with the current ROCKWOOL
83 • min. 1no. board layers
Sleeved Cable (Linear arrangement) guidelines.
• Fire rated to at least the same fire rating as the firestop seal 142
20 20 • max. Ø34mm Century Hose sleeve

Sleeved Cable (Single)


• min. 100mm length within wall
For further information please visit www.rockwool.co.uk or
• Partial penetration into the flexible wall
83 • max. Ø63mm PVC sleeve 55 • Conduit sleeving telecommunication cable contact our Technical Solutions Team on 01656 868490.
• min. 100mm length within wall • End of conduit plugged with RAW45 & 13mm depth of AIS
• Partial penetration into the flexible wall 20
Ø63
• Conduit sleeving telecommunication cable
• End of conduit plugged with RAW45 & 13mm depth of AIS
3No. Ø34
ROCKWOOL FIREPRO High ® ROCKWOOL FIREPRO® High
ELEVATION ELEVATION
Expansion Intumescent Sealant Expansion Intumescent Sealant
63mm Dia. PVC SLEEVE • 20mm annular
3 No. 34mm Dia. PVC SLEEVE • 20mm annular
PARTIAL PENETRATION • min. 12.5mm depth PARTIAL PENETRATION • min. 12.5mm depth

EI 90 EI 90/60 Integrity Performance: Insulation Performance:

90 minutes Up to 90 minutes

Flexible wall Flexible wall


• min. 75mm thick • min. 75mm thick
• min. 1no. board layers • min. 1no. board layers
• Fire rated to at least the same fire rating as the firestop seal • Fire rated to at least the same fire rating as the firestop seal

ROCKWOOL FIREPRO® High ROCKWOOL FIREPRO® High


Expansion Intumescent Sealant Expansion Intumescent Sealant Pencoed, Bridgend,
• 10mm annular • 20mm annular
• Min. 12.5mm depth • Min. 12.5mm depth South Wales CF35 6NY
• RWA45 backing material • RWA45 backing material
t: 01656 868490
technical.solutions@rockwool.co.uk

Drawing Title:
Galvanized Spiral Duct cPVC Pipe Penetration ROCKWOOL FIREPRO® High Expansion Int. Sealant
• Max. 100mm diameter • 63mm diameter
75mm Flexible Wall - 1no. Board - Pipe & Partial Pens.

100mm Dia. GALV. SPIRAL DUCT THROUGH 63mm Dia. CPVC PIPE THROUGH Scale: Date:
75mm FLEXIBLE WALL 75mm FLEXIBLE WALL NTS NOV 20
E 90 (Integrity Only) EI 90 Sheet Size: Drawn By: Checked By:
A3 RW. TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-HE-0111 B

(V9/AUG21) 49
PP PIPES ROCKWOOL Standard Detail:
Supporting Evidence : ETA 15-0325
Min. 200 Separation
FirePro High Expansion between seals The supporting construction must be capable of achieving
Intumescent sealant to the required fire rating of the proposed Firestop.
25mm depth & 20mm
annular 20 20
25 25 All service items should be adequately supported either
side of the seal.

100 100 The size and depth of sealant applied to the penetration
annular space must be within those identified in this detail
and product data sheet.

FirePro High Expansion ROCKWOOL backing material The sealant is to be applied above and below the floor
Intumescent sealant to 100mm deep 45 kg/m3 slab.
25mm depth & 20mm
annular 110mm PP PIPE 50mm PP PIPE Contact ROCKWOOL technical for information on service
10.7mm WALL 2.1mm WALL
separations.
EI 120 EI 240
These products should only be utilised for applications as
PVC PIPES outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
Min. 200 Separation Min. 200 Separation installed in accordance with the current ROCKWOOL
FirePro High Expansion between seals between seals guidelines.
Intumescent sealant to
25mm depth & 20mm
annular 20 20 20 For further information or alternative products please visit
25 25 25 www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490

100 100 100

FirePro High Expansion ROCKWOOL backing material


Intumescent sealant to 100mm deep 45 kg/m3
25mm depth & 20mm
annular 114mm PVC PIPE 114mm PVC PIPE 40mm PVC PIPE
Integrity Performance: Insulation Performance:
8.1mm WALL 3.6mm WALL 2mm WALL
EI 120 E 90 EI 240
Up to 240 Minutes Up to 240 Minutes
EI 45

PE PIPES

Min. 200 Separation Min. 200 Separation


FirePro High Expansion between seals between seals
Intumescent sealant to Pencoed, Bridgend,
25mm depth & 20mm South Wales CF35 6NY
annular 20 20 20
25 25 25 t: 01656 868490
technical.solutions@rockwool.co.uk
100 100 100
Drawing Title:

FirePro High Expansion Intumescent Sealant


Penetrations through floor (Double Sided)
FirePro High Expansion ROCKWOOL backing material
Intumescent sealant to 100mm deep 45 kg/m3
25mm depth & 20mm
annular Scale: Date:
125mm PE PIPE 125mm PE PIPE 40mm PE PIPE NTS 07.12.17
11.4mm WALL 7.6mm WALL 4.1mm WALL
EI 90 EI 60 EI 240 Sheet Size: Drawn By: Checked By:
A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-172-RDW B

(V9/AUG21) 50
ROCKWOOL Standard Detail:
Supporting Evidence : ETA 15-0325

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.

All service items should be adequately supported either


side of the seal.

The size and depth of sealant applied to the penetration


annular space must be within those identified in this detail
and product data sheet.

The sealant is to be applied to top of floor slab with min


100mm depth of ROCKWOOL RWA45 backing material.

Contact ROCKWOOL technical for information on service


separations.

These products should only be utilised for applications as


CABLE APPLICATION outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
Note: installed in accordance with the current ROCKWOOL
Maximum aperture size 200mm x 200mm guidelines.
Minimum aperture size 50mm x 50mm

Min. 200 Separation For further information or alternative products please visit
FirePro High Expansion Intumescent between seals ROCKWOOL backing material 100mm deep
sealant to 25mm depth
www.rockwool.co.uk or contact our Technical Solutions
45 kg/m3
Team on 01656 868490
20
25 25 25 25 25

Min 150 100 100 100 100 100

ROCKWOOL backing material


Integrity Performance: Insulation Performance:
100mm deep 45 kg/m3

Up to180 Minutes Up to 60 Minutes


ELECTRICAL ELECTRICAL NON-SHEATHED UP TO 21mm Dia.
CABLES UP TO CABLES 22mm ELECTRICAL CABLES TELECOMM CABLE
21mm Dia. TO 80mm Dia. UP TO 24mm Dia. BUNDLES UP TO
E 180 E 120 E 180 100mm Dia.
E 180 COPPER & STEEL PIPE
41mm - 159mm Dia.
WITH 16mm - 32mm
ARMAFLEX Pencoed, Bridgend,
EI 120 South Wales CF35 6NY
t: 01656 868490
technical.solutions@rockwool.co.uk

Drawing Title:

FirePro High Expansion Intumescent Sealant


Penetrations through floor (Single Sided Seal)

Scale: Date:
NTS May 18

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-174-RDW C

(V9/AUG21) 51
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5576

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.

All service items should be adequately supported either


side of the seal to ensure no load is transferred onto the
coated batt.
Masonry wall
The size and depth of sealant applied to the penetration
annular space must be within those identified in this detail
and product data sheet.
50mm ROCKWOOL Ablative Coated Batt with Acoustic
FirePro High Expansion Contact ROCKWOOL technical for information on service
Intumescent sealant to all batt to batt and substrate joints.
Intumescent sealant to 20mm separations.
Aperture pointed with a 15mm bead of Acoustic Intumescent
annular gap & full depth of batt 50
20 Sealant. These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
50mm o/a Dia. PVC pipe (Wall thickness 2.4mm - 3.7mm)
Resistance Testing. Additionally the product must be
125mm o/a Dia. PVC pipe (Wall thickness 4.8mm - 7.4mm) installed in accordance with the current ROCKWOOL
guidelines.

For further information or alternative products please visit


50 www.rockwool.co.uk or contact our Technical Solutions
20 Team on 01656 868490

Uponor Multi layer composite pipe


40mm - 110mm o/a Dia.
4mm - 10mm Wall thickness

300 Ablative Coating 300 Ablative Coating


50
20
500mm x 25mm perforated cable tray. Cable
tray to receive Ablative Coating 300mm from Integrity Performance: Insulation Performance:

face of batt
Acoustic intumescent 30 Minutes 30 Minutes
sealant to cut edge of batt
300 Ablative Coating 300 Ablative Coating
50
20
47mm Dia. cables. Cables to receive
Ablative Coating 300mm from face of batt
Pencoed, Bridgend,
FirePro High Expansion South Wales CF35 6NY
Intumescent sealant to 20mm t: 01656 868490
annular gap & full depth of batt technical.solutions@rockwool.co.uk

Drawing Title:

FirePro High Expansion Intumescent Sealant


Flexible wall - min 100mm thick
Penetrations through single layer 50mm coated batt

Scale: Date:
NTS 07.12.17

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-175-RDW B

(V9/AUG21) 52
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5576

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.

All service items should be adequately supported either


side of the seal to ensure no load is transferred onto the
Masonry wall coated batt.

