Ref: LION/IE3722/Ganga Ex-III/ Date: 06.06.

2023
To,
The Chief Project Manager,
M/s Hardoi Unnao Raod Ltd.
Ganga Expressway Project (Group-III),
Base camp-2, Pkg-8 at Ranipur Grant
Near Kailash HP Petrol Pump, Bangarmau - Sandila Road
Bangarmau, Unnao (U.P), Pin – 209869.
Email- anilkumar.sheoran@adani.com.
Subject Development of “Access Controlled Six Lane (Expendable to Eight Lane) Greenfield ‘Ganga
: Expressway’ [Group-III, from Km. 289+300 (Village: Ubariya Khurd, distt: Hardoi) to Km.
445+000, (Village: Sarso, Distt: Unnao), Design Length 155.700 Km] in the State of Uttar
Pradesh on DBFOT (Toll) basis under PPP- Non-Conformance Report (NCR) No.35,
regarding 1.0 to 1.2 m borrow earth dumped in one-go on uncompacted Embankment
11th-layer from Km. 383+700 to 383+850 (LHS+RHS). -Reg.
Ref: - 1 Joint Site Inspection of UPEIDA, IE & Concessionaire on 05-06-2023
.
Dear Sir,
During joint site visit of UPEIDA, IE & Concessionaire on 05-06-2023, It is being found/noted that over
an uncompacted bed of Emb.11th layer, approx., 1.0 to 1.2 m borrow earth dumped in one-go from
Km.383+700 to 383+850 (LHS+RHS). Hence, you are advised to remove all the excess soil dumping
over 11th layer & compact the 11th layer then proceed for next layer. This is for immediate action please.
Hence, you are advised to remove all the excess soil dumping over 11 th layer & compact the 11th layer then
proceed for next layer. Please note that without compliance of above works all further layers will be
treated null & void.
This is for immediate action please.
Thanks & Regards
For M/s Lion Engineering Consultants Pvt. Ltd. In
Join Venture with M/s Bloom Companies (LLC),

Team Leader
For Independent Engineer
Copy for information:
1 The Sr. CGM, Ganga Expressways, UPEIDA. Email-gangagreen2022@gmail.com
2 The Chief Engineer, Ganga Expressways, UPEIDA. Email-gangagreen2022@gmail.com
3 The Executive Engineer, (Group-III), UPEIDA. PIU-Raebareli. Email-piurbl12@gmail.com
4 The Authorized Signatory, M/S Lion Engineering Consultants, Pvt. Ltd., Bhopal (M.P.) Email:
design@liongroup.in
Independent Engineer M/s Hardoi Unnao Road Private Ltd.
Authority Concessionaire

Non-Conformance Report (NCR) no.35, Package-8, Group-3

Project: Development of "Access controlled six lane (Expendable to Eight lane) Green field) Ganga
Expressway (Groupe-III) from km 289+300 (village Ubariya Khurd Distt; Hardoi) to km 445+000 (village
Sarso, Distt; Unnao) in the state of Uttar Pradesh on DBFOT (toll) basis under PPP.
Employer/Authority : Uttar Pradesh Expressways Industrial Development Authority.
Independent Engineer : Lion Engineering Consultants Pvt Ltd JV with M/s Bloom Companies (LLC).
Concessionaire : Hardoi Unnao Road Private Ltd.
EPC Contractor : Adani Road Transport Ltd.
Inspected by: Report
UPEIDA /IE/Concessionaire NCR No. 35
NCR date 05-06-2023
RFI no.: Date: 05-06-2023. Inspected on 05-06-2023
Non-Conformance: Location: Km.383+700 to 383+850 Details: Excess layer
Over 11th layer, approx., 1.0 to 1.2 (LHS+RHS). thickness of approx., 1.0 to
m borrow earth dumped in one go 1.2 m borrow earth dumped
on uncompacted Embankment in one go over uncompacted
11th-layer from Km.383+700 to bed of Embankment 11th
383+850 (LHS+RHS). layer.
Detailed Description of Non- Conformance: During joint site visit of UPEIDA, IE & Concessionaire on 05-06-
2023, It is being found/noted that over an uncompacted bed Emb.11th layer, approx., 1.0 to 1.2 m borrow earth dumped
in one-go from Km.383+700 to 383+850 (LHS+RHS). Hence, you are advised to remove all the excess soil dumping
over 11th layer & compact the 11th layer then proceed for next layer. This is for immediate action please.
(Name & Signature) NCR Category
Vinod Kumar Singh (Resident Engineer) 1 2 3 4 5 6 7 8
Recommended Remedial Action:
Remove all the excess soil dumping over 11th layer & compact the 11th layer then proceed for next layer.
Please note that without compliance of above works all further layers will be treated null & void.
Issued by Name / Designation / Signature: Completion Target Date:
Vinod Kumar Singh (Resident Engineer) Before 10-06-2023

Copy to
UPEIDA Lion Engineering Consultants Pvt Ltd Hardoi Unnao Road Private Ltd
1. Client: 2. File IE/AE/Supervision Consultant 3. Concessionaire
1. Safety Arrangements Minor/Major 5. Check lists & records not authenticated Minor/Major
2. Defective Concrete Works. Minor/Major 6. Non-Compliance with Specification & Standards Major
3. Defective Road Works. Minor/Major 7. Non-Compliance with Recommendation Major
4. Test not Conducted as specified Minor/Major 8. Product not to be acceptable (Requires rejection) Major