Professional Documents
Culture Documents
sem. V, group SE
Longitudinal module: a = …
Number of modules: n = …
Distance between axes of lower parts of the column: L = …
The lift height of the crane: H = …
Crane lifting capacity: Q = …
Roofing system: …
Concrete: …
Location zone: …
Hall height and width should be adjusted to crane requirements, minimum distance between
crane and roof structure is 0.5 m.
Catalogs of precast concrete units of polish producers are available online.
1. ROOFING SYSTEM
Roofing system should be selected on the basis of individual data (concrete roof slabs without
purlins, high profile trapezoidal sheets without purlins, low profile trapezoidal sheets with
purlins or sandwich panels with purlins).
The type and dimensions of elements of a roofing system should be selected on the basis of
producers catalogues and calculations of loads acting on the roof.
The type and dimensions of a precast girder should be selected on the basis of producers
catalogues and calculations of loads acting on the girder.
The type of a crane should be selected on the basis of producers catalogues, the L
dimension of the hall and the maximum loading Q.
Example data:
Examples of rails:
𝑙0
heavy crane 𝑄 > 20𝑡: ℎ = (reinforced concrete beams are not recommended)
8
WIDTH: 𝑏𝑤 = 0.5ℎ 𝑐𝑚, 𝑒𝑣𝑒𝑟𝑦 5 𝑐𝑚
FLANGE HEIGHT: ℎ𝑓 = 10 ÷ 14 𝑐𝑚, 𝑒𝑣𝑒𝑟𝑦 2 𝑐𝑚
FLANGE WIDTH: 𝑏𝑓 = 𝑏𝑤 + 20𝑐𝑚
4. COLUMN