The size and depth of sealant applied to the penetration


FirePro High Expansion Double 50mm ROCKWOOL Ablative Coated Batt with Acoustic annular space must be within those identified in this detail
Intumescent sealant to and product data sheet.
Intumescent sealant to all batt to batt and substrate joints.
20mm annular gap & Aperture pointed with Acoustic Intumescent Sealant.
25 Contact ROCKWOOL technical for information on service
25mm depth separations.
20
These products should only be utilised for applications as
50mm o/a Dia. PVC pipe (Wall thickness 2.4mm - 3.7mm) outlined in the relevant ROCKWOOL product data sheet
125mm o/a Dia. PVC pipe (Wall thickness 4.8mm - 7.4mm) and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines.
25
20 For further information or alternative products please visit
www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
Multi layer composite pipe
40mm - 110mm o/a Dia.
4mm - 10mm Wall thickness

300 Ablative Coating 300 Ablative Coating


20
500mm x 25mm perforated cable tray. Cable
tray to receive Ablative Coating 300mm from
25 face of batt Integrity Performance: Insulation Performance:
Acoustic intumescent
sealant to cut edge of batt 120 Minutes 120 Minutes
300 Ablative Coating 300 Ablative Coating
20
47mm Dia. cables. Cables to receive
Ablative Coating 300mm from face of batt
FirePro High Expansion 25
Intumescent sealant to Pencoed, Bridgend,
20mm annular gap & full South Wales CF35 6NY
depth of batt t: 01656 868490
technical.solutions@rockwool.co.uk

Drawing Title:
Flexible wall - min 100mm thick
FirePro High Expansion Intumescent Sealant
Penetrations through double layer 50mm coated batt

Scale: Date:
NTS 07.12.17

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-176-RDW B

(V9/AUG21) 53
ROCKWOOL Standard Detail:
Supporting Evidence : CF 5576

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.

All service items should be adequately supported either


side of the seal to ensure no load is transferred onto the
coated batt.

The size and depth of sealant applied to the penetration


annular space must be within those identified in this detail
Cables to receive Ablative and product data sheet.
coating to 300mm from
face of batt
Contact ROCKWOOL technical for information on service
separations.
FirePro High Expansion FirePro High Expansion

300 Ablative Coating

300 Ablative Coating


Intumescent sealant to Intumescent sealant to
25mm depth & 20mm 25mm depth & 20mm These products should only be utilised for applications as
annular annular outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
20 20 20 20 20 Resistance Testing. Additionally the product must be
25
installed in accordance with the current ROCKWOOL
25 25 25 25
guidelines.

20 20 20 20 20 For further information or alternative products please visit

300 Ablative Coating

300 Ablative Coating


www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
FirePro High Expansion Double 50mm ROCKWOOL Ablative Coated Batt with
Intumescent sealant Acoustic Intumescent sealant to all batt to batt and
applied to both side of seal substrate joints. Aperture pointed with a 15mm bead
of Acoustic Intumescent Sealant.

PVC PIPE PVC PIPE UPONOR PERFORATED CABLE 47mm CABLES


50mm dia - wall 50mm dia - wall COMPOSITE PIPE TRAY 500mm x 25mm
thickness 2.4 - 7.4mm thickness 2.4 - 7.4mm 40-110mm O/A Dia.
to to 4-10mm wall EI 120 EI 120
125mm dia - wall 125mm dia - wall E 120
thickness 4.8mm - 7.4mm thickness 7.4mm EI 60
Integrity Performance: Insulation Performance:
EI 90 EI 120
Up to 120 Minutes Up to 120 Minutes

Pencoed, Bridgend,
South Wales CF35 6NY
t: 01656 868490
technical.solutions@rockwool.co.uk

Drawing Title:

FirePro High Expansion Intumescent Sealant Floor


Penetrations through double layer 50mm coated batt

Scale: Date:
NTS 07.12.17

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-177-RDW B

(V9/AUG21) 54
ROCKWOOL Standard Detail:
Supporting Evidence : Lubrizol P1753860 / ETA 15/0325

The supporting structure must be capable of achieving the


required 120 minutes Fire Rating as detailed within this
drawing.
Masonry Wall
All service items should be adequately supported either
side of the seal.
Double 50mm ROCKWOOL Ablative Coated Batt with
Refer to Lubrizol CPVC Piping Systems Compatible
25 Acoustic Intumescent sealant to all batt to batt and substrate
Product Finder for further information/evidence of
20 joints. Aperture pointed with Acoustic Intumescent Sealant.
compatibility.

50mm o/a Dia. cPVC pipe (Wall thickness 2.4mm - 3.7mm) For single board drywall constructions contact
125mm o/a Dia. cPVC pipe (Wall thickness 4.8mm - 7.4mm) ROCKWOOL Technical.

These products should only be utilised for applications as


FirePro High Expansion Intumescent Sealant - outlined in the relevant ROCKWOOL product data sheet
Applied to both side of penetration and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines. For further information please visit
www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490.
NOTE:
DETAIL TO BE READ IN
CONJUNCTION WITH SD-122-RDW

Flexible wall - min 100mm thick


Integrity Performance: Insulation Performance:
25

20 Up to 120 Minutes Up to 120 Minutes


40mm o/a Dia. cPVC pipe (Wall thickness 1.9mm)

FirePro High Expansion Intumescent Sealant -


25 Applied to both side of penetration
20
Pencoed, Bridgend,
125mm o/a Dia. cPVC pipe (Wall thickness 9.2mm) South Wales CF35 6NY
NOTE: t: 01656 868490
FLEXIBLE AND RIGID WALL
CONSTRUCTIONS
technical.solutions@rockwool.co.uk

100mm WALL THICKNESS FirePro High Expansion Intumescent Sealant - Drawing Title:
40mm cPVC PIPE - EI 120 Applied to both side of penetration
125mm cPVC PIPE - EI 60 High Expansion Intumescent Sealant
Batt Aperture Seal / Flexible or Masonry Wall
120mm WALL THICKNESS
40mm cPVC PIPE - EI 120
125mm cPVC PIPE - EI 120 Scale: Date:
NTS 23.04.18

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-179-RDW C

(V9/AUG21) 55
1) SLEEVED CPVC PIPE - LARGE ANNULAR GAP 2) SLEEVED CPVC PIPE - SMALL ANNULAR GAP ROCKWOOL Standard Detail:
1) SECTION 2) SECTION Supporting Evidence : WF 411297

Flexible wall Flexible wall Refer to Lubrizol / SPEARS CPVC Piping Systems
• min. 100mm thickness • min. 100mm thickness Compatible Product Finder for further information/evidence
• min. 2no. layers of plasterboard • min. 2no. layers of plasterboard
of compatibility.

ROCKWOOL High Expansion Sealant The supporting construction must be capable of achieving
• 20mm annular gap with min 25mm depth both sides of seal ROCKWOOL High Expansion Sealant the required fire rating of the proposed firestop.
cPVC Pipe & Sleeve cPVC Pipe & Sleeve • 20mm annular gap with min 25mm depth both sides of seal
• Ø89mm 150mm long cPVC sleeve • Ø89mm 150mm long cPVC sleeve
• Ø27mm cPVC pipe
24 • Ø60mm cPVC pipe 8 Aperture Size: Max. 600mm wide x 400mm high.

The flexible wall construction must be installed in


accordance with the manufacturer's guidelines with the
aperture being fully framed and lined out. The wall
50 50 construction should also be minimum 100mm thickness.
ROCKWOOL High Expansion Sealant ROCKWOOL High Expansion Sealant
• Fill annular gap between sleeve & pipe with 50mm depth to both • Fill annular gap between sleeve & pipe with 50mm depth to
sides of seal both sides of seal All service items should be adequately supported either
• PE backing rod between sleeve and pipe for depth control • PE backing rod between sleeve and pipe for depth control side of the firestop to ensure that no load is transferred
onto the seal.
ROCKWOOL Ablative Coated Batt ROCKWOOL Ablative Coated Batt
• 50mm thickness • 50mm thickness Please refer to the relevant product datasheet for further
• Installed in 2no. layer within the aperture • Installed in 2no. layer within the aperture installation guidance.
• Edges of the batt to be buttered with Acoustic Intumescent Sealant • Edges of the batt to be buttered with Acoustic Intumescent Sealant
• All batt-to-batt and batt-to-substrate joints to be sealed with Acoustic • All batt-to-batt and batt-to-substrate joints to be sealed with Acoustic
Intumescent Sealant Intumescent Sealant These products should only be utilised for applications as
1) ELEVATION 2) ELEVATION
outlined in the relevant ROCKWOOL product datasheet
Ø89 Ø89 Ø60 and in accordance with the relevant ROCKWOOL Fire
Ø27 Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
cPVC Pipe & Sleeve ROCKWOOL HE Sealant cPVC Pipe & Sleeve ROCKWOOL HE Sealant guidelines. For further information please visit
• Ø89mm 150mm long cPVC sleeve 20 • 20mm annular gap with min 25mm depth
• Ø89mm 150mm long cPVC sleeve 20 • 20mm annular gap with min 25mm depth
www.rockwool.co.uk or contact our Technical Solutions
• Ø27mm cPVC pipe
24 • Ø60mm cPVC pipe
Team on 01656 868490.
8

3) SLEEVED CPVC PIPE - NO ANNULAR GAP


3) ELEVATION
3) SECTION
Ø89 Ø73
Integrity Performance: Insulation Performance:
Flexible wall cPVC Pipe & Sleeve
• min. 100mm thickness • Ø89mm 150mm long cPVC sleeve ROCKWOOL High Expansion 120 minutes 120 minutes
• min. 2no. layers of plasterboard • Ø73mm cPVC pipe
Sealant
• 20mm annular gap full depth "fully filled"

20
ROCKWOOL High Expansion
cPVC Pipe & Sleeve 100 Sealant
• Ø89mm 150mm long cPVC sleeve
• 20mm Annular gap with 100mm depth "fully filled"
• Ø73mm cPVC pipe

150 0 Pencoed, Bridgend,


South Wales CF35 6NY
t: 01656 868490
technical.solutions@rockwool.co.uk
20 ROCKWOOL High Expansion Sealant ROCKWOOL High
• Small gaps between pipe & sleeve "pointed" with a bead of sealant
SPACING Expansion Sealant Drawing Title:
• Where sleeve is tight to aperture fill gaps
150mm BETWEEN SLEEVES with HE sealant to required minimum depth HIGH EXPANSION INTUMESCENT SEALANT
0mm TO APERTURE EDGE cPVC pipes with cPVC sleeves
ROCKWOOL Ablative Coated Batt
• 50mm thickness
• Installed in 2no. layer within the aperture
PERFORMANCE: EI 120
• Edges of the batt to be buttered with Acoustic Intumescent Sealant cPVC PIPE WITH 150mm LENGTH cPVC SLEEVE THROUGH ABLATIVE Scale:
NTS
Date:
OCT 20
• All batt-to-batt and batt-to-substrate joints to be sealed with Acoustic
Intumescent Sealant COATED BATT - TREATED WITH HIGH EXPANSION SEALANT
Sheet Size: Drawn By: Checked By:
A3 S. HIRONS L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-HE-0051 B

(V9/AUG21) 56
ROCKWOOL Standard Detail:
Supporting Evidence : PAR 13814/03 & PAR 17244/01

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.

Flexible or masonry wall Flexible or masonry wall These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
Note: For single batt seals the insulated
fire sleeve needs to project a minimum of and in accordance with the relevant ROCKWOOL Fire
40mm past the face of the coated batt on Resistance Testing. Additionally the product must be
each side of the seal Double 50mm Ablative Coated Batt installed in accordance with the current ROCKWOOL
25 25 guidelines.
Acoustic Intumescent Sealant Acoustic Intumescent Sealant
For further information or alternative products please visit
www.rockwool.co.uk or contact our Technical Solutions
PVC/PVCu duct PVC/PVCu duct
Team on 01656 868490

Oval Duct Insulated Fire Sleeve. cut Oval Duct Insulated Fire Sleeve
on site to suit width of wall and 25mm Cut on site to suit width of wall and
projection to each side of seal. 25mm project to each side of seal

Acoustic Intumescent
Sealant to perimeter of
seal

OVAL INSULATED FIRE SLEEVE ON DUCT OVAL INSULATED FIRE SLEEVE ON


WORK THROUGH BATT APERTURE SEAL DUCT WORK THROUGH WALL

Oval Insulated Fire Sleeve Performance Tables: Integrity Performance: Insulation Performance:

Oval duct insulated fire sleeve through wall and floor Up to 240 Minutes Up to 120 Minutes
Wall Supporting Integrity Performance Insulation Performance
Vent Duct
Service Type Thickness Material Construction (Minutes) (Minutes)
Size (mm)
(mm) Wall Floor Wall & Floor Wall & Floor
110 x 54
Duct work 1.5 - 2.0 PVC M/PB Concrete 120 90 120
204 x 60
Pencoed, Bridgend,
Oval duct insulated fire sleeve through wall and floor South Wales CF35 6NY
Wall Supporting Integrity Performance Insulation Performance t: 01656 868490
Vent Duct
Service Type
Size (mm)
Thickness Material Construction (Minutes) (Minutes) technical.solutions@rockwool.co.uk
(mm) Wall Floor Wall & Floor Wall & Floor
210 x 63 &
Duct work 1.6 - 3.0 PVC M/PB Concrete 120 90 120 Drawing Title:
308 x 66
FirePro Oval Insulated Fire Sleeve:
Trunking 100 x 100 3 PVC M/PB Concrete 120 90 120
Cable Conduit 55 Dia 3 PVC M/PB Concrete 120 90 120 Penetration Seal through batt & partition
M = Masonry Wall
PB = Plasterboard Wall Scale: Date:
NTS May 18

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-220-RDW B

(V9/AUG21) 57
ROCKWOOL Standard Detail:

ROCKWOOL INSULATED FIRE SLEEVE IN ROCKWOOL INSULATED FIRE SLEEVE IN Supporting Evidence : WF 411464 / WF 411460 / WF
411468 (BS EN 1366-3:2009)
SINGLE BATT SEAL DOUBLE BATT SEAL
The supporting construction must be capable of achieving
Fire rated flexible wall / Fire rated flexible wall / the required fire rating of the proposed Firestop.
plasterboard partition plasterboard partition
All service items should be adequately supported either
side of seal - min 400mm from face of batt seal.

Insulated Fire Sleeve to be minimum 150mm long through


the batt seal.
Pipe supported within Pipe supported within
400mm of each side of seal 400mm of each side of seal Solutions for flexible wall constructions can be used in
masonry constructions of the same minimum wall
thickness (75mm or 100mm)
ROCKWOOL Acoustic ROCKWOOL Acoustic
50 25 These products should only be utilised for applications as
ROCKWOOL Insulated Fire Intumescent Sealant ROCKWOOL Insulated Fire Intumescent Sealant
applied to all abutments, applied to all abutments, outlined in the relevant ROCKWOOL product data sheet
Sleeve 150mm long Sleeve 150mm long
joints in batt and joints in batt and and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
perimeter of aperture perimeter of aperture
installed in accordance with the current ROCKWOOL
guidelines.
1no. layer ROCKWOOL 2no. layer ROCKWOOL
Ablative Coated Batt Ablative Coated Batt For further information or alternative products please visit
www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490

Min 75 Min100

Insulated Fire Sleeve Performance Tables:

Insulated fie sleeve through single 50mm batt


Spacing Classification Integrity Performance: Insulation Performance:
Pipe Wall
Pipe Material Pipe Size (mm) Substrate Seal Closure Device Aperture Edge Service Separation
Thickness (mm) Integrity Insulation
Separation (mm) (mm) Up to 120 Minutes Up to 120 Minutes
PVC 40 - 160 1.8 - 9.5 50mm ablative
75mm thick PB / coated batt
HDPE 40 - 160 2.4 - 9.5 IFS - 150mm 0 0 30 30
Masonry wall 600mm (h) x
PP 40 - 160 1.8 - 9.1 900mm (w)

Pencoed, Bridgend,
South Wales CF35 6NY
Insulated fie sleeve through double 50mm batt t: 01656 868490
Spacing Classification technical.solutions@rockwool.co.uk
Pipe Wall
Pipe Material Pipe Size (mm) Substrate Seal Closure Device Aperture Edge Service Separation
Thickness (mm) Integrity Insulation
Separation (mm) (mm) Drawing Title:

Double 50mm FirePro Insulated Fire Sleeve:


PVC 40 - 160 1.8 - 9.5
100mm thick PB / ablative coated Penetration Seal through Single & Double Batt Wall Seal
IFS - 150mm 25 / 50 30 / 50 120 120
Masonry wall batt 600mm (h) x
HDPE 40 - 160 2.4 - 9.5 900mm (w)
Scale: Date:
NTS NOV 20

Sheet Size: Drawn By: Checked By:


A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-IFS-0001 B

(V9/AUG21) 58
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411467 (BS EN 1366-3:2009)

The supporting construction must be capable of achieving


ROCKWOOL INSULATED FIRE SLEEVE IN DOUBLE ROCKWOOL INSULATED FIRE SLEEVE IN DOUBLE the required fire rating of the proposed Firestop.
BATT SEAL - SINGLE SIDED INSTALL BATT SEAL - SEPARATION
All service items should be adequately supported either
Fire rated flexible wall / 0 (Sleeve to substrate) 0 (Between sleeves) side of seal - min 500mm from face of batt seal.
plasterboard partition
Insulated Fire Sleeve to be minimum 150mm long through
the batt seal.
25
Solutions for flexible wall constructions can be used in
25 masonry constructions of the same minimum wall
Insulated service pipe supported 25 50 thickness (100mm Min)
within 500mm of each side of seal Ø110
Single sided batt installs to allow for a staged seal with
ROCKWOOL Acoustic ROCKWOOL Acoustic Intumescent Sealant at each batt
600
Intumescent Sealant layer.
ROCKWOOL Insulated Fire applied to all abutments,
These products should only be utilised for applications as
Sleeve 150mm long joints in batt and
outlined in the relevant ROCKWOOL product data sheet
perimeter of aperture as a and in accordance with the relevant ROCKWOOL Fire
2no. layers ROCKWOOL staged seal to each batt Resistance Testing. Additionally the product must be
Ablative Coated Batt layer installed in accordance with the current ROCKWOOL
guidelines.

For further information or alternative products please visit


www.rockwool.co.uk or contact our Technical Solutions
900
ACCESSIBLE NON-ACCESSIBLE Team on 01656 868490

100

Integrity Performance: Insulation Performance:

Insulated Fire Sleeve Performance Tables: Up to 120 Minutes Up to 120 Minutes

Insulated fire sleeve through double 50mm batt - Single sided installation
Spacing Classification
Pipe Wall
Pipe Material Pipe Size (mm) Substrate Seal Closure Device Aperture Edge Service Separation
Thickness (mm) Integrity Insulation
Separation (mm) (mm)
Pencoed, Bridgend,
PVC 40 - 110 1.8 - 6.6 Double 50mm South Wales CF35 6NY
100mm thick PB / ablative coated t: 01656 868490
IFS - 150mm 0 0 120 120
Masonry wall batt 600mm (h) x technical.solutions@rockwool.co.uk
HDPE 40 - 110 2.4 - 6.6 900mm (w)
Drawing Title:

FirePro Insulated Fire Sleeve:


Single Sided Install Through Double Batt Wall Seal

Scale: Date:
NTS NOV 20

Sheet Size: Drawn By: Checked By:


A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-IFS-0002 B

(V9/AUG21) 59
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411471 (BS EN 1366-3:2009)

The supporting construction must be capable of achieving


ROCKWOOL INSULATED FIRE SLEEVE IN the required fire rating of the proposed Firestop.
SOFTSEAL - SECTION DETAIL ROCKWOOL INSULATED FIRE SLEEVE IN
All service items should be adequately supported either
SOFTSEAL @ 45 degrees - PLAN DETAIL
side of seal - min 350mm from face of batt seal.
Fire rated flexible wall /
plasterboard partition Insulated Fire Sleeve to be minimum 300mm long through
SoftSeal batt.

Combustible pipe through Solutions for flexible wall constructions can be used in
ROCKWOOL SoftSeal ROCKWOOL SoftSeal at 45 masonry constructions of the same minimum wall
Intumescent Sealant degree angle thickness (100mm Min.)
ROCKWOOL SoftSeal
applied to all abutments,
100 joints in batt and 300mm length of insulated fire 45° These products should only be utilised for applications as
perimeter of aperture sleeve 300 outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
Combustible Pipe installed in accordance with the current ROCKWOOL
100 guidelines.

For further information or alternative products please visit


ROCKWOOL Insulated Fire www.rockwool.co.uk or contact our Technical Solutions
ROCKWOOL SoftSeal Min 100mm thick Team on 01656 868490
Sleeve - 300mm long stud wall
intumescent sealant
ROCKWOOL
SoftSeal

100

Insulated Fire Sleeve Performance Tables:


Integrity Performance: Insulation Performance:
Insulated Fire Sleeve through SoftSeal - Angled Pipes (45 degrees)
Spacing Classification Up to 120 Minutes Up to 120 Minutes
Pipe Wall
Pipe Material Pipe Size (mm) Substrate Seal Closure Device Aperture Edge Service Separation
Thickness (mm) Integrity Insulation
Separation (mm) (mm)

PVC 40 - 110 1.8 - 6.6


0
HDPE 40 - 110 2.4 - 6.6 Pencoed, Bridgend,
100mm softseal
100mm thick PB /
1200mm (h) x IFS - 300mm 0 120 120 South Wales CF35 6NY
Masonry wall t: 01656 868490
PVC < 160 < 9.5 1200mm (w)
technical.solutions@rockwool.co.uk
35
HDPE < 160 < 9.5
Drawing Title:

FirePro Insulated Fire Sleeve:


SoftSeal - Angled Pipes

Scale: Date:
NTS NOV 20

Sheet Size: Drawn By: Checked By:


A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-IFS-0003 B

(V9/AUG21) 60
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411457 / WF 411460 / WF
ROCKWOOL INSULATED FIRE SLEEVE ROCKWOOL INSULATED FIRE SLEEVE 411464 / WF 411467 (BS EN 1366-3:2009)
THROUGH 100MM THICK WALL THROUGH 75MM THICK WALL
The supporting construction must be capable of achieving
the required fire rating of the proposed Firestop.
Fire rated flexible wall / ROCKWOOL Acoustic Fire rated flexible wall / ROCKWOOL Acoustic
plasterboard partition plasterboard partition Insulated Fire Sleeve to be minimum 150mm long through
Intumescent Sealant Intumescent Sealant wall.
to fill gaps up to 10mm to fill gaps up to 15mm
25 37.5
between insulated fire between insulated fire Solutions for flexible wall constructions can be used in
sleeve and substrate. sleeve and substrate. masonry constructions of the same minimum wall
Combustible and Minimum 12.5mm Combustible and Minimum 12.5mm thickness (75mm or 100mm)
non-combustible pipes to be depth non-combustible pipes to be depth
adequately supported on each adequately supported on each Core holes through walls to have a minimum separation of
150mm. For reduced separation please contact
side of the wall side of the wall
ROCKWOOL Technical.
50
ROCKWOOL Insulated Fire ROCKWOOL Insulated Fire
These products should only be utilised for applications as
Sleeve to project by min. Sleeve to project by min. outlined in the relevant ROCKWOOL product data sheet
25mm from each face of the 37.5mm from each face of the and in accordance with the relevant ROCKWOOL Fire
wall. Min 150mm total length. wall. Min 150mm total length. Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
100 75 guidelines.

For further information or alternative products please visit


www.rockwool.co.uk or contact our Technical Solutions
Insulated Fire Sleeve Performance Tables: Team on 01656 868490

Insulated fire sleeve through 100mm PB/Masonry Wall


Pipe Wall Classification
Pipe Material Pipe Size (mm) Substrate Closure Device Annular Gap
Thickness (mm) Integrity Insulation
PVC 40 - 160 1.8 - 9.5
120 120
HDPE 40 - 160 2.4 - 9.5
PP 40 - 110 1.8 - 6.3 100mm thick PB / 10mm max 25mm
IFS - 150mm Integrity Performance: Insulation Performance:
PP 160 4 Masonry depth
90 60
PP 160 9.1 Up to 120 Minutes Up to 120 Minutes

Steel ≤168 4 120 15


Cable Bundle with insulated fire sleeve
100mm thick PB / 5mm max
110mm Dia. Data Cable Bundle IFS - 150mm 60 60
Masonry 12.5mm depth
Pencoed, Bridgend,
South Wales CF35 6NY
Insulated fire sleeve through 75mm PB/Masonry Wall t: 01656 868490
Wall Thickness Classification technical.solutions@rockwool.co.uk
Pipe Material Pipe Size (mm) Substrate Closure Device Annular Gap
(mm) Integrity Insulation
PVC 40 - 160 1.8 - 9.5 Drawing Title:
100mm thick PB / 15mm max
HDPE 40 - 160 2.4 - 9.5 IFS - 150mm 60 60 FirePro Insulated Fire Sleeve:
Masonry 12.5mm depth
PP 40 - 160 1.8 - 9.1 Penetration Seal through Wall (75mm & 100mm thick)
Cable Bundle with insulated fire sleeve
100mm thick PB / 5mm max
110mm Dia. Data Cable Bundle IFS - 150mm 60 60 Scale: Date:
Masonry 12.5mm depth NTS NOV 20

Sheet Size: Drawn By: Checked By:


A3 RW TECH L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-IFS-0101 B

(V9/AUG21) 61
ROCKWOOL Standard Detail:
Supporting Evidence : WF 423089 / WF 423090
(BS EN 1366-3:2009)

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.

All service items should be adequately supported either


side of seal.
ROCKWOOL INSULATED FIRE SLEEVE IN DOUBLE ROCKWOOL INSULATED FIRE SLEEVE IN DOUBLE
BATT FLOOR SEAL - SECTION BATT FLOOR SEAL - SEPARATION PLAN Insulated Fire Sleeve to be minimum 150mm long through
double batt seal.
2 No. 50mm Abaltive 0 (Sleeve to substrate) 0 (Between sleeves)
Batt sealed from top These products should only be utilised for applications as
Combustible pipe penetration
outlined in the relevant ROCKWOOL product data sheet
side only
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
Concrete floor 25 guidelines.
150 Timber floor with
slab 25 50
exposed timber to For further information or alternative products please visit
perimeter of seal. Ø160 www.rockwool.co.uk or contact our Technical Solutions
120 22mm floor board Team on 01656 868490
ROCKWOOL Insulated Fire 47 x 198 timber joists at
Sleeve positioned centrally 600mm c/c
to the batt seal 15mm plasterboard lining

Insulated Fire Sleeve Performance Tables:


Integrity Performance: Insulation Performance:
Insulated fie sleeve through double 50mm batt
Spacing Classification Up to 90 Minutes Up to 90 Minutes
Pipe Wall
Pipe Material Pipe Size (mm) Substrate Seal Closure Device Aperture Edge Service Separation
Thickness (mm) Integrity Insulation
Separation (mm) (mm)

PVC 40 - 160 1.8 - 9.5 Double 50mm


ablative batt seal
HDPE 40 - 160 2.4 - 9.5 0 0 (Linear) 60 60
1600mm x
Pencoed, Bridgend,
PP 40 - 160 1.8 - 9.1 1100mm
Timber Floor South Wales CF35 6NY
Rehau (PEX) 40 5.5 IFS - 150mm 0 n/a 90 90
Construction t: 01656 868490
DN50 (66mm Double 50mm
Tracpipe 6 ablative batt seal 0 n/a 90 90 technical.solutions@rockwool.co.uk
od)
1100mm x
PVC/HDPE/PP 40 1.8 - 3.7 700mm 0 0 (Linear) 90 90 Drawing Title:

FirePro Insulated Fire Sleeve:


Double 50mm Ablative Coated Batt Floor Seal

Scale: Date:
NTS NOV 20

Sheet Size: Drawn By: Checked By:


A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-IFS-0501 B

(V9/AUG21) 62
ROCKWOOL Standard Detail:
Supporting Evidence : WF 416060

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.

Insulated Fire Sleeve to be minimum 150mm long through


floor. For floor thickness less than 150mm please contact
ROCKWOOL technical.

Combustible or non combustible Core holes through floors to have a minimum separation
pipes to be adequately of 150mm. For reduced separation please contact
supported on both side of the ROCKWOOL Technical.
floor slab
Min 150mm These products should only be utilised for applications as
>15 <15 outlined in the relevant ROCKWOOL product data sheet
concrete floor slab Annular gaps up to 15mm. and in accordance with the relevant ROCKWOOL Fire
Use 50mm depth RWA45 Resistance Testing. Additionally the product must be
backing with 20mm depth installed in accordance with the current ROCKWOOL
Gaps >15mm fill
150 ROCKWOOL Acoustic guidelines.
with ROCKWOOL
Intumescent Sealant
Standard or HS
For further information or alternative products please visit
Compound www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
150mm length of
insulated fire
sleeve

Insulated Fire Sleeve Performance Tables:


Integrity Performance: Insulation Performance:

Up to 120 Minutes Up to 120 Minutes


Insulated fire sleeve through 150mm AAC slab
Pipe Wall Thickness Classification
Pipe Material Pipe Size (mm) Substrate Closure Device Annular Gap
(mm) Integrity Insulation

PVC 40 - 160 1.8 - 9.5


15mm - sealed with
120
150mm Aerated 20mm deep AIS
HDPE 40 - 160 2.4 - 9.5 IFS - 150mm 180 Pencoed, Bridgend,
concrete slab with 50mm RWA45
South Wales CF35 6NY
backing
PP 40 - 160 1.8 - 9.1 60 t: 01656 868490
technical.solutions@rockwool.co.uk

Drawing Title:

FirePro Insulated Fire Sleeve:


Penetration Seal through Floor

Scale: Date:
NTS NOV 20

Sheet Size: Drawn By: Checked By:


A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-IFS-0601 B

(V9/AUG21) 63
ROCKWOOL Standard Detail:
Supporting Evidence : WF 411470
(BS EN 1366-3:2009)

The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.
ROCKWOOL OVAL INSULATED FIRE SLEEVE ROCKWOOL OVAL INSULATED FIRE SLEEVE IN
All service items should be adequately supported either
IN SOFTSEAL - SECTION SOFTSEAL - SEPARATION ELEVATION side of seal.

Fire rated flexible wall / Insulated Fire Sleeve to be minimum 150mm long through
plasterboard partition 0 (Sleeve to substrate) SoftSeal batt.
All gaps between sleeve 0 (Between sleeves)
Maximum of 2 No. Oval Sleeves side by side with zero
and substrate to be filled separation between sleeves.
with ROCKWOOL SoftSeal
Intumescent Sealant These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
25 and in accordance with the relevant ROCKWOOL Fire
ROCKWOOL Oval Insulated Fire Resistance Testing. Additionally the product must be
Max 2 No. side by side
Sleeve 60mm x 204mm 25 installed in accordance with the current ROCKWOOL
150mm long guidelines.

For further information or alternative products please visit


ROCKWOOL SoftSeal 1200
www.rockwool.co.uk or contact our Technical Solutions
Intumescent Sealant Team on 01656 868490
ROCKWOOL SoftSeal
applied to all abutments,
joints in batt and
perimeter of aperture

1200

100 Integrity Performance: Insulation Performance:

60 Minutes 60 Minutes

Oval Insulated Fire Sleeve Performance Tables:


Pencoed, Bridgend,
Oval insulated fire sleeve South Wales CF35 6NY
Spacing Classification t: 01656 868490
Pipe Wall technical.solutions@rockwool.co.uk
Vent Material Vent Size (mm) Substrate Seal Closure Device Aperture Edge Service Separation
Thickness (mm) Integrity Insulation
Separation (mm) (mm)
Drawing Title:
100mm softseal FirePro Oval Insulated Fire Sleeve:
100mm thick PB /
PVC 204 x 60 2 1200mm (h) x IFS - 150mm 0 0 60 60 Penetration Seal through SoftSeal
Masonry wall
1200mm (w)

Scale: Date:
NTS NOV 20

Sheet Size: Drawn By: Checked By:


A3 RW TECH L.HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-IFS-1003 B

(V9/AUG21) 64
ROCKWOOL Standard Detail:
Supporting Evidence : WF 377056

INSTALLATION NOTES The supporting construction must be capable of achieving


600 the required fire rating of the proposed Firestop.
Drywall substrate - Min. 100mm thick. with
1. Make sure that the area within the aperture is clean of 45kg/m3 stonewool insulation between studs
any debris and remove any dust from the edges. Stud wall constructions must be installed in accordance
Dry wall studs with the manufacturers guidelines. The wall construction
2. Cut Rockwool ablative coated batt to the size and shape must have a minimum thickness of 100mm.
required to fit the aperture ensuring the batt will make a 2 No. 50mm ROCKWOOL FirePro
tight fit with all edges of the aperture. Ablative Coated Batts friction fitted to
All service items should be adequately supported either
aperture side of the fire stop to ensure no load is transferred onto
the coated batt.
3. Cut rectangular holes from the coated batt to
STI EZ Path Series 44+ fire rated
accommodate the EZ-Path® Series 44 Fire-Rated Pathway
pathway These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
800
and in accordance with the relevant ROCKWOOL Fire
4. Cut the coated batt across its width at the mid-point of
Resistance Testing. Additionally the product must be
each rectangular hole to enable batt to be fitted into the
installed in accordance with the current ROCKWOOL
aperture.
EZ Path Series 44+ fixing plate fixed in guidelines.
accordance with manufacturers
details/specification For further information or alternative products please visit
5. Apply Rockwool acoustic intumescent sealant to all
edges of the batt, ensuring that an even cover is achieved www.rockwool.co.uk or contact our Technical Solutions
over the entire thickness of the batt. This should include the Team on 01656 868490
Bead of FirePro Acoustic Intumescent Sealant
outer edges of the batt and the edges of the cut made approx. 15mm wide to perimeter of batt
across the batt to allow fitting into the aperture. There is no /surrounding edges of aperture
requirement to apply sealant to the edges of the holes cut
to accommodate each cable tray or ladder.

6. Insert the batt into the aperture.

7. Any gaps between the ablative coated batt and the


substrate require sealing with acoustic intumescent sealant.
Drywall substrate - Min. 100mm thick.

8. Apply a bead of Rockwool acoustic intumescent sealant,


ROCKWOOL Acoustic Intumescent Sealant to all
approximately 15 mm wide, around the EZ-Path unit and edges of batt
Integrity Performance: Insulation Performance:
ablative coated batt.
2 No. 50mm ROCKWOOL FirePro 120 Minutes 90 Minutes
Ablative Coated Batts friction fitted to
9. Repeat step 7 and 8 on the other side of the batt aperture

STI EZ Path Series 44+ fire rated


pathway

Pencoed, Bridgend,
South Wales CF35 6NY
EZ Path Series 44+ fixing plate fixed in t: 01656 868490
accordance with manufacturers technical.solutions@rockwool.co.uk
details/specification

Drawing Title:

ROCKWOOL Acoustic Intumescent Sealant to all


EZ Path Unit:
edges of batt 2 No. 50mm Ablative Coated Batts

Scale: Date:
NTS March 2017

Sheet Size: Drawn By: Checked By:


A3 L.HAM R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-200-RDW B

(V9/AUG21) 65
Opening G
ROCKWOOL Standard Detail:
Supporting Evidence : WF 377056

INSTALLATION NOTES The supporting construction must be capable of achieving


the required fire rating of the proposed Firestop.
Drywall substrate - Min. 100mm thick. with
1. Make sure that the area within the aperture is clean of 45kg/m3 stonewool insulation between studs
any debris and remove any dust from the edges. Stud wall constructions must be installed in accordance
Dry wall studs
with the manufacturers guidelines. The wall construction
2. Cut Rockwool ablative coated batt to the size and shape must have a minimum thickness of 100mm.
required to fit the aperture ensuring the batt will make a
tight fit with all edges of the aperture. All service items should be adequately supported either
side of the fire stop to ensure no load is transferred onto
the coated batt.
3. Cut rectangular holes from the coated batt to
STI EZ Path Series 44+ fire rated
accommodate the EZ-Path® Series 44 Fire-Rated Pathway
pathway These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
4. Cut the coated batt across its width at the mid-point of
Resistance Testing. Additionally the product must be
each rectangular hole to enable batt to be fitted into the
installed in accordance with the current ROCKWOOL
aperture.
EZ Path Series 44+ fixing plate fixed in guidelines.
accordance with manufacturers
details/specification For further information or alternative products please visit
5. Apply Rockwool acoustic intumescent sealant to all
edges of the batt, ensuring that an even cover is achieved www.rockwool.co.uk or contact our Technical Solutions
over the entire thickness of the batt. This should include the Team on 01656 868490
Bead of FirePro Acoustic Intumescent Sealant
outer edges of the batt and the edges of the cut made approx. 15mm wide to perimeter of batt
across the batt to allow fitting into the aperture. There is no /surrounding edges of aperture
requirement to apply sealant to the edges of the holes cut
to accommodate each cable tray or ladder.

6. Insert the batt into the aperture.

7. Any gaps between the ablative coated batt and the


substrate require sealing with acoustic intumescent sealant.
Drywall substrate - Min. 100mm thick.

8. Apply a bead of Rockwool acoustic intumescent sealant, 50


approximately 15 mm wide, around the EZ-Path unit and ROCKWOOL Acoustic Intumescent Sealant to all Integrity Performance: Insulation Performance:
ablative coated batt. edges of batt
120 Minutes 90 Minutes
2 No. 50mm ROCKWOOL FirePro
Ablative Coated Batts friction fitted to
9. Repeat step 7 and 8 on the other side of the batt aperture

STI EZ Path Series 44+ fire rated


pathway

Pencoed, Bridgend,
South Wales CF35 6NY
t: 01656 868490
EZ Path Series 44+ fixing plate with
technical.solutions@rockwool.co.uk
composite sheet fixed to studs in
accordance with manufacturers
details/specification Drawing Title:

EZ Path Unit with Cover Plate:


ROCKWOOL Acoustic Intumescent Sealant to all 2 No. 50mm Ablative Coated Batts
edges of batt

50
Scale: Date:
NTS March 2017

Sheet Size: Drawn By: Checked By:


A3 L.HAM R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-201-RDW D

(V9/AUG21) 66
ROCKWOOL Standard Detail:
Supporting Evidence : WF 377055

The supporting construction must be capable of achieving


INSTALLATION NOTES the required fire rating of the proposed Firestop.
STI EZ Path Series 44+ fire All service items should be adequately supported either
A permanent shuttering made from 50mm ROCKWOOL
rated pathway
slab (minimum density 140kg/m3) is cut and friction fitted side of the Firestop to ensure that no permanent load is
between services and the edges of the floor slab. Firestop transferred onto the coated batt.
Compound is then trowelled over the shutter to a depth of
STI steel hanger brackets fixed to floor
25mm thick. This is allowed to cure. Further Firestop The Firestop compound is designed to accommodate light
slab in accordance with manufacturers
Compound is then mixed to a pouring grade and tops the
details/specification foot traffic in line with BS6399 for workspaces and
seal up to the required depth. cupboards.
Floor openings

1) A bag of compound to 10 litres water (3:1) by volume. ROCKWOOL Firestop Compund


Vary to suit site conditions

2) Set the shuttering into the opening ensuring a tight fit so


Floor slab
that once the required depth of Compound is installed it
finishes flush with the floor slab/screed unless otherwise
specified
PLAN VIEW
3) Mix and pour compound until the required thickness is
achieved.

STI EZ Path Series 44+ fire rated


pathway

STI steel hanger brackets fixed to floor Integrity Performance: Insulation Performance:
slab in accordance with manufacturers
details/specification 120 Minutes 120 Minutes

ROCKWOOL Firestop Compound


Min. 100mm thick Min. 100mm

Floor slab
TECHNICAL SOLUTIONS
ROCKWOOL 140 Kg/m3 shuttering insulation Pencoed, Bridgend,
South Wales CF35 6NY
t: 01656 862 621
technical.solutions@rockwool.co.uk
Drawing Title:

SECTION EZ Path with ROCKWOOL Firestop Compound


Floor Seal

Scale: Date:
NTS MAR 17

Sheet Size: Drawn By: Checked By:


A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-202-RW C

(V9/AUG21) 67
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 335645

1. Make sure that the area within the aperture is Maximum Opening Size: 400mm High x 6m long
clean of any debris and remove any dust from the
edges. The supporting construction must be capable of achieving
6m max. the required fire rating of the proposed Firestop.
2. Install the Rockwool Ablative Coated Batts
either vertically or using a stretcher bond pattern Flexible wall constructions must be installed in accordance
up to a maximum aperture size of 400mm x 6m. with the manufacturer's guidelines with the aperture being
Concrete soffit fully framed and lined out. The wall construction should be
3. Apply Rockwool Acoustic Intumescent Sealant of a minimum thickness of 100mm.
ROCKWOOL Acoustic
to the outer edges of the batt to seal the joints
Intumescent Sealant to all
between batts and supporting substrates. batt-to-batt and batt-to-substrate For service penetrations refer to single layer 50mm
joints. ablative coated batt penetration seal detail SD-112-RDW.
4. Continue installation until the aperture is
400mm max.
completely filled. These products should only be utilised for applications as
50mm ROCKWOOL Ablative
Coated Batt outlined in the relevant ROCKWOOL product data sheet
5. Apply a bead of Rockwool acoustic intumescent and in accordance with the relevant ROCKWOOL Fire
sealant, approximately 15 mm wide, around the Resistance Testing. Additionally the product must be
perimeter of the batt ensuring that all gaps installed in accordance with the current ROCKWOOL
between the batt and surrounding edges are fully Drywall or blockwork guidelines. For further information please visit
filled. supporting wall www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490
6. Repeat step 5 on the other side of the batt

7. Repair any damage to the coating which may


have occurred during installation by brush
applying Rockwool ablative coating.

Integrity Performance: Insulation Performance:

Up to 60 Minutes Up to 60 Minutes

Concrete soffit Concrete soffit

Pencoed, Bridgend,
50mm Ablative Coated Batt 50mm Ablative Coated Batt
South Wales CF35 6NY
t: 01656 868490
technical.solutions@rockwool.co.uk
15mm bead ROCKWOOL 15mm bead ROCKWOOL
Acoustic Intumescent Sealant Acoustic Intumescent Sealant Drawing Title:

50mm Ablative Coated Batt:


Solid or flexible wall Solid or flexible wall
Single Layer Head of Wall

Scale: Date:
NTS DEC 18

Sheet Size: Drawn By: Checked By:


A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-126-RW D

(V9/AUG21) 68
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 311319
20m max.

1. Make sure that the area within the aperture is Maximum Opening Size: 1200mm High x 20M long
clean of any debris and remove any dust from the
edges. The supporting construction must be capable of achieving
Steel beam or concrete soffit
the required fire rating of the proposed Firestop.
2. Install the Rockwool Ablative Coated Batts
either vertically or using a stretcher bond pattern Flexible wall constructions must be installed in accordance
up to a maximum aperture size of 1200mm x 20m. with the manufacturer's guidelines with the aperture being
fully framed and lined out. The wall construction should be
3. Apply Rockwool Acoustic Intumescent Sealant of a minimum thickness of 100mm.
to the outer edges of the batt to seal the joints ROCKWOOL Acoustic Intumescent
between batts and supporting substrates. Sealant to all batt-to-batt and
For service penetrations refer to single layer 60mm
batt-to-substrate joints.
ablative coated batt penetration seal detail SD-106-RDW.
1200mm max.
4. Continue installation until the aperture is
completely filled. Where the Ablative Coated Batt forms a seal up to a
structural beam, which has been protected with
5. Apply a bead of Rockwool acoustic intumescent intumescent paint then an Insulation rating cannot be given
sealant, approximately 15 mm wide, around the 60mm ROCKWOOL Ablative (due to heat transfer through the steel). For applications
perimeter of the batt ensuring that all gaps Coated Batt requiring an insulation rating from the beam then please
between the batt and surrounding edges are fully contact Rockwool Technical for Rockwool Beamclad
filled. solutions.

6. Repeat step 5 on the other side of the batt Drywall or blockwork These products should only be utilised for applications as
supporting wall outlined in the relevant ROCKWOOL product data sheet
7. Repair any damage to the coating which may and in accordance with the relevant ROCKWOOL Fire
have occurred during installation by brush Resistance Testing. Additionally the product must be
applying Rockwool ablative coating. installed in accordance with the current ROCKWOOL
guidelines. For further information please visit
www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490

Integrity Performance: Insulation Performance:

Up to 60 Minutes Up to 60 Minutes

Steel beam Concrete soffit

Pencoed, Bridgend,
60mm Ablative Coated Batt 60mm Ablative Coated Batt
South Wales CF35 6NY
t: 01656 868490
technical.solutions@rockwool.co.uk
15mm bead ROCKWOOL 15mm bead ROCKWOOL
Acoustic Intumescent Sealant Acoustic Intumescent Sealant Drawing Title:

60mm Ablative Coated Batt:


Solid or flexible wall Solid or flexible wall
Single Layer Head of Wall

Scale: Date:
NTS AUG 18

Sheet Size: Drawn By: Checked By:


A3 S.HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-125-RW D

(V9/AUG21) 69
GENERAL REQUIREMENTS ROCKWOOL Standard Detail:
Supporting Evidence : CC 295758
Supporting wall structures must have a
minimum density of 400 kg/m3 400 max.
For Air Seal paint linear fire stop with ROCKWOOL
Ablative Coating.
The supporting substrates must have a Fire
Resistance performance equal to or greater
This product should only be utilised for applications as
than that required by the Firestop.
outlined in the relevant ROCKWOOL product data sheet
ROCKWOOL Linear Firestop 2A ROCKWOOL Trapezoidal and in accordance with the relevant ROCKWOOL Fire
The Joint height from the top of the wall to the Self tapping screws or hammer Firestop 2B
Resistance Testing. Additionally the product must be
underside of the floor slab shall not be fixings
installed in accordance with the current ROCKWOOL
greater than the thickness of the wall. The ROCKWOOL Linear Firestop 2A
guidelines. For further information please visit
Firestop shall be the same depth of the wall.
www.rockwool.co.uk or contact our Technical Solutions
ROCKWOOL Trapezoidal Team on 01656 868490
Firestop 2B
INSTALLATION NOTES
SINGLE DECK PROFILE RUNNING IN LINE, DECK PROFILE RUNNING IN LINE WITH
1. Ensure the opening is clean and free of BUT ASYMMETRICAL, WITH THE WALL THE WALL
any debris. LINE

2. Linear Firestop 2A must be fitted as


rectangular pieces, tightly butt jointed and
400 max.
compressed by at least 5% thickness.

3. Up to 3 layers may be used. All layers shall


be installed simultaneously. The height of the
void shall not exceed the width of the
Firestop. ROCKWOOL Linear Firestop 2A ROCKWOOL Trapezoidal
Self tapping screws or hammer Firestop 2B
fixings
3. Small (nom 10mm) holes should be filled
with Rockwool Acoustic Intumescent Sealant. ROCKWOOL Linear Firestop 2A

4. Trapezoidal Firestop 2B shall be ordered to ROCKWOOL Trapezoidal


suit the profile type. The Firestop shall be Firestop 2B

installed under a tight fit.


TWO DECK PROFILES RUNNING IN LINE, DECK PROFILE RUNNING ACROSS THE
BUT ASYMMETRICAL, WITH THE WALL WALL
5. Dovetail Infill Firestop Strip shall are LINE
supplied as narrow rectangular strips for a
Integrity Performance: Insulation Performance:
pinched installation into the nominated
dovetail shaped deck. The Firestop shall be
See table See table
installed with vertical laminations.

ROCKWOOL Dovetail Infill


Firestop Strip
ROCKWOOL Trapezoidal
ROCKWOOL Linear Firestop 2A Firestop 2B
Pencoed, Bridgend,
ROCKWOOL Beamclad South Wales CF35 6NY
See Beamclad datasheet to calculate
required thickness t: 01656 868490
technical.solutions@rockwool.co.uk
Wall Integrity & Insulation
Thickness DOVETAIL INFILL FIRESTOP STRIPS DECK PROFILE RUNNING ACROSS A Drawing Title:
2A with 2B
RUNNING OVER LINEAR FIRESTOP 2A SUPPORTING STEEL BEAM WITH BOX Linear & Trapezoidal Firestop Systems
100mm 2 hours PROTECTION
150mm 3 hours
200mm 4 hours
Scale: Date:
NTS NOV 18
(Note: The above ratings are based on a masonry
wall construction with density of 400kg/m³) Sheet Size: Drawn By: Checked By:
A3 S. HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-134-RW D

(V9/AUG21) 70
ROCKWOOL Standard Detail:
ROCKWOOL FIREPRO® Acoustic
Rigid wall Intumescent Sealant Supporting Evidence : ETA15-0327 / CF5577
• min. 100mm thick
• max. width and depth as per table
• Fire rated to at least the same fire rating as the firestop seal

Backing rod Where ROCKWOOL insulation is to be used as a backing


ROCKWOOL FIREPRO® Acoustic material then the depth of material to achieve the detailed
Intumescent Sealant fire ratings is the width of the joint +10mm.
• max. width and depth as per table
Rigid floor
Backing rod • min. 150mm thick
• Fire rated to at least the same fire rating as the firestop seal
Movement Accommodation: +/- 12% of Joint Width

All surfaces must be thoroughly cleaned and free of bond


VERTICAL SEAL HORIZONTAL SEAL breaking contaminants prior to application of the sealant.
ACOUSTIC INTUMESCENT SEALANT BETWEEN ACOUSTIC INTUMESCENT SEALANT BETWEEN
CONCRETE SUBSTRATES CONCRETE SUBSTRATES
The supporting construction must be capable of achieving
the required fire rating of the proposed Firestop.

These products should only be utilised for applications as


outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Rigid wall
Resistance Testing. Additionally the product must be
• min. 100mm thick
ROCKWOOL FIREPRO® Acoustic
• Fire rated to at least the same fire rating as the firestop seal
Intumescent Sealant
installed in accordance with the current ROCKWOOL
Backing rod • max. width and depth as per table guidelines. For further information please visit
www.rockwool.co.uk or contact our Technical Solutions
Backing rod
ROCKWOOL FIREPRO® Acoustic Team on 01656 868490
Intumescent Sealant
• max. width and depth as per table
Rigid floor
• min. 150mm thick
Steel or Softwood substrate • Fire rated to at least the same fire rating as the firestop seal

Steel substrate

VERTICAL SEAL HORIZONTAL SEAL


ACOUSTIC INTUMESCENT SEALANT BETWEEN ACOUSTIC INTUMESCENT SEALANT BETWEEN
CONCRETE AND STEEL OR CONCRETE AND CONCRETE AND STEEL SUBSTRATES
SOFTWOOD SUBSTRATES

Integrity Performance: Insulation Performance:

See Table See Table

Flexible wall
Rigid floor
• min. 120mm thick
• min. 2no. board layers • Fire rated to at least the same fire rating as the firestop seal Pencoed, Bridgend,
• Fire rated to at least the same fire rating as the firestop seal
South Wales CF35 6NY
ROCKWOOL FIREPRO® Acoustic t: 01656 868490
ROCKWOOL FIREPRO® Acoustic Intumescent Sealant
Intumescent Sealant • max. width and depth as per table
technical.solutions@rockwool.co.uk
• max. width and depth as per table
Flexible wall
Backing rod • min. 120mm thick Drawing Title:
• min. 2no. board layers
Rigid wall • Fire rated to at least the same fire rating as the firestop seal
FIREPRO® Acoustic Intumescent Sealant
• min. 100mm thick
• Fire rated to at least the same fire rating as the firestop seal
Application Range
VERTICAL SEAL HORIZONTAL SEAL
ACOUSTIC INTUMESCENT SEALANT BETWEEN ACOUSTIC INTUMESCENT SEALANT
CONCRETE AND PLASTERBOARD SUBSTRATES BETWEEN PLASTERBOARD HEAD OF WALL
AND CONCRETE SOFFIT Scale: Date:
NTS JUN 21

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS L. HAM
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. RWSD-AIS-0001 A

(V9/AUG21) 71
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 341623 B

1). Measure the width of the Linear Joint to be sealed. The supporting construction must be capable of achieving
2). Cut the FIREPRO® SoftSeal Linear Joint Seal up to 25% larger than the joint width, so when installed the seal is under compression. the required fire rating of the proposed Firestop.

3). Ensure substrate is clean and free of dust and debris. As part of the testing to BS EN 1366-4, FIREPRO
SoftSeal was assessed for its movement capabilities,
4). Install the FIREPRO® SoftSeal Linear Joint Seal with the coating on the top surface. (Double sided coatings are available)
prior to conducting the fire test. The product was tested
5). Apply FIREPRO® SoftSeal Flexible Coating to top face of all butt joints between pieces of SoftSeal Linear Joint Seal. to accommodate movement (expansion and contraction)
of +/-25%.
6). Apply FIREPRO® SoftSeal Flexible Coating to top face of all joints between the seal and the substrate, overlapping by 20mm.
Linear joint widths of up to 350mm can be accommodated
7). Apply FIREPRO® SoftSeal Flexible Coating across the face of all butt joints between sections of Soft Seal Linear Joint Seal.
with the inclusion of steel Z brackets. For more advice
please contact ROCKWOOL technical.

Soft Seal Linear Joint Seal can be supplied on either one


or both sides.(Single Sided for Horizontal Applications.
Double sided for Vertical Applications).

These products should only be utilised for applications as


outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines.

For further information or alternative products please visit


FirePro SoftSeal Flexible Coating applied to www.rockwool.co.uk or contact our Technical Solutions
the top face of all joints between the seal Team on 01656 868490
and the substrate overlapping by 20mm
20 20

FirePro SoftSeal Linear single sided coating


cut up to 25% larger than void and installed
under compression. Seal installed with
Integrity Performance: Insulation Performance:
coating to top face.
Max. 300 Up to 240 Minutes Up to 120 Minutes

Floor slab

Pencoed, Bridgend,
SoftSeal Flexible Coating Application Notes: South Wales CF35 6NY
t: 01656 868490
1) Apply FirePro SoftSeal flexible coating to the top face of all joints between the seal and the substrate.
technical.solutions@rockwool.co.uk
2) Apply FirePro soft seal Flexible Coating to the top face of all butt joints between pieces of SoftSeal Linear Joint Seal.

Drawing Title:

FirePro SoftSeal Vertical Seal:


Linear Joints seal horizontal & vertical

Scale: Date:
NTS 07.12.17

Sheet Size: Drawn By: Checked By:


A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-160-RDW B

(V9/AUG21) 72
ROCKWOOL Standard Detail:
NOTE: FOR EXTENDED CAVITY WIDTHS OF 600mm - 1000mm
PLEASE CONTACT ROCKWOOL TECHNICAL FOR DETAILS
Supporting Evidence : BRE 89697_Rev 6 & WF 393583

Refer to table for Max. seal width The supporting construction must be capable of achieving
the required fire rating of the proposed Firestop.

For further details on Curtain Walling & Cladding


External brickwork / cladding / applications please refer to the SP FireStop product data
curtain walling SP FireStop brackets fixed to floor slab at 500mm sheet.
centres - 250mm from each joint. Bracket cut on
Cavity tray site to pentrate fire stop material by Min . 75%
For detail of SP120 as a vertical seal please contact
The brackets can be faced fixed to the internal
ROCKWOOL Technical
wall if required.
SP 60/120 FireStop
For cavity widths over 250mm seal joints For cavity widths of 250mm or more joints between
in FireStop with foil tape. Slab cut on site adjacent lengths of SP Firestop Slab should be sealed on
to suit cavity width + up to 5mm to allow the top surface with foil tape.
for compression
Floor slab For penetrations through SP slab as a horizontal barrier
please contact ROCKWOOL Technical.
Internal wall
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
HORIZONTAL ROCKWOOL SP FIRESTOP Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
guidelines.

For further information or alternative products please visit


www.rockwool.co.uk or contact our Technical Solutions
SP FireStop brackets fixed to wall at 500mm
Team on 01656 868490
centres - 250mm from each joint. Bracket cut
on site to pentrate fire stop material by Min .
75%

Internal wall

SP 60/120 FireStop
For cavity widths over 250mm seal joints Refer to table for Max. seal width Integrity Performance: Insulation Performance:
to top of FireStop with foil tape. Slab cut
on site to suit cavity width + up to 5mm to Up to 120 Minutes Up to 120 Minutes
allow for compression

External brickwork / cladding /


curtain walling

Vertical DPC Pencoed, Bridgend,


South Wales CF35 6NY
t: 01656 868490
VERTICAL ROCKWOOL SP FIRESTOP
technical.solutions@rockwool.co.uk
(Contact ROCKWOOL Technical for SP 120 vertical applications)
Drawing Title:
SP Slab Performance Table:
Contact ROCKWOOL Technical for: FirePro SP Slab:
Product Seal Width (mm) SP Brackets Orientation Performance Linear Joints seal horizontal & vertical
Brickwork support penetrations through SP Slab
SP60 50 - 400 50-100 SP/S -100-400 SP/L Horizontal & Vertical EI 60 Pipe penetrations through SP Slab
SP120 50 - 400 50-100 SP/S -100-400 SP/L Horizontal & Vertical EI 120
Scale: Date:
SP Plus 401 - 600 SP/XL Horizontal & Vertical EI 120 NTS May 2018
SP Plus 601 - 1000 SP/XL Horizotal & Vertical EI 60
Sheet Size: Drawn By: Checked By:
A3 RW TECH R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-230-RDW C

(V9/AUG21) 73
ROCKWOOL Standard Detail:
INSTALLATION NOTES Supporting Evidence : WF 393583

1. Cut the ROCKWOOL SP Firestop Slab to suit Seal joint with aluminium This detail is to be read in conjunction with the
the cavity size, ensuring a tight fit. foil tape if void is 250mm ROCKWOOL SP Firestop data sheet specific installation
or greater instructions.
2. Measure the location of the masonry support
bracket in relation to the SP Firestop Slab and If the masonry support anchor penetrates the SP FIrestop
SP Fixing Brackets at
carefully slit the SP Firestop, with a serrated 500mm centres (250mm by more than 50% contact ROCKWOOL Technical
blade, to tightly accommodate the masonry from each edge) Services.
support bracket.
These products should only be utilised for applications as
SP Firestop to be installed outlined in the relevant ROCKWOOL product data sheet
3. The masonry support bracket should only with masonry support anchor
impale the SP Firestop Slab by 50% of the 50% through firestop and in accordance with the relevant ROCKWOOL Fire
firestop thickness. Resistance Testing. Additionally the product must be
installed in accordance with the current ROCKWOOL
4. Bend the SP Fixing Brackets into a suitable guidelines. For further information please visit
profile, either Z-shape or L-shape. www.rockwool.co.uk or contact our Technical Solutions
Team on 01656 868490.
5. Impale the SP Fixing Brackets into the SP
Firestop at mid-depth, ensuring that the bracket
penetrated though 75% of the span of the
firestop. Space the SP Fixing Brackets at 500mm
centres (a maximum of 250mm in from each
edge).

6. Install the SP Firestop Slab into the void.

7. Mechanically fix the SP Fixing Brackets with


non-combustible fixings that are suitable for the
substrate.

8. Repeat the previous steps with the next length ROCKWOOL SP Firestop cut SP60 Integrity Performance: SP60 Insulation Performance:
of SP Firestop Slab ensuring both lengths of oversized for void to allow
for compression fit
firestop are tightly abutted. 60 Minutes 60 Minutes

9. If the cavity width is greater than, or equal to, ROCKWOOL SP Fixing Bracket SP120 Integrity Performance: SP120 Insulation Performance:
impaled through min. 75%
250mm then the joints between adjacent lengths of SP Firestop
of SP Firestop Slab should be sealed on the top 120 Minutes 120 Minutes
surface with aluminium foil tape. ROCKWOOL SP Fixing Bracket
secured with non-combustible fixings
suitable for the substrate

Masonry support anchor Pencoed, Bridgend,


South Wales CF35 6NY
Concrete floor slab t: 01656 868490
technical.solutions@rockwool.co.uk

Masonry external leaf Drawing Title:


400 max
ROCKWOOL SP Firestop installed with
masonry support anchor

Scale: Date:
NTS OCT 18

Sheet Size: Drawn By: Checked By:


A3 S. HIRONS R.WAKEFIELD
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-235-RDW C

(V9/AUG21) 74
SP Plus Firestop ROCKWOOL Standard Detail:
Cut SP Plus Firestop 10mm oversized to allow
≤ Ø 110mm PVC or HDPE plastic pipe for compression. Service penetrations through Supporting Evidence : WF 405114
2.8mm - 10.6mm wall thickness the SP Plus Firestop should be cut as small a
possible.
The supporting construction must be capable of achieving
SP FireStop Fixing Bracket
Fixed to floor slab at 500mm centres - 250mm
the required fire rating of the proposed Firestop.
ROCKWOOL Insulated Fire Sleeve
25mm thick and cut to 175mm length (50mm from each joint. Bracket cut on site to pentrate
protrusion each side of the seal) fire stop material by Min . 75% For further details on Curtain Walling & Cladding
Fitted around the pipe and jointed with foil tape The brackets can be faced fixed to the internal
50 wall if required. applications please refer to the SP FireStop product data
sheet.

For cavity widths of 250mm or more joints between


50
adjacent lengths of SP Firestop Slab should be sealed on
25
the top surface with foil tape.
Floor slab
For cavity widths larger than 300mm please contact our
External brickwork / cladding Technical Solutions Team.
/ curtain walling
Internal wall
These products should only be utilised for applications as
outlined in the relevant ROCKWOOL product data sheet
and in accordance with the relevant ROCKWOOL Fire
Resistance Testing. Additionally the product must be
≤ 110 installed in accordance with the current ROCKWOOL
300 max. guidelines.

For further information or alternative products please visit


SP Plus Firestop
Cut SP Plus Firestop 10mm oversized to allow www.rockwool.co.uk or contact our Technical Solutions
≤ Ø 108mm copper or steel pipe for compression. Service penetrations through Team on 01656 868490
the SP Plus Firestop should be cut as small a
possible.

SP FireStop Fixing Bracket


Rocklap H&V Pipe Section Fixed to floor slab at 500mm centres - 250mm
25mm thick and continued through the firestop for from each joint. Bracket cut on site to pentrate
min. 1000mm length. fire stop material by Min . 75%
The brackets can be faced fixed to the internal
wall if required.

Integrity Performance: Insulation Performance:

Floor slab
See Table See Table
External brickwork / cladding
/ curtain walling
Internal wall

≤ 110
Pencoed, Bridgend,
300 max.
South Wales CF35 6NY
t: 01656 868490
Performance (mins) Test
Service separation technical.solutions@rockwool.co.uk
Service type minimum (mm) Notes
Standard
Integrity Insulation Aperture Services
Drawing Title:
≤ Ø 40mm (1.9mm - 3mm wall) 90
PVC pipe Ø 41mm - 110mm (4.2mm - 6.6mm 120
60
Insulated Fire Sleeve wrapped SP Plus Firestop
wall) around the pipes with 50mm Service Penetration - Horizontal
≤ Ø 40mm (2.4mm - 3.7mm wall) 90 projection to both sides of
HDPE pipe Ø 41mm - 110mm (2.7mm - 10mm 120 EN 0 100 the seal.
60
wall) Scale: Date:
NTS MAY 19
Steel or copper H&V Pipe Section installed
≤ Ø 108 mm 120 30
pipe 1m centrally through the seal. Sheet Size: Drawn By: Checked By:
A3 S. HIRONS RW TECH
The published fire ratings have been achieved by following the instructions set out above. Use of alternative components or deviations from the instructions in any way is likely to mean that the installation will not comply with the assessed rating. Rockwool Ltd. does not accept responsibility for the consequences of using
Rockwool products in applications or for purposes not authorised by Rockwool Ltd. Expert advice should be sought where such applications are contemplated.The information contained in this drawing is believed to be correct at the date of publication, and is based upon tested and certified solutions. The policy of Rockwool Drawing Number: Revision:
Ltd. is one of constant improvement. Installers should therefore ensure that they are working from the latest published drawings and instructions. Whilst Rockwool will endeavour to keep its publications up to date the accuracy of the information contained within this drawing may be affected by pertinent changes in the law or
regulatory requirements and alterations or amendments to the specification of Rockwool products. SD-236-RW C

(V9/AUG21) 75
August 2021

ROCKWOOL Limited
Pencoed
Bridgend
CF35 6NY
Tel: 01656 862 621
info@rockwool.co.uk
rockwool.com/uk

You might also like